ML17311A806: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 64: | Line 64: | ||
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. | Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. | ||
2005 (18 Month reloads and full core discharge capability). | 2005 (18 Month reloads and full core discharge capability). | ||
III | III | ||
~ 0 | ~ 0 | ||
Line 95: | Line 94: | ||
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8, License 5-Reduction of 20% or Greater in the 5Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain) | C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8, License 5-Reduction of 20% or Greater in the 5Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain) | ||
G-Operational Error H-Other (Explain) | G-Operational Error H-Other (Explain) | ||
. E l | . E l | ||
I J | I J | ||
Line 106: | Line 104: | ||
AVERAGE DAILYUNIT POWER LEVEL I | AVERAGE DAILYUNIT POWER LEVEL I | ||
DOCKET NO. 24529 UNIT NAME ~59,~ | DOCKET NO. 24529 UNIT NAME ~59,~ | ||
DATE 9CL12LK COMPLETED BY ~~go MONTH: March 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 17 18 19 20 21 22 0 23 24 25 10 26 27 | DATE 9CL12LK COMPLETED BY ~~go MONTH: March 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 17 18 19 20 21 22 0 23 24 25 10 26 27 12 28 13 29 14 30 122 15 31 361 16 | ||
12 28 13 29 14 30 122 15 31 361 16 | |||
wl I | wl I | ||
Line 129: | Line 125: | ||
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. | Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. | ||
2005 (18 Month reloads and full core discharge capability). | 2005 (18 Month reloads and full core discharge capability). | ||
e 1' | e 1' | ||
Line 179: | Line 174: | ||
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. | Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity. | ||
2005 (18 Month reloads and full core discharge capability). | 2005 (18 Month reloads and full core discharge capability). | ||
V I | V I | ||
Line 205: | Line 199: | ||
03/31 0439 Increased RX power to 100/o. | 03/31 0439 Increased RX power to 100/o. | ||
03/31 2359 Unit ended the month in Mode 1 at 100/o power. | 03/31 2359 Unit ended the month in Mode 1 at 100/o power. | ||
'J IC Ih | 'J IC Ih | ||
Latest revision as of 02:57, 4 February 2020
ML17311A806 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 03/31/1995 |
From: | Fulton J, James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
182-06064-JML-J, 182-6064-JML-J, NUDOCS 9504190051 | |
Download: ML17311A806 (33) | |
Text
(ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9504190051 DOC.DATE: '9AV~
FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 NOTARIZED: NO DOCKET STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 P AUTH. NAME AUTHOR AFFILIATION FULTON,J.D. Arizona Public Service Co. (formerly Arizona Nuclear Power LEVINE,J.M. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repte for Mar 1995 for Palo Verde Nuclear Generating Station.W 950412 0 CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) ltr.'ISTRIBUTION t ENCL I SIZE: 4I NOTES:STANDARDIZED PLANT 05000528 I Standardized plant; 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 HOLIAN, B 1 1 TRAN,L 1 1 INTERNAL: ACRS 10 10 AEOD/SPD/RRAB 1 1 NTER 1 1 NRR/DISP/PIPB 1 1 1 1 RGN4 1 1 D
EXTERNAL LITCO BRYCE f J H 1 1 NOAC 1 1 NRC PDR 1 1 0 0
U NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 21
Arizona Public Service Company PALO VERDE NUCLEAR GENERATING STATION P.O. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 182-06064-JML/JLT/JDF JAMES M. LEVINE VICE PRESIDENT April 12, 1995 NUCLEAR PRODUCTION U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1,2, and 3 Docket Nos. STN 50-528/529/630 Monthly Operating Reports for March 1996 Enclosed are the Monthly Operating Reports for March 1995, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses. By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.
If you have any questions, please contact Judy Fulton at (602) 393-5277.
Sincerely, JML/J DF/gez
Enclosures:
March 1995 Monthly Operating eports cc: L. J. Callan (all w/enclosures)
K. E. Perkins NRC Senior Resident Inspector INPO Records Center Utility Data Institute
'I<'r r ~
cJ 95041CII0051- 950351 PDR ADDCK 05000528 I I
f Ji t
I AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. 5M26 UNIT NAME MHG&1 DATE Q FLU~~~
COMPLETED BY dJ2JMQQ MONTH: March 1995 DAY AVERAGE DAILYPOWER LEVEL DAY 'VERAGE DAILYPOWER LEVEL 1246'7 1247 18 1240 1147 1245 19 1063 1244 20 1055 1243 21 1057 1245 22 1065 1248 23 1065 1246 24 1069 1246 25 1071 10 1243 26 1070 1242 27 1069 12 1244 28 1070 13 1244 29 1053 14 1241 30 1011 15 1243 31 995 16 1241
I REFUELING INFORMATION I
DOCKET NO., SL526 UNIT NAME ~V DATE 'L12LK COMPLETED BY JJ2~fQQ IKalMJRZ Scheduled date for next refueling shutdown.
