   ,3 NONCONFORMANCE - REPORT LOG & STATUS BOOK                              n                            }
  ,
                                              -,
NONCONFORMANCE - REPORT LOG & STATUS BOOK                              n                            }
y
y
                                                                                                                                                               '~~''*
                                                                                                                                                               '~~''*
                                            .                                                                                                                '
REPORT DATE i ?"75    '
REPORT DATE i ?"75    '
PAGE COMPL.
PAGE COMPL.
: 1. PROJECT NO.--      799n                                                          " * * "
: 1. PROJECT NO.--      799n                                                          " * * "
                            '
NCR          ORIG  .
NCR          ORIG  .
NO,        DATE        PREPARED BY                        NONCONFORMANCE                                                  8^
NO,        DATE        PREPARED BY                        NONCONFORMANCE                                                  8^
Line 34: Line 29:
route        XMT 304      4-7        R. A. Moray                                                                                                    CLOSED      CLOSED BY
route        XMT 304      4-7        R. A. Moray                                                                                                    CLOSED      CLOSED BY
                   -75                              1- 104 A . Spool markinq di ffers from                                'lo              5-12 eader sheet markings ASME            4.114 t! . S .              4-11                R. A. iforay 4-3-75                    -75        -75 305        4      R. L. Bauren
                   -75                              1- 104 A . Spool markinq di ffers from                                'lo              5-12 eader sheet markings ASME            4.114 t! . S .              4-11                R. A. iforay 4-3-75                    -75        -75 305        4      R. L. Bauren
                   -75                            71PGh.Storaneon Stean Genera tor                      Field
                   -75                            71PGh.Storaneon Stean Genera tor                      Field JE-51A.                      A S!'E    4.021        1-9-75 m'6        4        h.R. Albert
          ,
JE-51A.                      A S!'E    4.021        1-9-75 m'6        4        h.R. Albert
(
(
                   -75                            :-231. Concrate tennoraturn. A(609)n' 1'.205 ricld
                   -75                            :-231. Concrate tennoraturn. A(609)n' 1'.205 ricld 4 5-IC-75 5-19
                                                                                                      -
4 5-IC-75 5-19
                                                                                                                                             -75 L.R. Albert 307        4                                                                                    d-4-76            -7s R. A. Mo ray
                                                                                                                                             -75 L.R. Albert 307        4                                                                                    d-4-76            -7s R. A. Mo ray
                   -75                            11 - 2 ')4 . Fittinns.F-10577. AEO-3?A. Pf a ri i            M.S,    'IU      4*IO          "
                   -75                            11 - 2 ')4 . Fittinns.F-10577. AEO-3?A. Pf a ri i            M.S,    'IU      4*IO          "
and Documentation. ASf1E                        (ng'l
and Documentation. ASf1E                        (ng'l
                                                                                                       -l -7E                  -75 308        4-17        R. A. Moray            it- 104 A
                                                                                                       -l -7E                  -75 308        4-17        R. A. Moray            it- 104 A
        '
                 -75 numbers.
                 -75 numbers.
anador ebne hae <nenrrect snne ' M.s,                                      5    2    R. A. Mora v 4-21-7 5
anador ebne hae <nenrrect snne ' M.s,                                      5    2    R. A. Mora v 4-21-7 5 ASME4.114                                      -
                                                                                                                                ,
ASME4.114                                      -
309        4-23        L. R. Albert          C-230. Batch Plant nualification nast
309        4-23        L. R. Albert          C-230. Batch Plant nualification nast
        '
~
~
                 -75                                due.                                              mM            5                                                                                      1.105,1.205    "-?3-M75 310                    R. A. Moray            '
                 -75                                due.                                              mM            5                                                                                      1.105,1.205    "-?3-M75 310                    R. A. Moray            '
                                                                                                                                                                      %
4 N"
4 N"
                 -                                  - ??  Danaaed Bean. Shinnent C 9A                ideld          5-1-75 -7a    -Ib                              M 1.201  4-gg_yg                                    .                  6 1311      4-30        R. A.    !!o ra v                                                                                                                          S As
                 -                                  - ??  Danaaed Bean. Shinnent C 9A                ideld          5-1-75 -7a    -Ib                              M 1.201  4-gg_yg                                    .                  6 1311      4-30        R. A.    !!o ra v                                                                                                                          S As
  '
               -75
               -75
* C-18.
* C-18.
Line 63: Line 48:
1.201    3-1-75                      75          -75                    x 12          4-30      R. A. iloray        F-3r                                                                                                                T
1.201    3-1-75                      75          -75                    x 12          4-30      R. A. iloray        F-3r                                                                                                                T
               -75                                        Damaned Roams. 9hinmnnt r '> "          WM              5      5-27                                  C 1.201    i-1-25              -75    -75 313          5-2-73 J . tl.M i l l e r          C-38.
               -75                                        Damaned Roams. 9hinmnnt r '> "          WM              5      5-27                                  C 1.201    i-1-25              -75    -75 313          5-2-73 J . tl.M i l l e r          C-38.
Beam material tensile strenoth 3-dield            5      5-27      5-29
Beam material tensile strenoth 3-dield            5      5-27      5-29 over ASTM A-36 limit                      1.201  4-9-76              75 = -75                    L.R. Albert 114          5-29      R.A.floray                                                                                                      -75
                                      .
over ASTM A-36 limit                      1.201  4-9-76              75 = -75                    L.R. Albert 114          5-29      R.A.floray                                                                                                      -75
               -75                              C-38. Beams, Shinment C-27 without                F ield            tio      6-16    6-17        R. A.?lo ra y ucinht or orienta tion marking            1.201  4- 3 0- 7 '                  -75      -75 (15 y 5-29            R. A.;1o ra y l -75, C-33. Danaaed Beans. Shinnent C 9F-                F i c i d.      6 '3 M G .tos osm oc 1.201 J
               -75                              C-38. Beams, Shinment C-27 without                F ield            tio      6-16    6-17        R. A.?lo ra y ucinht or orienta tion marking            1.201  4- 3 0- 7 '                  -75      -75 (15 y 5-29            R. A.;1o ra y l -75, C-33. Danaaed Beans. Shinnent C 9F-                F i c i d.      6 '3 M G .tos osm oc 1.201 J
                                                                                                     - 3 6+j                  -75 p, ,              j (,                                                          ,  ;                        Page 29                          11. PA*    j  OC-G31
                                                                                                     - 3 6+j                  -75 p, ,              j (,                                                          ,  ;                        Page 29                          11. PA*    j  OC-G31
                            ,


__
                                          - - .
        '        "
                                         .      NONCONFORMANCE - REPO f LOG & STATUS BOOK            12.
                                         .      NONCONFORMANCE - REPO f LOG & STATUS BOOK            12.
REPORT DATE''' b
REPORT DATE''' b
* j;
* j; PAGE COMPL.                  ,
    ,
PAGE COMPL.                  ,
: 1. PROJECT NO.              7220                                        0.C. ENG. SIGN
: 1. PROJECT NO.              7220                                        0.C. ENG. SIGN
                                       ~
                                       ~
OR          ORIG.                                    NONCONFORMANCE                                    STATUS O,          DATE      PREPARED BY                                                    6-DESCRIPTION / REMARKS              ROUTE  X TD
OR          ORIG.                                    NONCONFORMANCE                                    STATUS O,          DATE      PREPARED BY                                                    6-DESCRIPTION / REMARKS              ROUTE  X TD CLOSED BY blOSED 16      5-30    L. R. Albert    :-711. Structural Cackfill !1a t ' l not          7ield
                                                                                                      '
CLOSED BY blOSED 16      5-30    L. R. Albert    :-711. Structural Cackfill !1a t ' l not          7ield
             -75                    )f Gradation.                          1.004    'i-30-7  3 17      6-30    it . Shawl      :-38. Damaged Beam, Shipment C-26
             -75                    )f Gradation.                          1.004    'i-30-7  3 17      6-30    it . Shawl      :-38. Damaged Beam, Shipment C-26
             -75                                                                      rield 1.201
             -75                                                                      rield 1.201 4
$.-_
4
          .
     /
     /
   \ _,,                                                                                                                             *
   \ _,,
          .
* msc1 e          -        -                  -
          -
msc1 e          -        -                  -
                                                                 ~
                                                                 ~
r
r G.
:                  " - "
G.
                                                                                                                         -- o -
                                                                                                                         -- o -


