Record of 830331 Telephone Discussion Re Use of Appropriate ASME Code.Util Proposes to Use App F of 1980 ASME Code for Qualification of Pressurizer Support Lugs Rather than 1968 ASME Code Used for All Other ComponentsML20151H377 |
Person / Time |
---|
Site: |
Midland |
---|
Issue date: |
04/22/1983 |
---|
From: |
Mark Miller Office of Nuclear Reactor Regulation |
---|
To: |
|
---|
References |
---|
NUDOCS 8305040030 |
Download: ML20151H377 (3) |
|
|
---|
Category:ARCHIVE RECORDS
MONTHYEARML20094J5411984-07-18018 July 1984 Design Audit on 820728 of Auxiliary Bldg & Svc Water Pumping Structure.Diesel Generator Bldg Structural Analysis for Settlement,Bearing Capacities & Summary of 820721 Meeting W/ CPC Encl ML20094K3941983-06-30030 June 1983 Handwritten Record of Conference Call on 830630 W/Cpc, Bechtel,Nrc & Gei Re Drilling at Cast Hole in Top of Pier ML20081J6641983-06-29029 June 1983 News Articles Discussing Facility Const Completion Dates ML20081G1011983-06-0808 June 1983 Slide Presentation Entitled, Overview of Midland Independent Design & Const Verification Program, Presented to P Keshishian & G Gower ML20151H3771983-04-22022 April 1983 Record of 830331 Telephone Discussion Re Use of Appropriate ASME Code.Util Proposes to Use App F of 1980 ASME Code for Qualification of Pressurizer Support Lugs Rather than 1968 ASME Code Used for All Other Components ML20094G3561983-03-15015 March 1983 Presentation of Const Project Evaluation of Consumers Power Co,Midland Energy Ctr Project,Units 1 & 2. Handwritten Notes Re Gap Discovery Request & Nonconformance Rept Encl ML20079R2391983-03-14014 March 1983 Press Release Discussing Pier 9 Excavation,Divers Working in Pond,Welder Certification Program,Circulating Water Pump Motors Testing,Cable Reinsp & Work Support Evaporator Testing ML20080E6751983-02-24024 February 1983 News Article, Wrongful Discharge Suit Names Consumers, Zack ML20091F6051983-02-0808 February 1983 Presentation Entitled Midland Idvp for Auxiliary Feedwater Sys & Another Sys to Be Determined, Presented at 830208 Meeting.W/Oversize Chart Re Working Schedule for Const Completion Program.Aperture Card Available in PDR ML20081J7671982-12-28028 December 1982 News Articles Entitled, Test of Emergency Plans at Nuclear Plant Postponed & More Delays Mark Yr for Nuclear Plant Project ML20235B7191982-09-10010 September 1982 Partially Deleted Nonconformance Rept of Welding at Plant. Socket Welds Found to Be Below Listed Requirements Should Be Processed in Listed Manner ML20081J8251982-08-19019 August 1982 Midland Review, Vol 1,Number 39.Supporting Documentation Encl ML20094H4851982-07-13013 July 1982 Audit Rept M01-602-2 Re Audit Conducted at Zack Co on 820517-20 ML20024A1721982-07-12012 July 1982 Telcon W/B Garde,Govt Accountability Project on 820624 Re Allegations Concerning QA Program at Zack Co.Personally Indentifiable Info Deleted ML20094H4901982-05-14014 May 1982 Audit Rept M0-601-2 Re Audit Conducted of Zack Co on 820419- 22 to Verify Zack Co Compliance W/Program Requirements as Defined in Zack QA Manual,Plant QC Procedures & Weld Procedure Specs.Related Info Encl ML20094J3971982-03-26026 March 1982 Telcon W/Applicant & Bechtel on 820326 Re Adoption of Soil Spring Constants,Settlement Monitoring During Svc Water Structure Underpinning & Const Dewatering ML20091P3011982-03-12012 March 1982 Telcon W/Bechtel,Util & NRC on 820312 Re Remedial Soils Work ML20090B3881982-01-12012 January 1982 Slide Presentation Entitled Midland Project QA Organizational Change, Presented at 820112 Meeting in Glen Ellyn,Il ML20009A3421981-07-0606 July 1981 Summary of 810624 Telcons W/Util & G Keeley Re Monitoring Program Planned for Surcharging of Valve Pit Portion of Borated Water Storage Tank Foundation & Diesel Generator Bldg Lab Test Schedule,Respectively ML20126L9691981-05-18018 May 1981 Telcon on 810518 W/Util & Vendor Re Permanent Plant Dewatering ML20004E0361981-04-30030 April 1981 Selected Viewgraphs from 810430 Meeting ML20094H9671981-04-20020 April 1981 Provides Structural Audit on 810420 for Reactor Vessel Support Sys ML20004F2481981-04-15015 April 1981 Slide Presentation Entitled Fire Protection Design ML19347D0271981-03-0505 March 1981 Slide Presentation Re Final Design Review Presentation at 810326 Meeting of Util Design Review Board.Responses to NRC Questions Encl ML20062K9881980-12-0505 December 1980 Viewgraphs Presented at 801205 Meeting ML19345B7121980-10-29029 October 1980 Slide Presentation for 801029 Meeting Re Operator Training & Qualification ML20094K1241980-10-0303 October 1980 Telcon W/J Linsley on 801003 Re R Vollmer Decision on Applicant Appeal for Relief from Original 18 Borings ML19351G2371980-08-29029 August 1980 Slide Presentation for 800829 Meeting