ML18016A218: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:R EGULATOINFORMATION DISTRIBUTION PEM (RIDE).~ACCESSION NBR:9710280197 DOC.DATE: 97/10/22 NOTARIZED:
{{#Wiki_filter:R EGULATOINFORMATION             DISTRIBUTION   PEM     (RIDE)
NO l$I FACZL:50-400 Shearon Harris Nuclear Power Plant, Unit I, Carolina AUTH.NAME AUTHOR AFFILIATION DONAHUP,;".W.
.~ ACCESSION NBR:9710280197                   DOC.DATE: 97/10/22   NOTARIZED: NO         DOCKET  I l$ I FACZL:50-400 Shearon               Harris Nuclear Power Plant, Unit I, Carolina       05000400 AUTH. NAME                     AUTHOR AFFILIATION DONAHUP,;".W.             Carolina Power 6 Light Co.
Carolina Power 6 Light Co.RECIP.KAME RECIPIENT, AFFILIATION Document Control Branch (Document Control.Desk)DOCKET I 05000400 A T 05000400 NOTES:Application for permit renewal'filed.
RECIP.KAME                     RECIPIENT, AFFILIATION Document Control Branch (Document Control. Desk)


==SUBJECT:==
==SUBJECT:==
Forwards LER 97-.021-01,IAW 10CFR50.73.Rev describes two addi conditions identified during on-going TS surveillance procedure review project.DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR J ENCL J SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.RECIPIENT ID CODE/NAME PD2-1 PD'NTERNAL: ACRS AEOD/SPD/RRAB NRR/DE/ECGB NRR/DE/EMEB NRR/DRCH/HICB NRR/DRCH/HQMB NRR/DSSA/SPLB RES/DET/EIB EXTERNAL: L ST LOBBY WARD NOAC POOREFW NRC PDR COPIES LTTR ENCL 1 1'1 1 1 1 1 l.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME ROONEYFV OD N FILE CENTE EGB NRR/DRCH/HHFB NRR/DRCH/HOLB NRR/DRPM/PECB NRR/DSSA/SRXB RGN2 FILE 01 LITCO BRYCEFJ H NOAC QUEENERFDS NUDOCS FULL TXT COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 R D 0 E NOTE TO ALL"RIDS" RECIPIENTS:
Forwards LER 97-.021-01,IAW 10CFR50.73.Rev                 describes two addi conditions identified during on-going TS                 surveillance procedure review project.
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25 Caralina Power&Ligbt Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 OCT 22 1997 U.S.Nuclear Regulatory Commission ATTN: NR'C Document Control Desk Washington, DC 20555 Serial: HNP-97-197 10CFR50.73
DISTRIBUTION CODE: IE22T               COPIES RECEIVED:LTR TITLE: 50.73/50.9 Licensee Event Report (LER),
'HEARON HARRIS NUCLEAR POWER PLANT UNIT 1.DOCKET NO.50-400 LICENSE NO..NPF-63.;;LICENSEE EVENT REPORT 97-021-01 Sir or Madam: In accordance with Title 10 to the Code of Federal Regulations, the enclosed revision to Licensee Event Report 97-021 is submitted.
J  ENCL  J SIZE:
This revision describes two additional conditions identified during the on-going Technical Specification Surveillance Procedure Review Project.Sincerely, MV J.W.D nahue Director of Site Operations yt Harris Plant Enclosure c: Mr.J.B.Brady (HNP.-Senior NRC Resident)..
Incident Rpt, etc.
Mr.L.A.Reyes (NRC Regional Administrator,"Region II)'r.V.L.Rooney (NRC-NRR Pr'oject'Manager) 9710280%97 971022 PDR ADQCK 05000400 8 PDR llfffffffffflflfllfflllljlM!!IIIIII State Road 1134 New Hill NC}}
A T
NOTES:Application              for permit renewal'filed.                              05000400 RECIPIENT                  COPIES          RECIPIENT           COPIES ID CODE/NAME                 LTTR ENCL      ID  CODE/NAME        LTTR ENCL PD2-1 PD                         1    1    ROONEYFV                1    1              0 ACRS        'NTERNAL:
                                              '1    1      OD N                  2    2 R
AEOD/SPD/RRAB                   1    1    FILE  CENTE            1    1 NRR/DE/ECGB                     1    l.              EGB          1    1 NRR/DE/EMEB                     1    1    NRR/DRCH/HHFB          1    1 NRR/DRCH/HICB                    1   1     NRR/DRCH/HOLB          1    1 NRR/DRCH/HQMB                    1    1    NRR/DRPM/PECB           1    1 NRR/DSSA/SPLB                    1   1     NRR/DSSA/SRXB          1     1 RES/DET/EIB                      1   1     RGN2    FILE 01        1     1 EXTERNAL: L ST LOBBY WARD                    1   1     LITCO BRYCEFJ H        1     1               D NOAC POOREFW                    1   1     NOAC QUEENERFDS        1     1 NRC PDR                          1   1     NUDOCS FULL TXT        1     1               0 E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR                 25   ENCL     25
 