3
3
: 2. DJ A W4N1/PA 71T NJ.
: 2. DJ A W4N1/PA 71T NJ.
                                                        .
R E V.
R E V.
NONCONFORMANCE REPORT
NONCONFORMANCE REPORT
: 7. PHOJEC T NO.
: 7. PHOJEC T NO.
g g4            '
g g4            '
                                                                                                                                                                       '71                    ''' " y
                                                                                                                                                                       '71                    ''' " y E '    J'gTMD E Y / /t'            {DATE            IS. Ot$ POSITION CONCURRENCE Spec. 7220-C-38                      '6            07220
                                              .
E '    J'gTMD E Y / /t'            {DATE            IS. Ot$ POSITION CONCURRENCE Spec. 7220-C-38                      '6            07220
: 3. BT E M OCSCRIPTION A. A. llor6y /                      5/29/75            "---        "*"        - " ' - """"
: 3. BT E M OCSCRIPTION A. A. llor6y /                      5/29/75            "---        "*"        - " ' - """"
                                                                                                                                                                                                                     *p S. ITEM LOC AT4ON                                  -l    V    JOATEDsy
                                                                                                                                                                                                                     *p S. ITEM LOC AT4ON                                  -l    V    JOATEDsy
* 0 D
* 0 D
_
(4) Aux. Bldg. Beams
(4) Aux. Bldg. Beams
                                                                                                                                                                                                                            *
                                                                                                                                                                                                                           =
                                                                                                                                                                                                                           =
/                                                                Sasse Rd. Laydown Area                      \            hg,.d                    I " ATE p 2h @-                                                   *
/                                                                Sasse Rd. Laydown Area                      \            hg,.d                    I " ATE p 2h @-
                                                                                                                                                                                                                    -
* g
g
: 4. (E N I A S. P 'iH DE R                        S. ST A NTUP Eb STEM NO.
: 4. (E N I A S. P 'iH DE R                        S. ST A NTUP Eb STEM NO.
                                                                                                                   /[DL"ACEMENT P4        NO.            REV.        reesectreeseemetassa                  8478
                                                                                                                   /[DL"ACEMENT P4        NO.            REV.        reesectreeseemetassa                  8478
Line 125: Line 87:
: 6. CJNTR ACTOR /L9C ATION N/A                                            pd"M'*"""'""                          ""
: 6. CJNTR ACTOR /L9C ATION N/A                                            pd"M'*"""'""                          ""
ll.ASME        C YES        8 7. SOU RCE Ingalls Iron Works /Verona, Pa.                                            , ' , , , " g ,,              Vendor
ll.ASME        C YES        8 7. SOU RCE Ingalls Iron Works /Verona, Pa.                                            , ' , , , " g ,,              Vendor
                                                                                                                                                                                                  -
                                                                                                                                                                                                                   ,g s e. Pf%sJTING INSTRUCTION 9*                  ROU f E TO FIELD ENGIN EERING                  Q ROUTE TO M ATERI AL SUPERbISOR
                                                                                                                                                                                                                   ,g s e. Pf%sJTING INSTRUCTION 9*                  ROU f E TO FIELD ENGIN EERING                  Q ROUTE TO M ATERI AL SUPERbISOR
: 19. NONCON P ORMING CONDITIOMs Specification 7220-C-38 Rev. 6 paragraph 7.5 states, "The weight of all members 6,000 lbs.
: 19. NONCON P ORMING CONDITIOMs Specification 7220-C-38 Rev. 6 paragraph 7.5 states, "The weight of all members 6,000 lbs.
     -      and heavief shall be clearly stenciled th'ereupon and together with cn orientation north or east." Coittrary to
     -      and heavief shall be clearly stenciled th'ereupon and together with cn orientation north or east." Coittrary to
(                                            F              F            G
(                                            F              F            G G
                                                                                        -
u the above, beams 516B1 , Si6B2 , 520B7 and 520n8 are all listed as udinhinn more than 6.000 lbs. on shippinn notice C-27 but they are not marked with their weight or orientation. Nonconformance noted during receipt inspection.          "O" No. in 1.201.                    [        hold tans applied.
G u
the above, beams 516B1 , Si6B2 , 520B7 and 520n8 are all listed as udinhinn more than 6.000 lbs. on shippinn notice C-27 but they are not marked with their weight or orientation. Nonconformance noted during receipt inspection.          "O" No. in 1.201.                    [        hold tans applied.
2L      h FIELD DISPOSITION                  CFIELO RECOMMENDATION / ROUTE TO PROJECT ENGINEERING                                                        El. PIELD OSSPO$lTION RESULTS The content of NCR 314 does not depict a nonconforming condition. The weight and orientation eqrkinns are not quality related conditions but aids affixed to the beams for crection purposes.                        By definition, these discrepancies do not qualify as non-conformances under FIM procedure G-3 since thpy> dp,ngt render the quality of                      3 the item unacceptable or indeterminate.
2L      h FIELD DISPOSITION                  CFIELO RECOMMENDATION / ROUTE TO PROJECT ENGINEERING                                                        El. PIELD OSSPO$lTION RESULTS The content of NCR 314 does not depict a nonconforming condition. The weight and orientation eqrkinns are not quality related conditions but aids affixed to the beams for crection purposes.                        By definition, these discrepancies do not qualify as non-conformances under FIM procedure G-3 since thpy> dp,ngt render the quality of                      3 the item unacceptable or indeterminate.
: 22. ENGaNEE RING DISPOSITION M,pM [[[dypg. f g_tjf
: 22. ENGaNEE RING DISPOSITION M,pM (([dypg. f g_tjf Is f\      M
                      . . .
Is
      -
f\      M
: 24. 83 DESIGN CN ANGC REQUIRED ONO                                26. R EJECTED M ATERIAL DISPOSIT80N                    O = =vv aa ve .w =*ss= =
: 24. 83 DESIGN CN ANGC REQUIRED ONO                                26. R EJECTED M ATERIAL DISPOSIT80N                    O = =vv aa ve .w =*ss= =
O v ES. SEE 4Tv4CNED,                                                                      U"-                        3,.a / N    y, g",r'bu-
O v ES. SEE 4Tv4CNED,                                                                      U"-                        3,.a / N    y, g",r'bu-
                                                                                                                                                                                           '            YN'2 4),/...... .f< /
                                                                                                                                                                                           '            YN'2 4),/...... .f< /
                                                                                                                                                                          -
                                                                                                                                                                                -
                                                                               " ~ = - "
                                                                               " ~ = - "
D R K. WIN G                  R EV.              DCN                                                                                                                                              ,,,,
D R K. WIN G                  R EV.              DCN                                                                                                                                              ,,,,
awreson,ase emeesevee      /
awreson,ase emeesevee      /
                                                                                                                                                                                                            ..,,
                                                                                                                                                                                                                        "
         $PCC.      _
         $PCC.      _
R EV.              A O D.
R EV.              A O D.
Line 157: Line 108:
                                                                                                                                                                                                                               =
                                                                                                                                                                                                                               =
g,                                  .              _              .                    _              .                                o                                                                -
g,                                  .              _              .                    _              .                                o                                                                -
      '
                                                                .
                                                                                                                                                                                         '''^*''1                    " ' " ' " "
                                                                                                                                                                                         '''^*''1                    " ' " ' " "
* NONCONFORMANCE REPORT                                                              #                            OF                            *1P 2 Det A WING / PAR Y NO.                      e W E V. 7. PROJECT NO.                                      I 2. R E PO R T ED S Y  .
NONCONFORMANCE REPORT                                                              #                            OF                            *1P 2 Det A WING / PAR Y NO.                      e W E V. 7. PROJECT NO.                                      I 2. R E PO R T ED S Y  .
* DATE              25. DISPO54 TION CONCU R RENCE I                                                                                                                                                                                        .
DATE              25. DISPO54 TION CONCU R RENCE I                                                                                                                                                                                        .
Spnc. 7220-C-211                          ' 2              07220                                      L. 1. Albert                            : (./ 30/ 7..        ----          "'"'          ""-          ~ " "        "'
Spnc. 7220-C-211                          ' 2              07220                                      L. 1. Albert                            : (./ 30/ 7..        ----          "'"'          ""-          ~ " "        "'
: 3. 87EM DESC RIPT TON                                  S. IT E M LOC A T IO N                                13. V ALID ATED BY                    I S tructural 13ackfill                                        Stoc!: pile                                                                  .I            '
: 3. 87EM DESC RIPT TON                                  S. IT E M LOC A T IO N                                13. V ALID ATED BY                    I S tructural 13ackfill                                        Stoc!: pile                                                                  .I            '
C. L IRI A L N UM BE M                                  9. ET A R TUP S Y ST E M NO.
C. L IRI A L N UM BE M                                  9. ET A R TUP S Y ST E M NO.
                                                                                                                                                      .
lDATE f
lDATE f
                                                                                                                                                                        '
                                                                                                                                                                                  ;
3 5. REPL ACEM E NT P A RT NO s  s                          e.oe.ev e e.to m asen...                      saw.
3 5. REPL ACEM E NT P A RT NO s  s                          e.oe.ev e e.to m asen...                      saw.
                                                                                                                                                                         'REV.
                                                                                                                                                                         'REV.
Line 174: Line 120:
59UNCHASEONDERNO                                        t o. OC F sELD INSPECTtON PLA N NO.                    3 6. RE PL ACEMENT SER G A L NO.
59UNCHASEONDERNO                                        t o. OC F sELD INSPECTtON PLA N NO.                    3 6. RE PL ACEMENT SER G A L NO.
:/A                                                        C-211-1-7                                          !;/A                                                    ......... 6..    . .....
:/A                                                        C-211-1-7                                          !;/A                                                    ......... 6..    . .....
                                                                                                                                                                                                                              -
                                                                                                                                                                                                                                        ....
: 5. CONTR ACTC R/ LOC ATION                p;g , p1gg333{, f[1ghigvg3                gI.A5ME O vEs      ir.5ouRcE a w -+ - = = .~ = = ' a a                    =a'=
: 5. CONTR ACTC R/ LOC ATION                p;g , p1gg333{, f[1ghigvg3                gI.A5ME O vEs      ir.5ouRcE a w -+ - = = .~ = = ' a a                    =a'=
h u.aulier & S.on. Inc. P.O. box 411                                                CODE
h u.aulier & S.on. Inc. P.O. box 411                                                CODE
                                                                                                       , , , ,  :[1No            Supolier 3 8. HOUTING 4NSY N UCTIONS:
                                                                                                       , , , ,  :[1No            Supolier 3 8. HOUTING 4NSY N UCTIONS:
Q ROUTE TO FIE LD E NG8 NEE RING                    C ROUTE TO M ATERG AL SUPENVaSOR
Q ROUTE TO FIE LD E NG8 NEE RING                    C ROUTE TO M ATERG AL SUPENVaSOR
              "
       -            ~ "' "' ""'"" ' " '" "' S e c tion 5.1.1 o f S pe c. 7220-C-211-2 states in part that the crain size gradation shall have ~
       -            ~ "' "' ""'"" ' " '" "' S e c tion 5.1.1 o f S pe c. 7220-C-211-2 states in part that the crain size gradation shall have ~
C              a maximater of 600 passing tiac A40 nieve.                                      Contrary to the above gradation test performed on 06/26/75 in accordance trith Section 5.6.2 of S;>ec. 7220-C-211 key. 2 indicated the naterial had 62: passing the #40 sieve.
C              a maximater of 600 passing tiac A40 nieve.                                      Contrary to the above gradation test performed on 06/26/75 in accordance trith Section 5.6.2 of S;>ec. 7220-C-211 key. 2 indicated the naterial had 62: passing the #40 sieve.
G            . . -
G            . . -
                                          --
u-        /. o .a .4                          .-
u-        /. o .a .4                          .-
C      u    .          v .-        ..          ./,                                  J /              h,-  ,
C      u    .          v .-        ..          ./,                                  J /              h,-  ,
* 20        O PIELD DISPOSITION                        OFIELD RECOMMENDATION / ROUTE TO PROJECT ENGINEERlNG                                                              II . FIELD D45POSITsON R ESULTS:
20        O PIELD DISPOSITION                        OFIELD RECOMMENDATION / ROUTE TO PROJECT ENGINEERlNG                                                              II . FIELD D45POSITsON R ESULTS:
: 22. E NGIN ECHING DISPOSITION
: 22. E NGIN ECHING DISPOSITION
: 23. ENGINEE RING DeSPOSITION RESULTS:
: 23. ENGINEE RING DeSPOSITION RESULTS:
Line 193: Line 135:
O==aa.
O==aa.
O vES. 5EE Avr ACHED.                .. .. .                                                                                                                    -
O vES. 5EE Avr ACHED.                .. .. .                                                                                                                    -
                                                                                                                                                                                      . . . . . . . .
wgy.                                                                                                                                                                                    ....
wgy.                                                                                                                                                                                    ....
               @% A WING                                              DCN aweme.sa.o emers.vo.                            e.g.
               @% A WING                                              DCN aweme.sa.o emers.vo.                            e.g.
         .. C PE C.                            R F V.                ADD,
         .. C PE C.                            R F V.                ADD, s  .a. e-o white Copy          - Originator                                                  u C-G 3-2 Canary Copy        - F I.Id Engmeer O      ,
                                                --
                            . - -
s  .a. e-o white Copy          - Originator                                                  u C-G 3-2 Canary Copy        - F I.Id Engmeer
          ,
O      ,
Pink Copy Goldenrod Copy - QC
Pink Copy Goldenrod Copy - QC
                                                                                                                                                                             - POAE
                                                                                                                                                                             - POAE
                                                                                                                                                                                                          *
                                                                                                                                                                                                                                           '  s
                                                                                                                                                                                                                                           '  s
._                                                                                                                                                                                                                                -


____                                    _                                                                                      --
s.lf
s.lf
         "#                                                                                                                                                                            '"^"*'
         "#                                                                                                                                                                            '"^"*'
Line 215: Line 148:
: 8. BTEM LOCATION s//j A 4    EQ BY
: 8. BTEM LOCATION s//j A 4    EQ BY
                                                                                                                                                           , [    , k'DATE./f-75 T DATE
                                                                                                                                                           , [    , k'DATE./f-75 T DATE
                                                                                                                                                                                        " " - "        "''''        " " " ' " * " " "
                                                                                                                                                                                                                                           ""q (1) Aux. Bldg. Beam
                                                                                                                                                                                                                                           ""q
                                                                                                                '
(1) Aux. Bldg. Beam
     .LA S A L UMDER Sasse Road Laydown
     .LA S A L UMDER Sasse Road Laydown
: 9. ST ARTUP SYSTEM NO.
: 9. ST ARTUP SYSTEM NO.
                                                                                                                          .
ihPLACEM ENT PARTM4..
ihPLACEM ENT PARTM4..
br306 REV.      ,nos cf rease anse,ess ,                    car, 420B1
br306 REV.      ,nos cf rease anse,ess ,                    car, 420B1
Line 235: Line 164:
Beam 420BlE        has (1) bent connection angle with cracked welds.                                                      Damage noted during receipt j              inspection.      "Q" number is 1.201. /Holdtagapplied.
Beam 420BlE        has (1) bent connection angle with cracked welds.                                                      Damage noted during receipt j              inspection.      "Q" number is 1.201. /Holdtagapplied.
     ~ ,
     ~ ,
                                                                                                                                                                                                                                            -
em eum
em
: 20.      ' O FlCLD DISPOSITION                      OFICLD RECOMMENDATION / ROUTE TO PROJECT ENGINEERING                                                                          2 8. FIELD DISPOSITION RESULTSt 2' 'NGINCCRING OISrOSITION
            .
eum
: 20.      ' O FlCLD DISPOSITION                      OFICLD RECOMMENDATION / ROUTE TO PROJECT ENGINEERING                                                                          2 8. FIELD DISPOSITION RESULTSt
                                                                                                                                                                                                                .
2' 'NGINCCRING OISrOSITION
          .
: 23. ENGINEERING DISPOSITION R ESULTSa b
: 23. ENGINEERING DISPOSITION R ESULTSa b
                                  .
: 24. 82 DEZIGN Cp ANGE R CQUlHE              ONO                            **"'''*''"^""''''5"                            $"'  N                            a n=wan = -uan                                                              .-
: 24. 82 DEZIGN Cp ANGE R CQUlHE              ONO                            **"'''*''"^""''''5"                            $"'  N                            a n=wan = -uan                                                              .-
2,. O C ACCCPT ANCE 5
2,. O C ACCCPT ANCE 5
0 v E.. SE: ATT ACHED.                                                                                          Oseene
0 v E.. SE: ATT ACHED.                                                                                          Oseene DR AWING -                      REV.                    DCN                                                                                                                                                                      ,,,
                                                                            , , , , , , , ,
                                                                                                                                                                                    ,, ,,,,,...,
DR AWING -                      REV.                    DCN                                                                                                                                                                      ,,,
                                                                                                             ^
                                                                                                             ^
AUTHOR 64E D Ih SFab CTON                    g,yg
AUTHOR 64E D Ih SFab CTON                    g,yg
Line 260: Line 179:
Yeff                                                    MAUTI EDIT FiMiB                                                                i._..se e-2-13                  l 04/18/75
Yeff                                                    MAUTI EDIT FiMiB                                                                i._..se e-2-13                  l 04/18/75
     ,  (                                                                  -      ,
     ,  (                                                                  -      ,
                                                                                                                                              . . . . , ,
1 I
1 I
( V]
( V]
                                                                                                                                                ,
j        N/A
j        N/A
       .......,..........,..u..                                                    . . . . . . . . . , . . ,
       .......,..........,..u..                                                    . . . . . . . . . , . . ,
g,,,,,    . . . . . .
g,,,,,    . . . . . .
Midland 1 & 2                        Job 07220                              Project Constructio6].....                            G. Richardson
Midland 1 & 2                        Job 07220                              Project Constructio6].....                            G. Richardson 1                18 - 20                            Document Control Ce'ter              n                                  Valenzano/Muladore
      . . . . . . . . .              . . . . . . . . . .              ..,... ..
                                                                                                                                            . . . . . . . . . .
                                                                      ,
1                18 - 20                            Document Control Ce'ter              n                                  Valenzano/Muladore
       ..... m ... ... ...........................                                                                . . . . . . .
       ..... m ... ... ...........................                                                                . . . . . . .
       #                                                                                                          9 Fiald Procedure FPG-10, Rev. 2
       #                                                                                                          9 Fiald Procedure FPG-10, Rev. 2 4
      , ,.......
4.0.4            The work print drawing to be issued is recorded in the work print control sheet log.
4 4.0.4            The work print drawing to be issued is recorded in the work print control sheet log.
5.0.3            Notification of a revision is sent to the field engineer via " Document Received on Site" list.              ..... revisions will be highlighted.
5.0.3            Notification of a revision is sent to the field engineer via " Document Received on Site" list.              ..... revisions will be highlighted.
6.0              .... This person shall be hel'd a'ccountable for des.truction of the work print.
6.0              .... This person shall be hel'd a'ccountable for des.truction of the work print.
All superceded drawings maybereturned tc document control for accountability and destruction by the document control clerk or be properly placed in 'specified                                                        '
All superceded drawings maybereturned tc document control for accountability and destruction by the document control clerk or be properly placed in 'specified                                                        '
field centainers for destruction.                                                          '  '
field centainers for destruction.                                                          '  '
                                                                                                                                        ,
                                                                                                                                          .
                                                                                                                                        .
                                                                                                                                    .
      . ;. ... .
      ,
                 .During a check of work prints in work areas it uds noted that several prints are still p 4n use that are assigned to persons no' longer employed at this site. Aaay of these
                 .During a check of work prints in work areas it uds noted that several prints are still p 4n use that are assigned to persons no' longer employed at this site. Aaay of these
,, ( ) rints are not listed on the work print control log.                                                                  Some of the prints were noted to be outdated by later revisions or DCN's. Destruction of superceded prints is not ensured if the log is not properly maintained. It was also noted that "Specified Field Containe_rs" have not been placed in the work areas for work prints to be destroyed. Sec attached for details.
,, ( ) rints are not listed on the work print control log.                                                                  Some of the prints were noted to be outdated by later revisions or DCN's. Destruction of superceded prints is not ensured if the log is not properly maintained. It was also noted that "Specified Field Containe_rs" have not been placed in the work areas for work prints to be destroyed. Sec attached for details.
                                                                      .
Continued on Page No. 2 PNFc8E5ie~nded corrective action.
Continued on Page No. 2
                                                                                                              .
PNFc8E5ie~nded corrective action.
: 1.              Check all work areas for work printe that are not currently controlled and update log or destroy them.
: 1.              Check all work areas for work printe that are not currently controlled and update log or destroy them.
: 2.                Provide direction to assure that when field engineers terminate c=ploynent at this site work prints in their possession will be destroyed or reassigned.
: 2.                Provide direction to assure that when field engineers terminate c=ploynent at this site work prints in their possession will be destroyed or reassigned.
g ,.. .. .. ,,.,.......                                  ...............................
g ,.. .. .. ,,.,.......                                  ...............................
                                                                ,
5/30/75                                                Proierr Sunerintendent See-          a. Nac le) I d. M.
5/30/75                                                Proierr Sunerintendent
      ,,.......,,. ...
      .                          .....                                                                                                                                    -
See-          a. Nac le) I d. M.
   - a 6
   - a 6
                                                .
9 e
9 e
_
                                                      .          ..... . . .....
6".4-3.f..6
6".4-3.f..6
   ?. 75%,
   ?. 75%,
Line 317: Line 213:
                                                                                                                                                                   'A b h r
                                                                                                                                                                   'A b h r


