{{#Wiki_filter:DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 1 Examination Outline Cross
{{#Wiki_filter:Examination Outline Cross-reference:       Level                   RO             SRO Tier #                   2 Group #                 1 K/A #                   217000     K1.03 Importance Rating       3.6 Knowledge of the physical connections and/or cause-effect relationships between REACTOR CORE ISOLATION COOLING SYSTEM (RCIC) and the following: Suppression pool Proposed Question:     RO Question # 1 Which ONE of the following correctly describes the RCIC suction transfer interlock?
-reference:
The RCIC inboard and outboard Torus suction valves MO-2516 and MO-2517 open automatically on A. low CST level at 1' 1/4"; and, when both valves begin to open, MO-2500 CST Suction automatically closes.
Level RO SRO Tier # 2   Group # 1   K/A # 217000 K1.03 Importance Rating 3.6   Knowledge of the physical connections and/or cause
B. low CST level at 1' 1/4"; and, when both valves are fully open, MO-2500 CST Suction automatically closes.
-effect relationships between REACTOR CORE ISOLATION COOLING SYSTEM (RCIC) and the following: Suppression pool Proposed Question:
C. high Suppression Pool water level; when both valves begin to open, MO-2500 CST Suction automatically closes.
RO Question # 1 Which ONE of the following correctly describes the RCIC suction transfer interlock?
D. high Suppression Pool water level; and, when both valves are fully open, MO-2500 CST Suction automatically closes.
The RCIC inboard and outboard Torus suction valves MO
Proposed Answer:       B Explanation (Optional):
-2516 and MO
A. Incorrect - Torus suction valves must be full open before the MO-2500 CST Suction automatically closes. The first part of the distracter is correct, however the second part is not correct, but plausible, if the candidate assumes that both valves cycle at the same time to prevent having both valves fully open at the same time and cross connecting the CST and torus.
-2517 open automatically on
B. Correct - The suction path will automatically shift from the Condensate Storage Tanks to the Suppression Pool on a low level in the Condensate Storage Tanks of 1' 1/4".
A. low CST level at 1' 1/4"; and, when both valves begin to open, MO
The RCIC inboard and outboard torus suction valves MO-2516 and MO-2517 open automatically on low CST level, and when both valves are fully open, MO-2500 CST Suction automatically closes.
-2500 CST Suction automatically closes.
C. Incorrect - RCIC suction valves will NOT swap on a high Suppression Pool level.
B. low CST level at 1' 1/4"; and, when both valves are fully open, MO
Plausible because HPCI suction valves will swap on a high Suppression Pool level and if the candidate assumes that both valves cycle at the same time to prevent having both valves fully open at the same time and cross connecting the CST and torus.
-2500 CST Suction automatically closes.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 1
C. high Suppression Pool water level; when both valves begin to open, MO
 
-2500 CST Suction automatically closes.
D. Incorrect - RCIC suction valves will NOT swap on a high Suppression Pool level, plausible because HPCI suction valves will swap on a high Suppression Pool level.
D. high Suppression Pool water level; and, when both valves are fully open, MO
SD 150, pgs 10, 19 & 20 Technical Reference(s):                                      (Attach if not previously provided)
-2500 CST Suction automatically closes.
OI 150, pgs 30 & 31 Proposed References to be provided to applicants during examination:       None Learning Objective:                                             (As available)
Proposed Answer:
Question Source:       Bank #
B Explanation (Optional):
Modified Bank #                       (Note changes or attach parent)
A. Incorrect  
New               X Question History:                         Last NRC Exam:             N/A Question Cognitive Level:     Memory or Fundamental Knowledge     X Comprehension or Analysis 10 CFR Part 55 Content:       55.41     7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
- Torus suction valves must be full open before the MO
-2500 CST Suction automatically closes.
The first part of the distracter is correct, however the second part is not correct , but plausible
, if the candidate assumes that both valves cycle at the same time to prevent having both valves fully open at the same time and cross connecting the CST and torus. B. Correct - The suction path will automatically shift from the Condensate Storage Tanks to the Suppression Pool on a low level in the Condensate Storage Tanks of 1' 1/4".
The RCIC inboard and outboard torus suction valves MO
-2516 and MO
-2517 open automatically on low CST level, and when both valves are fully open, MO
-2500 CST Suction automatically closes.
C. Incorrect  
- RCIC suction valves will NOT swap on a high Suppression Pool level
. Plausible because HPCI suction valves will swap on a high Suppression Pool level and if the candidate assumes that both valves cycle at the same time to prevent having both valves fully open at the same tim e and cross connecting the CST and torus
.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page D. Incorrect  
- RCIC suction valves will NOT swap on a high Suppression Pool level, plausible because HPCI suction valves will swap on a high Suppression Pool level.
Technical Reference(s):
SD 150, pgs 10, 19 & 20 OI 150, pgs 30 & 31 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
N one  Learning Objective:
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 3 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 2
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 205000 K1.01 Importance Rating 3.6   Knowledge of the physical connections and/or cause
Examination Outline Cross-reference:       Level                     RO             SRO Tier #                   2 Group #                   1 K/A #                     205000     K1.01 Importance Rating         3.6 Knowledge of the physical connections and/or cause- effect relationships between SHUTDOWN COOLING SYSTEM (RHR SHUTDOWN COOLING MODE) and the following:
- effect relationships between SHUTDOWN COOLING SYSTEM (RHR SHUTDOWN COOLING MODE) and the following: Reactor pressure Proposed Question:
Reactor pressure Proposed Question:       RO Question # 2 Following a reactor scram, the following conditions exist:
RO Question # 2 Following a reactor scram
* Reactor level         +190 inches
, the following conditions exist:   Reactor level
* Reactor pressure         139 psig
  +1 90 inches Reactor pressure 1 39 psig Drywell pressure 1.72 psig Based upon the given conditions, which ONE of the following Residual Heat Removal valves is closed and prevented from opening?
* Drywell pressure         1.72 psig Based upon the given conditions, which ONE of the following Residual Heat Removal valves is closed and prevented from opening?
A. MO-2006 , RHR LOOP "A" TORUS SPRAY HEADER ISOLATION B. MO-190 8, RHR SHUTDOWN COOLING ISOLATION VALVE C. MO-2007 , RHR LOOP "A" TORUS COOLING AND TEST RETURN HDR ISOLATION D. MO-1940, RHR HX 1E-201B BYPASS VALVE Proposed Answer:
A. MO-2006, RHR LOOP A TORUS SPRAY HEADER ISOLATION B. MO-1908, RHR SHUTDOWN COOLING ISOLATION VALVE C. MO-2007, RHR LOOP A TORUS COOLING AND TEST RETURN HDR ISOLATION D. MO-1940, RHR HX 1E-201B BYPASS VALVE Proposed Answer:         B Explanation (Optional):
B Explanation (Optional):
A. Incorrect - For the given conditions MO-2006 is able to be opened, the valve is isolated when containment pressure is > 2 psig. Plausible because the candidate may assume that a high Drywell pressure is needed to place Torus sprays in service.
A. Incorrec t - For the given conditions MO-2006 is able to be opened, the valve is isolated when containment pressure is > 2 psig.
B. Correct - Of the signals listed, only the reactor pressure signal causes an RHR isolation/interlock. This high-pressure interlock prevents the SDC section of piping from being over pressurized. A reactor pressure of approximately 135 psig (per ARP 1C03B B-4 this pressure is approximately 100 psig) initiates an isolation of SDC suction valves MO-1908 and 1909. The LPCI piping is also protected from over pressurization, but the setpoint is 450 psig.
Plausible because the candidate may assume that a high Drywell pressure is needed to place Torus sprays in service.
C. Incorrect - For the given conditions MO-2007 is able to be opened, the valve is isolated when containment pressure is > 2 psig. Plausible because the candidate may assume that a high Drywell pressure is needed to place Torus sprays in service.
B. Correct - Of the signals listed, only the reactor pressure signal causes an RHR isolation/interlock. This high
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 3
-pressure interlock prevents the SDC section of piping from being over pressur iz ed. A reactor pressure of approximately 135 psig (per ARP 1C03B B-4 this pressure is approximately 100 psig) initiates an isolation of SDC suction valves MO-1908 and 1909. The LPCI piping is also protected from over pressurization, but the setpoint is 4 50 psig. C. Incorrect  
- For the given conditions MO-2007 is able to be opened
, the valve is isolated when containment pressure is > 2 psig.
Plausible because the candidate may assume that a high Drywell pressure is needed to place Torus sprays in service.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 4 D. Incorrect  
D. Incorrect - MO-1940 has an automatic open function on a LPCI initiation signal. It does NOT have an auto close function.
- MO-1940 has an automatic open function on a LPCI initiatio n signal. It does NOT have an auto close function.
ARP 1C05B, D-8 Technical Reference(s):                                     (Attach if not previously provided)
Technical Reference(s):
SD-149 pgs. 31-34 Proposed References to be provided to applicants during examination:       None Learning Objective:                                             (As available)
ARP 1C05B, D
Question Source:       Bank #
-8 SD-149 pgs. 31-34 (Attach if not previously provided)
Modified Bank #                       (Note changes or attach parent)
Proposed References to be provided to applicants during examination:
New             X Question History:                         Last NRC Exam:             N/A Question Cognitive Level:     Memory or Fundamental Knowledge     X Comprehension or Analysis 10 CFR Part 55 Content:       55.41   7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
N one  Learning Objective:
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 5 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 4
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 300000 K2.01 Importance Rating 2.8   Knowledge of electrical power supplies to the following: Instrument air compressor Proposed Question:
Examination Outline Cross-reference:     Level                     RO             SRO Tier #                   2 Group #                   1 K/A #                     300000   K2.01 Importance Rating         2.8 Knowledge of electrical power supplies to the following: Instrument air compressor Proposed Question:       RO Question # 3 Backup Instrument Air Compressor 1K1 is in STANDBY operating mode with power being supplied from the preferred source.
RO Question # 3 Backup Instrument Air Compressor 1K1 is in STANDBY operating mode with power being supplied from the preferred source. A n electrical disturbance occurs resulting in
An electrical disturbance occurs resulting in:
LLRPSF transformers XR1 and XR2 are de-energiz ed  A Bus 1A3 lockout Which ONE of the following is the response of the Air Compressor 1K1?   Air Compressor 1K1 will-A. start when header pressure reaches 90 psig and will cycle to maintain 90  
* LLRPSF transformers XR1 and XR2 are de-energized
- 100 psig. B. start when header pressure reaches 100 psig and will cycle to maintain 100  
* A Bus 1A3 lockout Which ONE of the following is the response of the Air Compressor 1K1?
- 110 psig. C. NOT start until its power supply is manually transferred from the normal source to the alternate source
Air Compressor 1K1 will A. start when header pressure reaches 90 psig and will cycle to maintain 90 - 100 psig.
. D. NOT start until HSS
B. start when header pressure reaches 100 psig and will cycle to maintain 100 - 110 psig.
-3002, BACKUP COMPRESSOR 1K
C. NOT start until its power supply is manually transferred from the normal source to the alternate source.
-1 PRESSURE SELECT SWITCH is placed to the PRIMARY position.
D. NOT start until HSS-3002, BACKUP COMPRESSOR 1K-1 PRESSURE SELECT SWITCH is placed to the PRIMARY position.
Proposed Answer:
Proposed Answer:         C Explanation (Optional):
C Explanation (Optional):
A. Incorrect - The electrical power supply to the backup compressor is lost due to the 1A3 lockout. Air Compressor 1K1 power source will NOT start and must be shifted to its alternate power source.
A. Incorrect  
B. Incorrect - The electrical power supply to the backup compressor is lost due to the 1A3 lockout. Air Compressor 1K1 power source will NOT start and must be shifted to its alternate power source.
- The electrical power supply to the backup compressor is lost due to the 1A3 lockout. Air Compressor 1K1 power source will NOT start and must be shifted to its' alternate power source.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 5
B. Incorrect  
- The electrical power supply to the backup compressor is lost due to the 1A3 lockout. Air Compressor 1K1 power source will NOT start and must be shifted to its' alternate power source.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 6 C. Correct - The electrical power supply to the backup compressor is from essential bus, 1B33 or 1B45. Bus 1B33, the normal source, is powered from Essential Bus 1A3, a lockout will prevent the 1G31 Diesel from supplying the bus therefore Air Compressor 1K1 power source must be shifted to its' alternate power source. The power source is selected from either 1B33 or 1B45, the alternate source, via a manually selectable power transfer switch 1N3312.
C. Correct - The electrical power supply to the backup compressor is from essential bus, 1B33 or 1B45. Bus 1B33, the normal source, is powered from Essential Bus 1A3, a lockout will prevent the 1G31 Diesel from supplying the bus therefore Air Compressor 1K1 power source must be shifted to its alternate power source. The power source is selected from either 1B33 or 1B45, the alternate source, via a manually selectable power transfer switch 1N3312.
D. Incorrect  
D. Incorrect - Pressure select switch HSS-3002 is a two position switch used to determine the operating mode of the backup compressor. The backup compressor is normally maintained in the STANDBY status. It will NOT have an effect until the power supply is transferred to the alternate source.
- Pressure select switch HSS
OI-518.1, Precaution and Technical Reference(s): Limitation 19 and Note in Sect 4.7, (Attach if not previously provided)
-3002 is a two position switch used to determine the operating mode of the backup compressor. The backup compressor is normally maintained in the STANDBY status. It will NOT have an effect until the power supply is transferred to the alternate source.
SD-518 pg. 18 Proposed References to be provided to applicants during examination:       None Learning Objective:                                               (As available)
Technical Reference(s):
DAEC Bank Question Source:     Bank #
OI-518.1, Precaution and Limitation 19 and Note in Sect 4.7, SD-518 pg. 18 (Attach if not previously provided)
(19111)22681 Modified Bank #                         (Note changes or attach parent)
Proposed References to be provided to applicants during examination:
New Question History:                         Last NRC Exam:       2011   DAEC (#4)
None Learning Objective:
Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:       55.41     4 55.43 Secondary coolant and auxiliary systems that affect the facility.
(As available)
Question Source:
Bank # DAEC Bank (19111)22681   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
2011 DAEC (#4) Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 4 55.43 Secondary coolant and auxiliary systems that affect the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 6
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 263000 K2.01 Importance Rating 3.1   Knowledge of electrical power supplies to the following: Major D.C. loads Proposed Question:
Examination Outline Cross-reference:       Level                       RO               SRO Tier #                     2 Group #                     1 K/A #                       263000       K2.01 Importance Rating           3.1 Knowledge of electrical power supplies to the following: Major D.C. loads Proposed Question:         RO Question # 4 The plant is at rated conditions with the electric plant in its normal full power lineup when a fault results in a loss of 125 VDC bus 1D20.
RO Question # 4 The plant is at rated conditions with the electric plant in its normal full power lineup when a fault results in a loss of 125 VDC bus 1D20.
While in this condition, a loss of coolant accident occurs and the reactor scrams.
While in this condition, a loss of coolant accident occurs and the reactor scrams.
Following the scram, the Main Turbine is manually tripped.
Following the scram, the Main Turbine is manually tripped.
Which one of the following is correct regarding high pressure systems or components that are available to control RPV level from the control room?
Which one of the following is correct regarding high pressure systems or components that are available to control RPV level from the control room?
A. HPCI and both Reactor Feed Pumps B. RCIC and both Reactor Feed Pumps C. HPCI and "A" Reactor Feed Pump ONLY D. RCIC and "A" Reactor Feed Pump ONLY   Proposed Answer:
A.     HPCI and both Reactor Feed Pumps B.     RCIC and both Reactor Feed Pumps C.     HPCI and A Reactor Feed Pump ONLY D.     RCIC and A Reactor Feed Pump ONLY Proposed Answer:           D Explanation (Optional):
D Explanation (Optional):
A.     Incorrect: HPCI will not function without 125 VDC Div II power (bus 1D20). Plausible if the candidate confuses the power supplies of HPCI and RCIC (Div 1 versus Div 2).
A. Incorrect: HPCI will not function without 125 VDC Div II power (bus 1D20). Plausible if the candidate confuses the power supplies of HPCI and RCIC (Div 1 versus Div 2). Additionally only the "A" RFP will be available because bus 1A2 will de
Additionally only the A RFP will be available because bus 1A2 will de-energize when the turbine is tripped due to the loss of control power. Plausible if the candidate does not understand the response of the electric plant to a loss of DC following a turbine trip.
-energize when the turbine is tripped due to the loss of control power. Plausible if the candidate does not understand the response of the electric plant to a loss of DC following a turbine trip.
B.     Incorrect: Only the A RFP will be available because bus 1A2 will de-energize when the turbine is tripped due to the loss of control power.
B. Incorrect: Only the "A" RFP will be available because bus 1A2 will de
C.     Incorrect: HPCI will not function without 125 VDC Div II power (bus 1D20). Plausible if the candidate confuses the power supplies of HPCI and RCIC (Div 1 versus Div 2).
-energize when the turbine is tripped due to the loss of control power.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                          Page 7
C. Incorrect: HPCI will not function without 125 VDC Div II power (bus 1D20). Plausible if the candidate confuses the power supplies of HPCI and RCIC (Div 1 versus Div 2).