Caralina Power & Ligbt Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 OCT   22   1997 U.S. Nuclear Regulatory Commission                                             Serial: HNP-97-197 ATTN: NR'C Document Control Desk                                                         10CFR50.73 Washington, DC 20555
                                                                                                            'HEARON HARRIS NUCLEAR POWER PLANT UNIT 1
                                  . DOCKET NO. 50-400 LICENSE NO.. NPF-63
                        .;; LICENSEE EVENT REPORT 97-021-01 Sir or Madam:
In accordance with Title 10 to the Code of Federal Regulations, the enclosed revision to Licensee Event Report 97-021 is submitted. This revision describes two additional conditions identified during the on-going Technical Specification Surveillance Procedure Review Project.
Sincerely, J. W. D nahue Director of Site Operations Harris Plant yt MV Enclosure c:       Mr. J. B. Brady (HNP.-Senior NRC Resident)..
Mr. L. A. Reyes (NRC Regional Administrator,"Region     II)'r.
V. L. Rooney (NRC - NRR Pr'oject'Manager) 9710280%97 971022                                                   llfffffffffflflfllfflllljlM!!IIIIII PDR     ADQCK   05000400 8                     PDR State Road 1134 New Hill NC}}

Latest revision as of 05:47, 22 October 2019

Forwards LER 97-021-01,IAW 10CFR50.73.Rev Describes Two Addl Conditions Identified During on-going TS Surveillance Procedure Review Project
ML18016A218
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/22/1997
From: Donahue J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18016A219 List:
References
HNP-97-197, NUDOCS 9710280197
Download: ML18016A218 (2)


Text

R EGULATOINFORMATION DISTRIBUTION PEM (RIDE)

.~ ACCESSION NBR:9710280197 DOC.DATE: 97/10/22 NOTARIZED: NO DOCKET I l$ I FACZL:50-400 Shearon Harris Nuclear Power Plant, Unit I, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION DONAHUP,;".W. Carolina Power 6 Light Co.

RECIP.KAME RECIPIENT, AFFILIATION Document Control Branch (Document Control. Desk)

SUBJECT:

Forwards LER 97-.021-01,IAW 10CFR50.73.Rev describes two addi conditions identified during on-going TS surveillance procedure review project.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR TITLE: 50.73/50.9 Licensee Event Report (LER),

J ENCL J SIZE:

Incident Rpt, etc.

A T

NOTES:Application for permit renewal'filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 ROONEYFV 1 1 0 ACRS 'NTERNAL:

'1 1 OD N 2 2 R

AEOD/SPD/RRAB 1 1 FILE CENTE 1 1 NRR/DE/ECGB 1 l. EGB 1 1 NRR/DE/EMEB 1 1 NRR/DRCH/HHFB 1 1 NRR/DRCH/HICB 1 1 NRR/DRCH/HOLB 1 1 NRR/DRCH/HQMB 1 1 NRR/DRPM/PECB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 RES/DET/EIB 1 1 RGN2 FILE 01 1 1 EXTERNAL: L ST LOBBY WARD 1 1 LITCO BRYCEFJ H 1 1 D NOAC POOREFW 1 1 NOAC QUEENERFDS 1 1 NRC PDR 1 1 NUDOCS FULL TXT 1 1 0 E

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25

Caralina Power & Ligbt Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 OCT 22 1997 U.S. Nuclear Regulatory Commission Serial: HNP-97-197 ATTN: NR'C Document Control Desk 10CFR50.73 Washington, DC 20555

'HEARON HARRIS NUCLEAR POWER PLANT UNIT 1

. DOCKET NO. 50-400 LICENSE NO.. NPF-63

.;; LICENSEE EVENT REPORT 97-021-01 Sir or Madam:

In accordance with Title 10 to the Code of Federal Regulations, the enclosed revision to Licensee Event Report 97-021 is submitted. This revision describes two additional conditions identified during the on-going Technical Specification Surveillance Procedure Review Project.

Sincerely, J. W. D nahue Director of Site Operations Harris Plant yt MV Enclosure c: Mr. J. B. Brady (HNP.-Senior NRC Resident)..

Mr. L. A. Reyes (NRC Regional Administrator,"Region II)'r.

V. L. Rooney (NRC - NRR Pr'oject'Manager) 9710280%97 971022 llfffffffffflflfllfflllljlM!!IIIIII PDR ADQCK 05000400 8 PDR State Road 1134 New Hill NC