ML18022A933: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:I RIDRI"PY (ACCELERATED RIDS PROCESSIN REGULA INFORMATION DISTRIBUTIO YSTEM (RIDS)ACCESSION NBR.:9408120260 DOC.DATE: 94/08/09 NOTARIZED:
{{#Wiki_filter:I RIDRI"PY (ACCELERATED RIDS PROCESSIN REGULA           INFORMATION DISTRIBUTIO         YSTEM (RIDS)
NO DOCKET FACIL:5Q:-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION ROBINSON,W.R.
ACCESSION NBR.:9408120260               DOC.DATE:   94/08/09   NOTARIZED: NO         DOCKET FACIL:5Q:-400 Shearon       Harris Nuclear Power Plant, Unit 1, Carolina             05000400 AUTH. NAME             AUTHOR AFFILIATION ROBINSON,W.R.         Carolina Power & Light Co.
Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
RECIP.NAME             RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwards"ISI Summary 1st Interval,2nd Period,5th Refueling Outage 1-2-05 Completed 940803," in accordance w/ASME Boiler&PV Code, Section XI,Article IWA-6220(b).
Forwards "ISI Summary 1st Interval,2nd Period,5th Refueling Outage 1-2-05 Completed 940803," in accordance w/ASME Boiler
DISTRIBUTION CODE: R047D COPIES RECEIVED:LTR J ENCL J SIZE: I TITLE: OR Submittal:
            & PV Code, Section       XI,Article IWA-6220(b).
Inservice/Testing/Relief from ASME Code-GL-89-04 NOTES:Application for permit renewal filed.05000400 RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS NRR/DE/EMEB NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: EG&G BROWN,B NRC PDR COPIES LTTR ENCL 1 1 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DSP/ROAB NRR/EMCB O 4rZO REG FILE 01 EG&G RANSOME,C NSIC COPIES LTTR E+CL 1 1.1 1, 1 1 0 1 1 1.1 1 1%t P!IW NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: R047D TITLE:  OR COPIES RECEIVED:LTR Submittal: Inservice/Testing/Relief from J  ENCL J  SIZE: I ASME Code   GL-89-04 NOTES:Application for permit renewal filed.                                           05000400 RECIPIENT               COPIES            RECIPIENT          COPIES ID CODE/NAME              LTTR ENCL        ID CODE/NAME       LTTR E+CL PD2-1 LA                                     PD2-1 PD              1 LE,N INTERNAL: ACRS                                         AEOD/DSP/ROAB          1  . 1 NRR/DE/EMEB                                 NRR/EMCB              1,    1 NUDOCS-ABSTRACT                 1      1    O  4rZO                1      0 OGC/HDS2                       1      0    REG  FILE      01    1      1 RES/DSIR/EIB                   1      1 EXTERNAL: EG&G BROWN,B                     1     1     EG&G RANSOME,C         1   . 1 NRC PDR                        1     1     NSIC                  1     1
PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P!-37 (EXT.504-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LIS I'S I'OR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR'NCL 9 I e gQ Carolina Power&Light Company PO Box 165 New Hill NC 27562 William R.Robinson Vice President Harris Nuclear Plant AUG 0 S 1S%File Number: HO-940351 SERIAL: HNP-94-065 United States Nuclear Regulatory Commission AITENTION:
                %t P!IW NOTE TO ALL"RIDS" RECIPIENTS:
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 INSERVICE INSPECTION REPORT Gentlemen; In accordance with the reporting requirements of the ASME Boiler and Pressure Vessel Code, Section XI, Article IWA-6220(b), Carolina Power&Light Company (CP&L)hereby submits Shearon Harris Nuclear Power Plant (SHNPP)Inservice Inspection results.The enclosed report covers the inspections performed during the fifth refueling outage in the first inspection interval.Questions regarding this matter may be referred to Mr.R.W.Prunty at (919)362-2030.Sincerely, W.R.Robinson SDC/sdc c: Mr.S.D.Ebneter (w/'enclosure)
PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P!-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIS I'S I'OR DOCUMENTS YOU DON'T NEED!
Mr.¹B.Le (w/o enclosure)
TOTAL NUMBER OF COPIES REQUIRED: LTTR                   'NCL     I 9
Mr.J.E.Tedrow (w/enclosure)
 
