Category:ARCHIVE RECORDS
MONTHYEARML20081J6641983-06-29029 June 1983 News Articles Discussing Facility Const Completion Dates ML20081G1011983-06-0808 June 1983 Slide Presentation Entitled, Overview of Midland Independent Design & Const Verification Program, Presented to P Keshishian & G Gower ML20151H3771983-04-22022 April 1983 Record of 830331 Telephone Discussion Re Use of Appropriate ASME Code.Util Proposes to Use App F of 1980 ASME Code for Qualification of Pressurizer Support Lugs Rather than 1968 ASME Code Used for All Other Components ML20079R2391983-03-14014 March 1983 Press Release Discussing Pier 9 Excavation,Divers Working in Pond,Welder Certification Program,Circulating Water Pump Motors Testing,Cable Reinsp & Work Support Evaporator Testing ML20080E6751983-02-24024 February 1983 News Article, Wrongful Discharge Suit Names Consumers, Zack ML20081J7671982-12-28028 December 1982 News Articles Entitled, Test of Emergency Plans at Nuclear Plant Postponed & More Delays Mark Yr for Nuclear Plant Project ML20235B7191982-09-10010 September 1982 Partially Deleted Nonconformance Rept of Welding at Plant. Socket Welds Found to Be Below Listed Requirements Should Be Processed in Listed Manner ML20081J8251982-08-19019 August 1982 Midland Review, Vol 1,Number 39.Supporting Documentation Encl ML20094H4851982-07-13013 July 1982 Audit Rept M01-602-2 Re Audit Conducted at Zack Co on 820517-20 ML20094H4901982-05-14014 May 1982 Audit Rept M0-601-2 Re Audit Conducted of Zack Co on 820419- 22 to Verify Zack Co Compliance W/Program Requirements as Defined in Zack QA Manual,Plant QC Procedures & Weld Procedure Specs.Related Info Encl ML20126L9691981-05-18018 May 1981 Telcon on 810518 W/Util & Vendor Re Permanent Plant Dewatering ML20004E0361981-04-30030 April 1981 Selected Viewgraphs from 810430 Meeting ML20004F2481981-04-15015 April 1981 Slide Presentation Entitled Fire Protection Design. ML19347D0271981-03-0505 March 1981 Slide Presentation Re Final Design Review Presentation at 810326 Meeting of Util Design Review Board.Responses to NRC Questions Encl ML20062K9881980-12-0505 December 1980 Viewgraphs Presented at 801205 Meeting ML19345B7121980-10-29029 October 1980 Slide Presentation for 801029 Meeting Re Operator Training & Qualification ML19351G2371980-08-29029 August 1980 Slide Presentation for 800829 Meeting in Midland,Mi Re Request for Relief from NRC Position Requiring Addl Borings & Tests of Plant Fill ML20125B8061979-11-15015 November 1979 Audit on 791105-15 of Small Pipe Design & Stress Groups, Including QA Findings.Qa Requests,Mgt Corrective Action Repts,Nonconformance Repts & Other Supporting Documentation Encl ML19252A0371979-09-25025 September 1979 Nonconformance Rept for Aug 1979.Rept Consists of Bechtel Nonconformance Repts & Log,Status Book,Qa Discrepancy Repts, Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19263C7611979-02-22022 February 1979 Monthly Nonconformance Rept for Jan 1979 ML20197D3691978-11-22022 November 1978 Nonconformance Rept for Oct 1978.Rept Consists of Bechtel Nonconformance Repts & Log,Status Book,Qa Discrepancy Repts, Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329G3461978-10-25025 October 1978 Nonconformance Rept for Sept 1978 Consisting of Nonconformance Rept Log on Open Items,Quality Action Requests,B&W Repts of Nonconformity & Util Nonconformance Repts Written or Closed During Month ML19331A2621978-07-31031 July 1978 Nonconformance Rept for Jul 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F0551978-06-30030 June 1978 Nonconformance Rept for June 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F0221978-05-31031 May 1978 Nonconformance Rept for May 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E8831978-04-30030 April 1978 Nonconformance Rept for Apr 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2291978-03-31031 March 1978 Nonconformance Rept for Mar 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F1901978-02-28028 February 1978 Nonconformance Rept for Feb 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F1891978-01-31031 January 1978 Nonconformance Rept for Jan 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2141977-12-31031 December 1977 Nonconformance Rept for