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 8 D. Correct: RCIC will still be available with a loss of 125 VDC. Although RCIC suction will transfer to the torus and one channel of isolation logic is disabled, it is still available for level control. Additionally when the turbine trips, bus 1A2 will de
D. Correct: RCIC will still be available with a loss of 125 VDC. Although RCIC suction will transfer to the torus and one channel of isolation logic is disabled, it is still available for level control. Additionally when the turbine trips, bus 1A2 will de-energize due to the loss of control power supplied by Div II 125 VDC. However, 1A1 still has control power and will transfer to the off-site power source which will supply power to the A RFP.
-energize due to the loss of control power supplied by Div II 125 VDC. However, 1A1 still has control power and will transfer to the off-site power source which will supply power to the "A" RFP.
AOP 302.1, page 10 Technical Reference(s):                                          (Attach if not previously provided)
Technical Reference(s):
ARP 1C04C, B-9 for effects on a loss of B logic (Div 2)
AOP 302.1, page 10 (Attach if not previously provided)
ARP 1C03C, C-9 for effects on a loss of B logic (Div 2)
ARP 1C04C, B
Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
-9 for effects on a loss of "B" logic (Div 2)
Question Source:       Bank #
ARP 1C03C, C
Modified Bank #                           (Note changes or attach parent)
-9 for effects on a loss of "B" logic (Div 2)
New               X Question History:                           Last NRC Exam:               N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41       7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Proposed References to be provided to applicants during examination:
Comments:
None Learning Objective:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                            Page 8
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam
: N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:  


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 9 Examination Outline Cross
Examination Outline Cross-reference:       Level                   RO               SRO Tier #                   2 Group #                 1 K/A #                   209001     K3 01 Importance Rating       3.8 Knowledge of the effect that a loss or malfunction of the LOW PRESSURE CORE SPRAY SYSTEM will have on following: Reactor water level Proposed Question:       RO Question # 5 The plant is operating at 100% power when a small A recirc loop leak results in drywell pressure rising to 3 psig. The following conditions exist:
-reference:
* The reactor is scrammed and all rods are fully inserted
Level RO SRO Tier # 2   Group # 1   K/A # 209001 K3 01 Importance Rating 3.8   Knowledge of the effect that a loss or malfunction of the LOW PRESSURE CORE SPRAY SYSTEM will have on following: Reactor water level Proposed Question:
* RPV level is stabilized at 190 inches range using high pressure injection systems
RO Question # 5 The plant is operating at 100% power when a small "A" recirc loop leak results in drywell pressure rising to 3 psig. The following conditions exist:   The reactor is scrammed and all rods are fully inserted RPV level is stabilized at 190 inches range using high pressure injection systems Drywell pressure remains at 3 psig RPV pressure is 900 psig and slowly lowering The CRS directs that both Core Spray pumps be manually shutdown The BOP operator:
* Drywell pressure remains at 3 psig
o Momentarily places both Core Spray pump control switches to the STOP position and then releases the switch.
* RPV pressure is 900 psig and slowly lowering
o The Core Spray pump amber OVERRIDE INITIATED lights above both pump control switches illuminate. Then, the "A" recirc loop ruptures, resulting in the following:
* The CRS directs that both Core Spray pumps be manually shutdown
RPV level and pressure lower rapidly Drywell pressure rises and stabilizes at ~ 22 psig.
* The BOP operator:
Which one of the following is correct regarding the ability of Core Spray to assist in water level recovery?   The Core Spray pumps will _______________ when RPV pressure lowers to less than 450 psig. A. NOT automatically restart
o   Momentarily places both Core Spray pump control switches to the STOP position and then releases the switch.
, but can be manually re
o   The Core Spray pump amber OVERRIDE INITIATED lights above both pump control switches illuminate.
-started and then will inject B. automatically re
Then, the A recirc loop ruptures, resulting in the following:
-start when RPV level lowers to less than +64 inches and inject C. automatically re
* RPV level and pressure lower rapidly
-start IF the CORE SPRAY INITIATION SEALED
* Drywell pressure rises and stabilizes at ~ 22 psig.
-IN reset pushbuttons are first depressed and will inject regardless of RPV level D. NOT automatically restart
Which one of the following is correct regarding the ability of Core Spray to assist in water level recovery?
, but can be manually restarted IF the CORE SPRAY INITIATION SEALED
The Core Spray pumps will _______________ when RPV pressure lowers to less than 450 psig.
-IN reset pushbuttons are first depressed and then will inject
A. NOT automatically restart, but can be manually re-started and then will inject B. automatically re-start when RPV level lowers to less than +64 inches and inject C. automatically re-start IF the CORE SPRAY INITIATION SEALED-IN reset pushbuttons are first depressed and will inject regardless of RPV level D. NOT automatically restart, but can be manually restarted IF the CORE SPRAY INITIATION SEALED-IN reset pushbuttons are first depressed and then will inject DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                        Page 9


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 10 Proposed Answer:
Proposed Answer:         A Explanation (Optional):
A Explanation (Optional):
A. Correct: Placing the core spray pump control switch to STOP with an auto start signal present seals out the auto start signal and lights an amber light located above the pump control switch indicating that the auto start signal has been overridden. The core spray pump may be restarted using the START position of the control switch.
A. Correct: Placing the core spray pump control switch to STOP with an auto start signal present seals out the auto start signal and lights an amber light located above the pump control switch indicating that the auto start signal has been overridden. The core spray pump may be restarted using the START position of the control switch.
B. Incorrect: The Core Spray pumps will not automatically restart. Plausible if the candidate believes that the redundant pump auto start signal of RPV level < 64" in conjunction with RPV pressure < 450 psig will restart the pump.
B. Incorrect: The Core Spray pumps will not automatically restart. Plausible if the candidate believes that the redundant pump auto start signal of RPV level < 64 in conjunction with RPV pressure < 450 psig will restart the pump.
C. Incorrect: The Core Spray pumps will not automatically restart. Plausible if the candidate believes that the pumps will restart if the initiation reset pushbuttons are depressed. With drywell pressure above 2 psig, the initiation logic will not reset if the reset pushbuttons are depressed, therefore the core spray pumps will not restart. Although, the injection valves will open when RPV pressure lowers below 450 psig.
C. Incorrect: The Core Spray pumps will not automatically restart. Plausible if the candidate believes that the pumps will restart if the initiation reset pushbuttons are depressed. With drywell pressure above 2 psig, the initiation logic will not reset if the reset pushbuttons are depressed, therefore the core spray pumps will not restart.
D. Incorrect: The core spray pump may be restarted using the START position of the control switch. Depressing the seal
Although, the injection valves will open when RPV pressure lowers below 450 psig.
-in pushbutton is not required. Plausible in that this pushbutton would reset the initiation and the pump override, but ONLY IF the initiation signals are clear. With the high drywell pressure condition the initiation cannot be reset.
D. Incorrect: The core spray pump may be restarted using the START position of the control switch. Depressing the seal-in pushbutton is not required. Plausible in that this pushbutton would reset the initiation and the pump override, but ONLY IF the initiation signals are clear. With the high drywell pressure condition the initiation cannot be reset.
Technical Reference(s):
SD 151, pg 9 Technical Reference(s):                                         (Attach if not previously provided)
SD 151, pg 9 OI 518.1, P & L 19 (Attach if not previously provided)
OI 518.1, P & L 19 Proposed References to be provided to applicants during examination:           None Learning Objective:                                                   (As available)
Proposed References to be provided to applicants during examination:
Question Source:     Bank #
N one  Learning Objective:
Modified Bank #                             (Note changes or attach parent)
(As available)
New                 X Question History:                         Last NRC Exam:                 N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41     7 55.43 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                         Page 10
Question Source:
 
Bank #   Modified Bank #
Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 7 55.43 DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 11 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 12 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 11
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 215004 K3.02 Importance Rating 3.4   Knowledge of the effect that a loss or malfunction of the SOURCE RANGE MONITOR (SRM) SYSTEM will have on following: Reactor manual control: Plant
Examination Outline Cross-reference:       Level                   RO             SRO Tier #                 2 Group #                 1 K/A #                   215004     K3.02 Importance Rating       3.4 Knowledge of the effect that a loss or malfunction of the SOURCE RANGE MONITOR (SRM)
-Specific Proposed Question:
SYSTEM will have on following: Reactor manual control: Plant-Specific Proposed Question:       RO Question # 6 During a reactor startup the following conditions exist:
RO Question # 6 During a reactor startup the following conditions exist:
* The reactor is critical
The reactor is critical IRM "C" is on range 2 All other IRMs are on range 3 All SRM detectors are partially withdrawn SRM readings are all approaching 10 5 cps Which ONE of the following is the effect of stuck withdraw button causing SRM "A" to withdraw from the core and its count rate to lower to 90 cps?   A. ONLY the retract permitted light on SRM/IRM drive controls will go out
* IRM C is on range 2
. B. ONLY the detector retracted w hen NOT permitted annunciator will alarm
* All other IRMs are on range 3
. C. ONLY the detector retracted when NOT permitted annunciator will alarm
* All SRM detectors are partially withdrawn
, and a rod block will prevent further rod motion.
* SRM readings are all approaching 105 cps Which ONE of the following is the effect of stuck withdraw button causing SRM A to withdraw from the core and its count rate to lower to 90 cps?
D. ONLY a detector retracted w hen N OT Permitted annunciator will alarm, a rod block will prevent further rod motion
A. ONLY the retract permitted light on SRM/IRM drive controls will go out.
, and a half scram will occur.
B. ONLY the detector retracted when NOT permitted annunciator will alarm.
Proposed Answer:
C. ONLY the detector retracted when NOT permitted annunciator will alarm, and a rod block will prevent further rod motion.
C Explanation (Optional): A. Incorrect  
D. ONLY a detector retracted when NOT Permitted annunciator will alarm, a rod block will prevent further rod motion, and a half scram will occur.
- withdrawing the SRM out past 90 will cause a rod withdrawal block if the SRM detectors are NOT fully inserted and SRM flux level is lower than 100 cps when the IRMs are on range 1 or 2.
Proposed Answer:         C Explanation (Optional):
B. Incorrect  
A. Incorrect - withdrawing the SRM out past 90 will cause a rod withdrawal block if the SRM detectors are NOT fully inserted and SRM flux level is lower than 100 cps when the IRMs are on range 1 or 2.
- withdrawing the SRM out past 90 will cause a rod withdrawal block if the SRM detectors are NOT fully inserted and SRM flux level is lower than 100 cps when the IRMs are on range 1 or 2.
B. Incorrect - withdrawing the SRM out past 90 will cause a rod withdrawal block if the SRM detectors are NOT fully inserted and SRM flux level is lower than 100 cps when the IRMs are on range 1 or 2.
C. Correct - A rod withdrawal block will occur if the SRM detectors are NOT fully inserted and SRM flux level is lower than 100 cps when the IRMs are on range 1 or 2.
C. Correct - A rod withdrawal block will occur if the SRM detectors are NOT fully inserted and SRM flux level is lower than 100 cps when the IRMs are on range 1 or 2.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 12


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 13 D. Incorrect  
D. Incorrect - withdrawing the SRM out past 90 will cause a rod withdrawal block if the SRM detectors are NOT fully inserted and SRM flux level is lower than 100 cps when the IRMs are on range 1 or 2. There are NO half scrams on the SRMs for normal operating conditions and even if the shorting links were installed the low reading on the SRM would NOT cause a scram.
- withdrawing the SRM out past 90 will cause a rod withdrawal block if the SRM detectors are NOT fully inserted and SRM flux level is lower than 100 cps when the IRMs are on range 1 or 2. There are NO half scrams on the SRMs for normal operating conditions and even if the shorting links were installed the low reading on the SRM would NOT cause a scram.
Technical Reference(s): ARP 1C05A, E-5                       (Attach if not previously provided)
Technical Reference(s):
Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
ARP 1C05A , E-5 (Attach if not previously provided)       Proposed References to be provided to applicants during examination:
Question Source:     Bank #
N one  Learning Objective:
Modified Bank #                         (Note changes or attach parent)
(As available)
New             X Question History:                         Last NRC Exam:               N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41   6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam: N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 14 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 13
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 262001 K4.06 Importance Rating 3.6   Knowledge of A.C. ELECTRICAL DISTRIBUTION design feature(s) and/or interlocks which provide for the following: Redundant power sources to vital buses Proposed Question:
Examination Outline Cross-reference:     Level                     RO             SRO Tier #                     2 Group #                   1 K/A #                     262001     K4.06 Importance Rating         3.6 Knowledge of A.C. ELECTRICAL DISTRIBUTION design feature(s) and/or interlocks which provide for the following: Redundant power sources to vital buses Proposed Question:       RO Question # 7 The plant is operating at 100% power. Essential Buses 1A3 and 1A4 are being supplied from the Standby Transformer.
RO Question # 7 The plant is operating at 100% power. Essential Buses 1A3 and 1A4 are being supplied from the Standby Transformer.
The Startup transformer has just been re-energized and is available.
The Startup transformer has just been re
Which ONE of the following describes the actions that will occur if the Standby Transformer Lockout Relay energizes to trip the "Standby Transformer Feeder Breaker, CB8490 (M Breaker)"?
-energized and is available.
Essential Buses1A3 and 1A4 A. de-energize and transfer to the Startup Transformer.
Which ONE of the following describes the actions that will occur if the Standby Transformer Lockout Relay energizes to trip the "Standby Transformer Feeder Breaker, CB8490 (M Breaker)
"?   Essential Buses1A3 and 1A4 -
A. de-energize and transfer to the Startup Transformer.
B. remain energized due to fast transfer to the Startup Transformer.
B. remain energized due to fast transfer to the Startup Transformer.
C. de-energize and are repowered by the Standby Diesel Generators.
C. de-energize and are repowered by the Standby Diesel Generators.
D. are de-energized with the Standby Diesel Generators running but NOT connected.
D. are de-energized with the Standby Diesel Generators running but NOT connected.
Proposed Answer: C Explanation (Optional):
Proposed Answer:         C Explanation (Optional):
A. Incorrect  
A. Incorrect - There NO is transfer to the Startup Transformer during this event. Plausible because the Startup Transformer also supplies the Essential Buses. Candidate may assume that the Startup Transformer will pick up the load.
- There NO is transfer to the Startup Transformer during this event. Plausible because the Startup Transformer also supplies the Essential Buses. Candidate may assume that the Startup Transformer will pick up the load.
B. Incorrect - The conditions are not met for a fast transfer. The DGs will re-energize the load centers. Plausible because the Startup Transformer also supplies the Essential Buses. Candidate may assume that the Startup Transformer will pick up the load.
B. Incorrect  
C. Correct - The Standby Transformer Feeder Breaker CB8490 breaker is the supply to the standby transformer. The loss of the Standby Transformer results in a loss of power to both vital buses. The EDGs will pick up the load centers on the bus undervoltage start signal.
- The conditions are not met for a fast transfer. The DGs will re
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 14
-energize the load centers. Plausible because the Startup Transformer also supplies the Essential Buses. Candidate may assume that the Startup Transformer will pick up the load.
C. Correct - The "Standby Transformer Feeder Breaker CB8490" breaker is the supply to the standby transformer. The loss of the Standby Transformer results in a loss of power to both vital buses. The EDGs will pick up the load centers on the bus undervoltage start signal.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 15 D. Incorrect  
D.     Incorrect - Standby Transformer Lockout Relay will Lock Out the Standby Transformer the Essential Load Centers 1A3 and 1A4 are not locked out and will be re-energized by the SBDGs. Plausible because the Essential Buses Supply Breakers 1A301 and 1A401 trip open deenergizing Buses 1A3 and 1A4 the candidate may assume the lockout extends to the Essential Buses or that the SBDGs will NOT automatically close in on the dead buses.
- Standby Transformer Lockout Relay will "Lock Out" the Standby Transformer the Essential Load Centers 1A3 and 1A4 are not locked out and will be re
SD 304 pgs. 24-29 Technical Reference(s):                                        (Attach if not previously provided)
-energized by the SBDGs. Plausible because the Essential Buses Supply Breakers 1A301 and 1A401 trip open deenergizing Buses 1A3 and 1A4 the candidate may assume the lockout extends to the Essential Buses or that the SBDGs will NOT automatically close in on the dead buses.
ARP 1C08B (A11)
Technical Reference(s):
Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
SD 304 pgs. 24-29 ARP 1C08B (A11)
Question Source:     Bank #
(Attach if not previously provided)
Modified Bank #                           (Note changes or attach parent)
Proposed References to be provided to applicants during examination:
New               X Question History:                         Last NRC Exam:               N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41     5 55.43 Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.
N one  Learning Objective:
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 5 55.43 Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 16 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 15
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 261000 K4.02 Importance Rating 2.6   Knowledge of STANDBY GAS TREATMENT SYSTEM design feature(s) and/or interlocks which provide for the following: Charcoal bed decay heat removal Proposed Question:
Examination Outline Cross-reference:       Level                       RO               SRO Tier #                     2 Group #                     1 K/A #                       261000       K4.02 Importance Rating           2.6 Knowledge of STANDBY GAS TREATMENT SYSTEM design feature(s) and/or interlocks which provide for the following: Charcoal bed decay heat removal Proposed Question:       RO Question # 8 Both SBGT Trains have been in operation following a LOCA in the Drywell. After some time the lineup was changed as follows:
RO Question # 8 Both SBGT Trains have been in operation following a LOCA in the Drywell. After some time the lineup was change d as follows
    *    "B" SBGT Train remains in service
"B" SBGT Train remains in service "A" SBGT Train has been placed in STANDBY "A" SBGT Train , Carbon B ed Temperature is 22 0 F and rising slowly At this time
    *    "A" SBGT Train has been placed in STANDBY
, which ONE of the following actions is required by OI 170, Standby Gas Treatment System , for the "A" SBGT Train?   A. Dispatch the fire brigade to manually start the fire deluge spray
    *    "A" SBGT Train, Carbon Bed Temperature is 220&deg;F and rising slowly At this time, which ONE of the following actions is required by OI 170, Standby Gas Treatment System, for the "A" SBGT Train?
: s. B. Initiate a manual cooldown using the Cooldown /Outside Air Valve.
A.     Dispatch the fire brigade to manually start the fire deluge sprays.
C. Dispatch the fire brigade to verify the automatic initiation of the fire deluge sprays.
B.     Initiate a manual cooldown using the Cooldown /Outside Air Valve.
D. Place the "A" SBGT Train back in service and verify Carbon Bed Temperatures lower
C.     Dispatch the fire brigade to verify the automatic initiation of the fire deluge sprays.
. Proposed Answer:
D.     Place the A SBGT Train back in service and verify Carbon Bed Temperatures lower.
B Explanation (Optional):
Proposed Answer:         B Explanation (Optional):
A. Incorrect  
A.     Incorrect - The operator has the option of manually starting the fire deluge sprays when Carbon Bed Temperatures reach 255&deg;F. The temperature given in the stem 220&deg;F is well below this.
- The operator has the option of manually starting the fire deluge sprays when Carbon Bed Temperatures reach 255 F. The temperature given in the stem 220F is well below this. B. Incorrect - The deluge system automatically initiates when charcoal temperatures reach 310 F. C. Correct - Per OI 170, Section 9.1. Manual Cooldown of SBGT System Train, Open COOLDOWN/OUTSIDE AIR VLV AV
B.     Incorrect - The deluge system automatically initiates when charcoal temperatures reach 310&deg;F.
-5801A and Place HS
C.     Correct - Per OI 170, Section 9.1. Manual Cooldown of SBGT System Train, Open COOLDOWN/OUTSIDE AIR VLV AV-5801A and Place HS-5825A INTAKE VALVE to CLOSE. Then monitor the CARBON BED TEMP Indicator TI-5838A on Panel 1C24A occasionally over the next 30 minutes to verify the carbon bed temperature remains within reasonable limits (between 150&deg;F and 255&deg;F).
-5825A INTAKE VALVE to CLOSE. Then monitor the CARBON BED TEMP Indicator TI
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                        Page 16
-5838A on Panel 1C24A occasionally over the next 30 minutes to verify the carbon bed temperature remains within reasonable limits (between 150F and 255&deg;F).