The 5th refueling outage is scheduled to begin 04/01/95.
Scheduled date for restart following refueling.
06/1 0/95.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
No Scheduled date for submitting proposed licensing action and supporting information.
12/28/94 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
The fuel assembly will utilize Erbium as a burnabie absorber (as was done for Units 2 and 3).
"The number of fuel assemblies.
b) In the spent fuel storage pool.
Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity. ~~
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
III
~ 0
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. ~KG UNIT NAME EMKi&i DATE ML12LK COMPLETED BY ~<i~
03/01 0000 Unit began the month in Mode 1 with 100% power.
03/09 2315 Decreased Rx power to 99% for Hi Rate Steam Generator Blowdowns.
03/10 0116 Increased Rx power to 100%.
03/16 2255 Decreased Rx power to 99% for Hi Rate Steam Generator Blowdowns.
03/16 2355 Increased Rx power to 100%.
03/17 2010 Decreased Rx power to 98% for Main Turbine control valve testing.
03/17 2045 Increased Rx power to 100%.
03/18 0828 Commenced RX downpower to 85% in preparation for isolating LP Feedwater Heater string C due to Heater 1C tube leak.
03/18 1456 Rx power at 85%.
03/20 1543 Decreased Rx power to 83.5% due to EHC leak.
03/20 1915 Commenced Rx 'power increase from 83.5% to 85%.
03/20 2040 Rx power at 85%.
03/29 1955 Decreased Rx power to 83% due to MT pressure switch failure.
03/30 0501 Commenced Rx power increase to 85%.
03/30 0539 Stabilized Rx power at 85%.
03/31 1548 Decreased Rx power 1% to aid in data gathering to evaluate unusual noise and vibration from the P1 Main Turbine Control Valve.
03/31 1620 Increased Rx to 85% power.
03/31 1953 Rx power decrease to 20% for outage.
'ommenced 03/31 2359 Unit ended the month in Mode 1 at 20% power.
'I SHUTDOWNS AND POWER REDUCTIONS March 1995 DOCKET NO UNIT NAME DATE P~~
MLQ55 COMPLETED BY Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of March, 1995.
"F-Forced 2Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8, License 5-Reduction of 20% or Greater in the 5Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)
G-Operational Error H-Other (Explain)
. E l
I J
j l
II '
I
't
AVERAGE DAILYUNIT POWER LEVEL I
DOCKET NO. 24529 UNIT NAME ~59,~
DATE 9CL12LK COMPLETED BY ~~go MONTH: March 1995 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 17 18 19 20 21 22 0 23 24 25 10 26 27 12 28 13 29 14 30 122 15 31 361 16
wl I
REFUELING INFORMATION DOCKET NO. QL539 UNIT NAME ~VV~!~
DATE MQZK COMPLETED BY Lf>MUHQQ Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled for 03/16/96.
Scheduled date for restart following refueling.
05/10/96.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
- a. Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape annealing matrix.
o Scheduled date for submitting proposed licensing action and supporting information.
12/08/95.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
Stretch Power to 102%.
~
The number of fuel assemblies.
e) tn the core.
b) ln the spent fuel storage pool. ~95 Licensed spent fuel storage capacity. ~~
Intended change in spent fuel storage capacity. ~~
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
e 1'
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. K-'RR UNIT NAME ElhLG&2 DATE MLI2LK COMPLETED BY dJUMaa TELEPHONE 03/01 0000 Unit began the month in refueling outage P5.
03/01 1508 Entered Mode 6.
03/09 1817 Entered Mode 5.
03/23 0408 Entered Mode 4.
03/25 0117 Entered Mode 3.
03/28 0152 Entered Mode 2.
03/28 0500 Unit 2 Rx is CRITICAL.
03/29 0435 Commenced Rx power increase to 2;3%.
03/29 0500 Rx power stable at 2%.
03/29 0830 Entered Mode 1.
03/30 0233 Synchronized the Main Generator to the grid. This signaled the end of the refueling outage.
Outage duration was 54 days, 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 30 minutes.
03/30 0727 Opened Main Generator breakers in preparatio for overspeed test.
03/30 0754 Commenced main turbine overspeed testing.
