ML19329F022 | |
Person / Time | |
---|---|
Site: | Midland |
Issue date: | 05/31/1978 |
From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | |
References | |
ALAB-106, NUDOCS 8006190810 | |
Download: ML19329F022 (376) | |
Similar Documents at Midland | |
---|---|
Category:ARCHIVE RECORDS
MONTHYEARML20093N5471984-07-18018 July 1984
[Table view]Lists Questions Asked of Util During FSAR & 10CFR50.54(f) Review,Including Questions Re Geological & Seismological Matters & Intake & Discharge Structures for Svc Water Sys ML20094J5411984-07-18018 July 1984 Design Audit on 820728 of Auxiliary Bldg & Svc Water Pumping Structure.Diesel Generator Bldg Structural Analysis for Settlement,Bearing Capacities & Summary of 820721 Meeting W/ CPC Encl ML20093N6981984-07-18018 July 1984 Question Re Discrepancy in Magnitude of Loading Stress on Fig 2 of 800914 Rept & Info on Tables 4-1A & 2.5-14 ML20094K3941983-06-30030 June 1983 Handwritten Record of Conference Call on 830630 W/Cpc, Bechtel,Nrc & Gei Re Drilling at Cast Hole in Top of Pier ML20081J6641983-06-29029 June 1983 News Articles Discussing Facility Const Completion Dates ML20081G1011983-06-0808 June 1983 Slide Presentation Entitled, Overview of Midland Independent Design & Const Verification Program, Presented to P Keshishian & G Gower ML20151H3771983-04-22022 April 1983 Record of 830331 Telephone Discussion Re Use of Appropriate ASME Code.Util Proposes to Use App F of 1980 ASME Code for Qualification of Pressurizer Support Lugs Rather than 1968 ASME Code Used for All Other Components ML20094G3561983-03-15015 March 1983 Presentation of Const Project Evaluation of Consumers Power Co,Midland Energy Ctr Project,Units 1 & 2. Handwritten Notes Re Gap Discovery Request & Nonconformance Rept Encl ML20094G3891983-03-15015 March 1983 Presentation on Const Project Evaluation on CPC Midland Energy Ctr Project,Units 1 & 2 ML20079R2391983-03-14014 March 1983 Press Release Discussing Pier 9 Excavation,Divers Working in Pond,Welder Certification Program,Circulating Water Pump Motors Testing,Cable Reinsp & Work Support Evaporator Testing ML20080E6751983-02-24024 February 1983 News Article, Wrongful Discharge Suit Names Consumers, Zack ML20091F6051983-02-0808 February 1983 Presentation Entitled Midland Idvp for Auxiliary Feedwater Sys & Another Sys to Be Determined, Presented at 830208 Meeting.W/Oversize Chart Re Working Schedule for Const Completion Program.Aperture Card Available in PDR ML20094J2911983-01-11011 January 1983 Telcon W/Cpc,Bechtel Corp & Geotechnical Engineers,Inc on 830111 to Discuss Background Settlement Readings for Auxiliary Bldg Underpinning ML20081J7671982-12-28028 December 1982 News Articles Entitled, Test of Emergency Plans at Nuclear Plant Postponed & More Delays Mark Yr for Nuclear Plant Project ML20235B7191982-09-10010 September 1982 Partially Deleted Nonconformance Rept of Welding at Plant. Socket Welds Found to Be Below Listed Requirements Should Be Processed in Listed Manner ML20081J8251982-08-19019 August 1982 Midland Review, Vol 1,Number 39.Supporting Documentation Encl ML20094H4851982-07-13013 July 1982 Audit Rept M01-602-2 Re Audit Conducted at Zack Co on 820517-20 ML20024A1721982-07-12012 July 1982 Telcon W/B Garde,Govt Accountability Project on 820624 Re Allegations Concerning QA Program at Zack Co.Personally Indentifiable Info Deleted ML20094H4901982-05-14014 May 1982 Audit Rept M0-601-2 Re Audit Conducted of Zack Co on 820419- 22 to Verify Zack Co Compliance W/Program Requirements as Defined in Zack QA Manual,Plant QC Procedures & Weld Procedure Specs.Related Info Encl ML20094J3971982-03-26026 March 1982 Telcon W/Applicant & Bechtel on 820326 Re Adoption of Soil Spring Constants,Settlement Monitoring During Svc Water Structure Underpinning & Const Dewatering ML20093P1451982-03-12012 March 1982 Telcon on 820312 Re Future Util Submittal of Info on Results of Liquefaction Studies.Results of Afifi Evaluation