_
              *
               ./                          ~'\
               ./                          ~'\
(                              {~  *
(                              {~  *
       ,    .b    -
       ,    .b    -
                    <
                      .
                                             \
                                             \
                                                                                          .
g              Block 11 Continued.
g              Block 11 Continued.
t
t The following work prints were noted to be available for use.
    .
Print No.              Rev. Issued to        Work area noted in      Remarks s    C-225                  2  Swartzlander        Aux. Bldg.      Not logged (2 copies)
The following work prints were noted to be available for use.
Print No.              Rev. Issued to        Work area noted in      Remarks
                '
s    C-225                  2  Swartzlander        Aux. Bldg.      Not logged (2 copies)
C-282-                3  Swartzlander            "
C-282-                3  Swartzlander            "
Not logged Rev. 4 is at sit $
Not logged Rev. 4 is at sit $
Line 349: Line 236:
Not logged t
Not logged t
C-39-AC-R          2  Betts        .
C-39-AC-R          2  Betts        .
                                                                              "
FSK-C-357                  Stockton-                " -
FSK-C-357                  Stockton-                " -
Not logged FSK-C-359                  Stockton                "
Not logged FSK-C-359                  Stockton                "
Line 357: Line 243:
Not logged FSK-C-397                  Stockton                "
Not logged FSK-C-397                  Stockton                "
Not logged FSK-C-402                  Stockton                "
Not logged FSK-C-402                  Stockton                "
Not logged
Not logged 0
            .
0 4
0 0
 
4
           %/                      fi                                mo O
        ,
  <. .
                                              ..
* __ _        _ _ _
           %/                      fi                                mo
        .&
                                  '
              '
    .
                                                                                  .
O
. .- G Block 11 Continued.
. .- G Block 11 Continued.
The following work prints were noted to be available for use.
The following work prints were noted to be available for use.
Line 389: Line 264:
Not logged C-39-AC-R        2    Betts                    "
Not logged C-39-AC-R        2    Betts                    "
FSK-C-357                Stockton                "-
FSK-C-357                Stockton                "-
Not logged
Not logged i
                                                                              ,
FSK-C-359                Stockton                "
i FSK-C-359                Stockton                "
Not logged FSK-C-391                Stockton                "
Not logged FSK-C-391                Stockton                "
Not logged
Not logged
Line 397: Line 271:
Not logged FSK-C-397                Stockton                "
Not logged FSK-C-397                Stockton                "
Not logged FSK-C-402                Stockton                "
Not logged FSK-C-402                Stockton                "
Not logged
Not logged B
        .
4' v                                                      -
B 4'
v                                                      -
6
6
                                     .e
                                     .e
                                                                                              .


    -            -
                                                                                                                          ,
                   ' . .[                        (\
                   ' . .[                        (\
          -
              -          '
                                                  -
Bechtel PowerCorporation I
Bechtel PowerCorporation I
interoffice Memorandum T'
interoffice Memorandum T'
G. L. Richardson                              **
G. L. Richardson                              **
May 29, 1975
May 29, 1975 suenct  Jcb 7220 Midland Project                  From            D. L. Palmer                                          ;
                                                                                                                                                  ;
suenct  Jcb 7220 Midland Project                  From            D. L. Palmer                                          ;
QADR 056 (Work Print Control)
QADR 056 (Work Print Control)
Corrective Actions                        a                Construction 0-950 - Quality Related                                                                                            l cop.ese                                          y                Midland, Michigan Ref: IOM to Close-Out QADR 056                                                                                    !
Corrective Actions                        a                Construction 0-950 - Quality Related                                                                                            l cop.ese                                          y                Midland, Michigan Ref: IOM to Close-Out QADR 056                                                                                    !
Document Control personnel have inspected all current work prints                                                  ,
Document Control personnel have inspected all current work prints                                                  ,
in the field. Outdated and voided material have been removed.                                                      l Those prints remaining as active work prints have been issued and controlled in accordance with.FPG-10. The logging procedure, as contained by FPG-10 and resulting record, has thus corrected the discrepancy.
in the field. Outdated and voided material have been removed.                                                      l Those prints remaining as active work prints have been issued and controlled in accordance with.FPG-10. The logging procedure, as contained by FPG-10 and resulting record, has thus corrected the discrepancy.
  , - .                                                                                    -
f
f
       ..                                                                                    . L. Palmer DLP/sv D                              h TAM 3 0875 POWER BEOUElyog, 7'110
       ..                                                                                    . L. Palmer DLP/sv D                              h TAM 3 0875 POWER BEOUElyog, 7'110
                                                                       ,0 32/-
                                                                       ,0 32/-
                .
b i
b
e l
                                                                                                                                                  ,
l l          fh                                                                                                                                    l
'
i e
l l
l          fh                                                                                                                                    l
           -k.                                                                  +
           -k.                                                                  +
s                    .
s                    .
* l l
l l
: l.                  SeN (10 7n
: l.                  SeN (10 7n
                                                                                                                          *
                                                                 ... .      -,__..._,_.m...                . . . ~ , _ _ ,  . _ - _ _ - , . _ _ -
                                                                 ... .      -,__..._,_.m...                . . . ~ , _ _ ,  . _ - _ _ - , . _ _ -


       .,      ~i  r
       .,      ~i  r
                                                                                   ~                m T                                    s
                                                                                   ~                m T                                    s Bechtel PowerCorporation Interoffice Memorandum 2          %. J To G. L. Richardson                          0**
              '
                . -  '
          -
                                              -
Bechtel PowerCorporation Interoffice Memorandum
        -
2          %. J To G. L. Richardson                          0**
11ay 29,1975 Subject Job 7220 Midland Project                  From    D. L. Palmer QADR 056 (Work Print Control)
11ay 29,1975 Subject Job 7220 Midland Project                  From    D. L. Palmer QADR 056 (Work Print Control)
Corrective Actions                        o,      Construction 0-950 - Quality Related copwito Ai llidland, !!ichigan Ref:  IOM to Close--Out QADR 056 Document Control personnel have inspected all current work prints in the field. Outdated and voided material have been removed.
Corrective Actions                        o,      Construction 0-950 - Quality Related copwito Ai llidland, !!ichigan Ref:  IOM to Close--Out QADR 056 Document Control personnel have inspected all current work prints in the field. Outdated and voided material have been removed.
Those prints remaining as active work prints have been issued and controlled in accordance with.FPG-10. The logging procedure, as contained by FPG-10 and resulting record, has thus corrected the discrepancy.
Those prints remaining as active work prints have been issued and controlled in accordance with.FPG-10. The logging procedure, as contained by FPG-10 and resulting record, has thus corrected the discrepancy.
    ,.
_
N i
N i
                                                                                   . L. Palmer DLP/sw b
                                                                                   . L. Palmer DLP/sw b
CORP POWER BECWEljoB 7210
CORP POWER BECWEljoB 7210 Y
'
ptR *
Y ptR *
              -                                                      !
                                                      .
                                                  #$
             \.-)
             \.-)
i
i i
                                                                          -
m l
i m
1 seu oo.m                                                                            !
                                                                                                      !
l 1
seu oo.m                                                                            !
                                                                                                       )
                                                                                                       )
: t.                                                                                                  .
: t.                                                                                                  .


                                                                    '
       ~ ,g]NUXmEd; fpy 90 7 Bechtel Power Corporation Post Office Box 1000 s
       ~ ,g]NUXmEd; fpy
    . . .          .
                                                            .
                                                                                  .
90 7 Bechtel Power Corporation Post Office Box 1000 s
                     ~
                     ~
                                                                                                      ;*
i Ann Arbor, Michigan 48106 f
i Ann Arbor, Michigan 48106 f
                                                                          .
June 9, 1975 Consumers Power Company 1945 West Parnall Road Jackson, Michigan Attention:    Mr. H. U. Slager Midland Project QA Administrator Hidland Units 1 & 2 Consumers Power Company Bechtel Job 7220 CLOSE0UT OF MANAGEMENT CORRECTIVE ACTION REPORT NO. 10
      .
                                            .
June 9, 1975
                                                                                                          *
                                                              .
Consumers Power Company 1945 West Parnall Road Jackson, Michigan Attention:    Mr. H. U. Slager Midland Project QA Administrator Hidland Units 1 & 2 Consumers Power Company Bechtel Job 7220 CLOSE0UT OF MANAGEMENT CORRECTIVE ACTION REPORT NO. 10
            .
[ 'N/                   
[ 'N/                   


Line 493: Line 322:


Attached is the signed off, closed out copy of Management Corrective Action Report No.10, which was written on the Midland project.
Attached is the signed off, closed out copy of Management Corrective Action Report No.10, which was written on the Midland project.
Since many revised responses to the MCAR were necessary, rather than atcaching all the related correspondence, it should be noted that all items referenced within my sut=iary letter of May 23 (Ref. WFH-5-75-397)
Since many revised responses to the MCAR were necessary, rather than atcaching all the related correspondence, it should be noted that all items referenced within my sut=iary letter of May 23 (Ref. WFH-5-75-397) have been accomplished satisfactorily.
                .
have been accomplished satisfactorily.
A complete set of all related documentation is available within the Bechtel Project QA files.                                                          .
A complete set of all related documentation is available within the Bechtel Project QA files.                                                          .
                                                          .
Q i
Q i
                                                   ,  y                Very truly yours,
                                                   ,  y                Very truly yours, p    /R CORP.                            (.      'k.        Q JO      110                              W. F. Holub NJ
        '
p    /R CORP.                            (.      'k.        Q JO      110                              W. F. Holub NJ
                                   ^
                                   ^
Project QA Engineer pyin /m,    ,_
Project QA Engineer pyin /m,    ,_
                                          -            *
     ,                cc: Mr. R. C. Bauman
     ,                cc: Mr. R. C. Bauman
;
     &q
     &q
* u WFH-6                      -
* u WFH-6                      -
          .
                                               --N                                      v-
                                               --N                                      v-


            ,
'*
  - , - -
   '/ -
   '/ -
          *
                  ,
0                                              ,
0                                              ,
QUALITY ASSUHANCE PROGRAM
QUALITY ASSUHANCE PROGRAM
                                                                                                                        '
          ,
                     ]                                  MANAGEMENT CORRECTIVE ACTION REPORT
                     ]                                  MANAGEMENT CORRECTIVE ACTION REPORT
           ,,                                                            MCAR-1 REPORT NO.          10 g JOB NO.            7220      . _ _ _ _ _                Q NO. 1.203                      DATE            March 3. 1975
           ,,                                                            MCAR-1 REPORT NO.          10 g JOB NO.            7220      . _ _ _ _ _                Q NO. 1.203                      DATE            March 3. 1975 I
      '
I
* DESCRIPTION (including references):
* DESCRIPTION (including references):
                                                                                          .
See attached page and also reference drawings C-212 Rev. 1, C-221 Rev. 3, Non conformance Report No. 295 and Field Sketch FSK C-A21 l
See attached page and also reference drawings C-212 Rev. 1, C-221 Rev. 3, Non conformance Report No. 295 and Field Sketch FSK C-A21
* RECOMMENDED ACTION (Optionat) j See Attached Page                                                                                                                l I
                                                                        .
l
* RECOMMENDED ACTION (Optionat) j See Attached Page                                                                                                                l
                                                                                                                                                  !
I
        .
{      lEFERRED TO                        ENGINEERING hCONSTRUCTION                ]QA MANAGEMENT I                                                                                        ISSUED BY                -
{      lEFERRED TO                        ENGINEERING hCONSTRUCTION                ]QA MANAGEMENT I                                                                                        ISSUED BY                -
I Project GA Engineer        Date ll REPORTABLE DESCREPANCY                                                                                          h 3, 197.5_
I Project GA Engineer        Date ll REPORTABLE DESCREPANCY                                                                                          h 3, 197.5_
Line 543: Line 349:
111 CAUSE
111 CAUSE
: 2. 0.ie f 7.5
: 2. 0.ie f 7.5
                                                                                                                                              .
* Currently under further                udy.
* Currently under further                udy.
NE          E MthMd NO                  '
NE          E MthMd NO                  '
                                                                                            -
CORRECTIVE ACTION TAKEN
CORRECTIVE ACTION TAKEN
                                                                                                                                         %M.\\
                                                                                                                                         %M.\\
See Holub letter WFH-5-75-397 dated 5/23/75, attached                                                                            i "t .
See Holub letter WFH-5-75-397 dated 5/23/75, attached                                                                            i "t .
* k-3-%              -
k-3-%              -
1 l
1 l
                                                          .
l AUTHORIZED BY                                                    l C.t e DIST Rf DUTION:
l AUTHORIZED BY                                                    l C.t e DIST Rf DUTION:
e          e....ci u.a..                                                        FOR MAL H EPORT TO CLIENT.______.
e          e....ci u.a..                                                        FOR MAL H EPORT TO CLIENT.______.
Crasteuct.on Manager                                                  (if Section il Applies)
Crasteuct.on Manager                                                  (if Section il Applies)
                                                                                                                                        .
Date I,".*l""E"'.".'.;'"'                      .
Date I,".*l""E"'.".'.;'"'                      .
           ""' ,5;"a'/,$j' o,C*",'',"',',.
           ""' ,5;"a'/,$j' o,C*",'',"',',.
                             ,      u                                          CORRECTlVE ACTION IMPLEMENTED
                             ,      u                                          CORRECTlVE ACTION IMPLEMENTED
           *[,''"e:'JJ.'J."T.""n'u.,
           *[,''"e:'JJ.'J."T.""n'u.,
_
( D h gih                                .T.T.
( D h gih                                .T.T.