in Midland,Mi Re Request for Relief from NRC Position Requiring Addl Borings & Tests of Plant Fill ML20125B8061979-11-15015 November 1979 Audit on 791105-15 of Small Pipe Design & Stress Groups, Including QA Findings.Qa Requests,Mgt Corrective Action Repts,Nonconformance Repts & Other Supporting Documentation Encl ML19252A0371979-09-25025 September 1979 Nonconformance Rept for Aug 1979.Rept Consists of Bechtel Nonconformance Repts & Log,Status Book,Qa Discrepancy Repts, Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19263C7611979-02-22022 February 1979 Monthly Nonconformance Rept for Jan 1979 ML20095A0681978-11-29029 November 1978 News Article Re Bldg for Backup Unit at Nuclear Plant Sinking.Sinking Caused by 20 Ft Rise in Local Water Table ML20197D3691978-11-22022 November 1978 Nonconformance Rept for Oct 1978.Rept Consists of Bechtel Nonconformance Repts & Log,Status Book,Qa Discrepancy Repts, Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329G3461978-10-25025 October 1978 Nonconformance Rept for Sept 1978 Consisting of Nonconformance Rept Log on Open Items,Quality Action Requests,B&W Repts of Nonconformity & Util Nonconformance Repts Written or Closed During Month ML19331A2621978-07-31031 July 1978 Nonconformance Rept for Jul 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F0551978-06-30030 June 1978 Nonconformance Rept for June 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F0221978-05-31031 May 1978 Nonconformance Rept for May 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E8831978-04-30030 April 1978 Nonconformance Rept for Apr 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2291978-03-31031 March 1978 Nonconformance Rept for Mar 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F1901978-02-28028 February 1978 Nonconformance Rept for Feb 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F1891978-01-31031 January 1978 Nonconformance Rept for Jan 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2421977-12-31031 December 1977 Nonconformance Rept for Dec 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2141977-12-31031 December 1977 Nonconformance Rept for Dec 1977.rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5211977-12-31031 December 1977 Nonconformance Rept 19 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Oct-Dec 1977.Resumes of Bechtel Corp & Util Engineers Encl ML19329E8871977-11-30030 November 1977 Nonconformance Rept for Nov 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F0311977-10-31031 October 1977 Nonconformance Rept for Oct 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformane Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings Mgt Corrective Action Repts Written or Closed During Month ML19329F0181977-09-30030 September 1977 Nonconformance Rept for Sept 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5491977-09-30030 September 1977 Nonconformance Rept 18 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Jul-Sept 1977.Resumes of Bechtel Corp & Util Engineers Encl ML19329E9401977-08-31031 August 1977 Nonconformance Rept for Aug 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2331977-07-31031 July 1977 Nonconformance Rept for Jul 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month 1984-07-18
[Table view] Category:TELEPHONE OR VERBAL CONVERSATION RECORD
MONTHYEARML20094K3941983-06-30030 June 1983 Handwritten Record of Conference Call on 830630 W/Cpc, Bechtel,Nrc & Gei Re Drilling at Cast Hole in Top of Pier ML20151H3771983-04-22022 April 1983 Record of 830331 Telephone Discussion Re Use of Appropriate ASME Code.Util Proposes to Use App F of 1980 ASME Code for Qualification of Pressurizer Support Lugs Rather than 1968 ASME Code Used for All Other Components ML20024A1721982-07-12012 July 1982 Telcon W/B Garde,Govt Accountability Project on 820624 Re Allegations Concerning QA Program at Zack Co.Personally Indentifiable Info Deleted ML20094J3971982-03-26026 March 1982 Telcon W/Applicant & Bechtel on 820326 Re Adoption of Soil Spring Constants,Settlement Monitoring During Svc Water Structure Underpinning & Const Dewatering ML20091P3011982-03-12012 March 1982 Telcon W/Bechtel,Util & NRC on 820312 Re Remedial Soils Work ML20009A3421981-07-0606 July 1981 Summary of 810624 Telcons W/Util & G Keeley Re Monitoring Program Planned for Surcharging of Valve Pit Portion of Borated Water Storage Tank Foundation & Diesel Generator Bldg Lab Test Schedule,Respectively ML20126L9691981-05-18018 May 1981 Telcon on 810518 W/Util & Vendor Re Permanent Plant Dewatering ML20094K1241980-10-0303 October 1980 Telcon W/J Linsley on 801003 Re R Vollmer Decision on Applicant Appeal for Relief from Original 18 Borings 1983-06-30
[Table view] |
Text
,
. V, W
x,,o DISTRIBUTION _: _.