of Liquefaction Mailed to Hadala & Will Be Available for Review During Mar 1982 Design Audit ML20094P3011982-03-12012 March 1982 Telcon Call Between Bechtel,Cpc & NRC on 820312 Re Remedial Soils Work ML20091P3011982-03-12012 March 1982 Telcon W/Bechtel,Util & NRC on 820312 Re Remedial Soils Work ML20090B3881982-01-12012 January 1982 Slide Presentation Entitled Midland Project QA Organizational Change, Presented at 820112 Meeting in Glen Ellyn,Il ML20038A8951981-10-30030 October 1981 Record of 811030 Telcon W/Util,Bechtel & Corps of Engineers Re Remedial Underpinning of Auxiliary Bldg & Feedwater Isolation Valve Pits ML20009A3421981-07-0606 July 1981 Summary of 810624 Telcons W/Util & G Keeley Re Monitoring Program Planned for Surcharging of Valve Pit Portion of Borated Water Storage Tank Foundation & Diesel Generator Bldg Lab Test Schedule,Respectively ML20126L9691981-05-18018 May 1981 Telcon on 810518 W/Util & Vendor Re Permanent Plant Dewatering ML20004E0361981-04-30030 April 1981 Selected Viewgraphs from 810430 Meeting ML20094J5961981-04-21021 April 1981 Telcon W/R Erickson on 810421 Re Discovery of Hole Near Diesel Generator Bldg ML20094H9671981-04-20020 April 1981 Provides Structural Audit on 810420 for Reactor Vessel Support Sys ML20094J5691981-04-20020 April 1981 Telcon W/B Stamiris on 810420 Re Conservativeness of Consultant Suggestion to Use Grating Instead of Compacted Fill & Slab,Change in NRC Position on Ae Design & FSAR Requirements ML20004F2481981-04-15015 April 1981 Slide Presentation Entitled Fire Protection Design ML20003E3061981-03-24024 March 1981 Telcon on 810320 W/G Keeley (CPC) Re Soil Borings Schedule Per Util Decision to Authorize Soils Borings & Testing Requested by NRC & Army Corps of Engineers ML19347D0271981-03-0505 March 1981 Slide Presentation Re Final Design Review Presentation at 810326 Meeting of Util Design Review Board.Responses to NRC Questions Encl ML20062K9881980-12-0505 December 1980 Viewgraphs Presented at 801205 Meeting ML19345B7121980-10-29029 October 1980 Slide Presentation for 801029 Meeting Re Operator Training & Qualification ML20094K1241980-10-0303 October 1980 Telcon W/J Linsley on 801003 Re R Vollmer Decision on Applicant Appeal for Relief from Original 18 Borings ML19351G2371980-08-29029 August 1980 Slide Presentation for 800829 Meeting in Midland,Mi Re Request for Relief from NRC Position Requiring Addl Borings & Tests of Plant Fill ML20094K1131980-07-0707 July 1980 Telcon W/G Keeley on 800707 Re Previous Telcon Request of a Schwencer to Clarify NRC Concerning Overlapping Safety Evaluations ML19320B5951980-05-23023 May 1980 Viewgraph Slides Used During 800523 Presentations ML20094K2921980-03-0404 March 1980 Telcon W/N Gehring of Geotechnical Engineering,Inc on 800304 Re Future Direction of Facility Review Effort.Summary of Questions Re Dewatering Encl ML19329F3111979-12-0606 December 1979 Notifies That 791206 Order Has Been Issued to Util Suspending Remedial Work Re Substandard Soil & Fill Beneath safety-related Structures & Sys.Order Effective Until Soil & Fill Inadequacy Correction Plans Approved ML20125B8061979-11-15015 November 1979 Audit on 791105-15 of Small Pipe Design & Stress Groups, Including QA Findings.Qa Requests,Mgt Corrective Action Repts,Nonconformance Repts & Other Supporting Documentation Encl ML19252A0371979-09-25025 September 1979 Nonconformance Rept for Aug 1979.Rept Consists of Bechtel Nonconformance Repts & Log,Status Book,Qa Discrepancy Repts, Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19263C7611979-02-22022 February 1979 Monthly Nonconformance Rept for Jan 1979 ML20095A0681978-11-29029 November 1978 News Article Re Bldg for Backup Unit at Nuclear Plant Sinking.Sinking Caused by 20 Ft Rise in Local Water Table ML20197D3691978-11-22022 November 1978 Nonconformance Rept for Oct 1978.Rept Consists of Bechtel Nonconformance Repts & Log,Status Book,Qa Discrepancy