LP b %      &54JL 4J '8b d  g
LP b %      &54JL 4J '8b d  g J. Milandin            ','                        ~
                    *
                                   'J. Hewgen J. Connolly R. Casticherry                                                .
                ..
                            ,
J. Milandin            ','                        ~
    .
          ,          ,
                                   'J. Hewgen J. Connolly
                                                                            '
R. Casticherry                                                .
G. Richardson p                ,
G. Richardson p                ,
  -
( Q)
( Q)
Jhy 23, l'975 Concurers Pouer Co=pany 1945 Uect Parnall Road Jackson, !!ichigan 49201                  -
Jhy 23, l'975 Concurers Pouer Co=pany 1945 Uect Parnall Road Jackson, !!ichigan 49201                  -
Attention:          Mr. H. U. Sinner Midland Project QA Administrator
Attention:          Mr. H. U. Sinner Midland Project QA Administrator
                                                                       . Midland Unito 1 & 2 Consumers Power Company Ecchtcl Job 7220 STATUS OF MCAR No. 10
                                                                       . Midland Unito 1 & 2 Consumers Power Company Ecchtcl Job 7220 STATUS OF MCAR No. 10
                                                                                                .


==Dear Mr. Slager:==
==Dear Mr. Slager:==
Line 587: Line 378:
('"g              efforts planned, and estimated time of completion for the subject itenc c . ( ,j                  identified in Management Corrective Action Report No.10. This letter can also be used in response to your letter of May 16, 1975, addressed
('"g              efforts planned, and estimated time of completion for the subject itenc c . ( ,j                  identified in Management Corrective Action Report No.10. This letter can also be used in response to your letter of May 16, 1975, addressed
                           *o me (Slag 73-75) concerning the same subject.
                           *o me (Slag 73-75) concerning the same subject.
Actions Taken and Planned by Field Engineering A.      A total review of all Project Engineering comments on reinforcing  j steel for the turbine and centainment buildings was completed      4
Actions Taken and Planned by Field Engineering A.      A total review of all Project Engineering comments on reinforcing  j steel for the turbine and centainment buildings was completed      4 on March 14, 1975. This review did not disclose any instances where design requirements were not met due to failure to incorporate Project Engineering comments.                          ;
                  ,
on March 14, 1975. This review did not disclose any instances where design requirements were not met due to failure to incorporate Project Engineering comments.                          ;
I B.      On March 4 and 5, 1975, a total review of all Project Engineering  i comments on reinforcing steel drawings for the auxiliary            )
I B.      On March 4 and 5, 1975, a total review of all Project Engineering  i comments on reinforcing steel drawings for the auxiliary            )
building was made. This review resulted in one iten requiring      l
building was made. This review resulted in one iten requiring      l
                                     . resolution. NCR 298 was written to document the condition.
                                     . resolution. NCR 298 was written to document the condition.
C.      Field Engineering Training Session No. 3475 was held ot. March 4,
C.      Field Engineering Training Session No. 3475 was held ot. March 4, 1975. The subject of MCAR 10 was discussed in detail.
          -
1975. The subject of MCAR 10 was discussed in detail.
            -
D.      In addition, FPG-13 (formerly FPC-3), Review of Vendor Drawings, was issued on }by 16, 1975, to core formally describe and clarify the" review cycle of supplier engineering documents,
D.      In addition, FPG-13 (formerly FPC-3), Review of Vendor Drawings, was issued on }by 16, 1975, to core formally describe and clarify the" review cycle of supplier engineering documents,
         ,_s                              including the review cycle of reinforcing steel detail drawings.
         ,_s                              including the review cycle of reinforcing steel detail drawings.
       /        T
       /        T
       <        1 x _ ,r M
       <        1 x _ ,r M
                                                      .
                                                                                                            .


__          _ _ _.
                                                                                     '~
                                                                                     '~
Ef-          -
Ef-          -
Line 610: Line 393:
* r
* r
     -*' /
     -*' /
          -
                      .
I ay 23,1975      .
I ay 23,1975      .
Pann 2                                                                    .
Pann 2                                                                    .
Line 632: Line 413:
e in th i
e in th i
                   .                Actions Taken/ Planned by Quality Control A.
                   .                Actions Taken/ Planned by Quality Control A.
Management Corrective Action Report No.10 was the subj            ect of a formal QC training session attended by QC                  e.personn l The requirements for conctruction drawings and thei Quality Control- verification was stressed.                r role in sesJion was documented as was the list of attendeesThe training
Management Corrective Action Report No.10 was the subj            ect of a formal QC training session attended by QC                  e.personn l The requirements for conctruction drawings and thei Quality Control- verification was stressed.                r role in sesJion was documented as was the list of attendeesThe training B.
                                                                                                        .
B.
(_~/ \  '-
(_~/ \  '-
design draving on their inspection                                me as plans until the full closure and resulting corrective action      to prevent recurrence can be resolved.
design draving on their inspection                                me as plans until the full closure and resulting corrective action      to prevent recurrence can be resolved.
Line 640: Line 419:
Control  a n ngtr i i session to be held in the near future.
Control  a n ngtr i i session to be held in the near future.
when the additional field procedure                                        ism reviewed ments,                  an fact be    thattoProject ready      close MCAR  QANo.10.
when the additional field procedure                                        ism reviewed ments,                  an fact be    thattoProject ready      close MCAR  QANo.10.
will be  auditing this control      sy t e , and the s em, QA vill soon
will be  auditing this control      sy t e , and the s em, QA vill soon Very truly yours, Uilliam F. Holub Project QA Engineer cc: Mr. R. Bauman              '
                    .
Very truly yours,
                                              '
            '
                                                                          .
                                                                                .
Uilliam F. Holub Project QA Engineer cc: Mr. R. Bauman              '
        .
wrn-3-73~ 3 Ci Q
wrn-3-73~ 3 Ci Q
                                                '
(^O s J
(^O s J
      ,
                .
                                                                               ~
                                                                               ~
                                                                                                  .
M P
M P
                                                                                                                                        .
9 _                                                            -    -      .                        a
9 _                                                            -    -      .                        a


      . .    .
h1                                    '
h1                                    '
                                                                                     )                Attachment A
                                                                                     )                Attachment A Route To      This Cony For              .                File        16.3.6 CSKeeley        SHHowell
                                                                '
Route To      This Cony For              .                File        16.3.6 CSKeeley        SHHowell
:                  Issue Date  M.,v 9. 197 5              I EN        HUSlager        WEKessler (2)
:                  Issue Date  M.,v 9. 197 5              I EN        HUSlager        WEKessler (2)
                                                             \u                Project    MMland 1
                                                             \u                Project    MMland 1
Line 672: Line 435:
Mr. J. P. ConnollY Approved By Ybb Date Mfb Bechtel Project Field Quality Control                WrittenRepihequested /4 Date              6-6 Engineer                                                                    ted By Date  6-6={
Mr. J. P. ConnollY Approved By Ybb Date Mfb Bechtel Project Field Quality Control                WrittenRepihequested /4 Date              6-6 Engineer                                                                    ted By Date  6-6={
Corrective Action Req who is resnonsible for corrective action.                                                          l Nonconfomance Description and Supporting Details:          (1) Specification C-208, Rev. 4          l section.7.3.2 states "A slump musurement shall be made for every 35 cubic yards or                  1 fraction thereof of concrete produced for Class I structures." For concrete placement CC(652.75)a' and CC(621.0)a', 56 cubic yards of concrete was placed between slump measurements.    (2) The C12-1 fom (In-Process Concrete Test Report) for CC(652.75)a' I indicates one air meter and one thermometer was used in the field for testing.                      i However, at least three air meters and two ther=cmeters were used in the field.                      !
Corrective Action Req who is resnonsible for corrective action.                                                          l Nonconfomance Description and Supporting Details:          (1) Specification C-208, Rev. 4          l section.7.3.2 states "A slump musurement shall be made for every 35 cubic yards or                  1 fraction thereof of concrete produced for Class I structures." For concrete placement CC(652.75)a' and CC(621.0)a', 56 cubic yards of concrete was placed between slump measurements.    (2) The C12-1 fom (In-Process Concrete Test Report) for CC(652.75)a' I indicates one air meter and one thermometer was used in the field for testing.                      i However, at least three air meters and two ther=cmeters were used in the field.                      !
One air meter and one ther=ometer was needed at the pump discharge. One air meter and one thermometer was needed at the truck discharge. Also, the QC inspector noted
One air meter and one ther=ometer was needed at the pump discharge. One air meter and one thermometer was needed at the truck discharge. Also, the QC inspector noted on the C12-1 form an air meter change af ter obtaining 7.5% and 6.5% air with the original air meter.    . Limits AEC Reportable    Yes U Ho k, air content are 3.0%-6.0%.See Procedure 9 (For Muclear Projects O (m
            ,
on the C12-1 form an air meter change af ter obtaining 7.5% and 6.5% air with the original air meter.    . Limits AEC Reportable    Yes U Ho k, air content are 3.0%-6.0%.See Procedure 9 (For Muclear Projects O (m
hO              Stop Work Necessary Yes O Ho            See Procedure 16 - Stop Work No                    ,
hO              Stop Work Necessary Yes O Ho            See Procedure 16 - Stop Work No                    ,
Reco=nended Corrective ' Action:    (a) For item (1) above, receive an Engineering                i evaluation of the acceptability of the concrete placed without the required slump measurement. No additional corrective action is neces:;ary, because it has already been covered in letter C-208-56 from Bechtel to U.S. Testing, concerning concret.e                  l testing frequencies and test locations. The written reply to this item is requested with the Engineering evaluation. (b) For item (2) above, take corrective action to l preclude these occurrences. Written reply and corrective action requested for both i Corrective Action Taken:                                                by June 6, 1975.          I (a) A Bechtel Engineering evaluation of the concrete cylinders was performed on the concrete placed without the required slump measurements and the concrete was determia acceptable.      (b) The missing infomation in (2) above, was found and placed in the placement package for CC(652.75)a'.          Also, a training session was given on May 16,1R for U.S. Testing personnel to preclude repetition.
Reco=nended Corrective ' Action:    (a) For item (1) above, receive an Engineering                i evaluation of the acceptability of the concrete placed without the required slump measurement. No additional corrective action is neces:;ary, because it has already been covered in letter C-208-56 from Bechtel to U.S. Testing, concerning concret.e                  l testing frequencies and test locations. The written reply to this item is requested with the Engineering evaluation. (b) For item (2) above, take corrective action to l preclude these occurrences. Written reply and corrective action requested for both i Corrective Action Taken:                                                by June 6, 1975.          I (a) A Bechtel Engineering evaluation of the concrete cylinders was performed on the concrete placed without the required slump measurements and the concrete was determia acceptable.      (b) The missing infomation in (2) above, was found and placed in the placement package for CC(652.75)a'.          Also, a training session was given on May 16,1R for U.S. Testing personnel to preclude repetition.
Line 682: Line 443:
Connolly, that stated Engineering's evaluation. (b) Reviewed placement package for CC(652.75)a' to comfirm the corrective action taken. Also reviewed the docu-mentation of the training session.
Connolly, that stated Engineering's evaluation. (b) Reviewed placement package for CC(652.75)a' to comfirm the corrective action taken. Also reviewed the docu-mentation of the training session.
o
o
,
(
(
(
(
          '
             )      Ronconfomance Closure Confimed By              ewM    . bW/                                      l Date 6 '-i - M                                                !
             )      Ronconfomance Closure Confimed By              ewM    . bW/                                      l Date 6 '-i - M                                                !
1                                                                ~
1                                                                ~
Line 691: Line 450:
1                  Pa6e 1 Of 1
1                  Pa6e 1 Of 1


                                                                          '
i
i
       .                                                                                        Attachment A Route To      This Cony For          j[                File        16.3.4616.3.6 GSKecley      SHHowell                ]                  Issue Date May 22, 1975 N        HUSlager      UEKessler (2)
       .                                                                                        Attachment A Route To      This Cony For          j[                File        16.3.4616.3.6 GSKecley      SHHowell                ]                  Issue Date May 22, 1975 N        HUSlager      UEKessler (2)
Line 699: Line 457:
Nonconfomance Description and Supporting Details: Additional emphasis on concrete tg ing frequencies and locations were expanded beyond Specifications C-208 and C-230, in letter C-208-56 dated March 19, 1975, to U.S. Testing. Item 1 in this letter states in part "The point of record testing for concrete slump, air content, and temperatur@
Nonconfomance Description and Supporting Details: Additional emphasis on concrete tg ing frequencies and locations were expanded beyond Specifications C-208 and C-230, in letter C-208-56 dated March 19, 1975, to U.S. Testing. Item 1 in this letter states in part "The point of record testing for concrete slump, air content, and temperatur@
is at the truck discharge. . .". Item 5 in this letter states " Slump, air content, and temperature tests taken at the batch plant must always be backed-up with a record tee at the truck discharge"'. Contrary to items 1 and 5, no slump or air content tests were taken at the truck discharge for concrete placeme.nt A(589)b, four cubic yards of A-1 mix.
is at the truck discharge. . .". Item 5 in this letter states " Slump, air content, and temperature tests taken at the batch plant must always be backed-up with a record tee at the truck discharge"'. Contrary to items 1 and 5, no slump or air content tests were taken at the truck discharge for concrete placeme.nt A(589)b, four cubic yards of A-1 mix.
:
p            AEC Reportable    Yes    No @ See Procedure 9 (For Nuclear Projects Only)
p            AEC Reportable    Yes    No @ See Procedure 9 (For Nuclear Projects Only)
           )
           )
Line 710: Line 467:
l herificationofCorrectiveActionRequired Yes X No
l herificationofCorrectiveActionRequired Yes X No
(
(
    -
bethcdofVerification: Reviewed Bechtel Field Engineering's evaluation of the concrete in question, letter 0-952 to J. P. Connolly from T. C. Valenzano.              Also i
bethcdofVerification: Reviewed Bechtel Field Engineering's evaluation of the concrete in question, letter 0-952 to J. P. Connolly from T. C. Valenzano.              Also i
                                                                                                                !
reviewed documentation of telephone conversation between Field Engineering and Project Engineering, da.ted June 18, 1975. In this conversation, Project Engineer-                l ing is in complete agreement with Field Engineering's evaluation.
reviewed documentation of telephone conversation between Field Engineering and Project Engineering, da.ted June 18, 1975. In this conversation, Project Engineer-                l ing is in complete agreement with Field Engineering's evaluation.
1 4
1 4
Eonconfomance Closure Confirmed By          C                  ./d
Eonconfomance Closure Confirmed By          C                  ./d
[.
[.
                                                                        -
Date %>x>,IH,/925~                                          l 1
Date %>x>,IH,/925~                                          l 1
1                                                                                                  1 To be completed at time of closure by Consumers Power OA Services.
1                                                                                                  1 To be completed at time of closure by Consumers Power OA Services.
Pace 1 of 1
Pace 1 of 1


