Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARBSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 BSEP-98-0055, Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0038, Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0007, Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 2 BSEP-97-0528, Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0500, Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0456, Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant BSEP-97-0410, Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 2 BSEP-97-0373, Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0323, Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0266, Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-97-0219, Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0142, Monthly Operating Repts for March 1997 for Bsep,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Bsep,Units 1 & 2 BSEP-97-0105, Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 21997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 2 BSEP-97-0055, Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 21997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 2 ML20138H7881996-12-31031 December 1996 Corrected Monthly Operating Rept for Dec 1996 for Brunswick Unit 1 BSEP-97-0015, Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0451, Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 2 ML20138H7821996-11-30030 November 1996 Corrected Monthly Operating Rept for Nov 1996 for Brunswick Unit 1 BSEP-96-0422, Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0375, Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 2 BSEP-96-0330, Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0295, Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0253, Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0236, Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0204, Monthly Operating Repts for April 1996 for BSEP1996-04-30030 April 1996 Monthly Operating Repts for April 1996 for BSEP BSEP-96-0146, Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0097, Monthly Operating Repts for Feb 1996 for BSEP1996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for BSEP BSEP-96-0053, Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 2 BSEP-96-0008, Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 ML20236T1961998-07-0101 July 1998 Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr ML20236T1921998-07-0101 July 1998 Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20236T1971998-06-30030 June 1998 Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 ML20247N7501998-04-30030 April 1998 Rev 0 to BSEP Unit 1,Cycle 12 Colr ML20247N7721998-04-30030 April 1998 Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 1999-09-30
[Table view] |
Text
-
APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 )
UNIT:
- Brunswick Unit 1 i DATE: 4-3-80 ,
COMPLETED BY: Eulis Willis TELEP110NE: (919) 457-9521 MARCH 1980 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE NET) (K'E NET) 1 708 17 728
3 778 19 768 -
4 639 20 764 5 534 21 ,735 ,
6 557 22 589 7 727 23 0 f 8 567 24 11 ,
9 662 25 448 10 761 26 299 11 712 27 0 12 713 28 232 ,
13 778 29 493 14 769 30 631 15 728 31 372 16 717 l
l I
~ \
8004140 tW7
- j
.1
OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 4-3-80 COMPLETED BY Eu11s Willis
- TELEPIIONE 919-457-9521 OPERATING STATUS y ---- J NOTES: 7 7
- 1. UNIT NAME: Brunswick Unit 1 I I
- 2. REPORTING PERIOD: March 1980
- 3. LICENSED THERMAL POUER (MWT): 2436 I I
- 4. NAMEPLATE RATING (CROSS MWE): 867.0 1 I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 7 I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 y ------
y
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS
. 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): None
- 10. REASONS FOR RESTRICTION IF ANY: .
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.0 2184.0 26641.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL e 698.2 2138.2 19527.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1
- 14. HOURS GENERATOR ON LINE 649.8 2089.8 18422.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1331440.6 4603666.4 38433163.5
- 17. CROSS ELECTRICAL ENERGY GENERATED (MWH) 445423.0 1540650.0 12779469.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 430293.0 1489315.0 12297125.0
- 19. UNIT SERVICE FACTOR . 87.3 95.7 69.2
- 20. UNIT AVAILABILITY FACTOR 87.3 95.7 69.2
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 73.2 86.3 58.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 70.4 83.1 56.2
- 23. UNIT FORCED OUTAGE RATE 12.7 4.3 19.9
- 74. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
REFUELING 800428 1920
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 4-3-80
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHIEVED.
INITIAL CRITICALITY ----
INITIAL CRITICALITY ----- ---
COMMERCIAL OPERATION -- ,
l l .
l ,
0 DOCKET NO. 050-0325 UNITSHUTDOWNS AND POWER REDUCTIONS .
UNIT N AME Brunswick No. 1*
DATE A;:rf1 lorn COMPLETED BY Eulis A. Willis REPORT MONTil MARCH 1980 TELEPllONE (919) 457-9521
~h -
e .. 3 _o .: _
e1, Licensee 5% c Cause & Corrective
, .E e E .g .E ;;;
N,o. Date g g g .3 g 5 Event . - '2 E. Action to N0 U
[3 Prevent Recurrence 6
s 004 800304 F 31.3 A 1 N/A HC HTEXCH Power was reduced to leak check the condenser waterboxes. 1B-North condenser was checked for leaks by -
hanging Handi-Wrap on the tube sheets .
Leaks could not be identified by this method; a Science Applications, Inct, representative was contaceed to come in and use helium to find the leaks.
This waterbox was returned to service and leaks con. trolled with sawdust until the vendor could get on site to identify leaks.
e I 2 3 . 4 F: Forced Reason: Method: Exhibit G-Instructions A Equipment Failure (Explain) 1-Manual for Preparation of Data S: Scheduled B Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F Administrative 5 G-Operational Error (Explain) Exhibit I Same Source
, 19/77) ll-Other (Explain)
o .
- DOCKET NO. 050-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS .
UNIT NAME Brunswick No. 1 DATE April 19tio COMPLETED BY Eulis A. Willis REPORT MONTH MARCH 1980 TELEPilONE (919) 457-9521
- E c
.$ g 3 $ .Y 3 Licensee j r, ja. Cause & Corrective No. Date g 3g 5 .2 s e Event -
g mO pO Action to H y: E 3 e di g Report #
uo Prevent Recurrence O
005 800308 F 23.75 A 1 N/A HC HTEXCH Power reduced to leak check and repair condenser waterbox 1B-North. '
1B-North condenser was checked for leaks using a he.lium leak detection method. Approximately five tubes '
were identified as leaking. These tubes were plugged and the condenser returned to satisfactory service.