Dec 1977.rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2421977-12-31031 December 1977 Nonconformance Rept for Dec 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5211977-12-31031 December 1977 Nonconformance Rept 19 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Oct-Dec 1977.Resumes of Bechtel Corp & Util Engineers Encl ML19329E8871977-11-30030 November 1977 Nonconformance Rept for Nov 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F0311977-10-31031 October 1977 Nonconformance Rept for Oct 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformane Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings Mgt Corrective Action Repts Written or Closed During Month ML19329F0181977-09-30030 September 1977 Nonconformance Rept for Sept 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5491977-09-30030 September 1977 Nonconformance Rept 18 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Jul-Sept 1977.Resumes of Bechtel Corp & Util Engineers Encl ML19329E9401977-08-31031 August 1977 Nonconformance Rept for Aug 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2331977-07-31031 July 1977 Nonconformance Rept for Jul 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5091977-06-30030 June 1977 Nonconformance Rept 17 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Apr-June 1977. Resumes of Bechtel Corp & Util Engineers Encl ML19329E8801977-05-31031 May 1977 Nonconformance Rept for May 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2631977-04-30030 April 1977 Nonconformance Rept for Mar & Apr 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book,Qa Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Months ML19329F5621977-03-31031 March 1977 Nonconformance Rept 16 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Jan - Mar 1977.Resumes of Bechtel Corp & Util Engineers Encl ML19331A2281977-02-28028 February 1977 Nonconformance Rept for Feb 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E9051977-01-31031 January 1977 Nonconformance Rept for Jan 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5571976-12-31031 December 1976 Nonconformance Rept 15 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Oct - Dec 1976.Resumes of Bechtel Corp & Util Engineers Encl ML19329E8851976-11-30030 November 1976 Nonconformance Rept for Nov 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E9201976-10-31031 October 1976 Nonconformance Rept for Oct 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Finding & Mgt Corrective Corrective Action Repts Written or Closed During Month ML19329E9921976-09-30030 September 1976 Nonconformance Rept for Sept 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5531976-09-30030 September 1976 Nonconformance Rept 14 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Jul - Sept 1976.Resumes of Bechtel Corp & Util Engineers Encl ML19329E9721976-08-31031 August 1976 Nonconformance Rept for Aug 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month 1983-06-08
[Table view] Category:PHOTOGRAPHS & SLIDES
MONTHYEARML20081G1011983-06-0808 June 1983 Slide Presentation Entitled, Overview of Midland Independent Design & Const Verification Program, Presented to P Keshishian & G Gower ML20004E0361981-04-30030 April 1981 Selected Viewgraphs from 810430 Meeting ML20004F2481981-04-15015 April 1981 Slide Presentation Entitled Fire Protection Design. ML19347D0271981-03-0505 March 1981 Slide Presentation Re Final Design Review Presentation at 810326 Meeting of Util Design Review Board.Responses to NRC Questions Encl ML20062K9881980-12-0505 December 1980 Viewgraphs Presented at 801205 Meeting ML19345B7121980-10-29029 October 1980 Slide Presentation for 801029 Meeting Re Operator Training & Qualification ML19351G2371980-08-29029 August 1980 Slide Presentation for 800829 Meeting in Midland,Mi Re Request for Relief from NRC Position Requiring Addl Borings & Tests of Plant Fill 1983-06-08
[Table view] |
Text
. .
s.
ENCLCSURE 2 VIEWGRAPH SLIDES USED DURING 12/5/80 MEETING 810110 0 NOT
' o ,-
Enclosure 1 ATTENDEES December 5, 1980 Name Organization / Position Darl Hood DPM/NRR Lic. Proj. Mgr.
Edward N. Levine Weston Geophysical Richard Holt Weston Geophysical Dennis M. Budzik Consumers Power Co.