                                                                                            . _ _ _            __      _ _ _ _ _ _ _ _ _ _
A                                      -
A                                      -
Attachment A
Attachment A
                                           \
                                           \
          '
                   ' Route To        Tnis Copy For              fp                  rile              J6.3.6 CSKeeley        SHHowell f
                   ' Route To        Tnis Copy For              fp                  rile              J6.3.6 CSKeeley        SHHowell f
I Issue Date June 12. 1975
I Issue Date June 12. 1975
Line 732: Line 484:
_            HUSlager        UEKessler (2)                  .1
_            HUSlager        UEKessler (2)                  .1
(        )    CQHills        TCCooke                  CODT&.E;3 FDET
(        )    CQHills        TCCooke                  CODT&.E;3 FDET
-[' j                                JMilandin File Title      ~  NCR's on Bechte) Ouel Control
-[' j                                JMilandin File Title      ~  NCR's on Bechte) Ouel Control T7FHolub                Honconfomance GLRichardson        Report Ho 0F-50 ouo ect rate This Nonconfomanc;e Report is Issued To:                                          .e Prepared By a. em,dd(_c,.%n.%.,Date
  '
                                                                                                             ,            C - 12 .i Approved ByhMhd((*-,/ Date #d-M'i Mr. J. P. Connolly Bechtel Project Field Quality Control                  Written ReA k Reques            By Date                          7-11=
T7FHolub                Honconfomance GLRichardson        Report Ho 0F-50 ouo ect rate This Nonconfomanc;e Report is Issued To:                                          .e
                                                                                        .
Prepared By a. em,dd(_c,.%n.%.,Date
                                                                                                             ,            C - 12 .i Approved ByhMhd[[*-,/ Date #d-M'i Mr. J. P. Connolly Bechtel Project Field Quality Control                  Written ReA k Reques            By Date                          7-11=
Engineer                                          Corrective Action Requested By Date 7-11=
Engineer                                          Corrective Action Requested By Date 7-11=
who is responsible for corrective action.
who is responsible for corrective action.
Honconfomance Description und Supporting Details: Specification C-230 Rev. 5 section 12.2.3a states " Chemical and physical tests will be perfomed by the Contractor on pozzolans during the work as specified in ASTM C311-68, ASTM C618-72, and Technical Specifications 7220-C-208". ASTM C618-72 section 5 states in part, detemine the property in 5.1.11 "Unifomity Requirements (Quantity of Air-Entraining Admixture)"
Honconfomance Description und Supporting Details: Specification C-230 Rev. 5 section 12.2.3a states " Chemical and physical tests will be perfomed by the Contractor on pozzolans during the work as specified in ASTM C311-68, ASTM C618-72, and Technical Specifications 7220-C-208". ASTM C618-72 section 5 states in part, detemine the property in 5.1.11 "Unifomity Requirements (Quantity of Air-Entraining Admixture)"
for every 100 tons of fly ash.          Contrary to this requirement, "Unifomity Require-ments (Quantity of Air-Entraining Admixture) has not been determined for any fly ash " User Tests".
for every 100 tons of fly ash.          Contrary to this requirement, "Unifomity Require-ments (Quantity of Air-Entraining Admixture) has not been determined for any fly ash " User Tests".
            .
AEC Reportable      Yes        Ho ( See Procedure 9 (For Nuclear Projects Only)
AEC Reportable      Yes        Ho ( See Procedure 9 (For Nuclear Projects Only)
       ,m
       ,m y_ ('  -
              '
y_ ('  -
Stop Triork Hecessag Yes          no  -
Stop Triork Hecessag Yes          no  -
See Procedure 16 - Stop Work No
See Procedure 16 - Stop Work No
(
(
'                                                                                                                                        ..
Recc::: mended Corrective Action:    (a) Receive an Engineering evaluation of the accepta-bility of the fly ash received and used without the required tests above being run.
Recc::: mended Corrective Action:    (a) Receive an Engineering evaluation of the accepta-bility of the fly ash received and used without the required tests above being run.
(b) Take corrective action to preclude repetition. The written reply to this item is requested with the Engineering evaluation.
(b) Take corrective action to preclude repetition. The written reply to this item is requested with the Engineering evaluation.
Line 757: Line 501:
(7 )        bionconfomance Closure Confimed By
(7 )        bionconfomance Closure Confimed By
     \
     \
Date
Date 1
  -
To be completed at tine of closure by Consumers Power OA Services.
1 To be completed at tine of closure by Consumers Power OA Services.
Pa.ge 1 of1
Pa.ge 1 of1
>                                                                                                                  .


                                                                                -
Attachment A
Attachment A
          '                                            '
                 ' Route To        'ihis Cony For          f.y                      File        16.3.6 GSKeeley        SHHowell F -                      Issue Date June 12. 1975 Project    Midland 1 & 2 HUSlager        UEKessler (2)              4;,.
                 ' Route To        'ihis Cony For          f.y                      File        16.3.6
>
GSKeeley        SHHowell F -                      Issue Date June 12. 1975 Project    Midland 1 & 2 HUSlager        UEKessler (2)              4;,.
         /          CQHills-        TCCooke                COMUi:E;3 FDWir            File Title  NCR's on Bechtel Oual
         /          CQHills-        TCCooke                COMUi:E;3 FDWir            File Title  NCR's on Bechtel Oual
(\s]                            JMilandin 1.THolub            Nonconfomance Control GLRichardson      Report No OF-50              -
(\s]                            JMilandin 1.THolub            Nonconfomance Control GLRichardson      Report No OF-50              -
aaoseau x21e This Nonconformance Report is Issued To:                Prepared By M.eudd. 6,.Eh/t. ,Date f- 12-1 Approved Bybhb[['<,/ Date (INN echtel roj    t  eld Quality Control              Wri ten R h Reques        & Date          FW Engineer                                          Corrective Action Requested By Date 7-11 who is responsible for corrective action.
aaoseau x21e This Nonconformance Report is Issued To:                Prepared By M.eudd. 6,.Eh/t. ,Date f- 12-1 Approved Bybhb(('<,/ Date (INN echtel roj    t  eld Quality Control              Wri ten R h Reques        & Date          FW Engineer                                          Corrective Action Requested By Date 7-11 who is responsible for corrective action.
Honconfomance Description and Supporting Details: Specification C-230 Rev. 5 section 12.2.3a states " Chemical and physical tests will be perfomed by the Contractor on pozzolans during the work as specified in ASTM C311-68, ASTM C618-72, and Technical S acifications 7220-C-208". ASTM C618-72 section 5 states in part, detemine the property in 5.1.11 "Unifomity Requirements (Quantity of Air-Entraining Admixture)"
Honconfomance Description and Supporting Details: Specification C-230 Rev. 5 section 12.2.3a states " Chemical and physical tests will be perfomed by the Contractor on pozzolans during the work as specified in ASTM C311-68, ASTM C618-72, and Technical S acifications 7220-C-208". ASTM C618-72 section 5 states in part, detemine the property in 5.1.11 "Unifomity Requirements (Quantity of Air-Entraining Admixture)"
for every 100 tons of fly ash. Contrary to this requirement, " Uniformity Require-ments (Quantity of Air-Entraining Admixture) has not been determined for any fly ash " User Tests".
for every 100 tons of fly ash. Contrary to this requirement, " Uniformity Require-ments (Quantity of Air-Entraining Admixture) has not been determined for any fly ash " User Tests".
            .
AEC Reportable      Yes      no O See Procedure 9 (For Nuclear Projects Only) c/              Stop Work Hecessary Yes          no -    See Procedure 16 - Stop Work No
AEC Reportable      Yes      no O See Procedure 9 (For Nuclear Projects Only) c/              Stop Work Hecessary Yes          no -    See Procedure 16 - Stop Work No
{' \d                                                                                                            ..
{' \d                                                                                                            ..
Line 788: Line 525:
3~To be completed at tine of closure by Consumers Power QA Services.
3~To be completed at tine of closure by Consumers Power QA Services.
1 Pa.ge 1 of1      l
1 Pa.ge 1 of1      l
                                                                                                          *
                                                            -      -. -              ,                  ,    -    -.-


                                                                                                . _ _ _ _ _ _ _ _ _ _ _ _        _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
                                                                               -(                                          Attachment A Routa To      This Copy For                  .            File        16.3.6 Is::ue Date  June 23, 1975 GSKeeley        SHHowell                fl d /              Project      Midland 1 & 2
                                                                               -(                                          Attachment A
                '                                      '
Routa To      This Copy For                  .            File        16.3.6 Is::ue Date  June 23, 1975 GSKeeley        SHHowell                fl d /              Project      Midland 1 & 2
       '~
       '~
1    CQHills          WEKessler (2)
1    CQHills          WEKessler (2)
T5            HWSlager        TCCooke C      3 PD'#3r        File T3.tle  NCR's on Bechtel Ouality Control
T5            HWSlager        TCCooke C      3 PD'#3r        File T3.tle  NCR's on Bechtel Ouality Control (last)      WFHolub            Konconfomance GLRichardson      Report No QF-51
    -
                     'fnis Honconfomance Report is Issued To:            Prepared By (( ~ k Date ( /2 M kS~
(last)      WFHolub            Konconfomance GLRichardson      Report No QF-51
                     'fnis Honconfomance Report is Issued To:            Prepared By [[ ~ k Date ( /2 M kS~
J. P. Connolly Approved By        j 'dd k Date 4 /z Ukr Bechtel PFQCE                                      WrittenRepIRequeste[                                Date                                  7/23/75 Corrective Action Requested By Date 7/23/%
J. P. Connolly Approved By        j 'dd k Date 4 /z Ukr Bechtel PFQCE                                      WrittenRepIRequeste[                                Date                                  7/23/75 Corrective Action Requested By Date 7/23/%
who is resuonsible for corrective action.                                                                                                              l Uonconfomance Description and Supporting Details:
who is resuonsible for corrective action.                                                                                                              l Uonconfomance Description and Supporting Details:
Line 806: Line 536:
AEC Reportable    Yes      No @ See Procedure 9 (For nuclear Projects only)
AEC Reportable    Yes      No @ See Procedure 9 (For nuclear Projects only)
  ,.g                Stop Work Hecessary Yes        No      See Procedure 16 - Stop Work No j
  ,.g                Stop Work Hecessary Yes        No      See Procedure 16 - Stop Work No j
  '
ks)
ks)
Recom:nended Corrective Action:                                                                                                                -
Recom:nended Corrective Action:                                                                                                                -
Line 814: Line 543:
l l
l l
1 Verification of Corrective Action Required Yes            no b4ethod of Verification:                                                                                                                                l l
1 Verification of Corrective Action Required Yes            no b4ethod of Verification:                                                                                                                                l l
l
l l
              .
l
                                            .
      ,-
       -        konconfomance Closure Confimed By
       -        konconfomance Closure Confimed By
               ')                                      Date
               ')                                      Date
Line 824: Line 549:
1 To be completed at time of closure by Consuners Power Q/s Services.
1 To be completed at time of closure by Consuners Power Q/s Services.
Page 1 of 4
Page 1 of 4
                                                                                                                              ,


                                   /                                Issue-' ate: June 23, 1975
                                   /                                Issue-' ate: June 23, 1975
  '
       , /  ,                                                      Proj e . . :    Midland 1 & 2 File
       , /  ,                                                      Proj e . . :    Midland 1 & 2 File


Line 837: Line 560:
Section IX-3334.3 " Number of Penetrameters To Be Used," requires that film density through the diagnostic area be from -15% to plus 30% of the density through the penetrameter which is normal to the radiation beam. However, if the density varies by more than these requirements, an additional penetrameter is required for the exceptional area and the density of the diagnostic area may be checked using the density of the second penetrameter. The additional penetra-meter does not need to be normal to the radiation beam.
Section IX-3334.3 " Number of Penetrameters To Be Used," requires that film density through the diagnostic area be from -15% to plus 30% of the density through the penetrameter which is normal to the radiation beam. However, if the density varies by more than these requirements, an additional penetrameter is required for the exceptional area and the density of the diagnostic area may be checked using the density of the second penetrameter. The additional penetra-meter does not need to be normal to the radiation beam.
One hundred radiographic films of liner plate welds were reviewed for compliance with the above requirement. The density check was performed on a Macbeth Qucnta Log Densitometer using calibrated film strip BPC 465 (Certified on 5-15-75, due for recertification on 5-15-76) te calibrate the densitameter.
One hundred radiographic films of liner plate welds were reviewed for compliance with the above requirement. The density check was performed on a Macbeth Qucnta Log Densitometer using calibrated film strip BPC 465 (Certified on 5-15-75, due for recertification on 5-15-76) te calibrate the densitameter.
It was found that fifteen films did not meet '^? luirements of Section IX-3334.3
It was found that fifteen films did not meet '^? luirements of Section IX-3334.3 of Appendix C to the specification.
                                                                  -
of Appendix C to the specification.
The films reviewed and the results are listed below:
The films reviewed and the results are listed below:
fw r(    "'
fw r(    "'
Line 847: Line 568:
_L____.
_L____.


