ML19331B903: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
        -
c August 4, 1980                                                TELECCPY h Received Verified Receipt: h no 8 90          _
c
          ,
                -
                                                                .                                          .
                                                          '
August 4, 1980                                                TELECCPY h Received Verified Receipt: h no 8 90          _
                                                                                     ",,,f,*,          / :35        hours knitials                -
                                                                                     ",,,f,*,          / :35        hours knitials                -
                                                                                                                           ~
                                                                                                                           ~
TO:  U. S. Nuclear Regulatory Commisssion Office of Inspection and Enforcement                                                .
TO:  U. S. Nuclear Regulatory Commisssion Office of Inspection and Enforcement                                                .
Region III Attention:    Tom Tambling s
Region III Attention:    Tom Tambling s
                                                                              .


==SUBJECT:==
==SUBJECT:==
Interruption of Decay Heat Flow.
Interruption of Decay Heat Flow.
Davis-Besse Unit 1-    Mode 5    Power (MWT)=0, Load (Gross MWE)=0 At 1454 hours on August 3,1980, Instrument and Controls personnel were removing Safety Features Actuation System (SFAS) Channel 4 bistable i                  BA413 and accidentally caused Decay Heat Isolation Valve DHil to travel
Davis-Besse Unit 1-    Mode 5    Power (MWT)=0, Load (Gross MWE)=0 At 1454 hours on August 3,1980, Instrument and Controls personnel were removing Safety Features Actuation System (SFAS) Channel 4 bistable i                  BA413 and accidentally caused Decay Heat Isolation Valve DHil to travel closed. The reactor operator immediately stopped DH pump 1-1. This stopped decay heat flow for approximately 3 minutes until the bistable could be re-installed and the pump restarted.
      ,
closed. The reactor operator immediately stopped DH pump 1-1. This stopped decay heat flow for approximately 3 minutes until the bistable
  ..
could be re-installed and the pump restarted.
                 '  This occurrence placed the unit in violation of Technical Specification 3.4.1 which requires at least one decay-heat pump- be in operation while the unit is in Mode 5. This incident is being reported in accordance with Technical Specification 6.9.1.8.b.
                 '  This occurrence placed the unit in violation of Technical Specification 3.4.1 which requires at least one decay-heat pump- be in operation while the unit is in Mode 5. This incident is being reported in accordance with Technical Specification 6.9.1.8.b.
Luis Reyes, Davis-Besse Unit 1 Resident Inspector, was notified at 220 hours on August 4, 1980.
Luis Reyes, Davis-Besse Unit 1 Resident Inspector, was notified at 220 hours on August 4, 1980.
7 D. W & lA m                                                .
7 D. W & lA m                                                .
Terry D. Murray Station Superintendent            ,
Terry D. Murray Station Superintendent            ,
                                                                                                      ,
Davis-Besse Nuclear Power Station Toledo Edison Company TDM/mmb r
Davis-Besse Nuclear Power Station Toledo Edison Company TDM/mmb
I                                                                                                                e 800813o 5 0 7  .      - .
,
r I                                                                                                                e
                  .              .
800813o 5 0 7  .      - .
                                                                   . - - -      - . . - - - - .. -                          - - -}}
                                                                   . - - -      - . . - - - - .. -                          - - -}}

Latest revision as of 17:44, 31 January 2020

Ro:On 800803,heat Decay Flow Interrupted.Caused by Traveling Decay Heat Isolation Valve DH11 During Safety Features Actuation Sys Removal.Bistable Reinstalled & Pump Restarted within 3 Minutes
ML19331B903
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/04/1980
From: Murray T
TOLEDO EDISON CO.
To:
Shared Package
ML19331B901 List:
References
NUDOCS 8008130507
Download: ML19331B903 (1)


Text

.

c August 4, 1980 TELECCPY h Received Verified Receipt: h no 8 90 _

",,,f,*, / :35 hours knitials -

~

TO: U. S. Nuclear Regulatory Commisssion Office of Inspection and Enforcement .

Region III Attention: Tom Tambling s

SUBJECT:

Interruption of Decay Heat Flow.

Davis-Besse Unit 1- Mode 5 Power (MWT)=0, Load (Gross MWE)=0 At 1454 hours0.0168 days <br />0.404 hours <br />0.0024 weeks <br />5.53247e-4 months <br /> on August 3,1980, Instrument and Controls personnel were removing Safety Features Actuation System (SFAS) Channel 4 bistable i BA413 and accidentally caused Decay Heat Isolation Valve DHil to travel closed. The reactor operator immediately stopped DH pump 1-1. This stopped decay heat flow for approximately 3 minutes until the bistable could be re-installed and the pump restarted.

' This occurrence placed the unit in violation of Technical Specification 3.4.1 which requires at least one decay-heat pump- be in operation while the unit is in Mode 5. This incident is being reported in accordance with Technical Specification 6.9.1.8.b.

Luis Reyes, Davis-Besse Unit 1 Resident Inspector, was notified at 220 hours0.00255 days <br />0.0611 hours <br />3.637566e-4 weeks <br />8.371e-5 months <br /> on August 4, 1980.

7 D. W & lA m .

Terry D. Murray Station Superintendent ,

Davis-Besse Nuclear Power Station Toledo Edison Company TDM/mmb r

I e 800813o 5 0 7 . - .

. - - - - . . - - - - .. - - - -