03/30 0929 Synchronized the Main Generator to the grid.
03/30 1005 Commenced Rx power to 14%.
03/30 1035 Rx power is at 14%.
03/30 1105 FWCS swapover completed satisfactorily. Rx power stabilized at 18%.
03/31 0509 Rx power is greater than 20%. Increasing power to 70%.
03/31 2359 Unit ended the month in Mode 1 at 30% power in power ascension to 70%.
SHUTDOWNS AND POWER REDUCTIONS March 1995 DOCKET NO UNIT NAME DATE MLl2LK COMPLETED BY Outage Method of Duration Shutting Down System Component Cause and Corrective Action Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5. to Prevent Occurrence 95-01 02/04/95 S 700.6 N/A N/A N/A Continuation of 5th refueling outage from previous month.
"F-Forced Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source
. Examination Past 24 Hours F-Administrative 9-Other-(Explain)
G-Operational Error H-Other (Explain)
J AVERAGE DAILYUNIT POWER LEVEL DOCKET NO. ~39 UNIT NAME ~bLGR2 DATE &002LK COMPLETED BY ~~gO KllHUUII MONTH: March 1995 DAY AVERAGE DAILYPOWER LEVEL 'DAY AVERAGE DAILYPOWER LEVEL 1228 17 1249 1085 18 1250 1113 19 1249 1248 20 1250 1251 21 1249 1252 22 1256 1256 23 1254 1255 24 1255 1256 25 1254 10 1254 26 1256 1254 27 1255 12 1254 28 1258 13 1254 29 1257 14 1253 30 1256 15 1250 31 1253 16 1249
I REFUELING INFORMATION DOCKET NO. ¹HQ UNIT NAME ~VI~~>~
DATE ML12LK COMPLETED BY ~i~ljjgn Scheduled date for next refueling shutdown.
The 5th refueling outage is scheduled to begin 10/14/95.
Scheduled date for restart following refueling.
12/23/95.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment7 1
- a. Technical Specification change to Note 5 of Table 4.3-1 for the proposed installation of a cycle independent shape anneaiing matrix. (submitted 12/7/94 to NRC).
Scheduled date for submitting proposed licensing action and supporting information.
June 1995, if required.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, and new operating procedures.
None.
The number of fuel assemblies.
b) In the spent fuel storage pool.
Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
V I
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. ~39 UNIT NAME DATE ML12LK COMPLETED BY ~~I~
IESlMJBD h1azl~%
03/01 0000 Unit began the month in Mode 1 at 100/o power.
03/01 1326 Commenced Rx downpower to 95~/o to remove condensate pump C from service due to high vibration.
03/01 1334 Rx power at 95/o.
03/01 1359 Commenced Rx power increase to 100'/o.
03/01 1530 Stopped Rx power increase at 99/o power due to MFP suction pressure being 300 psig.
03/01, 1535 Commenced Rx power reduction from 99 lo to place cond. demins. in service for SG chemistry cleanup.
03/01 1555 Stopped Rx power decrease at 96/o power.
03/01 2230 Commenced Rx power reduction to 86/o power for chemistry concerns.
0301 2252 Completed Rx power reduction to 86'lo in compliance with chemistry action level 1 for SG ¹1 hi sulfates.
03/03 1733 CommencedRxpowerincreasetoapproximately96-98/o.
03/03 2301 Stopped power increase at 97.3'/o to perform surveillance test.
03/04 0123 Commenced Rx power increase to 100/o.
03/04 0408 Rx power stabilized at 100/o.
03/19 0058 Decreased Rx power to 99'io for Hi Rate Steam Generator Blowdown.
03/19 0250 Increased Rx power to 100'lo.
03/25 2221 Decreased Rx power to 99/o for Hi Rate Steam Generator Blowdown.
03/25 2358 Increased Rxpowerto100/o.
03/31 0157 Decreased Rx power to 99'/o for control valve testing 8 Hi Rate Steam Generator Blowdown.
03/31 0439 Increased RX power to 100/o.
03/31 2359 Unit ended the month in Mode 1 at 100/o power.
'J IC Ih
SHUTDOWNS AND POWER REDUCTIONS March 1995 DOCKET NO 530 UNIT NAME ~~S-DATE 5HL12M~
COMPLETED BY ~gHQQ Outage Method of Duration Shutting Down System Component Cause and Corrective Action No. Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of March, 1995.
1F-Forced 2Reason: 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)
C-Refueling 3-Automatic Scram D-Regulatory Restriction Continuation from Previous Month E-Operator Training & License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)
G-Operational Error H-Other (Explain) 15-