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 17 D. Incorrect  
D. Incorrect - The A SBGT Train should NOT be returned to service the train must be shutdown, cooled and monitored over the next 30 minutes to verify the carbon bed temperature remains within reasonable limits (between 150&deg;F and 255&deg;F).
- The "A" SBGT Train should NOT be returned to service the train must be shutdown, cooled and monitored over the next 30 minutes to verify the carbon bed temperature remains within reasonable limits (between 150F and 255&deg;F
Technical Reference(s): OI 170 Section 9.1, pgs. 22-23     (Attach if not previously provided)
). Technical Reference(s):
Proposed References to be provided to applicants during examination:       None Learning Objective:                                             (As available)
OI 170 Section 9.1, pgs. 22-23 (Attach if not previously provided)
Question Source:   Bank #
Proposed References to be provided to applicants during examination:
Modified Bank #                         (Note changes or attach parent)
N one  Learning Objective:
New             X Question History:                       Last NRC Exam:               N/A Question Cognitive Level:   Memory or Fundamental Knowledge       X Comprehension or Analysis 10 CFR Part 55 Content:     55.41     10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 18 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 17
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 206000  K5.06  Importance Rating 2.6    Knowledge of the operational implications of the following concepts as they apply to HIGH PRESSURE COOLANT INJECTION SYSTE M: Turbine speed measurement:  BWR
-2,3,4 Proposed Question:
RO Question # 9 The plant is at power and operators are performing post maintenance testing on the HPCI turbine in order to exit the HPCI LCO.
HPCI has been manually started in the CST
-CST mode using the manual control and adjusting the pulsar knob on the front of the flow controller. The system is stable at 3500 rpm and 2000 gpm. At this point, the operator throttles open CV
-2315, TEST BYPASS, to achieve 3000 GPM.
Which ONE of the followin g correctly describes the response of HPCI Discharge Pressure and turbine speed?  PI-2306 (HPCI) PUMP DISCHARGE PRESSURE indication on 1C03 _____(1)_____
. SI-2284, HPCI TURBINE SPEED indication on 1C03
______(2)______
. A.  (1) Rises (2) Rises  B.  (1) Lowers (2) Lowers C.  (1) Rises (2) Remains the same D.  (1) Lowers (2) Remains the same Proposed Answer:
D  Explanation (Optional):
A. Incorrect
- Pump laws dictate that a pump at constant speed will have a lower discharge pressure at higher flow. HPCI speed does not change because the control signal remains the same until the manual control knob is adjusted.
B. Incorrect
- HPCI speed does not change because the control signal remains the same until the manual control knob is adjusted.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 19  C. Incorrect - Discharge pressure will not rise but will lower with a constant speed and higher flow.
Examination Outline Cross-reference:        Level                    RO            SRO Tier #                    2 Group #                  1 K/A #                    206000    K5.06 Importance Rating        2.6 Knowledge of the operational implications of the following concepts as they apply to HIGH PRESSURE COOLANT INJECTION SYSTEM: Turbine speed measurement: BWR-2,3,4 Proposed Question:        RO Question # 9 The plant is at power and operators are performing post maintenance testing on the HPCI turbine in order to exit the HPCI LCO.
HPCI has been manually started in the CST-CST mode using the manual control and adjusting the pulsar knob on the front of the flow controller. The system is stable at 3500 rpm and 2000 gpm.
At this point, the operator throttles open CV-2315, TEST BYPASS, to achieve 3000 GPM.
Which ONE of the following correctly describes the response of HPCI Discharge Pressure and turbine speed?
PI-2306 (HPCI) PUMP DISCHARGE PRESSURE indication on 1C03 _____(1)_____.
SI-2284, HPCI TURBINE SPEED indication on 1C03 ______(2)______.
A.      (1) Rises (2) Rises B.      (1) Lowers (2) Lowers C.      (1) Rises (2) Remains the same D.      (1) Lowers (2) Remains the same Proposed Answer:          D Explanation (Optional):
A.      Incorrect - Pump laws dictate that a pump at constant speed will have a lower discharge pressure at higher flow. HPCI speed does not change because the control signal remains the same until the manual control knob is adjusted.
B.      Incorrect - HPCI speed does not change because the control signal remains the same until the manual control knob is adjusted.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 18
 
C. Incorrect - Discharge pressure will not rise but will lower with a constant speed and higher flow.
D. Correct - Pump laws dictate that a pump at constant speed will have a lower discharge pressure at higher flow. HPCI speed does not change because the control signal remains the same until the manual control knob is adjusted.
D. Correct - Pump laws dictate that a pump at constant speed will have a lower discharge pressure at higher flow. HPCI speed does not change because the control signal remains the same until the manual control knob is adjusted.
Technical Reference(s):
Technical Reference(s): SD 152, page 11 & 12                   (Attach if not previously provided)
SD 152, page 11 & 12 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
Proposed References to be provided to applicants during examination:
Question Source:       Bank #
N one  Learning Objective:
Modified Bank #                           (Note changes or attach parent)
(As available)
New             X Question History:                         Last NRC Exam:                 N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41   7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 20 Examination Outline Cross-reference:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 19
Level RO SRO Tier # 2   Group # 1   K/A # 218000 K5.01 Importance Rating 3.8   Knowledge of the operational implications of the following concepts as they apply to AUTOMATIC DEPRESSURIZATION SYSTEM: ADS logic operation Proposed Question: RO Question # 10 The plant was operating at 100% when the following events occurred:
 
A transient occurred which resulted in a total loss of feedwater A large unisolable RWCU leak OUTSIDE the Drywell has occurred HPCI is unavailable due to planned maintenance Assuming no operator action, which ONE of the following correctly state s ALL the necessary conditions for the ADS Valves to open?
Examination Outline Cross-reference:       Level                     RO             SRO Tier #                   2 Group #                   1 K/A #                     218000     K5.01 Importance Rating         3.8 Knowledge of the operational implications of the following concepts as they apply to AUTOMATIC DEPRESSURIZATION SYSTEM: ADS logic operation Proposed Question:       RO Question # 10 The plant was operating at 100% when the following events occurred:
The ADS logic will open the ADS Valves when any low pressure ECCS Pump-A. breaker is closed and RPV water level reaches Low
* A transient occurred which resulted in a total loss of feedwater
-Low-Low. B. reaches normal discharge pressure and RPV water level reaches Low
* A large unisolable RWCU leak OUTSIDE the Drywell has occurred
-Low-Low. C. breaker is closed , and RPV water level reaches Low
* HPCI is unavailable due to planned maintenance Assuming no operator action, which ONE of the following correctly states ALL the necessary conditions for the ADS Valves to open?
-Low-Low, and two minutes have elapsed. D. reaches normal discharge pressure, and RPV water level reaches Low-Low-Low, and two minutes have elapsed
The ADS logic will open the ADS Valves when any low pressure ECCS Pump A.     breaker is closed and RPV water level reaches Low-Low-Low.
. Proposed Answer:
B.     reaches normal discharge pressure and RPV water level reaches Low-Low-Low.
D Explanation (Optional):
C.     breaker is closed, and RPV water level reaches Low-Low-Low, and two minutes have elapsed.
A. Incorrect  
D.     reaches normal discharge pressure, and RPV water level reaches Low-Low-Low, and two minutes have elapsed.
- This would be true if Pump breakers were used by logic and two minute timer didn't delay actuation B. Incorrect  
Proposed Answer:         D Explanation (Optional):
- This would be true if two minute timer didn't delay actuation C. Incorrect  
A.     Incorrect - This would be true if Pump breakers were used by logic and two minute timer didn't delay actuation B.     Incorrect - This would be true if two minute timer didn't delay actuation C.     Incorrect - This would be true if Pump breakers were used by logic D.     Correct - ECCS Pump Discharge Pressure signal is used for ADS Logic, when RPV water level reaches Low-Low-Low and two minutes elapse, ADS Valves will OPEN.
- This would be true if Pump breakers were used by logic D. Correct - ECCS Pump Discharge Pressure signal is used for ADS Logic, when RPV water level reaches Low
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 20
-Low-Low and two minutes elapse, ADS Valves will OPEN
 
.
OI-183.1, pg 7 Technical Reference(s):                                      (Attach if not previously provided)
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 21 Technical Reference(s):
SD-183-1 pg 9 & 14 Proposed References to be provided to applicants during examination:       None Learning Objective:                                             (As available)
OI-183.1, pg 7 SD-183-1 pg 9 & 14 (Attach if not previously provided)
Question Source:       Bank #             WTSI 11320 Modified Bank #                       (Note changes or attach parent)
Proposed References to be provided to applicants during examination:
New Question History:                         Last NRC Exam:   2007     Duane Arnold Question Cognitive Level:     Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:       55.41     7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
N one  Learning Objective:
(As availabl e) Question Source:
Bank # WTSI 11320 Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
2007 Duane Arnold Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 22 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 21
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 215003 K6.0 2  Importance Rating 3.6   Knowledge of the effect that a loss or malfunction of the following will have on the INTERMEDIATE RANGE MONITOR (IRM) SYSTEM
Examination Outline Cross-reference:       Level                     RO               SRO Tier #                   2 Group #                   1 K/A #                     215003     K6.02 Importance Rating         3.6 Knowledge of the effect that a loss or malfunction of the following will have on the INTERMEDIATE RANGE MONITOR (IRM) SYSTEM: 24/48 volt D.C. power: Plant-Specific Proposed Question:       RO Question # 11 The plant is starting up with the following:
: 24/48 volt D.C. power: Plant
* Mode Switch is in STARTUP
-Specific Proposed Question:
* IRMs are on Range 6 24 VDC power to IRM E is then lost.
RO Question # 11 The plant is starting up with the following:
Which ONE of the following describes the effect of the power loss?
Mode Switch is in STARTUP IRMs are on Range 6 24 VDC power to IRM "E" is then lost. Which ONE of the following describes the effect of the power loss?
A. NO effect.
A. NO effect. B. ONLY a rod block will occu r. C. ONLY a half scram will occur. D. A rod block and half scram will occur. Proposed Answer:
B. ONLY a rod block will occur.
D Explanation (Optional):
C. ONLY a half scram will occur.
A. Incorrect  
D. A rod block and half scram will occur.
- With a loss of 24 VDC, the indication fails downscale and the IRM become s inoperative, causing a rod block and half scram.
Proposed Answer:         D Explanation (Optional):
B. Incorrect  
A. Incorrect - With a loss of 24 VDC, the indication fails downscale and the IRM becomes inoperative, causing a rod block and half scram.
- With a loss of 24 VDC, the IRM becomes inoperative, causing a rod block and half scram.
B. Incorrect - With a loss of 24 VDC, the IRM becomes inoperative, causing a rod block and half scram.
C. Incorrect  
C. Incorrect - With a loss of 24 VDC the indication fails downscale.
- With a loss of 24 VDC the indication fails downscale.
D. Correct - With a loss of 24 VDC, the indication fails downscale and the IRM becomes inoperative, causing a rod block and half scram.
D. Correct - With a loss of 24 VDC, the indication fails downscale and the IRM becomes inoperative, causing a rod block and half scram.
Technical Reference(s):
AOP-375, pgs 3 & 6 Technical Reference(s): OI-878.2, pg 3                         (Attach if not previously provided)
AOP-375, pgs 3 & 6 OI-878.2, pg 3 SD-878.2, pg 17 (Attach if not previously provided)
SD-878.2, pg 17 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                        Page 22