_
_',
    -
        *
            '*
               /'
               /'
                  '
[.                          File:          16.3.6                  ]
[.                          File:          16.3.6                  ]
Issue Date: June 23, 1975 Proj ect :      Midland 1 & 2 File Titla: NCR's on Bechtel
Issue Date: June 23, 1975 Proj ect :      Midland 1 & 2 File Titla: NCR's on Bechtel
Line 861: Line 576:
(  's_    /
(  's_    /
Attachment A to NCR QF-51 (Contd)
Attachment A to NCR QF-51 (Contd)
Density Through Density Through Liner Plate          Film              Lightest            Weld          Location Assembly                            Penetrameter Identification                        Actual / Allowable  on No. Belt 2.07/2.23          1-2
Density Through Density Through Liner Plate          Film              Lightest            Weld          Location Assembly                            Penetrameter Identification                        Actual / Allowable  on No. Belt 2.07/2.23          1-2 2.08/2.23          1-3 637' 0"                      2.68            2.03/2.27          0-2 2.20/2.27          11-12 659' 0"                      2.28            1.85/2.0            0-2 1.90/2.0          11-12 639' 0"                      2.22            1.86/2.0            0-2 1.90/2.0          11-12
                                                    ,
2.08/2.23          1-3 637' 0"                      2.68            2.03/2.27          0-2 2.20/2.27          11-12 659' 0"                      2.28            1.85/2.0            0-2 1.90/2.0          11-12 639' 0"                      2.22            1.86/2.0            0-2 1.90/2.0          11-12
     , ''}        C-111-107    Scam A 15' S of C, R1
     , ''}        C-111-107    Scam A 15' S of C, R1
( {v                                                        2.35            1.85/2.0          11-12
( {v                                                        2.35            1.85/2.0          11-12 1
                                                                                                          .
                                                                .
1
                                                                                                              ;
l
l
     ./~'s,
     ./~'s,
Line 875: Line 584:
xs )
xs )
Page 3 of 4
Page 3 of 4
_. _          , .--.  -


    -
           -.-,v                  -
           -.-,v                  -
s r!                                                                                16.3.6 j' -''
s r!                                                                                16.3.6 j' -''
j
j
              *
                 ~
                 ~
                  *
                      -
h              -
h              -
                                                          '
File Issu [: J' ate:June 23, 1975 7
File Issu [: J' ate:June 23, 1975 7
Proj ect:      Midland 1 & 2                '
Proj ect:      Midland 1 & 2                '
Line 894: Line 597:
NCR's on'Bechtel f"<
NCR's on'Bechtel f"<
Quality-Control i{C)
Quality-Control i{C)
-
Attachment B to NCR QF-51 Recommended Corrective Action:                          ,
Attachment B to NCR QF-51 Recommended Corrective Action:                          ,
                           -1. -Review all acceptable radiographs 100% for proper density.      Review i
                           -1. -Review all acceptable radiographs 100% for proper density.      Review i
Line 901: Line 603:
: 3. Determine if the radiographs of liner plate welds have fulfilled their purpose as is stated in ' Volume II, Section 5.1.4.1.1 c. of the Midland Plant PSAR.
: 3. Determine if the radiographs of liner plate welds have fulfilled their purpose as is stated in ' Volume II, Section 5.1.4.1.1 c. of the Midland Plant PSAR.
: 4. Determine underlying cause of improper densities and take corrective action to preclude recurrence.
: 4. Determine underlying cause of improper densities and take corrective action to preclude recurrence.
                                                    .
                                                                                                             .J
                                                                                                             .J
            .
'k,
'k,
                                                                                                        .
                                                                                                           ,s 1
                                                                                                           ,s
i
                                                                            .
1 i
                                                                                    ..
                                          ..
     /:f\ Q.
     /:f\ Q.
v.
v.
Page 4 of 4 V              . :-
Page 4 of 4 V              . :-
                                                                          .
                                                                                                 .}}
                                                                                                 .}}

Latest revision as of 00:41, 16 March 2020

Nonconformance Rept for Apr 1975.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month
ML19329E898
Person / Time
Site: Midland
Issue date: 04/30/1975
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML19329E890 List:
References
NUDOCS 8006180741
Download: ML19329E898 (22)


Text

f.. .}.

,3 NONCONFORMANCE - REPORT LOG & STATUS BOOK n }

y

'~~*

REPORT DATE i ?"75 '

PAGE COMPL.

1. PROJECT NO.-- 799n " * * "

NCR ORIG .

NO, DATE PREPARED BY NONCONFORMANCE 8^

DESCRIPTION / REMARKS **

route XMT 304 4-7 R. A. Moray CLOSED CLOSED BY

-75 1- 104 A . Spool markinq di ffers from 'lo 5-12 eader sheet markings ASME 4.114 t! . S . 4-11 R. A. iforay 4-3-75 -75 -75 305 4 R. L. Bauren

-75 71PGh.Storaneon Stean Genera tor Field JE-51A. A S!'E 4.021 1-9-75 m'6 4 h.R. Albert

(

-75  :-231. Concrate tennoraturn. A(609)n' 1'.205 ricld 4 5-IC-75 5-19

-75 L.R. Albert 307 4 d-4-76 -7s R. A. Mo ray

-75 11 - 2 ')4 . Fittinns.F-10577. AEO-3?A. Pf a ri i M.S, 'IU 4*IO "

and Documentation. ASf1E (ng'l

-l -7E -75 308 4-17 R. A. Moray it- 104 A

-75 numbers.

anador ebne hae <nenrrect snne ' M.s, 5 2 R. A. Mora v 4-21-7 5 ASME4.114 -

309 4-23 L. R. Albert C-230. Batch Plant nualification nast

~

-75 due. mM 5 1.105,1.205 "-?3-M75 310 R. A. Moray '

4 N"

- - ?? Danaaed Bean. Shinnent C 9A ideld 5-1-75 -7a -Ib M 1.201 4-gg_yg . 6 1311 4-30 R. A.  !!o ra v S As

-75

  • C-18.

List Roans shinned. nnt nn chinninn fl. S.  !! 5 5-12 R. A . ifo ra.@

1.201 3-1-75 75 -75 x 12 4-30 R. A. iloray F-3r T

-75 Damaned Roams. 9hinmnnt r '> " WM 5 5-27 C 1.201 i-1-25 -75 -75 313 5-2-73 J . tl.M i l l e r C-38.

Beam material tensile strenoth 3-dield 5 5-27 5-29 over ASTM A-36 limit 1.201 4-9-76 75 = -75 L.R. Albert 114 5-29 R.A.floray -75

-75 C-38. Beams, Shinment C-27 without F ield tio 6-16 6-17 R. A.?lo ra y ucinht or orienta tion marking 1.201 4- 3 0- 7 ' -75 -75 (15 y 5-29 R. A.;1o ra y l -75, C-33. Danaaed Beans. Shinnent C 9F- F i c i d. 6 '3 M G .tos osm oc 1.201 J

- 3 6+j -75 p, , j (, ,  ; Page 29 11. PA* j OC-G31

. NONCONFORMANCE - REPO f LOG & STATUS BOOK 12.

REPORT DATE b

  • j; PAGE COMPL. ,
1. PROJECT NO. 7220 0.C. ENG. SIGN

~

OR ORIG. NONCONFORMANCE STATUS O, DATE PREPARED BY 6-DESCRIPTION / REMARKS ROUTE X TD CLOSED BY blOSED 16 5-30 L. R. Albert  :-711. Structural Cackfill !1a t ' l not 7ield

-75 )f Gradation. 1.004 'i-30-7 3 17 6-30 it . Shawl  :-38. Damaged Beam, Shipment C-26

-75 rield 1.201 4

/

\ _,,

  • msc1 e - - -

~

r G.

-- o -

3

2. DJ A W4N1/PA 71T NJ.

R E V.

NONCONFORMANCE REPORT

7. PHOJEC T NO.

g g4 '

'71 " y E ' J'gTMD E Y / /t' {DATE IS. Ot$ POSITION CONCURRENCE Spec. 7220-C-38 '6 07220

3. BT E M OCSCRIPTION A. A. llor6y / 5/29/75 "--- "*" - " ' - """"
  • p S. ITEM LOC AT4ON -l V JOATEDsy
  • 0 D

(4) Aux. Bldg. Beams

=

/ Sasse Rd. Laydown Area \ hg,.d I " ATE p 2h @-

  • g
4. (E N I A S. P 'iH DE R S. ST A NTUP Eb STEM NO.

/[DL"ACEMENT P4 NO. REV. reesectreeseemetassa 8478

_Sce_H1eck 19 N/A  ! N/A I S. PU%CN ASE ORDCN NO. le. QC FIELD INSPECTION Pl.AN NO. ..... ....

8 6. R EPL ACEMENT SERI AL NO. jy 7220-C-38 C-27 C-38-R-49 b /].][

6. CJNTR ACTOR /L9C ATION N/A pd"M'*"""'"" ""

ll.ASME C YES 8 7. SOU RCE Ingalls Iron Works /Verona, Pa. , ' , , , " g ,, Vendor

,g s e. Pf%sJTING INSTRUCTION 9* ROU f E TO FIELD ENGIN EERING Q ROUTE TO M ATERI AL SUPERbISOR

19. NONCON P ORMING CONDITIOMs Specification 7220-C-38 Rev. 6 paragraph 7.5 states, "The weight of all members 6,000 lbs.

- and heavief shall be clearly stenciled th'ereupon and together with cn orientation north or east." Coittrary to

( F F G G

u the above, beams 516B1 , Si6B2 , 520B7 and 520n8 are all listed as udinhinn more than 6.000 lbs. on shippinn notice C-27 but they are not marked with their weight or orientation. Nonconformance noted during receipt inspection. "O" No. in 1.201. [ hold tans applied.

2L h FIELD DISPOSITION CFIELO RECOMMENDATION / ROUTE TO PROJECT ENGINEERING El. PIELD OSSPO$lTION RESULTS The content of NCR 314 does not depict a nonconforming condition. The weight and orientation eqrkinns are not quality related conditions but aids affixed to the beams for crection purposes. By definition, these discrepancies do not qualify as non-conformances under FIM procedure G-3 since thpy> dp,ngt render the quality of 3 the item unacceptable or indeterminate.

22. ENGaNEE RING DISPOSITION M,pM (([dypg. f g_tjf Is f\ M
24. 83 DESIGN CN ANGC REQUIRED ONO 26. R EJECTED M ATERIAL DISPOSIT80N O = =vv aa ve .w =*ss= =

O v ES. SEE 4Tv4CNED, U"- 3,.a / N y, g",r'bu-

' YN'2 4),/...... .f< /

" ~ = - "

D R K. WIN G R EV. DCN ,,,,

awreson,ase emeesevee /

$PCC. _

R EV. A O D.

80078-l

~ Whito copy - Originator Q C-G 3-2 Canary Copy - Field Engineer Pink Copy - POAE Goldenrod Copy - OC

. ( a - >

=

g, . _ . _ . o -

'^*1 " ' " ' " "

NONCONFORMANCE REPORT # OF *1P 2 Det A WING / PAR Y NO. e W E V. 7. PROJECT NO. I 2. R E PO R T ED S Y .

DATE 25. DISPO54 TION CONCU R RENCE I .

Spnc. 7220-C-211 ' 2 07220 L. 1. Albert  : (./ 30/ 7.. ---- "'"' ""- ~ " " "'

3. 87EM DESC RIPT TON S. IT E M LOC A T IO N 13. V ALID ATED BY I S tructural 13ackfill Stoc!: pile .I '

C. L IRI A L N UM BE M 9. ET A R TUP S Y ST E M NO.

lDATE f

3 5. REPL ACEM E NT P A RT NO s s e.oe.ev e e.to m asen... saw.

'REV.

.:/A li/A  :!/A I ....... .... ... ....

59UNCHASEONDERNO t o. OC F sELD INSPECTtON PLA N NO. 3 6. RE PL ACEMENT SER G A L NO.

/A C-211-1-7  !;/A ......... 6.. . .....
5. CONTR ACTC R/ LOC ATION p;g , p1gg333{, f[1ghigvg3 gI.A5ME O vEs ir.5ouRcE a w -+ - = = .~ = = ' a a =a'=

h u.aulier & S.on. Inc. P.O. box 411 CODE

, , , ,  :[1No Supolier 3 8. HOUTING 4NSY N UCTIONS:

Q ROUTE TO FIE LD E NG8 NEE RING C ROUTE TO M ATERG AL SUPENVaSOR

- ~ "' "' ""'"" ' " '" "' S e c tion 5.1.1 o f S pe c. 7220-C-211-2 states in part that the crain size gradation shall have ~

C a maximater of 600 passing tiac A40 nieve. Contrary to the above gradation test performed on 06/26/75 in accordance trith Section 5.6.2 of S;>ec. 7220-C-211 key. 2 indicated the naterial had 62: passing the #40 sieve.

G . . -

u- /. o .a .4 .-

C u . v .- .. ./, J / h,- ,

20 O PIELD DISPOSITION OFIELD RECOMMENDATION / ROUTE TO PROJECT ENGINEERlNG II . FIELD D45POSITsON R ESULTS:

22. E NGIN ECHING DISPOSITION
23. ENGINEE RING DeSPOSITION RESULTS:

e' 2s. as DE5iG N CH ANGE HEQUlH ED O NO '* "' "^'""' " ' ' ' ' " U"'**~'***' '"*"

O==aa.

O vES. 5EE Avr ACHED. .. .. . -

wgy. ....

@% A WING DCN aweme.sa.o emers.vo. e.g.

.. C PE C. R F V. ADD, s .a. e-o white Copy - Originator u C-G 3-2 Canary Copy - F I.Id Engmeer O ,

Pink Copy Goldenrod Copy - QC

- POAE

' s

s.lf

"# '"^"*'

. NONCONFORMANCE REPORT er 1

'***My IJ AWINT/PA"JT ND. IRCV. ' 7. PHitJECT N2. I 2. RCPOTOTED SEY 25. OsjSPISIT13N CuNCURRENCC ipecification 7220-C-38 '!6 (TlM C ESCRIPTION 07220

8. BTEM LOCATION s//j A 4 EQ BY

, [ , k'DATE./f-75 T DATE

""q (1) Aux. Bldg. Beam

.LA S A L UMDER Sasse Road Laydown

9. ST ARTUP SYSTEM NO.

ihPLACEM ENT PARTM4..

br306 REV. ,nos cf rease anse,ess , car, 420B1

3. PU 2CN ASE ORD ER NO.

N/A

10. QC FIELD INSPECTION PLAN NO.

N/A I s. **EPLA CEMENT Sfl11 AL NO.