1 I -
2 3 4 F: Forced Reason: Method: Exhibit G-Instructiims A Equipment Failure (Explain) 1-Manual for Preparation of Data S: Scheduled B. Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C.Rcfueling 3-Automatic Scram. Event ReporI (LERI File INURI.G-D. Regulatory Restriction 4-Other (Explain) 0161)
. E-Operator Training & Ucense Examination
~
F-Administ rative 5 G-Operational Error (Explain) Exhibit I Same Source (4/77) Il-Other (Explain)
v ,
o .
~ DOCKET NO. 050-0325 UNIT SHUTDOWNS AND POWER REDUCTIONS .
UNIT N AME Brunswick No. 1 DATE April 1980 COMPI ETED BY Eulis A. Willis REPORT MONTil MARCH 1980 TELEPilONE (919) 457-9521 1
~.
- E e
- , .E_ ? 3 yY5 Licensec ' [-r,, ., Cause & Corrective No. Date c. 3g s jg5 Event u7 $"?
- o. Action to F
$E $ Ji e 5; =y Report #
g mU { Action to H 55g Report # Prevent Recurrence f~ ci uo e
O 008 800331 F 10.8 A 3 N/A EB ELECON Reactor scram on low water level due to the apparent loss of 1D bus.
..V . ;-
t 4
1 2 3 T: Forced Reason: Method: Exhibit G. Instructions S: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Dats
, B Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee t C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
. E-Operator Training & Ucense Examination
- F Administrative 5
- G Operational Error (Explain) Exhibit ! Same Source to/77) Il-Other (Explain)
4 APPENDIX DOCKET NO: 050-0325 UNIT: Brunswick No. 1 DATE: April 1980 COMPLETED BY: Eulis A. Willis OPERATIONS
SUMMARY
BRUNSWICK NO. 1 Brunswick Unit No.1 operated at a 73.2% capacity factor for the month of March.
The following changes and shutdowns occurred during the month:
March 4: Power was reduced to leak check the condenser waterboxes.
March 8: Power was reduced again to leak check and repair condenser waterbox 1B-North.
March 23: The Reactor scrammed because a stuck pen recorder gave erroneous water level indications.
March 26: The unit was separated from the grid due to examine drywell floor leakage.
March 31: Reactor SCRAM because of an apparent loss of 1D Bus.
Monthly availability factor was 87.3%. The unit is expected back on line April 3.
a 4
e 9
O APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050.-0324 UNIT: Brunswick Unit 2 DATE 4-1-80 COMPLETED BY: Eulis Willis TELEP110NE: (919) 457-9521 HARCII 1980 DAY AVG DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE NET) (MWE NET) 1 50 17 0 2 0 18 0 3 0 19 .0 4 0 20 0 5 0 21 0 6 0 22 0 1
7 0 23 0 ;
8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 4
m r- "' - -.g - -- -- -- - r---r r
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 4-1-80 COMPLETED BY Eulis Willis ;
TELEP110NE 919-457-9521 y 7 OPERATING STATUS NOTES:
7
- 1. UNIT NAME: Brunswick Unit 2 7 7 2.- REPORTING PERIOD: March 1580 .
7 7
- 3. LICENSED THERMAL POUER (MWT): 2436 7 7
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 7 7
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 7 7
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 7 7
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 ,
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
None
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): '
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTl! DATE ATIVE 744.0 2184.0 38665.0
- 11. HOURS IN REPORTING PERIOD 2.7 1365.7 26689.7
- 12. NUMBER OF 110URS REACTOR WAS CRITICAL 0.0 0.0 0.0
- 13. REACTOR RESERVE SilUTDOWN HOURS
- 14. 110URS GENERATOR ON LINE 2.7 1228.1 25102.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 4471.4 2604959.4 46339422.6
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 1503.0 872613.0 15487687.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0.0 842126.0 14882598.0
- 19. UNIT SERVICE FACTOR 0.4 56.2 64.9 0.4 56.2 64.9
- 20. UNIT AVAILABILITY FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 48.8 48.7
- 22. " UNIT CAPACITY FACTOR (USING DER NET) 0.0 47.0 46.9
- 23. UNIT FORCED OUTAGE RATE 0.0. 8.1 12.7 *
- 24. SHUTDOWNS SCllEDULED OVER NEXT 6 MONTHC (TYPE, DATE, AND DURATION OF EACH):
REFUF. LING 800301 1680
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTItMTED DATE OF STARTUP: 5/10/80 ACHIEVED
- 26. UNI,TS IN TEST STATUS (PRIOR TO COMMERCIAL OFFRA. TION): FORCAST INITIAL CRITICALITY __ _
INITIAL CRITICALITY _
COMMERCIAL OPERATION .
4 O
b fi
APPENDIX DOCKET NO: 050-0324 UNIT: Brunswick No. 2 DATE:. April 1980 COMPLETED BY: Eulis A. Willis OPERATIONS SU}&fARY BRUNSWICK NO. 2
. i s
Brunswick Unit No. 2 operated for 2.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> during the month of March before being shut down for a scheduled Refueling Outage. The availability factor for the month was .4% with the capacity factor being 0%.
The unit was separated at 0244 on March 1, 1980, and is expected back on-line on May 10, 1980. A more detailed description of the Refueling Outage will be provided in the Monthly Operating Report the month the unit returns to service.
O i
n 9
s
_ - _y