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 23        Proposed References to be provided to applicants during examination:
Proposed References to be provided to applicants during examination:     None Learning Objective:                                             (As available)
N one  Learning Objective:
Question Source:   Bank #
(As available)
Modified Bank #                         (Note changes or attach parent)
Question Source:
New             X Question History:                       Last NRC Exam:             N/A Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis             X 10 CFR Part 55 Content:     55.41     6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 24 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 23
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 239002 K6.04 Importance Rating 3.0   Knowledge of the effect that a loss or malfunction of the following will have on the RELIEF/SAFETY VALVES: D.C. power: Plant
Examination Outline Cross-reference:       Level                   RO             SRO Tier #                   2 Group #                 1 K/A #                   239002     K6.04 Importance Rating       3.0 Knowledge of the effect that a loss or malfunction of the following will have on the RELIEF/SAFETY VALVES: D.C. power: Plant-Specific Proposed Question:       RO Question # 12 The plant is operating at 100% power when the following events occur:
-Specific Proposed Question:
* 1D13 Circuit 14 "AUTO BLOWDOWN RELAY PANEL 1C45" trips
RO Question # 12 The plant is operating at 100% power when the following events occur:
* Annunciator 1C03A (C-6) ADS/LLS 125 VDC CONTROL POWER FAILURE alarms Regarding ADS operation, which ONE of the following describes the effect of the breaker trip?
1D13 Circuit 14 "AUTO BLOWDOWN RELAY PANEL 1C45" trips Annunciator 1C03A (C-6) ADS/LLS 125 VDC CONTROL POWER FAILURE alarms Regarding ADS operation, which ONE of the following describes the effect of the breaker trip?
A.     "A" ADS logic shifts to its alternate power supply so there is temporary loss of power to the ADS logic.
A. "A" ADS logic shifts to its alternate power supply so there is temporary loss of power to the ADS logic. B. "A" ADS logic has lost power; however, all 4 ADS SRVs have control power
B.     "A" ADS logic has lost power; however, all 4 ADS SRVs have control power, and there is NO effect on the operation of ADS.
, and there is NO effect on the operation of ADS.
C.     "A" ADS logic has lost power; however, ONLY PSV 4401 and PSV 4407 have alternate control power and will open during ADS initiation.
C. "A" ADS logic has lost power; however, ONLY PSV 440 1 and PSV 4407 have alternate control power and will open during ADS initiation.
D.     "A" ADS logic shifts to its alternate power supply; however, control power is lost to PSV-4402 and PSV-4405, therefore, these valves will NOT open during ADS initiation.
D. "A" ADS logic shifts to its alternate power supply
Proposed Answer:         B Explanation (Optional):
; however , control power is lost to PSV-4402 and PSV
A. Incorrect - The "A" logic does NOT have control power, there is no alternate power to the A logic.
-4405 , therefore , these valves will NOT open during ADS initiation.
B. Correct - Because either logic system is capable of producing ADS initiations in each of the four ADS valves the loss of DC power to logic "A has no affect on ADS operation.
Proposed Answer:
C. Incorrect - All the ADS SRVs have an alternate source of control power. The loss of DC power to logic "A has no affect on ADS operation and all four ADS SRVs open.
B Explanation (Optional):
D. Incorrect - The "A" logic does NOT have control power, there is no alternate power to the A logic. The loss of DC power to logic "A has no affect on ADS operation and all four ADS SRVs open.
A. Incorrect  
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 24
- The "A" logic does NOT have control power, there is no alternate power to the "A" logic.
B. Correct - Because either logic system is capable of producing ADS initiations in each of the four ADS valves the loss of DC power to logic "A" has no affect on ADS operation.
C. Incorrect  
- All the ADS SRVs have an alternate source of control power. The loss of DC power to logic "A" has no affect on ADS operation and all four ADS SRVs open
. D. Incorrect  
- The "A" logic does NOT have control power, there is no alternate power to the "A" logic. The loss of DC power to logic "A" has no affect on ADS operation and al l four ADS SRVs open.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 25 Technical Reference(s):
SD 183.1, pg 22 Technical Reference(s):                                     (Attach if not previously provided) 1C03A, C-6 Proposed References to be provided to applicants during examination:       None Learning Objective:                                             (As available)
SD 183.1, pg 22 1C03A, C-6 (Attach if not previously provided)
Question Source:       Bank #             DAEC Bank 20458 Modified Bank #                       (Note changes or attach parent)
Proposed References to be provided to applicants during examination:
New Question History:                         Last NRC Exam:             Not Used Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:       55.41   7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
N one  Learning Objective:
(As available)
Question Source:
Bank # DAEC Bank 20458 Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 26 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 25
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 212000  A1.11  Importance Rating 3.4    Ability to predict and/or monitor changes in parameters associated with operating the REACTOR PROTECTION SYSTEM controls including: System status lights and alarms Proposed Question:
RO Question # 13 Following a reactor scram the Scram Discharge Volume High Water Level Bypass Switch was placed in BYP A SS to reset the scram and was left in that position
. After the scram was reset
, the following alarms cleared:    1C05B (D-1) SCRAM DISCHARGE VOLUME NOT DRAINED 1C05B (C-1) SCRAM DISCHARGE VOLUME HI LEVEL TRIP


Then the mode switch is placed in Startup.
Examination Outline Cross-reference:      Level                      RO              SRO Tier #                    2 Group #                    1 K/A #                      212000    A1.11 Importance Rating          3.4 Ability to predict and/or monitor changes in parameters associated with operating the REACTOR PROTECTION SYSTEM controls including: System status lights and alarms Proposed Question:        RO Question # 13 Following a reactor scram the Scram Discharge Volume High Water Level Bypass Switch was placed in BYPASS to reset the scram and was left in that position.
Which ONE of the following describes the position of the Scram Discharge Volume Vent and Drain Valves (1) after resetting the scram and (2) after the mode switch is placed in Startup
After the scram was reset, the following alarms cleared:
A. (1) Open (2) Open B. (1) Open (2) Closed C. (1) Closed (2) Open D. (1) Closed (2) Closed Proposed Answer:
* 1C05B (D-1) SCRAM DISCHARGE VOLUME NOT DRAINED
A Explanation (Optional):
* 1C05B (C-1) SCRAM DISCHARGE VOLUME HI LEVEL TRIP Then the mode switch is placed in Startup.
A. Correct. The scram discharge volume high water level bypass switch only bypasses the SDV high level scram it does nothing regarding the position of the SDV vent and drain valves. Therefore when the scram is reset the SDV vent and drain valves open and will remain open even after the scram bypass switch is taken out of bypass.
Which ONE of the following describes the position of the Scram Discharge Volume Vent and Drain Valves (1) after resetting the scram and (2) after the mode switch is placed in Startup?
B. Incorrect - Once the mode switch is in startup the scram bypass is removed and the valves remain open.
A.       (1) Open (2) Open B.       (1) Open (2) Closed C.       (1) Closed (2) Open D.       (1) Closed (2) Closed Proposed Answer:         A Explanation (Optional):
A.       Correct. The scram discharge volume high water level bypass switch only bypasses the SDV high level scram it does nothing regarding the position of the SDV vent and drain valves. Therefore when the scram is reset the SDV vent and drain valves open and will remain open even after the scram bypass switch is taken out of bypass.
B.       Incorrect - Once the mode switch is in startup the scram bypass is removed and the valves remain open.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 26


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 27  C. Incorrect - the SDV vent and drain valves will be open before and open after the mode switch is placed in Startup D. Incorrect - the SDV vent and drain valves will be open before the mode switch is placed in Startup.
C. Incorrect - the SDV vent and drain valves will be open before and open after the mode switch is placed in Startup D. Incorrect - the SDV vent and drain valves will be open before the mode switch is placed in Startup.
Technical Reference(s):
Technical Reference(s): ARP 1C05B (E-1)                       (Attach if not previously provided)
ARP 1C05B (E
Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
-1) (Attach if not previously provided)
Question Source:     Bank #             DAEC Bank 48127 Modified Bank #                         (Note changes or attach parent)
Proposed References to be provided to applicants during examinati on: N one  Learning Objective:
New Question History:                       Last NRC Exam:               Not Used Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:     55.41     6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
(As available)
Question Source:
Bank # DAEC Bank 48127   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowled ge  Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 28 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 27
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 215005  A1.07  Importance Rating 3.0    Ability to predict and/or monitor changes in parameters associated with operating the AVERAGE POWER RANGE MONITOR/LOCAL POWER RANGE MONITOR SYSTEM controls including: APRM (gain adjustment factor)
Proposed Question:
RO Question # 14 The plant is operating at 100% power. The Process Computer indicates the following information:
1                  2                    3                  4                  5                  6 APRM READING 101.5            99.4              99.2 101.4 101.0            99.8 APRM GAF              0.967 1.002              1.009          0.987            0.986            1.001


Which ONE of the following provides the correct response?
Examination Outline Cross-reference:      Level                    RO              SRO Tier #                  2 Group #                  1 K/A #                    215005      A1.07 Importance Rating        3.0 Ability to predict and/or monitor changes in parameters associated with operating the AVERAGE POWER RANGE MONITOR/LOCAL POWER RANGE MONITOR SYSTEM controls including: APRM (gain adjustment factor)
Proposed Question:        RO Question # 14 The plant is operating at 100% power. The Process Computer indicates the following information:
1            2            3          4            5            6 APRM READING        101.5        99.4          99.2      101.4        101.0        99.8 APRM GAF            0.967      1.002        1.009      0.987        0.986        1.001 Which ONE of the following provides the correct response?
The indication from APRMs ___(1)___ are conservative because thermal power is ___(2)___
indicated power.
A.      (1) 1, 4, 5 (2) less than B.      (1) 2, 3, 6 (2) greater than C.      (1) 2, 3, 6 (2) less than D.      (1) 1, 4, 5 (2) greater than Proposed Answer:          A Explanation (Optional):
A.      Correct - The APRMs at all times should read no lower than actual core power. If the AGAF is greater than 1.0 then the APRM needs adjustment. Thus any AGAF >1.0 would be non-conservative with respect to power operations because actual thermal power would be greater than indicated power.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 28


The indication from APRMs ___(1)___ are conservative because thermal power is ___(2)___ indicated power.
B. Incorrect - APRMs 2, 3, 6 are NOT conservative and for the GAF to be conservative the actual power must be less than the indicated power.
A. (1)  1, 4, 5 (2)  less than  B.  (1)  2, 3, 6 (2)  greater than C. (1)  2, 3, 6  (2)  less than D. (1) 1, 4, 5  (2) greater than Proposed Answer:
C. Incorrect - Incorrect - APRMs 2, 3, 6 are NOT conservative.
A  Explanation (Optional):
D. Incorrect - For the GAF to be conservative the actual power must be less than the indicated power.
A. Correct - The APRMs at all times should read no lower than actual core power. If the AGAF is greater than 1.0 then the APRM needs adjustment. Thus any AGAF >1.0 would be n on-conservative with respect to power operations because actual thermal power would be greater than indicated power.
Technical Reference(s): SD-878.3, pgs 38 & 39                (Attach if not previously provided)
Proposed References to be provided to applicants during examination:         None Learning Objective:                                              (As available)
Question Source:      Bank #            WTSI 10732 Modified Bank #                        (Note changes or attach parent)
New Question History:                        Last NRC Exam:      2005    Monticello Question Cognitive Level:    Memory or Fundamental Knowledge Comprehension or Analysis                X 10 CFR Part 55 Content:       55.41    6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 29


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 29 B. Incorrect - APRMs 2, 3, 6 are NOT conservative and for the GAF to be conservative the actual power must be less than the indicated power. C. Incorrect - Incorrect
Examination Outline Cross-reference:         Level                 RO             SRO Tier #                 2 Group #               1 K/A #                 211000     A2.03 Importance Rating     3.2 Ability to (a) predict the impacts of the following on the STANDBY LIQUID CONTROL SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: A.C. power failures Proposed Question:           RO Question # 15 An ATWS has occurred resulting in the need to inject boron using Standby Liquid Control (SBLC).
- APRMs 2, 3, 6 are NOT conservative
* A loss of Instrument AC 1Y11 occurs
. D. Incorrect - For the GAF to be conservative the actual power must be less than the indicated power.
* The operator places the STANDBY LIQUID CONTROL Switch HS-2613 in the PUMPS A and B RUN position (1) How will the SBLC system and indications respond?
Technical Reference(s):
(2) What actions are required?
SD-878.3, pg s 38 & 39 (Attach if not previously provided)        Proposed References to be provided to applicants during examination:
A.       (1)   Both pumps indicate they are running and squib valve continuity lights extinguish.
N one  Learning Objective:
SBLC tank level, pump discharge pressure and flow will indicate zero.
(As available)
(2)   Inject boron into the RPV with RWCU (SEP 304).
Question Source:
B.       (1)   Both pumps indicate they are running and squib valve continuity lights extinguish.
Bank # WTSI 10732 Modified Bank #
SBLC tank level, pump discharge pressure and flow will indicate zero.
(Note changes or attach parent)
(2)   Send an operator to the SBLC system to monitor parameters.
New    Question History:
C.       (1)   Both pumps indicate they are shutdown and the squib valve continuity lights are illuminated. Pump discharge pressure and flow will indicate zero. SBLC tank level will indicate normally.
Last NRC Exam: 2005 Monticello Question Cognitive Level:
(2)   Inject boron into the RPV with RWCU (SEP 304).
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
D.       (1)   Both pumps indicate they are shutdown and the squib valve continuity lights are illuminated. Pump discharge pressure and flow will indicate zero. SBLC tank level will indicate normally.
55.41 6  55.43  Design, components, and function of reactivity control mechanisms and instrumentation.
(2)   Send an operator to the SBLC system to monitor parameters Proposed Answer:             B Explanation (Optional):
Comments:
A.       Incorrect - Both pumps and squib valves operate normally (powered from 1B34 and 1B44) there is no need for alternate boron injection DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 30
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 30 Examination Outline Cross
-reference:
Level RO SRO Tier # 2   Group # 1   K/A # 211000 A2.03 Importance Rating 3.2   Ability to (a) predict the impacts of the following on the STANDBY LIQUID CONTROL SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: A.C. power failures Proposed Question:
RO Question # 15 A n ATWS has occurred resulting in the need to inject boron using Standby Liquid Control (SBLC). A loss of Instrument AC 1Y11 occurs The operator places the STANDBY LIQUID CONTROL Switch HS
-2613 in the PUMPS A and B RUN position (1) How will the SBLC system and indications respond
? (2) What actions are required?
A. (1) Both pump s indicate the y are running and squib valve continuity lights extinguish. SBLC tank level
, pump discharge pressure and flow will indicate zero.
(2) Inject boron into the RPV with RWCU (SEP 304).
B. (1) Both pump s indicate the y are running and squib valve continuity lights extinguish. SBLC tank level
, pump discharge pressure and flow will indicate zero.
(2) S end an operator to the SBLC system to monitor parameters.
C. (1) Both pump s indicate the y are shutdown and the squib valve continuity lights are illuminated. Pump discharge pressure and flow will indicate zero. SBLC tank level will indicate normally.
(2) Inject boron into the RPV with RWCU (SEP 304)
. D. (1) Both pump s indicate they are shutdown and the squib valve continuity lights are illuminated. Pump discharge pressure and flow will indicate zero. SBLC tank level will indicate normally.
(2) Send an operator to the SBLC system to monitor parameters Proposed Answer:
B Explanation (Optional):
A. Incorrect  
- Both pumps and squib valves operate normally (powered from 1B34 and 1B44) there is no need for alternate boron injection


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 31 B. Correct - Per AOP 317, The loss of Instrument AC will result in a loss of power to: SBLC Storage Tank Level (LI
B. Correct - Per AOP 317, The loss of Instrument AC will result in a loss of power to: SBLC Storage Tank Level (LI-2600A), SBLC Pump Discharge Pressure (PI-2605), SBLC System Flow (FI-2620), Injection Valve Position (V26-0032). Therefore, flow and tank level indication will fail to zero. The pumps & squib valves have NOT lost power (powered from 1B34 and 1B44). There is NO need for alternate boron injection and IAW the ARP for the low SBLC tank level the control room should send an operator to the SBLC system to monitor the system parameters.
-2600A), SBLC Pump Discharge Pressure (PI
C. Incorrect - Both pumps and squib valves operate normally (powered from 1B34 and 1B44), the loss of 1Y11 will cause SBLC tank level, flow and pressure to indicate zero.
-2605), SBLC System Flow (FI
-2620), Injection Valve Position (V26
-0032). Therefore, flow and tank level indication will fail to zero. The pumps & squib valves have NOT lost power (powered from 1B34 and 1B44). There is NO need for alternate boron injection and IAW the ARP for the low SBLC tank level the control room should send an operator to the SBLC system to monitor the system parameters.
C. Incorrect  
- Both pumps and squib valves operate normally (powered from 1B34 and 1B44), the loss of 1Y11 will cause SBLC tank level, flow and pressure to indicate zero.
There is NO need for alternate boron injection and IAW the ARP for the low SBLC tank level the control room should send an operator to the SBLC system to monitor the system parameters.
There is NO need for alternate boron injection and IAW the ARP for the low SBLC tank level the control room should send an operator to the SBLC system to monitor the system parameters.
D. Incorrect  
D. Incorrect - Both pumps and squib valves operate normally (powered from 1B34 and 1B44), the loss of 1Y11 will cause flow and pressure to indicate zero AOP 317, pg 10 Technical Reference(s):                                       (Attach if not previously provided)
- Both pumps and squib valves operate normally (powered from 1B34 and 1B44), the loss of 1Y11 will cause flow and pressure to indicate zero Technical Reference(s):
ARP 1C05A (E-3)
AOP 317, pg 10 ARP 1C05A (E
Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
-3) (Attach if not previously provided)
DAEC Bank #
Proposed References to be provided to applicants during examination:
Question Source:     Bank #
N one  Learning Objective:
46971(1410)
(As available)
Modified Bank #                           (Note changes or attach parent)
Question Source:
New Question History:                           Last NRC Exam:             Not Used Question Cognitive Level:       Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:         55.41     7 55.43 Comments:
Bank # DAEC Bank # 46971(1410)
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 31
Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
Not Used Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 7 55.43 Comments:  