{/ I , , , , , , , . . . . . . ....

7220-C-38-AC N/A ' " " ' " " ' ' ' " " " " " " " """

6. C5 NTR ACTOR / LOC ATION ll.ASME C YES l't. SO U R C E Ingalls Iron Works /Verona, PA. *

, , ' 00_N O Vendor as. L%UTING INSTRUCTIONSs

{ ROUTE TO FIELD ENGINEERING O route TO u ATrni L SUPERVISOR 8..NsNCeNPORuiNGC " "' "'

Beam 420BlE has (1) bent connection angle with cracked welds. Damage noted during receipt j inspection. "Q" number is 1.201. /Holdtagapplied.

~ ,

em eum

20. ' O FlCLD DISPOSITION OFICLD RECOMMENDATION / ROUTE TO PROJECT ENGINEERING 2 8. FIELD DISPOSITION RESULTSt 2' 'NGINCCRING OISrOSITION
23. ENGINEERING DISPOSITION R ESULTSa b
24. 82 DEZIGN Cp ANGE R CQUlHE ONO **"*"^""'5" $"' N a n=wan = -uan .-

2,. O C ACCCPT ANCE 5

0 v E.. SE: ATT ACHED. Oseene DR AWING - REV. DCN ,,,

^

AUTHOR 64E D Ih SFab CTON g,yg

[PEC. . R E V. A D D.

t a a -' . .h 4G ORIGINATOR er' a c-"

t - L - - - - - - - - - - - --- - - -------E---

,. , g (\ [ cr . . . . ,.

Yeff MAUTI EDIT FiMiB i._..se e-2-13 l 04/18/75

, ( - ,

1 I

( V]

j N/A

.......,..........,..u.. . . . . . . . . . , . . ,

g,,,,, . . . . . .

Midland 1 & 2 Job 07220 Project Constructio6]..... G. Richardson 1 18 - 20 Document Control Ce'ter n Valenzano/Muladore

..... m ... ... ........................... . . . . . . .

  1. 9 Fiald Procedure FPG-10, Rev. 2 4

4.0.4 The work print drawing to be issued is recorded in the work print control sheet log.

5.0.3 Notification of a revision is sent to the field engineer via " Document Received on Site" list. ..... revisions will be highlighted.

6.0 .... This person shall be hel'd a'ccountable for des.truction of the work print.

All superceded drawings maybereturned tc document control for accountability and destruction by the document control clerk or be properly placed in 'specified '

field centainers for destruction. ' '

.During a check of work prints in work areas it uds noted that several prints are still p 4n use that are assigned to persons no' longer employed at this site. Aaay of these

,, ( ) rints are not listed on the work print control log. Some of the prints were noted to be outdated by later revisions or DCN's. Destruction of superceded prints is not ensured if the log is not properly maintained. It was also noted that "Specified Field Containe_rs" have not been placed in the work areas for work prints to be destroyed. Sec attached for details.

Continued on Page No. 2 PNFc8E5ie~nded corrective action.

1. Check all work areas for work printe that are not currently controlled and update log or destroy them.
2. Provide direction to assure that when field engineers terminate c=ploynent at this site work prints in their possession will be destroyed or reassigned.

g ,.. .. .. ,,.,....... ...............................

5/30/75 Proierr Sunerintendent See- a. Nac le) I d. M.

- a 6

9 e

6".4-3.f..6

?. 75%,

" Je b. h. w-n ..

y

)'

$i7 Y ll$< buW.

~

../.

. .... ,. . .k.. ,. . . . as . h Y2.b k.

j ..,.

'A b h r

./ ~'\

( {~ *

, .b -

\

g Block 11 Continued.

t The following work prints were noted to be available for use.

Print No. Rev. Issued to Work area noted in Remarks s C-225 2 Swartzlander Aux. Bldg. Not logged (2 copies)

C-282- 3 Swartzlander "

Not logged Rev. 4 is at sit $

C-203 2 Revereza "

DCN's 4 & 5 not <

(3 copies) attached )

C-204 1 Shawl (2 copics) "

Not logged M-614-12 0 Jenkins "

Not logged M-614-9 0 Revereza "

Not logged M-614-7 1 Revereza "

DCN 2 not attach @i

/ C-39-A C-R. 2 Betts Cont. #1

,- \.

._- C-39-AC-R 2 Betts "

C-39-AC-R 2 Amani "

Not logged t

C-39-AC-R 2 Betts .

FSK-C-357 Stockton- " -

Not logged FSK-C-359 Stockton "

Not logged FSK-C-391 Stockton " ^

Not logged

'FSK-C-392 Stockton "

Not logged FSK-C-397 Stockton "

Not logged FSK-C-402 Stockton "

Not logged 0

0 4

%/ fi mo O

. .- G Block 11 Continued.

The following work prints were noted to be available for use.

Print No. Rev. Issued to Work area noted in Remarks

, C-225 2 Swartzlander Aux. Bldg. Not logged (2 copies)

C-282- 3 Swartzlander "

Not logged Rev. 4 is at site C-203 2 Revereza "

DCN's 4 & 5 not (3 copies) attached C-204 ' 1 Shawl (2 copies) "

Not logged M-614-12 0 Jenkins "

Not logged M-614-9 0 Revereza "

Not logged M-614-7 1 Revereza "

DCN 2 not attach @

/ C-39-AC-R 2 Betts Cont. #1

, _ . (

C-39-AC-R-2 3- 2 Betts "

C-39-AC-R 2 Amani "

Not logged C-39-AC-R 2 Betts "

FSK-C-357 Stockton "-

Not logged i

FSK-C-359 Stockton "

Not logged FSK-C-391 Stockton "

Not logged

' FSK-C-392 Stockton "

Not logged FSK-C-397 Stockton "

Not logged FSK-C-402 Stockton "

Not logged B

4' v -

6

.e

' . .[ (\

Bechtel PowerCorporation I

interoffice Memorandum T'

G. L. Richardson **

May 29, 1975 suenct Jcb 7220 Midland Project From D. L. Palmer  ;

QADR 056 (Work Print Control)

Corrective Actions a Construction 0-950 - Quality Related l cop.ese y Midland, Michigan Ref: IOM to Close-Out QADR 056  !

Document Control personnel have inspected all current work prints ,

in the field. Outdated and voided material have been removed. l Those prints remaining as active work prints have been issued and controlled in accordance with.FPG-10. The logging procedure, as contained by FPG-10 and resulting record, has thus corrected the discrepancy.

f

.. . L. Palmer DLP/sv D h TAM 3 0875 POWER BEOUElyog, 7'110

,0 32/-

b i

e l

l l fh l

-k. +

s .

l l

l. SeN (10 7n

... . -,__..._,_.m... . . . ~ , _ _ , . _ - _ _ - , . _ _ -

., ~i r

~ m T s Bechtel PowerCorporation Interoffice Memorandum 2  %. J To G. L. Richardson 0**

11ay 29,1975 Subject Job 7220 Midland Project From D. L. Palmer QADR 056 (Work Print Control)

Corrective Actions o, Construction 0-950 - Quality Related copwito Ai llidland, !!ichigan Ref: IOM to Close--Out QADR 056 Document Control personnel have inspected all current work prints in the field. Outdated and voided material have been removed.

Those prints remaining as active work prints have been issued and controlled in accordance with.FPG-10. The logging procedure, as contained by FPG-10 and resulting record, has thus corrected the discrepancy.

N i

. L. Palmer DLP/sw b

CORP POWER BECWEljoB 7210 Y

ptR *

\.-)

i i

m l

1 seu oo.m  !

)

t. .

~ ,g]NUXmEd; fpy 90 7 Bechtel Power Corporation Post Office Box 1000 s

~

i Ann Arbor, Michigan 48106 f

June 9, 1975 Consumers Power Company 1945 West Parnall Road Jackson, Michigan Attention: Mr. H. U. Slager Midland Project QA Administrator Hidland Units 1 & 2 Consumers Power Company Bechtel Job 7220 CLOSE0UT OF MANAGEMENT CORRECTIVE ACTION REPORT NO. 10

[ 'N/

Dear Mr. Slager:

Attached is the signed off, closed out copy of Management Corrective Action Report No.10, which was written on the Midland project.

Since many revised responses to the MCAR were necessary, rather than atcaching all the related correspondence, it should be noted that all items referenced within my sut=iary letter of May 23 (Ref. WFH-5-75-397) have been accomplished satisfactorily.

A complete set of all related documentation is available within the Bechtel Project QA files. .

Q i

, y Very truly yours, p /R CORP. (. 'k. Q JO 110 W. F. Holub NJ

^

Project QA Engineer pyin /m, ,_

, cc: Mr. R. C. Bauman

&q

  • u WFH-6 -

--N v-

'/ -

0 ,

QUALITY ASSUHANCE PROGRAM

] MANAGEMENT CORRECTIVE ACTION REPORT

,, MCAR-1 REPORT NO. 10 g JOB NO. 7220 . _ _ _ _ _ Q NO. 1.203 DATE March 3. 1975 I

  • DESCRIPTION (including references):

See attached page and also reference drawings C-212 Rev. 1, C-221 Rev. 3, Non conformance Report No. 295 and Field Sketch FSK C-A21 l

  • RECOMMENDED ACTION (Optionat) j See Attached Page l I

{ lEFERRED TO ENGINEERING hCONSTRUCTION ]QA MANAGEMENT I ISSUED BY -

I Project GA Engineer Date ll REPORTABLE DESCREPANCY h 3, 197.5_

% P TIFIED LIENT_.}

@NO i YES ^ "-

,wec, u.n.se,

-I  !

111 CAUSE

2. 0.ie f 7.5
  • Currently under further udy.

NE E MthMd NO '

CORRECTIVE ACTION TAKEN

%M.\\

See Holub letter WFH-5-75-397 dated 5/23/75, attached i "t .

k-3-% -

1 l

l AUTHORIZED BY l C.t e DIST Rf DUTION:

e e....ci u.a.. FOR MAL H EPORT TO CLIENT.______.

Crasteuct.on Manager (if Section il Applies)

Date I,".*l""E"'.".'.;'"' .

""' ,5;"a'/,$j' o,C*",,"',',.

, u CORRECTlVE ACTION IMPLEMENTED

  • [,"e:'JJ.'J."T.""n'u.,

( D h gih .T.T.

LP b % &54JL 4J '8b d g J. Milandin ',' ~

'J. Hewgen J. Connolly R. Casticherry .

G. Richardson p ,

( Q)

Jhy 23, l'975 Concurers Pouer Co=pany 1945 Uect Parnall Road Jackson, !!ichigan 49201 -

Attention: Mr. H. U. Sinner Midland Project QA Administrator

. Midland Unito 1 & 2 Consumers Power Company Ecchtcl Job 7220 STATUS OF MCAR No. 10

Dear Mr. Slager:

The following represents, in su==ary ferm, the current status, remaining

('"g efforts planned, and estimated time of completion for the subject itenc c . ( ,j identified in Management Corrective Action Report No.10. This letter can also be used in response to your letter of May 16, 1975, addressed

  • o me (Slag 73-75) concerning the same subject.

Actions Taken and Planned by Field Engineering A. A total review of all Project Engineering comments on reinforcing j steel for the turbine and centainment buildings was completed 4 on March 14, 1975. This review did not disclose any instances where design requirements were not met due to failure to incorporate Project Engineering comments.  ;

I B. On March 4 and 5, 1975, a total review of all Project Engineering i comments on reinforcing steel drawings for the auxiliary )

building was made. This review resulted in one iten requiring l

. resolution. NCR 298 was written to document the condition.

C. Field Engineering Training Session No. 3475 was held ot. March 4, 1975. The subject of MCAR 10 was discussed in detail.

D. In addition, FPG-13 (formerly FPC-3), Review of Vendor Drawings, was issued on }by 16, 1975, to core formally describe and clarify the" review cycle of supplier engineering documents,

,_s including the review cycle of reinforcing steel detail drawings.

/ T

< 1 x _ ,r M

'~

Ef- -

Kr. 11. U. Slage_

  • r

-*' /

I ay 23,1975 .

Pann 2 .

)

e l

/

j '\,,T/ E.

1 z1% Additicaally, Field Engineering is currently prepari ng a

)

j a more fornal description of the preparation, , and es rev !

1 This procedure is currently scheduled e c es.for iss

, 1975.

l l

_ Actions Taken/Pinnned by Proicct Encincering A. i Project Engincoring has issued their position on th 1

\

e necessity '

with you during one of your recent visits to o .

B.

Project Engineering has co:cmented on field proced r u e FPG-13 and these cocaents were considered and incorporated procedore.

e in th i

. Actions Taken/ Planned by Quality Control A.

Management Corrective Action Report No.10 was the subj ect of a formal QC training session attended by QC e.personn l The requirements for conctruction drawings and thei Quality Control- verification was stressed. r role in sesJion was documented as was the list of attendeesThe training B.

(_~/ \ '-

design draving on their inspection me as plans until the full closure and resulting corrective action to prevent recurrence can be resolved.

will still be the primary acceptance document but referAt tha ences to the field sketch as a supplementary document This will also be the cubject of a Quality can be used.

Control a n ngtr i i session to be held in the near future.

when the additional field procedure ism reviewed ments, an fact be thattoProject ready close MCAR QANo.10.

will be auditing this control sy t e , and the s em, QA vill soon Very truly yours, Uilliam F. Holub Project QA Engineer cc: Mr. R. Bauman '

wrn-3-73~ 3 Ci Q

(^O s J

~

M P

9 _ - - . a

h1 '

) Attachment A Route To This Cony For . File 16.3.6 CSKeeley SHHowell

Issue Date M.,v 9. 197 5 I EN HUSlager WEKessler (2)

\u Project MMland 1

~~^ F. 7 I t

j CQHills TCCooke CCCSum!G POW 2f File Title NCR's on Bechtel

.k JMiland.4n Quality Control WFHolub Eonconfomance GLRichardson Report No or_4g This Honconfomance Report is Issued To: Prepared By3)e-w2) f,$ns Date 6-9 '7)

Mr. J. P. ConnollY Approved By Ybb Date Mfb Bechtel Project Field Quality Control WrittenRepihequested /4 Date 6-6 Engineer ted By Date 6-6={

Corrective Action Req who is resnonsible for corrective action. l Nonconfomance Description and Supporting Details: (1) Specification C-208, Rev. 4 l section.7.3.2 states "A slump musurement shall be made for every 35 cubic yards or 1 fraction thereof of concrete produced for Class I structures." For concrete placement CC(652.75)a' and CC(621.0)a', 56 cubic yards of concrete was placed between slump measurements. (2) The C12-1 fom (In-Process Concrete Test Report) for CC(652.75)a' I indicates one air meter and one thermometer was used in the field for testing. i However, at least three air meters and two ther=cmeters were used in the field.  !