Repts, Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329G3461978-10-25025 October 1978 Nonconformance Rept for Sept 1978 Consisting of Nonconformance Rept Log on Open Items,Quality Action Requests,B&W Repts of Nonconformity & Util Nonconformance Repts Written or Closed During Month ML19331A2621978-07-31031 July 1978 Nonconformance Rept for Jul 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F0551978-06-30030 June 1978 Nonconformance Rept for June 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month 1984-07-18 Category:LICENSEE INTERNAL NON-CONFORMANCE REPORT MONTHYEARML19252A0371979-09-25025 September 1979
[Table view]Nonconformance Rept for Aug 1979.Rept Consists of Bechtel Nonconformance Repts & Log,Status Book,Qa Discrepancy Repts, Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19263C7611979-02-22022 February 1979 Monthly Nonconformance Rept for Jan 1979 ML20197D3691978-11-22022 November 1978 Nonconformance Rept for Oct 1978.Rept Consists of Bechtel Nonconformance Repts & Log,Status Book,Qa Discrepancy Repts, Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329G3461978-10-25025 October 1978 Nonconformance Rept for Sept 1978 Consisting of Nonconformance Rept Log on Open Items,Quality Action Requests,B&W Repts of Nonconformity & Util Nonconformance Repts Written or Closed During Month ML19331A2621978-07-31031 July 1978 Nonconformance Rept for Jul 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F0551978-06-30030 June 1978 Nonconformance Rept for June 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F0221978-05-31031 May 1978 Nonconformance Rept for May 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E8831978-04-30030 April 1978 Nonconformance Rept for Apr 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2291978-03-31031 March 1978 Nonconformance Rept for Mar 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F1901978-02-28028 February 1978 Nonconformance Rept for Feb 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F1891978-01-31031 January 1978 Nonconformance Rept for Jan 1978.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2141977-12-31031 December 1977 Nonconformance Rept for Dec 1977.rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2421977-12-31031 December 1977 Nonconformance Rept for Dec 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5211977-12-31031 December 1977 Nonconformance Rept 19 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Oct-Dec 1977.Resumes of Bechtel Corp & Util Engineers Encl ML19329E8871977-11-30030 November 1977 Nonconformance Rept for Nov 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F0311977-10-31031 October 1977 Nonconformance Rept for Oct 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformane Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings Mgt Corrective Action Repts Written or Closed During Month ML19329F5491977-09-30030 September 1977 Nonconformance Rept 18 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Jul-Sept 1977.Resumes of Bechtel Corp & Util Engineers Encl ML19329F0181977-09-30030 September 1977 Nonconformance Rept for Sept 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E9401977-08-31031 August 1977 Nonconformance Rept for Aug 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2331977-07-31031 July 1977 Nonconformance Rept for Jul 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML20037A8731977-06-30030 June 1977 Nonconformance Rept for June 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5091977-06-30030 June 1977 Nonconformance Rept 17 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Apr-June 1977. Resumes of Bechtel Corp & Util Engineers Encl ML19329E8801977-05-31031 May 1977 Nonconformance Rept for May 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2631977-04-30030 April 1977 Nonconformance Rept for Mar & Apr 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book,Qa Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Months ML19329F5621977-03-31031 March 1977 Nonconformance Rept 16 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Jan - Mar 1977.Resumes of Bechtel Corp & Util Engineers Encl ML19331A2281977-02-28028 February 1977 Nonconformance Rept for Feb 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E9051977-01-31031 January 1977 Nonconformance Rept for Jan 1977.