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 32 Examination Outline Cross
Examination Outline Cross-reference:         Level                   RO           SRO Tier #                 2 Group #                 1 K/A #                   400000   A2.03 Importance Rating       2.9 Ability to (a) predict the impacts of the following on the CCWS and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal operation: High/low CCW temperature Proposed Question:         RO Question # 16 DAEC has just completed refueling and is back on line. The following additional conditions exist:
-reference:
* The Fuel Pool Cooling (FPC) system is in its normal configuration IAW OI 435, Fuel Pool Cooling System
Level RO SRO Tier # 2   Group # 1   K/A # 400000 A2.03 Importance Rating 2.9   Ability to (a) predict the impacts of the following on the CCWS and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal operation: High/low CCW temperature Proposed Question:
* The FPC Heat Exchanger (HX) outlet temperature is slowly rising due to the recently discharged fuel Based on the above, which ONE of the following is correct regarding:
RO Question
(1) the impact of the FPC HX outlet temperature reaching 130&deg;F AND (2) the action taken in order to mitigate the rising temperature?
# 16 DAEC has just completed refueling and is back on line. The following additional conditions exist:   The Fuel Pool Cooling (FPC) system is in its normal configuration IAW OI 435, Fuel Pool Cooling System The FPC Heat Exchanger (HX) outlet temperature is slowly rising due to the recently discharged fuel
A.        (1) Temperature limit on the Filter/Demin resin will be exceeded.
(2) Throttle close the FPC HX bypass valve as required to increase flow through the heat exchanger.
B.        (1) Temperature limit on the Filter/Demin resin will be exceeded.
(2) Throttle open the FPC HX RBCCW outlet isolation valve as required to increase cooling to the heat exchanger.
C.        (1) Temperature limit on the Spent Fuel Pool will be exceeded.
(2) Throttle close the FPC HX bypass valve as required to increase flow through the heat exchanger.
D.        (1) Temperature limit on the Spent Fuel Pool will be exceeded.
(2) Throttle open the FPC HX RBCCW outlet isolation valve as required to increase cooling to the heat exchanger.
Proposed Answer:            B Explanation (Optional):
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 32


Based on the above, which ONE of the following is correct regarding:
A. Incorrect: The Heat Exchanger bypass valve is a normally closed valve. Temperature is controlled by throttling the RBCCW flow to the heat exchanger. Plausible if the candidate believes that the HX bypass valve is normally in mid position to control system temperature.
(1)  the impact of the FPC HX outlet temperature reaching 130&deg;F AND  (2) the action taken in order to mitigate the rising temperature?
B. Correct: The temperature limit to preclude resin damage is 130 degrees. Temperature control is via throttling the RBCCW cooling flow through the heat exchanger.
A.  (1) Temperature limit on the Filter/Demin resin will be exceeded
C. Incorrect: The temperature limit on the Spent Fuel Pool will not be exceeded till 150 degrees. Additionally, the temperature is controlled by throttling the RBCCW flow to the heat exchanger.
.  (2) Throttle close the FPC HX bypass valve as required to increase flow through the heat exchanger.
D. Incorrect: The temperature limit on the Spent Fuel Pool will not be exceeded till 150 degrees.
B.  (1) Temperature limit on the Filter/Demin resin will be exceeded
Technical Reference(s): SD 435, page 9                         (Attach if not previously provided)
.  (2) Throttle open the FPC HX RBCCW outlet isolation valve as required to increase cooling to the heat exchanger.
OI 435, section 4.0, Normal Operation of the FPC System, page 12.
C.  (1) Temperature limit on the Spent Fuel Pool will be exceeded
Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
.  (2) Throttle close the FPC HX bypass valve as required to increase flow through the heat exchanger.
Question Source:     Bank #
D.  (1) Temperature limi t on the Spent Fuel Pool will be exceeded. (2) Throttle open the FPC HX RBCCW outlet isolation valve as required to increase cooling to the heat exchanger.
Modified Bank #                         (Note changes or attach parent)
Proposed Answer:
New               X Question History:                           Last NRC Exam:               N/A Question Cognitive Level:       Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:         55.41     10 55.43 Secondary coolant and auxiliary systems that affect the facility.
B  Explanation (Optional):
Comments:
 
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 33
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 33 A. Incorrect: The Heat Exchanger bypass valve is a normally closed valve. Temperature is controlled by throttling the RBCCW flow to the heat exchanger. Plausible if the candidate believes that the HX bypass valve is normally in mid position to control system temperature.
B. Correct: The temperature limit to preclude resin damage is 130 degrees. Temperature control is via throttling the RBCCW cooling flow through the heat exchanger.
C. Incorrect:
The temperature limit on the Spent Fuel Pool will not be exceeded till 150 degrees. Additionally, the temperature is controlled by throttling the RBCCW flow to the heat exchanger.
D. Incorrect: The temperature limit on the Spent Fuel Pool will not be exceeded till 150 degrees. Technical Reference(s):
SD 435, page 9 (Attach if not previously provided)
OI 435, section 4.0, Normal Operation of the FPC System, page 12. Proposed References to be provided to applicants during examination:
None   Learning Objective:
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X Question History:
Last NRC Exam:
N/A   Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10 55.43 Secondary coolant and auxiliary systems that affect the facility.
Comments:  
 
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 34 Examination Outline Cross
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 203000  A3.02  Importance Rating 4.0    Ability to monitor automatic operations of the RHR/LPCI:  INJECTION MODE (PLANT SPECIFIC) including: Pump start Proposed Question:
RO Question # 17 The plant is operating at 100% power when a Reactor SCRAM on High DRYWELL PRESSURE occurs simultaneously with a STARTUP and STANDBY TRANSFORMER Lockout. Both Standby Diesel Generators START as designed and come up to rated speed and voltage.
Reactor Water Level: 100 inches and rising slowly Reactor Pressure: 800 psig and lowering slowly Which of the following describe the ECCS response to these conditions?


After the SBDG Output B reakers CLOSE, ... A. "A" and "B" RHR Pumps START after 5 seconds "C" and "D" RHR Pumps START after 10 seconds "A" and "B" Core Spray Pumps START after 15 seconds B. "A" and "C" RHR Pumps START after 5 seconds "B" and "D" RHR Pumps START after 10 sec onds "A" and "B" Core Spray Pumps START after 15 seconds C. "A" and "B" Core Spray Pumps START after 5 seconds "A" and "B" RHR Pumps START after 10 seconds "C" and "D" RHR Pumps START after 15 seconds D. "A" and "B" Core Spray Pumps START after 5 seconds "A" and "C" RHR Pumps START after 10 seconds "B" and "D" RHR Pumps START after 15 seconds Proposed Answer:
Examination Outline Cross-reference:      Level                  RO              SRO Tier #                2 Group #                1 K/A #                  203000      A3.02 Importance Rating      4.0 Ability to monitor automatic operations of the RHR/LPCI: INJECTION MODE (PLANT SPECIFIC) including: Pump start Proposed Question:        RO Question # 17 The plant is operating at 100% power when a Reactor SCRAM on High DRYWELL PRESSURE occurs simultaneously with a STARTUP and STANDBY TRANSFORMER Lockout. Both Standby Diesel Generators START as designed and come up to rated speed and voltage.
C Explanation (Optional):
* Reactor Water Level: 100 inches and rising slowly
A. Incorrect  
* Reactor Pressure: 800 psig and lowering slowly Which of the following describe the ECCS response to these conditions?
- The CS pumps in both subsystems are automatically started approximately 5 seconds after AC power is available. The RHR C and D pumps approximately 15 seconds after AC power is available. The RHR A and B pumps approximately 10 seconds after AC power is available
After the SBDG Output Breakers CLOSE, ...
A.       "A" and "B" RHR Pumps START after 5 seconds "C" and "D" RHR Pumps START after 10 seconds "A" and "B" Core Spray Pumps START after 15 seconds B.       "A" and "C" RHR Pumps START after 5 seconds "B" and "D" RHR Pumps START after 10 seconds "A" and "B" Core Spray Pumps START after 15 seconds C.       "A" and "B" Core Spray Pumps START after 5 seconds "A" and "B" RHR Pumps START after 10 seconds "C" and "D" RHR Pumps START after 15 seconds D.       "A" and "B" Core Spray Pumps START after 5 seconds "A" and "C" RHR Pumps START after 10 seconds "B" and "D" RHR Pumps START after 15 seconds Proposed Answer:         C Explanation (Optional):
A.       Incorrect - The CS pumps in both subsystems are automatically started approximately 5 seconds after AC power is available. The RHR C and D pumps approximately 15 seconds after AC power is available. The RHR A and B pumps approximately 10 seconds after AC power is available DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                  Page 34


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 35 B. Incorrect - The CS pumps in both subsystems are automatically started approximately 5 seconds after AC power is available. The RHR C and D pumps approximately 15 seconds after AC power is available. The RHR A and B pumps approximately 10 seconds after AC power is available C. Correct - Upon receipt of an initiation signal, the CS pumps in both subsystems are automatically started approximately 5 seconds after AC power is available.
B. Incorrect - The CS pumps in both subsystems are automatically started approximately 5 seconds after AC power is available. The RHR C and D pumps approximately 15 seconds after AC power is available. The RHR A and B pumps approximately 10 seconds after AC power is available C. Correct - Upon receipt of an initiation signal, the CS pumps in both subsystems are automatically started approximately 5 seconds after AC power is available.
Upon receipt of an initiation signal, all four LPCI pumps are automatically started (A and B pumps approximately 10 seconds after AC power is available, and C and D pumps approximately 15 seconds after AC power is available).
Upon receipt of an initiation signal, all four LPCI pumps are automatically started (A and B pumps approximately 10 seconds after AC power is available, and C and D pumps approximately 15 seconds after AC power is available).
D. Incorrect  
D. Incorrect - The CS pumps in both subsystems are automatically started approximately 5 seconds after AC power is available. The RHR C and D pumps approximately 15 seconds after AC power is available. The RHR A and B pumps approximately 10 seconds after AC power is available SD 149, pg 20 SD 151, pg 18 Technical Reference(s):                                        (Attach if not previously provided)
- The CS pumps in both subsystems are automatically started approximately 5 seconds after AC power is available. The RHR C and D pumps approximately 15 seconds after AC power is available. The RHR A and B pumps approximately 10 seconds after AC power is available Technical Reference(s):
OI 149, pg 11 OI 151, pg 6 Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
SD 149, pg 20 SD 151, pg 18 OI 149, pg 11 OI 151, pg 6 (Attach if not previously provided)
Question Source:       Bank #             DAEC Bank 46127 Modified Bank #                         (Note changes or attach parent)
Proposed References to be provided to applicants during examination:
New Question History:                         Last NRC Exam:               Not Used Question Cognitive Level:     Memory or Fundamental Knowledge       X Comprehension or Analysis 10 CFR Part 55 Content:       55.41     7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
N one  Learning Objective:
(As available)
Question Source:
Bank # DAEC Bank 46127   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
Not Used Question Cognitive Level
: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 36 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 35
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 223002 A3.03 Importance Rating 2.5   Ability to monitor automatic operations of the PRIMARY CONTAINMENT ISOLATION SYSTEM/NUCLEAR STEAM SUPPLY SHUT
Examination Outline Cross-reference:       Level                     RO               SRO Tier #                   2 Group #                   1 K/A #                     223002     A3.03 Importance Rating         2.5 Ability to monitor automatic operations of the PRIMARY CONTAINMENT ISOLATION SYSTEM/NUCLEAR STEAM SUPPLY SHUT-OFF including: SPDS/ERIS/CRIDS/GDS: Plant-Specific Proposed Question:         RO Question # 18 A plant startup and heatup is in progress at 600 psig RPV pressure. The Main Turbine is in Chest Warming. IDT computer terminals are set up as follows:
-OFF including: SPDS/ERIS/CRIDS/GDS: Plant
* The terminal next to 1C14 is being used to monitor KAMAN parameters.
-Specific Proposed Question:
* The Chemist is collecting data from the MIDAS terminal.
RO Question # 18 A plant startup and heatup is in progress at 600 psig RPV pressure. The Main Turbine is in Chest Warming. IDT computer terminals are set up as follows:   The terminal next to 1C14 is being used to monitor KAMAN parameters.
* The terminal to the left of the ANSOE desk is being used as the alarm monitor as usual.
The Chemist is collecting data from the MIDAS terminal.
The terminal to the left of the ANSOE desk is being used as the alarm monitor as usual.
For the remaining terminals, which set of Plant Process Computer displays meets the requirement for this plant condition?
For the remaining terminals, which set of Plant Process Computer displays meets the requirement for this plant condition?
A. TURBINE (Key turbine parameters)
A.       TURBINE (Key turbine parameters)
Group Display 15 (APRM and other data)
Group Display 15 (APRM and other data)
STATUS (Plant status overview display)
STATUS (Plant status overview display)
B. HEATUP (9 Reactor Temperature parameters)
B.       HEATUP (9 Reactor Temperature parameters)
Group Display 32 (Startup parameters)
Group Display 32 (Startup parameters)
POWER (Turbine parameter display)
POWER (Turbine parameter display)
C. SPDS Containment Conditions DR (Rod position display)
C.       SPDS Containment Conditions DR (Rod position display)
Group Display 3 (Turbine vibration data)
Group Display 3 (Turbine vibration data)
D. SCR (Strip Chart Request output points)
D.       SCR (Strip Chart Request output points)
PPC Menu (Top Level Menu)
PPC Menu (Top Level Menu)
Group Display 33 (Turbine Startup parameters)
Group Display 33 (Turbine Startup parameters)
Proposed Answer:
Proposed Answer:           C Explanation (Optional):
C Explanation (Optional):
A.       Incorrect - All options are groups of normal displays used in the control room. Plausible because they all contain displays that may be used at times during reactor startup /
A. Incorrect - All options are groups of normal displays used in the control room. Plausible because they all contain displays that may be used at times during reactor startup / turbine warm-up, but incorrect because they do not contain SPDS displays.
turbine warm-up, but incorrect because they do not contain SPDS displays.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 36


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 37 B. Incorrect  
B. Incorrect - All options are groups of normal displays used in the control room. Plausible because they all contain displays that may be used at times during reactor startup /
- All options are groups of normal displays used in the control room. Plausible because they all contain displays that may be used at times during reactor startup / turbine warm-up, but incorrect because they do not contain SPDS displays.
turbine warm-up, but incorrect because they do not contain SPDS displays.
C. Correct - "SPDS should be continuously displayed in the Control Room. Any of the SPDS displays (top level, 2nd level, 3rd level or graphs) are acceptable. Containment Conditions is an SPDS display that displays containment isolation valve status. D. Incorrect  
C. Correct - "SPDS should be continuously displayed in the Control Room. Any of the SPDS displays (top level, 2nd level, 3rd level or graphs) are acceptable. Containment Conditions is an SPDS display that displays containment isolation valve status.
- All options are groups of normal displays used in the control room. Plausible because they all contain displays that may be used at times during reactor startup / turbine warm-up, but incorrect because they do not contain SPDS displays.
D. Incorrect - All options are groups of normal displays used in the control room. Plausible because they all contain displays that may be used at times during reactor startup /
Technical Reference(s):
turbine warm-up, but incorrect because they do not contain SPDS displays.
OI-831.4, P&L #5 (Attach if not previously provided)
Technical Reference(s): OI-831.4, P&L #5                       (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
N one  Learning Objective:
Question Source:     Bank #             DAEC Bank Modified Bank # 48747                   (Note changes or attach parent)
(As available)
New Question History:                         Last NRC Exam:               Not Used Question Cognitive Level:     Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:       55.41   10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Question Source:
Bank # DAEC Bank Modified Bank #
48747 (Note changes or attach parent)
New   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 1 0  55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 38 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 37
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 262002 A4.01 Importance Rating 2.8   Ability to manually operate and/or monitor in the control room: Transfer from alternative source to preferred source Proposed Question:
Examination Outline Cross-reference:     Level                     RO             SRO Tier #                   2 Group #                   1 K/A #                     262002     A4.01 Importance Rating         2.8 Ability to manually operate and/or monitor in the control room: Transfer from alternative source to preferred source Proposed Question:       RO Question # 19 The plant is at 100% power when the following sequence occurs:
RO Question # 19 The plant is at 100% power when the following sequence occurs:   UPS Inverter 1D45 output voltage lowers to 80% of nominal output voltage Ten seconds later, UPS Inverter 1D45 output voltage recovers to its nominal output voltage Which ONE of the following is correct regarding:
* UPS Inverter 1D45 output voltage lowers to 80% of nominal output voltage
(1) The response of the UPS AND (2) Any associated control room indications?
* Ten seconds later, UPS Inverter 1D45 output voltage recovers to its nominal output voltage Which ONE of the following is correct regarding:
UPS distribution panel 1Y23 is currently being supplied by-A. (1) Regulating Transformer 1Y4 (2) Both feedwater regulating valves are locked up due to the "break before make" transfer B. (1) Regulating Transformer 1Y4 (2) There are no adverse indications in the control room due to the "make before break" transfer C. (1) Static Inverter 1D45 (2) Both feedwater regulating valves are locked up due to the "break before make" transfer D. (1) Static Inverter 1D45 (2) There are no adverse indications in the control room due to the "make before break" transfer   Proposed Answer:
(1) The response of the UPS AND (2) Any associated control room indications?
D Explanation (Optional):
UPS distribution panel 1Y23 is currently being supplied by A.         (1) Regulating Transformer 1Y4 (2) Both feedwater regulating valves are locked up due to the break before make transfer B.         (1) Regulating Transformer 1Y4 (2) There are no adverse indications in the control room due to the make before break transfer C.         (1) Static Inverter 1D45 (2) Both feedwater regulating valves are locked up due to the break before make transfer D.         (1) Static Inverter 1D45 (2) There are no adverse indications in the control room due to the make before break transfer Proposed Answer:         D Explanation (Optional):
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 38