Zenon Cybriwsky Weston Geophysical J. W. Cook Consumers Power Co.
R. C. Bauman Consumers Power Co.
T. E. Johnson Bechtel/ Chief Civil R. P. Kennedy Struct. Mechanics Assoc.
F. Rinaldi NRC/NRR/SEB George C. Klimkiewicz Weston Geophysical Corp.
Joseph Kane* NRR/HGEB/GES George Lear
- NRR/HGEB Leon Reiter* NRC/GSB Jeff Kimball NRC/GSB R. E. Jackson NRC/GSB B. Dhar Bechtel/ Midland Civil T. R. Thiruvengadam Consumers Power Co./ Civil Engineering Dinesh C. Gupta NRR/HGEB/GES John P. Matra, Jr. NSWC
4 l
cc: Commander, Naval Surface Weapons Center ATTN: P. C. Huang G-402 White Oak i
Silver Spring, fdaryland 20910 4
Mr. L. J. Auge, Manager Facility Design Engineering i Energy Technology Engineering Center P. O. Box 1449 Canega Park, California 91304 3
Mr. William Lawhead
- U. S. Corps of Engineers I!CEED - T 7th Flecr a77 fiichican Aver.ue 1 Detroit, Michigan 48225 a
Charles Dechhcefer, Esc.
Atcmic Safety & Licensing Scard
- U. S. Iuclear Regulatory Commission Hashington, D. C. 20555
]
) Mr. Gustave A. Linenberger 4
Atcmic Safety & Licensing Ecard U. S. Nuclear Regulatory Commission j Pashingten, D. C 20555 Dr. Frederick P. Cowan 1 Apt. B-125 6125 N. Verde Trail Eoca Raton, Florida 33433 4
E e
I e
4 e
e
l l
I
- Mr. J. W. Cook Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 l'
cc: Michael I. Miller, Esq. Mr. Don van Farowe, Chief Ronald G. Zamarin, Esq. Division of Radiological Health Alan S. Farnell, Esq. Department of Public Health Isham, Lincoln & Beale P.O. Box 33035 -
Suite 4200 Lansing, Michigan 48909
- 1 First National Plaza Chicago, Illinois 60603 William J. Scanlon, Esq, James E. Brunner, Esq. 2034 Pauline Boulevard Consumers Power Company Ann Arbor, Michigan 48103 212 West Michigan Avenue Jackson, Michigan 49201 U. S. Nuclear Regulatory Cc=nission Resident Inspectors Office -
Myron M. Cherry, Esq. Route 7 1 IBM Plaza Midland, Michigan 48640 Chicago, Illinois 60611 Ms. Mary Sinclair Ms. Barbara Stamiris 5711 Summerset Drive 5795 N. River Midland, Michigan 48640 Freeland, Michigan 4P623 :
Frank J. Kelley, Esq. Ms. Sharon K. Warren Attorney General 636 Hillcrest State of Michigan Environmental Midland, Michigan 48640 i Protection Division 720 Law Building I' Lansing, Michigan 48913 .'
Mr. Wendell Marshall Route 10 Midland, Michigan 48640 -
Mr. Steve Gadler 2120 Carter Avenue St. Paul, Minnesota 55108 O
i
-es
l DEC 2 21980 MEETING SUMIMRY DISTRIBUTION Docket File G. Lear ,
flRC PDR V. I;oonan '
Local PDR S. Pawlicki TIC /t; SIC / Tera V. Benaroya NRR Reading Z. Rosztoczy LBii 3 Reading W. Haass H. Denton D. f*uller .-
E. Case R. Ballard '
y D. Eisenhut W. Regan c_.
P.. Purple D. Ross EE )
- 8. J. Ycungbiccd P. Check :
A. Schwencer R. Satterfield e ;
- ?i. ;; l F. Miraglia 0. Parr E;qi, J.'jj J. Miller 3 !