rDocket Nos.,50-329/330.4cm April 22, 1983 NRC PDR Local PDR Docket tios: 50-329 LB #4 r/f and 50-333 EAdensam DHood fHiller TNovak APPLICANT: Consumers Power Company
- 40uncan JSniezak: I&E FACILITY:
Midland Plant, Units 1 and 2 JStone: I&E ACRS (16)
SUBJECT:
RECORD OF TELEPHONE DISCUSSION REGARDING USE OF APPRCPRIATE ASME CODE A telephone conversation was held on March 31, 1983, from 2:00 - 2:30 p.m. with Ernie Koepke, llarry Daykins and Bruce Henley of Consn:ners Powar Corapany; Randy Howard, Bob Lide, Bill Gray, Harry Harrison and Tom Helms of Babcock and Wilcox; Henry Flecht of Energy Technology Enoineering Center; and Melanie Miller and Jai Rajan of the !!RC.
Consumers proposes to use Appendix F of the 1980 ASME Code (approved February 1, 1982 by the llRC) for qualification of the pressurizer support lugs rather than the 1968 ASME Code which is being used for all other components. The purpose of the call was to notify the flRC of the proposed change.Section III Subsection
!!CA Article 1140 of the ASME Code requires approval of the enforcement authority.
Consumers indicated that the change would be documented formally in July 1983 in their FSAR amendment package.
/
Melanie A. Miller, Project Manager Licensing Branch !!o. 4 Division of Licensing cc:
See next page 8305040030 830422 PDR ADOCK 05000329 A
PDR 0..i.4..
omen.DL
.DuLa.y....
p sua - m a ac.
o H ood......y....
....EAd nsam...
4L&L83......
4L.WL83.......
. 4/2ll83..
w pac rosu sia no-so3 nacu mo OFFICIAL RECORD COPY usom u-amm
MIDLAND Mr. J. W. Cook Vice President Consumers Power Company 1945 West Parnall Road Jackson, Micnigan 49201 cc: Michael I. Miller, Esq.
Mr. Don van Farrowe, Chief i
Ronald G. Zamarin, Esq.
Division of Radiological Health Alan S. Farnell, Esq.
Department of Public Health Isham, Lincoln & Beale P.O. Box 33035 Three First National Plaza, Lansing, Michigan 48909 Sist floor
- Chicago, Illinois 60602 Mr. Steve Gadler 2120 Carter Avenue James E. Brunner, Esq.
St. Paul, Minnesota 55108 Consumers Power Company 212 West Michigan Avenue U.S. Nuclear Regulatory Commission Jackson, Michigan 49201 Resident Inspectors Office Route 7 Ms. Mary Sinclair Midland, Michigan 48640 5711 Summerset Drive Midland, Michigan 48640 Ms. Barbara Stamiris 5795 N. River Stewart H. Freeman Freeland, Michigan t*862'3 Assistant Attorney General State of Michigan Environmental Mr. Paul A. Perry, Secretary Prctection Division Consumers Power Company 720 Law Building.-
212 W. Michigan Avenue Lansing, Michigan 48913 Jackson, Michigan 49201 Mr. Wendell Marshall Mr. Walt Apley Route 10 c/o Mr. Max Clausen Midland, Michigan 48640 Battelle Pacific North West Labs (PNWL)
Battelle Blvd.
Mr. Roger W. Huston SIGMA IV Building Suite 220 Richland, Washington 99352 7910 Woodmont Avenue l
Bethesda, Maryland 20814 Mr. I. Charak, Manager j
NRC Assistance Project Mr. R. B. Borsum Argonne National Laboratory Nuclear Power Generation Division 9700 South Cass Avenue Babcock & Wilcox Argonne, Illinois 60439 7910 Woodmont Avenue, Suite 220 Bethesda, Maryland 20814 James G. Keppler, Regional Administrator U.S. Nuclear Regulatory Commission, Cherry & Flynn Region III Suite 3700 739 Roosevelt Road Three First National Plaza Glen Ellyn, Illinois 60137 Chicago, Illinois 60602
Mr. J. W. Cook cc: Lee L. Bishop Harmon & Weiss 1725 I Street, N.W., Suite 506 Washington, D. C.
20006 Mr. Ron Callen Michigan Public Service Commission 6545 Mercantile Way P.O. Box 30221 Lansing, Michigan 48909 Mr. Paul Rau Midland Daily News 124 Mcdonald Street Midland, Michigan 48640 Billie Pirner Garde Director, Citizens Clinic for Accountable Government Government Accountability Project Institute for Policy Studies 1901 Que Street, N.W.
Washington, D. C.
20009 Mr. Howard Levin, Project Manager TERA Corporation 7101 Wisconsin Avenue Bethesda, Maryland 20814 Ms. Lynne Bernabei Government Accountability Project 1901 Q Street, N.W.
Washington, D. C.
20009 9
- - - - -