One air meter and one ther=ometer was needed at the pump discharge. One air meter and one thermometer was needed at the truck discharge. Also, the QC inspector noted on the C12-1 form an air meter change af ter obtaining 7.5% and 6.5% air with the original air meter. . Limits AEC Reportable Yes U Ho k, air content are 3.0%-6.0%.See Procedure 9 (For Muclear Projects O (m

hO Stop Work Necessary Yes O Ho See Procedure 16 - Stop Work No ,

Reco=nended Corrective ' Action: (a) For item (1) above, receive an Engineering i evaluation of the acceptability of the concrete placed without the required slump measurement. No additional corrective action is neces:;ary, because it has already been covered in letter C-208-56 from Bechtel to U.S. Testing, concerning concret.e l testing frequencies and test locations. The written reply to this item is requested with the Engineering evaluation. (b) For item (2) above, take corrective action to l preclude these occurrences. Written reply and corrective action requested for both i Corrective Action Taken: by June 6, 1975. I (a) A Bechtel Engineering evaluation of the concrete cylinders was performed on the concrete placed without the required slump measurements and the concrete was determia acceptable. (b) The missing infomation in (2) above, was found and placed in the placement package for CC(652.75)a'. Also, a training session was given on May 16,1R for U.S. Testing personnel to preclude repetition.

1

^ Verification of Corrective Action Required Yes X No Method of Verification:

(a) Reviewed letter BEBC-807 dated June 6,1975 from R. L. Castleberry to J. P.

Connolly, that stated Engineering's evaluation. (b) Reviewed placement package for CC(652.75)a' to comfirm the corrective action taken. Also reviewed the docu-mentation of the training session.

o

(

(

) Ronconfomance Closure Confimed By ewM . bW/ l Date 6 '-i - M  !

1 ~

To be completed at time of closure by Consumers Power QA Services.

1 Pa6e 1 Of 1

i

. Attachment A Route To This Cony For j[ File 16.3.4616.3.6 GSKecley SHHowell ] Issue Date May 22, 1975 N HUSlager UEKessler (2)

\u' Project Midland 1 & 2 CQHills TCCooke

( _ _,/ JMilandin C03SUQ2G FC M File Title NCR's on Fe<bral WFHolub Uonconfomance Constriction & Ouality Cond GLRichardson Report No OF-49 This Nonconfor$an$ PIepo$is Issued To:  !

Prepared By 3s-,.M) f'cE%, Date ~ - 2 2. d Mr. J. F. Newgen Bechtel Project Superintendent Approved Mdd , Date M 22nd Mr. J. P. Connolly Written -[rReque By Date r,_71 Bechtel Project Field Quality Control Engineer Corrective Action Requested By Date r,-79b who is responsible for corrective action.

Nonconfomance Description and Supporting Details: Additional emphasis on concrete tg ing frequencies and locations were expanded beyond Specifications C-208 and C-230, in letter C-208-56 dated March 19, 1975, to U.S. Testing. Item 1 in this letter states in part "The point of record testing for concrete slump, air content, and temperatur@

is at the truck discharge. . .". Item 5 in this letter states " Slump, air content, and temperature tests taken at the batch plant must always be backed-up with a record tee at the truck discharge"'. Contrary to items 1 and 5, no slump or air content tests were taken at the truck discharge for concrete placeme.nt A(589)b, four cubic yards of A-1 mix.

p AEC Reportable Yes No @ See Procedure 9 (For Nuclear Projects Only)

)

Stop Work Necessary Yes No See ProceQ e 16 - Stop Work No

{_'

Recc=nended Corrective Action:

(a) Receive an Engineering evaluation of the accepta-bility of the concrete placed without the record tests being run. The written reply to this itca is requested with the Engineering evaluation.

(b) Implement .the requirements emphasized in Letter C-208-56 to preclude repetition.

1 Corrective Action Taken: The concrete in question has been evaluated and found acceptable by Bechtel Field Engineering. Project Engineering concurs with this evaluation.

l herificationofCorrectiveActionRequired Yes X No

(

bethcdofVerification: Reviewed Bechtel Field Engineering's evaluation of the concrete in question, letter 0-952 to J. P. Connolly from T. C. Valenzano. Also i

reviewed documentation of telephone conversation between Field Engineering and Project Engineering, da.ted June 18, 1975. In this conversation, Project Engineer- l ing is in complete agreement with Field Engineering's evaluation.

1 4

Eonconfomance Closure Confirmed By C ./d

[.

Date %>x>,IH,/925~ l 1

1 1 To be completed at time of closure by Consumers Power OA Services.

Pace 1 of 1

A -

Attachment A

\

' Route To Tnis Copy For fp rile J6.3.6 CSKeeley SHHowell f

I Issue Date June 12. 1975

\. 3 Project Midland 1 & 2

_ HUSlager UEKessler (2) .1

( ) CQHills TCCooke CODT&.E;3 FDET

-[' j JMilandin File Title ~ NCR's on Bechte) Ouel Control T7FHolub Honconfomance GLRichardson Report Ho 0F-50 ouo ect rate This Nonconfomanc;e Report is Issued To: .e Prepared By a. em,dd(_c,.%n.%.,Date

, C - 12 .i Approved ByhMhd((*-,/ Date #d-M'i Mr. J. P. Connolly Bechtel Project Field Quality Control Written ReA k Reques By Date 7-11=

Engineer Corrective Action Requested By Date 7-11=

who is responsible for corrective action.

Honconfomance Description und Supporting Details: Specification C-230 Rev. 5 section 12.2.3a states " Chemical and physical tests will be perfomed by the Contractor on pozzolans during the work as specified in ASTM C311-68, ASTM C618-72, and Technical Specifications 7220-C-208". ASTM C618-72 section 5 states in part, detemine the property in 5.1.11 "Unifomity Requirements (Quantity of Air-Entraining Admixture)"

for every 100 tons of fly ash. Contrary to this requirement, "Unifomity Require-ments (Quantity of Air-Entraining Admixture) has not been determined for any fly ash " User Tests".

AEC Reportable Yes Ho ( See Procedure 9 (For Nuclear Projects Only)

,m y_ (' -

Stop Triork Hecessag Yes no -

See Procedure 16 - Stop Work No

(

Recc::: mended Corrective Action: (a) Receive an Engineering evaluation of the accepta-bility of the fly ash received and used without the required tests above being run.

(b) Take corrective action to preclude repetition. The written reply to this item is requested with the Engineering evaluation.

1 Corrective Action Taken:

Verification of Corrective Action Required Yes Ho O Method of Verification:

(7 ) bionconfomance Closure Confimed By

\

Date 1

To be completed at tine of closure by Consumers Power OA Services.

Pa.ge 1 of1

Attachment A

' Route To 'ihis Cony For f.y File 16.3.6 GSKeeley SHHowell F - Issue Date June 12. 1975 Project Midland 1 & 2 HUSlager UEKessler (2) 4;,.

/ CQHills- TCCooke COMUi:E;3 FDWir File Title NCR's on Bechtel Oual

(\s] JMilandin 1.THolub Nonconfomance Control GLRichardson Report No OF-50 -

aaoseau x21e This Nonconformance Report is Issued To: Prepared By M.eudd. 6,.Eh/t. ,Date f- 12-1 Approved Bybhb(('<,/ Date (INN echtel roj t eld Quality Control Wri ten R h Reques & Date FW Engineer Corrective Action Requested By Date 7-11 who is responsible for corrective action.

Honconfomance Description and Supporting Details: Specification C-230 Rev. 5 section 12.2.3a states " Chemical and physical tests will be perfomed by the Contractor on pozzolans during the work as specified in ASTM C311-68, ASTM C618-72, and Technical S acifications 7220-C-208". ASTM C618-72 section 5 states in part, detemine the property in 5.1.11 "Unifomity Requirements (Quantity of Air-Entraining Admixture)"

for every 100 tons of fly ash. Contrary to this requirement, " Uniformity Require-ments (Quantity of Air-Entraining Admixture) has not been determined for any fly ash " User Tests".

AEC Reportable Yes no O See Procedure 9 (For Nuclear Projects Only) c/ Stop Work Hecessary Yes no - See Procedure 16 - Stop Work No

{' \d ..

Reco:::nended Corrective Action: (a) Receive an Engineering evaluation of the accepta-bility of the fly ash received and used without the required tests above being run.

(b) Take corrective action to preclude repetition. The written reply to this item is requested with the Engineering evaluation.

1 Corrective Action Taken:

l l

1 Verification of Corrective Action Required Ye= 0 No  !

bethodofVerification:

n bionconfomance Closure Confimed By

- (ws ) Date

\ .

3~To be completed at tine of closure by Consumers Power QA Services.

1 Pa.ge 1 of1 l

-( Attachment A Routa To This Copy For . File 16.3.6 Is::ue Date June 23, 1975 GSKeeley SHHowell fl d / Project Midland 1 & 2

'~

1 CQHills WEKessler (2)

T5 HWSlager TCCooke C 3 PD'#3r File T3.tle NCR's on Bechtel Ouality Control (last) WFHolub Konconfomance GLRichardson Report No QF-51

'fnis Honconfomance Report is Issued To: Prepared By (( ~ k Date ( /2 M kS~

J. P. Connolly Approved By j 'dd k Date 4 /z Ukr Bechtel PFQCE WrittenRepIRequeste[ Date 7/23/75 Corrective Action Requested By Date 7/23/%

who is resuonsible for corrective action. l Uonconfomance Description and Supporting Details:

See Attachment A i

AEC Reportable Yes No @ See Procedure 9 (For nuclear Projects only)

,.g Stop Work Hecessary Yes No See Procedure 16 - Stop Work No j

ks)

Recom:nended Corrective Action: -

See Attachment B l

l I

1 Corrective Action Taken:

l l

1 Verification of Corrective Action Required Yes no b4ethod of Verification: l l

l l

- konconfomance Closure Confimed By

') Date

(. (' ..

1 To be completed at time of closure by Consuners Power Q/s Services.

Page 1 of 4

/ Issue-' ate: June 23, 1975

, / , Proj e . . : Midland 1 & 2 File

Title:

NCR's on Bechtel Quality Control

Attachment A to NCR QF-51

(-

Specification C-111 (Q), " Technical Specification for the Erection of the Reactor Building Liner Plate" contains Nondestructive Examination require-ments for the liner plate under Section 9.0 which references Appendix C, Section IX-3300 for radiographic examination techniques.

Section IX-3334.3 " Number of Penetrameters To Be Used," requires that film density through the diagnostic area be from -15% to plus 30% of the density through the penetrameter which is normal to the radiation beam. However, if the density varies by more than these requirements, an additional penetrameter is required for the exceptional area and the density of the diagnostic area may be checked using the density of the second penetrameter. The additional penetra-meter does not need to be normal to the radiation beam.

One hundred radiographic films of liner plate welds were reviewed for compliance with the above requirement. The density check was performed on a Macbeth Qucnta Log Densitometer using calibrated film strip BPC 465 (Certified on 5-15-75, due for recertification on 5-15-76) te calibrate the densitameter.

It was found that fifteen films did not meet '^? luirements of Section IX-3334.3 of Appendix C to the specification.

The films reviewed and the results are listed below:

fw r( "'

) Density Through Density Through w Liner Plate Film Lightest Weld Location Assembly Identification Penetrameter Actual / Allowable on No. Belt C-111-22 734' 2" 6' w L 2.94 2.25/2.49 11-12 2.30/2.49 0-1 736' 3" 4' e (L 2.75 2.09/2.33 11-12 736' 11" 6' edR1 2.45 1.90/2.08 11-12 C-111-31 731' 6" 73" v 4 2.89 2.26/2.45 0-1 C-111-44 603' 6" R8R 2.54 2.0/2.15 0-2 C-lll-48 648' 0" R2 2.70 2.15/2.29 11-12 655' 0" 2.48 2.0/2.11 11-12 643' 0" T 2.60 2.0/2.21 8 640' 0" 2.82 2.25/2.40 11-12 f'~ T 658' 0" 2.44 1.95/2.40 11-12

'~

636' 0" R1 2.63 1.82/2.23 0-1 Page 2 of 4

_L____.

/'

[. File: 16.3.6 ]

Issue Date: June 23, 1975 Proj ect : Midland 1 & 2 File Titla: NCR's on Bechtel

's.

Quality Control

, f

( 's_ /

Attachment A to NCR QF-51 (Contd)

Density Through Density Through Liner Plate Film Lightest Weld Location Assembly Penetrameter Identification Actual / Allowable on No. Belt 2.07/2.23 1-2 2.08/2.23 1-3 637' 0" 2.68 2.03/2.27 0-2 2.20/2.27 11-12 659' 0" 2.28 1.85/2.0 0-2 1.90/2.0 11-12 639' 0" 2.22 1.86/2.0 0-2 1.90/2.0 11-12

, } C-111-107 Scam A 15' S of C, R1

( {v 2.35 1.85/2.0 11-12 1

l

./~'s,

(

xs )

Page 3 of 4

-.-,v -

s r! 16.3.6 j' -

j

~

h -

File Issu [: J' ate:June 23, 1975 7

Proj ect: Midland 1 & 2 '

l File

Title:

NCR's on'Bechtel f"<

Quality-Control i{C)

Attachment B to NCR QF-51 Recommended Corrective Action: ,

-1. -Review all acceptable radiographs 100% for proper density. Review i

is to apply to 100% of Q-list, field weldment radiographs.

2. Provide a justified disposition for each weld represented by a radiograph with unacceptable density.
3. Determine if the radiographs of liner plate welds have fulfilled their purpose as is stated in ' Volume II, Section 5.1.4.1.1 c. of the Midland Plant PSAR.
4. Determine underlying cause of improper densities and take corrective action to preclude recurrence.