F. Rosa 3) e=
G. Lainas W. Butler d o 'S R. Vollmer W. Kreger C co j J. P. Knight R. Ifouston ~
R. Bosnak T. Murphy F. Schauer L. Rubenstein R. E. Jackson T. Speis Project Manager D. Hood W. Johnston Attorney, OELD J. Stolz J. Lee S. Hanauer 0IE (3) W. Ccmmill ACRS (16) T. fturley R. Tedesco F. Schroeder {
D.-Skovholt M. Ernst NRC Particioants: R. Baer C. Berlinger F. Rinaldi K. Kniel J. Kane G. Knighton G. Lear A. Thadani L. Reiter D. Toneli J. Kimball J. Kramer R. Jackson D. Vassallo D. C. Gupta
. P. Collins D. Ziemann bcc: Applicant & Service List O
r a D D s#
The NRC staff caucused briefly after the presentations and then requested that the applicant document the presentations presented for the docket record. The staff also recommended the following to the applicant and its consultants, to be considered in the submittal to be reviewed by the staff:
- 1. The submittal should indicate to what degree Consumers Power intends for the staff to use the probability study (i.e., to a limited extent such as was the case for Sequoyah, or to some broader application?).
If this is intended to be used with some weight in the staff review, then considerably more emphasis will need to be placed on sensitivity studies.
- 2. The staff suggested that the applicant perform theoretical studies on possible ground motion amplification through the plant fill tc compare with the proposed site specific response spectra for the Diesel Generator Building.
- 3. The staff raised concerns that the consultants site specific response spectra for a soil site matches the Livermore rock data set for the same magnitude and distance range. Weston Geophysical noted its intent to look into this further.
- 4. The applicant was asked to discuss the choice of both site stations and specific earthquakes used for the real time histories with the NRC staff.
Mr. R. Jackson of the NRC staff expressed his belief that the studies presented by the applicant represent a significant step forward in resolving this matter and that the additional work suggested during this meeting is needed to conclude this open item. He further suggested that a follow-up meeting one month after receipt of the above submittal would be appropriate.
s . ,
Darl Hood, Project Manager Licensing Branch #3 Division of Licensing
Enclosures:
As stated 4
, O DEC 2 21980 Mr. Holt presented figures showing the regional seismic picture both in the Central U. S. and the Michigan area in particular. Mr. Holt stated that he feels strongly that the Midland site could easily be l characterized by a magnitude 5.0 earthquake; however for conservatism, a 5.3 magnitude will be used as suggested by the NRC staff. Mr. Holt also noted that a magnitude 5.3 earthquake is larger than any which has :
occurred within 300 miles of the Midland site. He then introduced other Weston personnel who prasented various stages of Weston's work as discussed below.
The site specific response spectra approach was discussed in terms of recording site conditions and applicable earthquake records. Weston atterroted to match the shear velocity profile at the Midland site to accelerograph recording sites in the U. S. and Italy. Weston showed tables of collected earthquake data matching the requested magnitude and epicentral distance. Two sets of site specific data were collected, one for the Diesel Generator Building and one for seismic Category I structures founded partially upon the glacial till. Both the mean and 84th percentile real time history response spectra were shown compared to the modified Housner spectra. The staff raised the following questions and cor: erns about Weston's work:
- 1. Are there enough recording sites and earthquakes to developed different real time response spectra for different buildings at the Midland site?
- 2. Do the sites which were used in the real time collection have similar impedance contrasts to the Midland site?
- 3. Has Weston used all available data, and should not certain records uwJ be left out? j
- 4. Why does the 84th percentile for a soil site matc5 the collected Livermore rock data set at the 84th percentiles for the same magnitude and distance range? Particular interest is on the approximate resonant frequency of the upper 30 to 50 feet of {
the glacial till.
- 5. What response spectra are intended for seismic Category I structures and components other than the Diesel Generator Building, Containments, Auxiliary Building and Service Water Pump Structure?
Weston Geophysical also presented a probabilistic seismic hazards assess-ment (i.e. , probability study) for the Midland site. Input parameters included various earthquake source zones, upper magnitude cutoff for each zone, ground motion attenuation relationships and earthquake recurrence rates for each source zone. The results indicated that the annual probability of a Modified Mercalli within the range of 10'{ntensit to 10 MMI-VII seismic event was approximately
-