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 39 A. Incorrect: When Inverter output voltage lowered, the Static Transfer switch transferred the power supply to the Regulating Transformer 1Y4. When Inverter output voltage recovered, it transferred back to the Inverter. These transfers are "make before break" and would have no adverse impact on plant systems. Plausible if the candidate believes that a manual transfer back to the inverter is required. Additionally if the candidate believes it is a "break before make" transfer, both feed reg valves would lock up (see AOP 357, Loss of 120 VAC UPS)
A. Incorrect: When Inverter output voltage lowered, the Static Transfer switch transferred the power supply to the Regulating Transformer 1Y4. When Inverter output voltage recovered, it transferred back to the Inverter. These transfers are make before break and would have no adverse impact on plant systems. Plausible if the candidate believes that a manual transfer back to the inverter is required. Additionally if the candidate believes it is a break before make transfer, both feed reg valves would lock up (see AOP 357, Loss of 120 VAC UPS)
B. Incorrect: When Inverter output voltage lowered, the Static Transfer switch transferred the power supply to the Regulating Transformer 1Y4. When Inverter output voltage recovered, it transferred back to the Inverter. Plausible if the candidate believes that a manual transfer back to the inverter is required.
B. Incorrect: When Inverter output voltage lowered, the Static Transfer switch transferred the power supply to the Regulating Transformer 1Y4. When Inverter output voltage recovered, it transferred back to the Inverter. Plausible if the candidate believes that a manual transfer back to the inverter is required.
C. Incorrect: The transfers are "make before break" and would have no adverse impact on plant systems. Plausible if the candidate believes the transfer is similar to that of transfer switch 1Y22 which is a "break before make" transfer.
C. Incorrect: The transfers are make before break and would have no adverse impact on plant systems. Plausible if the candidate believes the transfer is similar to that of transfer switch 1Y22 which is a break before make transfer.
D. Correct: When Inverter output voltage lowered, the Static Transfer switch transferred the power supply to Regulating Transformer 1Y4. When Inverter output voltage recovered, it transferred back to the Inverter. The transfers are "make before break" resulting in continuous power to 1Y23 distribution panel.
D. Correct: When Inverter output voltage lowered, the Static Transfer switch transferred the power supply to Regulating Transformer 1Y4. When Inverter output voltage recovered, it transferred back to the Inverter. The transfers are make before break resulting in continuous power to 1Y23 distribution panel.
Technical Reference(s):
Technical Reference(s): SD 357, pages 10 and 11                 (Attach if not previously provided)
SD 357, pages 10 and 11 (Attach if not previously provided)
AOP 357, page 2 Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
AOP 357, page 2 Proposed References to be provided to applicants during examination:
Question Source:       Bank #
None Learning Objective:
Modified Bank #                         (Note changes or attach parent)
(As available)
New             X Question History:                         Last NRC Exam:                 NA Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41   7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Question Source
: Bank #   Modified Bank #
(Note changes or attach parent)
New X Question History:
Last NRC Exam:
NA Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 40 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 39
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 2 64000  A4.02 Importance Rating 3.4   Ability to manually operate and/or monitor in the control room: Synchroscope Proposed Question:
Examination Outline Cross-reference:     Level                     RO             SRO Tier #                     2 Group #                   1 K/A #                     264000      A4.02 Importance Rating         3.4 Ability to manually operate and/or monitor in the control room: Synchroscope Proposed Question:       RO Question # 20 OI 324, Standby Diesel Generators, Section 6.5, PARALLELING THE A SBDG SYSTEM TO ESSENTIAL BUS 1A3, is being performed.
RO Question # 20 OI 324, Standby Diesel Generators, Section 6.5 , PARALLELING THE "A" SBDG SYSTEM TO ESSENTIAL BUS 1A3 , is being performed
Which ONE of the following describes what the operator must ensure during this evolution?
. Which ONE of the following describes what the operator must ensure during this evolution?
Adjust the INCOMING VOLTS SYNCHRONIZE to slightly ____(1)____ than RUNNING VOLTS SYNCHRONIZE.
Adjust the INCOMING VOLTS SYNCHRONIZE to slightly ____(1)____
Using the A DIESEL GENERATOR 1G-31 SPEED ADJUST, adjust diesel generator speed to a slow, ____(2)____ synchroscope rotation.
than RUNNING VOLTS SYNCHRONIZE.
A.       (1) lower (2) clockwise B.       (1) higher (2) clockwise C.       (1) lower (2) counter clockwise D.       (1) higher (2) counter clockwise Proposed Answer:         B Explanation (Optional):
Using the A DIESEL GENERATOR 1G
A.       Incorrect - Incoming voltages must be raised to slightly more than running volts.
-31 SPEED ADJUST, adjust diesel generator speed to a slow, ____(2)____
B.       Correct - Incoming voltages must be raised to slightly more than running volts and the diesel speed adjusted to where the Synchroscope is rotating slowly in the clockwise direction.
synchroscope rotation.
C.       Incorrect - Incoming voltages must be raised to slightly more than running volts and the diesel speed adjusted to where the Synchroscope is rotating slowly in the clockwise direction.
A. (1) lower (2) clockwise B. (1) higher (2) clockwise C. (1) lower (2) counter clockwise D. (1) higher (2) counter clockwise Proposed Answer:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 40
B Explanation (Optional):
A. Incorrect  
- Incoming voltages must be raised to slightly more than running volts.
B. Correct - Incoming voltages must be raised to slightly more than running volts and the diesel speed adjusted to where the Synchroscope is rotating slowly in the clockwise direction.
C. Incorrect  
- Incoming voltages must be raised to slightly more than running volts and the diesel speed adjusted to where the Synchroscope is rotating slowly in the clockwise direction.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 41 D. Incorrect  
D. Incorrect - the diesel speed adjusted to where the Synchroscope is rotating slowly in the clockwise direction.
- the diesel speed adjusted to where the Synchroscope is rotating slowly in the clockwise direction.
Technical Reference(s): OI-324, Sect 6.5, pg 33             (Attach if not previously provided)
Technical Reference(s):
Proposed References to be provided to applicants during examination:       None Learning Objective:                                             (As available)
OI-324, Sect 6.5, pg 33 (Attach if not previously provided)
Question Source:     Bank #             WTSI 1738 Modified Bank #                         (Note changes or attach parent)
Proposed References to be provided to applicants during examination: N one  Learning Objective:
New Question History:                         Last NRC Exam:     2007     Susquehanna Question Cognitive Level:     Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:       55.41     10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
(As available)
Question Source:
Bank # WTSI 1738   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
2007 Susquehanna Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 42  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 41
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 259002 2.4.50 Importance Rating 4.2   Emergency Procedures / Plan: Ability to verify system alarm setpoints and operate controls identified in the alarm response manual.
Examination Outline Cross-reference:         Level                   RO             SRO Tier #                   2 Group #                 1 K/A #                   259002     2.4.50 Importance Rating       4.2 Emergency Procedures / Plan: Ability to verify system alarm setpoints and operate controls identified in the alarm response manual.
Proposed Question:
Proposed Question:         RO Question # 21 The plant is operating at 100% power when the following indications occur:
RO Question # 21 The plant is operating at 100% power when the following indications occur:
* 1C05A (D-1), REACTOR VESSEL HI/LO LEVEL RECORDER ALARM actuates.
1C05A (D-1), REACTOR VESSEL HI/LO LEVEL RECORDER ALARM actuates.
    *    "B" GEMAC RPV Water Level Indicator LI-4560 indicates 198 inches, RISING.
  "B" GEMAC RPV Water Level Indicator LI
    *    "A" and "C" GEMAC RPV Water Level Indicators LI-4559 and 4561 indicates 186 inches, LOWERING.
-4560 indicates 198 inches, RISING.
* Reactor Vessel Level Control is in 3 ELEMENT with B Level selected.
  "A" and "C" GEMAC RPV Water Level Indicators LI
* Total Steam Flow is 7.0 Mlbm/hr.
-4559 and 4561 indicates 186 inches, LOWERING.
* Total Feedwater Flow is 6.5 Mlbm/hr.
Reactor Vessel Level Control is in "3" ELEMENT with "B" Level selected.
Total Steam Flow is 7.0 Mlbm/hr.
Total Feedwater Flow is 6.5 Mlbm/hr.
Which ONE of the following is correct regarding the ACTUAL RPV Water Level trend and the action that will stabilize RPV Water Level?
Which ONE of the following is correct regarding the ACTUAL RPV Water Level trend and the action that will stabilize RPV Water Level?
ACTUAL RPV Water Level is:
ACTUAL RPV Water Level is:
A. RISING; place the 1
A.       RISING; place the 1-ELEMENT 3-ELEMENT Control Switch in the 1-ELEMENT position.
-ELEMENT 3-ELEMENT Control Switch in the 1
B.       LOWERING; place the 1-ELEMENT 3-ELEMENT Control Switch in the 1-ELEMENT position.
-ELEMENT position. B. LOWERING; place the 1
C.       RISING; select A-LEVEL on REACTOR WATER LEVEL CONTROL INPUT SELECT HSS-4560.
-ELEMENT 3-ELEMENT Control Switch in the 1
D.       LOWERING; select A-LEVEL on REACTOR WATER LEVEL CONTROL INPUT SELECT HSS-4560.
-ELEMENT position. C. RISING; select A
Proposed Answer:           D Explanation (Optional):
-LEVEL on REACTOR WATER LEVEL CONTROL INPUT SELECT HSS-4560. D. LOWERING; select A
A.       Incorrect - Level is lowering, this response is plausible and would be a correct trend and action for a Feedwater Flow input failed LOW.
-LEVEL on REACTOR WATER LEVEL CONTROL INPUT SELECT HSS
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                        Page 42
-4560. Proposed Answer:
D Explanation (Optional):
A. Incorrect  
- Level is lowering, this response is plausible and would be a correct trend and action for a Feedwater Flow input failed LOW.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 43 B. Incorrect  
B. Incorrect - Level is lowering, this response with level rising is plausible and would be a correct trend and action for a Steam Flow input failed HIGH.
- Level is lowering, this response with level rising is plausible and would be a correct trend and action for a Steam Flow input failed HIGH. C. Incorrect  
C. Incorrect - This is plausible; would be true for mismatched Steam Flow and Feed Flow with no disparity between level channels.
- This is plausible; would be true for mismatched Steam Flow and Feed Flow with no disparity between level channels.
D. Correct - With LI-4559 rising and redundant channels LI-4560 and LI-4561 lowering, level channel failure is indicated. Additionally with steam flow greater than feedwater flow the lowering level is substantiated. This will be corrected by swapping level channels as directed in the ARP.
D. Correct - With LI-4559 rising and redundant channels LI
Technical Reference(s): ARP 1C05A D-1                           (Attach if not previously provided)
-4560 and LI
Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
-4561 lowering, level channel failure is indicated. Additionally with steam flow greater than feedwater flow the lowering level is substantiated. This will be corrected by swapping level channels as directed in the ARP.
Question Source:     Bank #           WTSI 4078 Modified Bank                             (Note changes or attach parent)
Technical Reference(s):
New Question History:                         Last NRC Exam:       2007     Duane Arnold Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41     7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
ARP 1C05A D
-1 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
None Learning Objective:
(As available)
Question Source:
Bank # WTSI 4078   Modified Bank  
(Note changes or attach parent)
New   Question History:
Last NRC Exam
: 2007 Duane Arnold Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 44 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 43
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 262002 2.4.3 Importance Rating 3.7   Emergency Procedures / Plan: Ability to identify post-accident instrumentation.
Examination Outline Cross-reference:     Level                     RO               SRO Tier #                     2 Group #                   1 K/A #                     262002     2.4.3 Importance Rating         3.7 Emergency Procedures / Plan: Ability to identify post-accident instrumentation. (Uninterruptable Power Supply)
(Uninterruptable Power Supply)
Proposed Question:     RO Question # 22 Which ONE of the following is a post-accident instrument that will lose power during a loss of 120 VAC Instrument Control Power Panel 1Y11?
Proposed Question:
RO Question # 22 Which ONE of the following is a post
-accident instrument that will lose power during a loss of 120 VAC Instrument Control Power Panel 1Y11?
A. NMR-9253, SRM COUNTS B. LI-4565C, FUEL ZONE RX LEVEL C. PI-1816A, CRD CHARGING WATER PRESS D. PI-4563, A PRESSURE (REACTOR PRESSURE)
A. NMR-9253, SRM COUNTS B. LI-4565C, FUEL ZONE RX LEVEL C. PI-1816A, CRD CHARGING WATER PRESS D. PI-4563, A PRESSURE (REACTOR PRESSURE)
Proposed Answer:
Proposed Answer:       B Explanation (Optional):
B Explanation (Optional):
A. Incorrect - SRM COUNTS NMR-9253 is NOT a post accident instrument and this instrument is powered from 120 VAC UNINTERRUPTIBLE POWER B. Correct - During a loss of instrument AC Panel 1Y11 FUEL ZONE RX LEVEL LI-4565C fails downscale activating 2/3 core coverage interlock.
A. Incorrect  
C. Incorrect - Although PI-1816A, CRD CHARGING WATER PRESS is powered from Instrument AC it is not a post accident instrument D. Incorrect - (REACTOR PRESSURE) A PRESSURE PI-4563 is powered from 120 VAC UNINTERRUPTIBLE POWER AOP-317, pg 4 & 11 Technical Reference(s):                                      (Attach if not previously provided)
- SRM COUNTS NMR
T.S. Table 3.3.3.1-1 Proposed References to be provided to applicants during examination:         None DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 44
-9253 is NOT a post accident instrument and this instrument is powered from 120 VAC UNINTERRUPTIBLE POWER B. Correct - During a loss of instrument AC Panel 1Y11 FUEL ZONE RX LEVEL LI
 
-4565C fails downscale activating 2/3 core coverage interlock.
Learning Objective:                                             (As available)
C. Incorrect  
Question Source:       Bank #
- Although PI
Modified Bank #                       (Note changes or attach parent)
-1816A, CRD CHARGING WATER PRESS is powered from Instrument AC it is not a post accident instrument D. Incorrect  
New               X Question History:                         Last NRC Exam:             N/A Question Cognitive Level:     Memory or Fundamental Knowledge       X Comprehension or Analysis 10 CFR Part 55 Content:       55.41   7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
- (REACTOR PRESSURE) A PRESSURE PI
Comments:
-4563 is powered from 120 VAC UNINTERRUPTIBLE POWER Technical Reference(s):
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                  Page 45
AOP-317, pg 4 & 11 T.S. Table 3.3.3.1
-1 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
None DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 45 Learning Objective:
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:  


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 46 Examination Outline Cross
Examination Outline Cross-reference:       Level                     RO                 SRO Tier #                     2 Group #                   1 K/A #                     262001       2.1.7 Importance Rating         4.4 Conduct of Operations: Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation. (AC Electrical Distribution)
-reference:
Proposed Question:         RO Question # 23 During the watch turnover it is noted that the Standby Transformer is energized and Standby Transformer Breaker (M), OCB-8490, is closed. Later, during a panel walkdown, it is noted that the Standby Transformer Breaker (M), OCB-8490, RED and GREEN indicating lights are NOT lit. BOTH light bulbs are GOOD.
Level RO SRO Tier # 2   Group # 1   K/A # 262001 2.1.7 Importance Rating 4.4   Conduct of Operations: Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
All other 1C08 panel indications are normal for this plant configuration, and no annunciators were received from this event.
(AC Electrical Distribution)
Proposed Question:
RO Question # 23 During the watch turnover it is noted that the Standby Transformer is energized and Standby Transformer Breaker (M), OCB
-8490, is closed. Later
, during a panel walkdown, it is noted that the Standby Transformer Breaker (M), OCB
-8490, RED and GREEN indicating lights are NOT lit. BOTH light bulbs are GOOD.
All other 1C08 panel indications are normal for this plant configuration
, and no annunciators were received from this event.
Which ONE of the following describes the impact of this indication?
Which ONE of the following describes the impact of this indication?
A. Essential bus power will not transfer to the Standby Transformer when required.
A.     Essential bus power will not transfer to the Standby Transformer when required.
B. OCB-8490 has lost control power and will ONLY respond to breaker protective breaker trips. C. OCB-8490 has lost control power and will NOT OPEN when the control switch is taken to the TRIP position D. Essential Bus Power will ONLY slow transfer to the Standby Transformer when required. Proposed Answer:
B.     OCB-8490 has lost control power and will ONLY respond to breaker protective breaker trips.
C Explanation (Optional):
C.     OCB-8490 has lost control power and will NOT OPEN when the control switch is taken to the TRIP position D.     Essential Bus Power will ONLY slow transfer to the Standby Transformer when required.
A. Incorrect  
Proposed Answer:           C Explanation (Optional):
- This is plausible however, this condition would not inhibit the ability of the essential busses to transfer to the Standby Transformer. The failure is in the Standby Transformer Feeder Breaker not the essential bus logic.
A.     Incorrect - This is plausible however, this condition would not inhibit the ability of the essential busses to transfer to the Standby Transformer. The failure is in the Standby Transformer Feeder Breaker not the essential bus logic.
B. Incorrect  
B.     Incorrect - This is plausible because 125 VDC supplies control power to the breaker.
- This is plausible because 12 5 VDC supplies control power to the breaker. However a loss of power to the tripping circuit would block all remote and protective trips.
However a loss of power to the tripping circuit would block all remote and protective trips.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 47 C. Correct - The breaker indicating lights are powered from breaker control power, lost continuity in the control circuit de
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                         Page 46
-energizes indicating lights. A loss of power to the tripping circuit would block all remote and protective trips.
 