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5571976-12-31031 December 1976 Nonconformance Rept 15 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Oct - Dec 1976.Resumes of Bechtel Corp & Util Engineers Encl ML19329E8851976-11-30030 November 1976 Nonconformance Rept for Nov 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E9201976-10-31031 October 1976 Nonconformance Rept for Oct 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Finding & Mgt Corrective Corrective Action Repts Written or Closed During Month ML19329F5531976-09-30030 September 1976 Nonconformance Rept 14 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Jul - Sept 1976.Resumes of Bechtel Corp & Util Engineers Encl ML19329E9921976-09-30030 September 1976 Nonconformance Rept for Sept 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E9721976-08-31031 August 1976 Nonconformance Rept for Aug 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E9891976-07-31031 July 1976 Nonconformance Rept for Jul 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E9151976-06-30030 June 1976 Nonconformance Rept for June 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5451976-06-30030 June 1976 Nonconformance Rept 13 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Apr-June 1976 Resumes of Bechtel Corp & Util Engineers Encl ML19329E9391976-05-31031 May 1976 Nonconformance Rept for May 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E9271976-04-30030 April 1976 Nonconformance Rept for Apr 1976.Rept Consists of Bechtel Nonconformancee Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5461976-03-31031 March 1976 Nonconformance Rept 12 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Jan-Mar 1976.Resumes of Bechtel Corp & Util Engineers Encl ML19329E8791976-03-31031 March 1976 Nonconformance Rept for Mar 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19331A2231976-02-29029 February 1976 Nonconformance Rept for Feb 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E9211976-01-31031 January 1976 Nonconformance Rept for Jan 1976.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F5361975-12-31031 December 1975 Nonconformance Rept 11 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Oct-Dec 1975.Resumes of Bechtel Corp & Util Engineers Encl ML19329F0191975-10-31031 October 1975 Nonconformance Rept for Oct 1975.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E8661975-09-30030 September 1975 Nonconformance Rept for Sept 1975.Rept Consists of Bechtel Nonconformance Rept & Log,Status Book,Qa Discrepancy Repts, Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F4941975-09-30030 September 1975 Nonconformance Rept 10 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Jul-Sept 1975.Resumes of Bechtel Corp & Util Engineers Encl ML19320A4681975-08-31031 August 1975 Nonconformance Rept for Aug 1975.Rept Consists of Bechtel Nonconformance Repts & Log,Status Book,Qa Discrepancy Repts, Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329E8991975-07-31031 July 1975 Nonconformance Rept for Jul 1975.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month ML19329F4881975-06-30030 June 1975 Nonconformance Rept 9 Per Condition 2 of CPPR-81 & CPPR-82 Re Const Work Performed During Apr-June 1975,based on Preliminary Schedule of Activities to Be Performed During 1975 ML19320A4731975-05-31031 May 1975 Nonconformance Rept for May 1975.Rept Consists of Bechtel Nonconformance Repts,Nonconformance Rept Log & Status Book, QA Discrepancy Repts,Quality Audit Findings & Mgt Corrective Action Repts Written or Closed During Month 1979-09-25 |