Mr.Billy Walker (w/enclosure)
e gQ
 
Carolina Power & Light Company                                                 William R. Robinson PO Box 165                                                                     Vice President New Hill NC 27562                                                               Harris Nuclear Plant AUG 0   S 1S%
File Number: HO-940351                                                       SERIAL: HNP-94-065 United States Nuclear Regulatory Commission AITENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 INSERVICE INSPECTION REPORT Gentlemen; In accordance with the reporting requirements of the ASME Boiler and Pressure Vessel Code, Section XI, Article IWA-6220(b), Carolina Power & Light Company (CP&L) hereby submits Shearon Harris Nuclear Power Plant (SHNPP) Inservice Inspection results. The enclosed report covers the inspections performed during the fifth refueling outage in the first inspection interval.
Questions regarding this matter may be referred to Mr. R. W. Prunty at (919) 362-2030.
Sincerely, W. R. Robinson SDC/sdc c:
Mr.  ¹ Mr. S. D. Ebneter (w/'enclosure)
B. Le         (w/o enclosure)
Mr. J. E. Tedrow (w/ enclosure)
Mr. Billy Walker (w/ enclosure)
Honorable Hugh Wells (w/o enclosure)
Honorable Hugh Wells (w/o enclosure)
PDR~+0++0809 p~AppcK pppppgpp I PDR State Road 113k Newhiit i~C Tel 919362-2502 Fax 919 362-6950 0'~4~
PDR~        ~+0 ++0809 p       AppcK pppppgpp PDR I
INSERVICE INSPECTION
State Road 113k Newhiit i~C Tel 919362-2502   Fax 919 362-6950
 
0' ~
4~
 
INSERVICE INSPECTION  


==SUMMARY==
==SUMMARY==
1st Interval, 2nd Period, 5th Refueling Outage 1-2-05 Completed August 3,1994 Carolina Power 5 Light Company P.O.Box 1551 Raleigh, NC 27602 Shearon Harris Nuclear Power Plant-Unit 1 P.O.Box 165 New Hill, NC 27562 Commercial Operation May 2, 1987}}
 
1st Interval, 2nd Period, 5th Refueling Outage 1-2-05 Completed August 3,1994 Carolina Power   5 Light Company P. O. Box 1551 Raleigh, NC 27602 Shearon Harris Nuclear Power Plant - Unit 1 P. O. Box 165 New Hill, NC 27562 Commercial Operation May 2, 1987}}

Latest revision as of 03:35, 22 October 2019

Forwards ISI Summary 1st Interval,2nd Period,5th Refueling Outage 1-2-05 Completed 940803, in Accordance W/Asme Boiler & PV Code,Section Xi,Article IWA-6220(b)
ML18022A933
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/09/1994
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18011A539 List:
References
HNP-94-065, HNP-94-65, HO-940351, NUDOCS 9408120260
Download: ML18022A933 (5)


Text

I RIDRI"PY (ACCELERATED RIDS PROCESSIN REGULA INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR.:9408120260 DOC.DATE: 94/08/09 NOTARIZED: NO DOCKET FACIL:5Q:-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROBINSON,W.R. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards "ISI Summary 1st Interval,2nd Period,5th Refueling Outage 1-2-05 Completed 940803," in accordance w/ASME Boiler

& PV Code, Section XI,Article IWA-6220(b).

DISTRIBUTION CODE: R047D TITLE: OR COPIES RECEIVED:LTR Submittal: Inservice/Testing/Relief from J ENCL J SIZE: I ASME Code GL-89-04 NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR E+CL PD2-1 LA PD2-1 PD 1 LE,N INTERNAL: ACRS AEOD/DSP/ROAB 1 . 1 NRR/DE/EMEB NRR/EMCB 1, 1 NUDOCS-ABSTRACT 1 1 O 4rZO 1 0 OGC/HDS2 1 0 REG FILE 01 1 1 RES/DSIR/EIB 1 1 EXTERNAL: EG&G BROWN,B 1 1 EG&G RANSOME,C 1 . 1 NRC PDR 1 1 NSIC 1 1

%t P!IW NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P!-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LIS I'S I'OR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 'NCL I 9

e gQ

Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant AUG 0 S 1S%

File Number: HO-940351 SERIAL: HNP-94-065 United States Nuclear Regulatory Commission AITENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 INSERVICE INSPECTION REPORT Gentlemen; In accordance with the reporting requirements of the ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-6220(b), Carolina Power & Light Company (CP&L) hereby submits Shearon Harris Nuclear Power Plant (SHNPP) Inservice Inspection results. The enclosed report covers the inspections performed during the fifth refueling outage in the first inspection interval.

Questions regarding this matter may be referred to Mr. R. W. Prunty at (919) 362-2030.

Sincerely, W. R. Robinson SDC/sdc c:

Mr. ¹ Mr. S. D. Ebneter (w/'enclosure)

B. Le (w/o enclosure)

Mr. J. E. Tedrow (w/ enclosure)

Mr. Billy Walker (w/ enclosure)

Honorable Hugh Wells (w/o enclosure)

PDR~ ~+0 ++0809 p AppcK pppppgpp PDR I

State Road 113k Newhiit i~C Tel 919362-2502 Fax 919 362-6950

0' ~

4~

INSERVICE INSPECTION

SUMMARY

1st Interval, 2nd Period, 5th Refueling Outage 1-2-05 Completed August 3,1994 Carolina Power 5 Light Company P. O. Box 1551 Raleigh, NC 27602 Shearon Harris Nuclear Power Plant - Unit 1 P. O. Box 165 New Hill, NC 27562 Commercial Operation May 2, 1987