D. Incorrect  
C. Correct - The breaker indicating lights are powered from breaker control power, lost continuity in the control circuit de-energizes indicating lights. A loss of power to the tripping circuit would block all remote and protective trips.
- This is plausible however, this condition would not have any effect on the ability of the essential busses to transfer to the Standby Transformer. The failure is in the Standby Transformer Feeder Breaker not the essential bus logic.
D. Incorrect - This is plausible however, this condition would not have any effect on the ability of the essential busses to transfer to the Standby Transformer. The failure is in the Standby Transformer Feeder Breaker not the essential bus logic.
Technical Reference(s):
OI-304.2, Sect 2 (2), pg 4 Technical Reference(s): SD-304                                   (Attach if not previously provided)
OI-304.2, Sect 2 (2), pg 4 SD-304 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:           None Learning Objective:                                                   (As available)
Proposed References to be provided to applicants during examination:
Question Source:       Bank #               WTSI 11277 Modified Bank #                           (Note changes or attach parent)
None Learning Objective:
New Question History:                           Last NRC Exam:               Not Used Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41     7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
(As available)
Question Source:
Bank # WTSI 11277 Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 48 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                         Page 47
-reference:
Level RO  SRO  Tier # 2    Group # 1    K/A # 264000  K5.06  Importance Rating 3.4    Knowledge of the operational implications of the following concepts as they apply to EMERGENCY GENERATORS (DIESEL/JET): Load sequencing Proposed Question:
RO Question # 24 Which ONE of the following describe s the load sequencing of the Standby Diesel Generators (SBDGs) following a complete instantaneous loss of offsite power?
(Assume normal full power operation and SBDGs in standby readiness as initial conditions.
)  SBDG picks up the 1A3 and 1A4 buses _____(1)_____
after the loss of power.
Emergency Service Water Pump 1P
-99A(B) starts _____(2)_____
after the SBDG picks up the 1A3 and 1A4 buses.


Diesel Generator Room Ventilation Supply Fan 1V
Examination Outline Cross-reference:    Level                      RO              SRO Tier #                    2 Group #                    1 K/A #                      264000    K5.06 Importance Rating          3.4 Knowledge of the operational implications of the following concepts as they apply to EMERGENCY GENERATORS (DIESEL/JET): Load sequencing Proposed Question:      RO Question # 24 Which ONE of the following describes the load sequencing of the Standby Diesel Generators (SBDGs) following a complete instantaneous loss of offsite power?
-SF-20 (1V-SF-21) starts and ventilation dampers align to control room temperature and pressure _____(3)_____
(Assume normal full power operation and SBDGs in standby readiness as initial conditions.)
after the SBDG picks up the 1A3 and 1A4 buses..
SBDG picks up the 1A3 and 1A4 buses _____(1)_____ after the loss of power.
A.   (2) immediately (3) immediately B.   (2) immediately (3) 5 seconds C.   (2) 5 seconds (3) immediately D.   (2) 5 seconds (3) 5 seconds Proposed Answer:
Emergency Service Water Pump 1P-99A(B) starts _____(2)_____ after the SBDG picks up the 1A3 and 1A4 buses.
A Explanation (Optional):
Diesel Generator Room Ventilation Supply Fan 1V-SF-20 (1V-SF-21) starts and ventilation dampers align to control room temperature and pressure _____(3)_____ after the SBDG picks up the 1A3 and 1A4 buses..
A.     (1) 10 seconds (2) immediately (3) immediately B.     (1) 10 seconds (2) immediately (3) 5 seconds C.     (1) 18.5 seconds (2) 5 seconds (3) immediately D.     (1) 18.5 seconds (2) 5 seconds (3) 5 seconds Proposed Answer:       A Explanation (Optional):
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                  Page 48


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 49 A. Correct - The time frame assumed in the UFSAR and the Technical Specifications for pump and SBDG room ventilation start immediately when power is restored to the bus.
A. Correct - The time frame assumed in the UFSAR and the Technical Specifications for the SBDGs to start and reenergize the essential busses is 10 seconds). The ESW pump and SBDG room ventilation start immediately when power is restored to the bus.
The 18.5 seconds used as a distracter is based on the 8 to 8.5 second delay to start the SBDG during a degraded voltage situation. In this question the stem specifies a complete instantaneous loss of offsite power, therefore the time delay does NOT apply.
The 18.5 seconds used as a distracter is based on the 8 to 8.5 second delay to start the SBDG during a degraded voltage situation. In this question the stem specifies a complete instantaneous loss of offsite power, therefore the time delay does NOT apply.
B. Incorrect  
B. Incorrect - The ESW pump and SBDG room ventilation start immediately when power is restored to the bus.
- The ESW pump and SBDG room ventilation start immediately when power is restored to the bus.
C. Incorrect - The ESW pump and SBDG room ventilation start immediately when power is restored to the bus. The 18.5 seconds used as a distracter is based on the 8 to 8.5 second delay to start the SBDG during a degraded voltage situation. In this question the stem specifies a complete instantaneous loss of offsite power, therefore the time delay does NOT apply.
C. Incorrect - The ESW pump and SBDG room ventilation start immediately when power is restored to the bus. The 18.5 seconds used as a distracter is based on the 8 to 8.5 second delay to start the SBDG during a degraded voltage situation. In this question the stem specifies a complete instantaneous loss of offsite power, therefore the time delay does NOT apply.
D. Incorrect  
D. Incorrect - The ESW pump and SBDG room ventilation start immediately when power is restored to the bus. The 18.5 seconds used as a distracter is based on the 8 to 8.5 second delay to start the SBDG during a degraded voltage situation. In this question the stem specifies a complete instantaneous loss of offsite power, therefore the time delay does NOT apply.
- The ESW pump and SBDG room ventilation start immediately when power is restored to the bus. The 18.5 seconds used as a distracter is based on the 8 to 8.5 second delay to start the SBDG during a degraded voltage situation. In this question the stem specifies a complete instantaneous loss of offsite power, therefore the time delay does NOT apply.
SD 324, pg 36, 38 Technical Reference(s):                                      (Attach if not previously provided)
Technical Reference(s):
OI 324, pg 6 Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
SD 324, pg 36, 38 OI 324, pg 6 (Attach if not previously provided)
DAEC Bank #
Proposed References to be provided to applicants during examination:
Question Source:       Bank #
None Learning Objective:
46985 Modified Bank #                       (Note changes or attach parent)
(As available)
New Question History:                         Last NRC Exam:             Not Used Question Cognitive Level:     Memory or Fundamental Knowledge       X Comprehension or Analysis 10 CFR Part 55 Content:       55.41     7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Question Source:
Bank # DAEC Bank #
46985   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 50 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 49
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 223002 A4.04 Importance Rating 3.5   Ability to manually operate and/or monitor in the control room: System indicating lights and alarms. (Primary Containment Isolation System
Examination Outline Cross-reference:       Level                     RO             SRO Tier #                   2 Group #                   1 K/A #                     223002     A4.04 Importance Rating         3.5 Ability to manually operate and/or monitor in the control room: System indicating lights and alarms. (Primary Containment Isolation System /Nuclear Steam Supply Shut-Off)
/Nuclear Steam Supply Shut
Proposed Question:       RO Question # 25 The plant is operating at 12% power. A plant transient occurred; and several seconds later, the CIMS panel indicates the following:
-Off) Proposed Question:
RO Question # 25 The plant is operating at 12% power. A plant transient occurred; and several seconds later, the CIMS panel indicates the following:
Which ONE of the following correctly describes a condition which would cause the above indications?
Which ONE of the following correctly describes a condition which would cause the above indications?
A. Drywell pressure rising above 2.5 psig , and there has been a failure of CV4412 "A" MAIN STEAM LINE INBOARD ISOLATION to isolate.
A.       Drywell pressure rising above 2.5 psig, and there has been a failure of CV4412 "A" MAIN STEAM LINE INBOARD ISOLATION to isolate.
B. A reactor high water level tripped the main turbine
B.       A reactor high water level tripped the main turbine, and there has been a failure of CV4419 "C" MAIN STEAM LINE OUTBOARD ISOLATION to isolate.
, and there has been a failure of CV4419 "C" MAIN STEAM LINE OUTBOARD ISOLATION to isolate.
C.       Steam tunnel temperatures rising above 200&deg;F for several seconds, and there has been a failure of CV4420 "D" MAIN STEAM LINE INBOARD ISOLATION to isolate.
C. Steam tunnel temperatures rising above 2 0 0&deg;F for several seconds
D.       Turbine building main steam line area temperatures rising above 200&deg;F for several seconds, and there has been a failure of CV4416 "B" MAIN STEAM LINE OUTBOARD ISOLATION to isolate.
, and there has been a failure of CV4420 "D" MAIN STEAM LINE INBOARD ISOLATION to isolate.
Proposed Answer:         C DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 50
D. Turbine building main steam line area temperatures rising above 2 0 0&deg;F for several seconds , and there has been a failure of CV4416 "B" MAIN STEAM LINE OUTBOARD ISOLATION to isolate.
 
Proposed Answer:
Explanation (Optional):
C DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 51 Explanation (Optional):
A. Incorrect - DW press > 2# will NOT provide a Group 1 isolation signal; Plausible: failure of an INBOARD MSIV to close will provide an incomplete "A" Logic indication for the MSIVs. Also, 2.5 psig in DW would result in Group 2 & 3 isolation signals.
A. Incorrect  
B. Incorrect - There is NOT a Group 1 isolation signal from a reactor high water level.
- DW press > 2#
Failure of an OUTBOARD MSIV to close will NOT provide an incomplete "A" Logic indication for the MSIVs.
will NOT provide a Group 1 isolation signal; Plausible: failure of an INBOARD MSIV to close will provide an incomplete "A" Logic indication for the MSIVs. Also, 2.5 psig in DW would result in Group 2 & 3 isolation signals.
C. Correct - Steam Tunnel temps > 200&deg;F provide a Group 1 isolation signal; Failure of an INBOARD MSIV to close will provide an incomplete "A" Logic indication for the MSIVs.
B. Incorrect  
D. Incorrect - Plausible - Turbine building main steam line area temps > 200&deg;F provide a Group 1 isolation signal; however, failure of an OUTBOARD MSIV to close will NOT provide an incomplete "A" Logic indication for the MSIVs.
- There is NOT a Group 1 isolation signal from a reactor high water level.
50007_57-05_lp, pages 24-27 and 40-42 SD 959.1, Technical Reference(s):                                        (Attach if not previously provided)
Failure of an OUTBOARD MSIV to close will NOT provide an incomplete "A" Logic indication for the MSIVs. C. Correct - Steam Tunnel temps > 200
All conditions verified using DAEC Simulator 4/10/12 Print this question in COLOR Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
&deg;F provide a Group 1 isolation signal; Failure of an INBOARD MSIV to close will provide an incomplete "A" Logic indication for the MSIVs. D. Incorrect  
DAEC Bank #
- Plausible  
Question Source:       Bank #
- Turbine building main steam line area temps > 200
48708 Modified Bank #                         (Note changes or attach parent)
&deg;F provide a Group 1 isolation signal; however, failure of an OUTBOARD MSIV to close will NOT provide an incomplete "A" Logic indication for the MSIVs. Technical Reference(s):
New Question History:                           Last NRC Exam:             Not Used Question Cognitive Level:       Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:         55.41     7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
50007_57-05_lp, pages 24
-27 and 40-42 SD 959.1, All conditions verified using DAEC Simulator 4/10/12 Print this question in COLOR (Attach if not previously provid ed)  Proposed References to be provided to applicants during examination:
None Learning Objective:
(As available)
Question Source:
Bank # DAEC Bank #
48708   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam: Not Used Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 52  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 51
-reference:
 
Level RO SRO Tier # 2   Group # 1   K/A # 211000 K1.03 Importance Rating 2.5   Knowledge of the physical connections and/or caus e- effect relationships between STANDBY LIQUID CONTROL SYSTEM and the following: Plant air systems: Plant
Examination Outline Cross-reference:     Level                     RO             SRO Tier #                     2 Group #                   1 K/A #                     211000     K1.03 Importance Rating         2.5 Knowledge of the physical connections and/or cause- effect relationships between STANDBY LIQUID CONTROL SYSTEM and the following: Plant air systems: Plant-Specific Proposed Question:       RO Question # 26 The plant is operating at 100% power.
-Specific Proposed Question:
RO Question # 26 The plant is operating at 100% power.
A loss of Instrument Air occurred to the Standby Liquid Control (SBLC) tank bubbler dip tube.
A loss of Instrument Air occurred to the Standby Liquid Control (SBLC) tank bubbler dip tube.
Which ONE of the following correctly describes the effect on indicated SBLC tank level and SBLC heater operation?
Which ONE of the following correctly describes the effect on indicated SBLC tank level and SBLC heater operation?
The control room Indicated SLC tank level will fail __
The control room Indicated SLC tank level will fail ___ (1) ___.
_ (1) ___. The SBLC Tank Heater will ___
The SBLC Tank Heater will ____ (2) ____.
_ (2) ____. A. (1) low (2) trip B. (1) high (2) trip C. (1) low (2) NOT trip D. (1) high (2) NOT trip Proposed Answer:
A.     (1) low (2) trip B.     (1) high (2) trip C.     (1) low (2) NOT trip D.     (1) high (2) NOT trip Proposed Answer:         C Explanation (Optional):
C Explanation (Optional):
A. Incorrect - A low level in the SLC Tank will NOT automatically trip the heaters.
A. Incorrect  
B. Incorrect - SLC Tank level indication will fail low. A low level in the SLC Tank will NOT automatically trip the heaters.
- A low level in the SLC Tank will NOT automatically trip the heaters.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 52
B. Incorrect  
- SLC Tank level indication will fail low. A low level in the SLC Tank will NOT automatically trip the heaters.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 53 C. Correct - Instrument Air provides compressed air for storage tank level bubbler instrumentation via PCV
C. Correct - Instrument Air provides compressed air for storage tank level bubbler instrumentation via PCV- 2600 and FIC-2600. In the event of a Loss of Instrument Air, air-flow to the SBLC Storage Tank bubbler (level indication) will be lost. As a result, indicated storage tank level will decrease (or fail low). A low level in the SLC Tank will NOT automatically trip the heaters.
- 2600 and FIC
D. Incorrect - Incorrect - SLC Tank level indication will fail low.
-2600. In the event of a Loss of Instrument Air, air-flow to the SBLC Storage Tank bubbler (level indication) will be lost. As a result, indicated storage tank level will decrease (or fail low). A low level in the SLC Tank will NOT automatically trip the heaters.
OI 153, pg 7 Technical Reference(s): AOP 518, pg 8                           (Attach if not previously provided)
D. Incorrect - Incorrect  
SD 153, pgs 8 & 27 Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
- SLC Tank level indication will fail low.
DAEC Bank #
Technical Reference(s):
Question Source:     Bank #
OI 153, pg 7 AOP 518, pg 8 SD 153, pgs 8 & 27 (Attach if not previously provided)
48408 Modified Bank #                           (Note changes or attach parent)
Proposed References to be provided to applicants during examination:
New Question History:                         Last NRC Exam:                   Not Used Question Cognitive Level:     Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:       55.41     4 55.43 Secondary coolant and auxiliary systems that affect the facility.
None Learning Objective:
(As available)
Question Source:
Bank # DAEC Bank #
48408   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 4 55.43 Secondary coolant and auxiliary systems that affect the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 54  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                         Page 53
-reference:
 
Level RO SRO Tier # 2   Group # 2   K/A # 290002 K1.01 Importance Rating 3.2   Knowledge of the physical connections and/or cause
Examination Outline Cross-reference:       Level                     RO               SRO Tier #                     2 Group #                   2 K/A #                     290002     K1.01 Importance Rating         3.2 Knowledge of the physical connections and/or cause- effect relationships between REACTOR VESSEL INTERNALS and the following: Main steam system Proposed Question:       RO Question # 27 Which ONE of the following prevents the Reactor Pressure Vessel Steam Dryer from lifting as steam flow rises?
- effect relationships between REACTOR VESSEL INTERNALS and the following: Main steam system Proposed Question:
A. Hold-down ties which attach the steam separator and dryer to the core shroud.
RO Question # 27 Which ONE of the following prevents the Reactor Pressure Vessel Steam Dryer from lifting as steam flow rises?   A. Hold-down ties which attach the steam separator and dryer to the core shroud.
B. Its weight, and analysis that high dryer Ps are limited by the length of the dryer skirt.
B. Its weight
C. Hold-down brackets fitted to the underside of the vessel head contact the top of the dryer.
C. Hold-down brackets fitted to the underside of the vessel head contact the top of the dryer. D. Its weight
D. Its weight, and that steam flow is directed perpendicular both up and down within the dryer.
, and that steam flow is directed perpendicular both up and down within the dryer. Proposed Answer:
Proposed Answer:         C Explanation (Optional):
C Explanation (Optional):
A. Incorrect - Only the steam separator is attached to the core shroud.
A. Incorrect - Only the steam separator is attached to the core shroud.
B. Incorrect  
B. Incorrect - The dryer is restricted from lifting by hold-down brackets fitted to the underside of the vessel head.
- The dryer is restricted from lifting by hold
C. Correct - The dryer rests on support brackets attached to the reactor vessel wall and is restricted from lifting by hold-down brackets fitted to the underside of the vessel head.
-down brackets fitted to the underside of the vessel head.
D. Incorrect - Regardless of the steam flows the P would try to lift the dryer.
C. Correct - The dryer rests on support brackets attached to the reactor vessel wall and is restricted from lifting by hold
SD-262, pgs 27-28 Technical Reference(s):                                          (Attach if not previously provided)
-down brackets fitted to the underside of the vessel head.
LP-50007-262, pg 15 Proposed References to be provided to applicants during examination:           None DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                         Page 54
D. Incorrect  
 
-   Technical Reference(s):
Learning Objective:                                               (As available)
SD-262, pgs 27
DAEC Bank #
-28 LP-50007-262, p g 15 (Attach if not previously provided)
Question Source:   Bank #
Proposed References to be provided to applicants during examination:
22356 Modified Bank #                           (Note changes or attach parent)
None DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 55  Learning Objective:
New Question History:                         Last NRC Exam:               Not Used Question Cognitive Level:   Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:     55.41     2 55.43 General design features of the core, including core structure, fuel elements, control rods, core instrumentation, and coolant flow.
(As available)
Question Source:
Bank # DAEC Bank #
22356   Modified Bank #
(Note changes or attach parent) New   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 2 55.43 General design features of the core, including core structure, fuel elements, control rods, core instrumentation, and coolant flow.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 56  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 55
-reference:
 
Level RO SRO Tier # 2   Group # 2   K/A # 202001 K2.03 Importance Rating 2.7   Knowledge of electrical power supplies to the following: Recirculation system valves Proposed Question:
Examination Outline Cross-reference:       Level                   RO             SRO Tier #                 2 Group #                 2 K/A #                   202001     K2.03 Importance Rating       2.7 Knowledge of electrical power supplies to the following: Recirculation system valves Proposed Question:       RO Question # 28 The plant is at 100% power with the electric plant aligned for normal full power operation.
RO Question # 28 The plant is at 100% power with the electric plant aligned for normal full power operation.
Then the following occurs:
Then the following occurs:
A load reject scram and complete loss of offsite power occurs.
* A load reject scram and complete loss of offsite power occurs.
  "A" Diesel Generator fails to start.
* A Diesel Generator fails to start.
  "B" Diesel Generator starts and re
* B Diesel Generator starts and re-energizes bus 1A4.
-energizes bus 1A4.
What is the status of the power supply to the Recirc Loop Suction, Discharge and Discharge Bypass valves?
What is the status of the power supply to the Recirc Loop Suction, Discharge and Discharge Bypass valves?
Suction Valve Discharge Valve Discharge Bypass Valve A. Loop "A" De-energized Energized Energized   Loop "BDe-energized Energized Energized   B. Loop "A" De-Energized De-Energized De-Energized   Loop "BEnergized Energized Energized   C. Loop "A" Energized Energized Energized   Loop "BEnergized Energized Energized   D. Loop "A" De-Energized De-Energized De-Energized   Loop "BDe-energized Energized Energized   Proposed Answer:
Suction Valve     Discharge Valve     Discharge Bypass Valve A. Loop A       De-energized           Energized             Energized Loop B       De-energized           Energized             Energized B. Loop A       De-Energized         De-Energized           De-Energized Loop B         Energized           Energized             Energized C. Loop A         Energized           Energized             Energized Loop B         Energized           Energized             Energized D. Loop A       De-Energized         De-Energized           De-Energized Loop B       De-energized           Energized             Energized Proposed Answer:         C Explanation (Optional):
C Explanation (Optional):
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 56
 
A. Incorrect: The Recirc pump suction valves will also have power. Plausible in that LPCI swing bus 1B34A/1B44A supplies power to all LPCI and RHR valves that may have to reposition during a LPCI Loop selection. However the Recirc loop suction valves which do not reposition are also powered from 1B34A/1B44A. This would be correct if this answer if this were not the case.
B. Incorrect: LPCI swing bus 1B34A/1B44A supplies power to all Recirc Loop valves.
The bus is normally aligned to 1A3 via 1B34. When 1A3 failed to re-energize following the loss of off-site power, a power seeking ABT circuit transfers the LPCI swing bus to 1A4 via 1B44. Plausible if the candidate is believes that the Recirc and LPCI loop select valves are divisional in configuration.
C. Correct: LPCI swing bus 1B34A/1B44A supplies power to all Recirc Loop valves. The bus is normally aligned to 1A3 via 1B34. When 1A3 failed to re-energize following the loss of off-site power, a power seeking ABT circuit transfers the LPCI swing bus to 1A4 via 1B44.
D. Incorrect: Incorrect: LPCI swing bus 1B34A/1B44A supplies power to all Recirc Loop valves. The bus is normally aligned to 1A3 via 1B34. When 1A3 failed to re-energize following the loss of off-site power, a power seeking ABT circuit transfers the LPCI swing bus to 1A4 via 1B44. Plausible if the candidate believes that the Recirc and LPCI loop select valves are divisional in configuration and that the recirc suction valves are not powered from this bus.
Technical Reference(s): SD 304, page 34                        (Attach if not previously provided)
Proposed References to be provided to applicants during examination:          None Learning Objective:                                                (As available)
Question Source:      Bank #
Modified Bank #                          (Note changes or attach parent)
New                X Question History:                          Last NRC Exam:              N/A Question Cognitive Level:      Memory or Fundamental Knowledge Comprehension or Analysis            X 10 CFR Part 55 Content:        55.41    7 55.43 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 57
 
Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                  Page 58


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 57 A. Incorrect: The Recirc pump suction valves will also have power. Plausible in that "LPCI swing bus" 1B34A/1B44A supplies power to all LPCI and RHR valves that may have to reposition during a LPCI Loop selection. However the Recirc loop suction valves which do not reposition are also powered from 1B34A/1B44A. This would be correct if this answer if this were not the case.
Examination Outline Cross-reference:     Level                     RO             SRO Tier #                   2 Group #                   2 K/A #                     219000   K3.01 Importance Rating         3.9 Knowledge of the effect that a loss or malfunction of the RHR/LPCI: TORUS/SUPPRESSION POOL COOLING MODE will have on following: Suppression pool temperature control Proposed Question:       RO Question # 29 The plant is operating at 90% power.
B. Incorrect: "LPCI swing bus" 1B34A/1B44A supplies power to all Recirc Loop valves. The bus is normally aligned to 1A3 via 1B34. When 1A3 failed to re
* HPCI is running to support a pump operability surveillance
-energize following the loss of off
* Torus Cooling is in service IAW OI 149, RHR System Which ONE of the following describes:
-site power, a power seeking ABT circuit transfers the "LPCI swing bus" to 1A4 via 1B44. Plausible if the candidate is believes that the Recirc and LPCI loop select valves are divisional in configuration.
(1)     How Torus water temperature is controlled, IAW OI 149, during this evolution?
C. Correct: "LPCI swing bus" 1B34A/1B44A supplies power to all Recirc Loop valves. The bus is normally aligned to 1A3 via 1B34. When 1A3 failed to re
AND (2)     How Torus water temperature would be affected if an inadvertent LPCI initiation signal occurred during the HPCI surveillance test?
-energize following the loss of off
A.     (1) Throttle MO-2031 [1941] HEAT EXCH OUTLET (2) Torus water temperature would rise B.     (1) Close, Open or Throttle MO-2030 [1940] A[B] HEAT EXCH BYPASS (2) Torus water temperature would rise C.     (1) Throttle MO-2031 [1941] HEAT EXCH OUTLET (2) Torus water temperature would remain the same or lower D.     (1) Close, Open or Throttle MO-2030 [1940] A[B] HEAT EXCH BYPASS (2) Torus water temperature would remain the same or lower Proposed Answer:         B Explanation (Optional):
-site power, a power seeking ABT circuit transfers the "LPCI swing bus" to 1A4 via 1B44.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                  Page 59
D. Incorrect: Incorrect: "LPCI swing bus" 1B34A/1B44A supplies power to all Recirc Loop valves. The bus is normally aligned to 1A3 via 1B34. When 1A3 failed to re
-energize following the loss of off
-site power, a power seeking ABT circuit transfers the "LPCI swing bus" to 1A4 via 1B44. Plausible if the candidate believes that the Recirc and LPCI loop select valves are divisional in configuration and that the recirc suction valves are not powered from this bus.
Technical Reference(s):
SD 304, page 34 (Attach if not previously provided)        Proposed References to be provided to applicants during examination:
None  Learning Objective:
(As available)
Question Source:
Bank #    Modified Bank #
(Note changes or attach parent)
New  X  Question History:
Last NRC Exam:  N/A  Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41 7  55.43 DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 58 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments: .
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 59 Examination Outline Cross
-reference:
Level RO SRO Tier # 2   Group # 2   K/A # 219000 K3.01 Importance Rating 3.9   Knowledge of the effect that a loss or malfunction of the RHR/LPCI: TORUS/SUPPRESSION POOL COOLING MODE will have on following: Suppression pool temperature control Proposed Question:
RO Question # 29 The plant is operating at 90% power.
HPCI is running to support a pump operability surveillance Torus Cooling is in service IAW OI 149, RHR System Which ONE of the following describes:
(1) How Torus water temperature is controlled
, IAW OI 149, during this evolution? AND   (2) How Torus water temperature would be affected if an inadvertent LPCI initiation signal occurred during the HPCI surveillance test?
A. (1) Throttle MO
-2031 [1941] HEAT EXCH OUTLET (2) Torus water temperature would rise B. (1) Close , Open or Throttle MO-2030 [1940] A[B] HEAT EXCH BYPASS (2) Torus water temperature would rise C. (1) Throttle MO
-2031 [1941] HEAT EXCH OUTLET (2) Torus water temperature would remain the same or lower D. (1) Close , Open or Throttle MO-2030 [1940] A[B] HEAT EXCH BYPASS (2) Torus water temperature would remain the same or lower Proposed Answer:
B Explanation (Optional):


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 60 A. Incorrect  
A. Incorrect - The RHR heat exchanger outlet valves (MO-2031 [1941]) are isolation valves and NOT used for throttling flow, torus cooling is controlled by closing or opening MO-2030 [1940] A[B] HEAT EXCH BYPASS. Plausible because the RHR Heat Exchanger INLET valve is used for controlling the cooldown rate in shutdown cooling mode as stated in OI 149, Control the cooldown rate by adjusting MO-2030 [MO-1940]
- The RHR heat exchanger outlet valves (MO
A[B] HEAT EXCH BYPASS valve and MO-2029 [MO-1939] A[B] HX INLET THROTTLE valve on 1C03.
-2031 [1941]) are isolation valves and NOT used for throttling flow, torus cooling is controlled by closing or opening MO-2030 [1940] A[B] HEAT EXCH BYPASS. Plausible because the RHR Heat Exchanger INLET valve is used for controlling the cooldown rate in shutdown cooling mode as stated in OI 149, "Control the cooldown rate by adjusting MO
-2030 [MO-1940] A[B] HEAT EXCH BYPASS valve and MO
-2029 [MO-1939] A[B] HX INLET THROTTLE valve on 1C03".
B. Correct - (1) Per OI 149, Section 5.4, Open or Close MO 2030 [1940] A[B] HEAT EXCH BYPASS valve as required.
B. Correct - (1) Per OI 149, Section 5.4, Open or Close MO 2030 [1940] A[B] HEAT EXCH BYPASS valve as required.
(2) Per SD 149  
(2) Per SD 149 - The LPCI initiation signal overrides all modes of the RHR System (except shutdown cooling). The intent is to direct maximum system effort toward restoring and maintaining the reactor vessel water level, i.e., all pumps are started, all non LPCI modes secured. This would secure torus cooling and the resulting HPCI surveillance test would cause torus temperature to rise.
- The LPCI initiation signal overrides all modes of the RHR System (except shutdown cooling). The intent is to direct maximum system effort toward restoring and maintaining the reactor vessel water level, i.e., all pumps are started, all non LPCI modes secured. This would secure torus cooling and the resulting HPCI surveillance test would cause torus temperature to rise.
C. Incorrect - The RHR heat exchanger outlet valves (MO-2031 [1941]) are isolation valves and NOT used for throttling flow. Plausible because the RHR Heat Exchanger INLET valve is used for controlling the cooldown rate in shutdown cooling mode as stated in OI 149, Control the cooldown rate by adjusting MO-2030 [MO-1940] A[B] HEAT EXCH BYPASS valve and MO-2029 [MO-1939] A[B] HX INLET THROTTLE valve on 1C03.
C. Incorrect  
Torus cooling is controlled by closing or opening MO-2030 [1940] A[B] HEAT EXCH BYPASS. A LPCI signal would shut the Torus Cooling valves and Torus temperature would rise.
- The RHR heat exchanger outlet valves (MO
D. Incorrect - A LPCI signal would shut the Torus Cooling valves and Torus temperature would rise.
-2031 [1941]) are isolation valves and NOT used for throttling flow. Plausible because the RHR Heat Exchanger INLET valve is used for controlling the cooldown rate in shutdown cooling mode as stated in OI 149, "Control the cooldown rate by adjusting MO
OI 149, Sect 5.4 Technical Reference(s):                                        (Attach if not previously provided)
-2030 [MO-1940] A[B] HEAT EXCH BYPASS valve and MO
SD 149, pg 21 Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
-2029 [MO-1939] A[B] HX INLET THROTTLE valve on 1C03.
Question Source:     Bank #
Torus cooling is controlled by closing or opening MO
Modified Bank #                           (Note changes or attach parent)
-2030 [1940] A[B] HEAT EXC H BYPASS". A LPCI signal would shut the Torus Cooling valves and Torus temperature would rise.
New               X Question History:                         Last NRC Exam:               Not Used Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                 X DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 60
D. Incorrect  
 
- A LPCI signal would shut the Torus Cooling valves and Torus temperature would rise.
10 CFR Part 55 Content:       55.41   7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Technical Reference(s):
OI 149, Sect 5.4 SD 149, pg 21 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
None Learning Objective:
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 61 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 62 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 61
-reference:
 
Level RO SRO Tier # 2   Group # 2   K/A # 201002 K4.07 Importance Rating 2.5   Knowledge of REACTOR MANUAL CONTROL SYSTEM design feature(s) and/or interlocks which provide for the following: Timing of rod insert and withdrawal cycles (rod movement sequence timer)
Examination Outline Cross-reference:         Level                     RO               SRO Tier #                   2 Group #                   2 K/A #                     201002     K4.07 Importance Rating         2.5 Knowledge of REACTOR MANUAL CONTROL SYSTEM design feature(s) and/or interlocks which provide for the following: Timing of rod insert and withdrawal cycles (rod movement sequence timer)
Proposed Question:
Proposed Question:       RO Question # 30 During a control rod single notch withdrawal, a Reactor Manual Control System timer malfunction occurs resulting in the withdraw bus remaining energized.
RO Question # 30 During a control rod single notch withdrawal
, a Reactor Manual Control System timer malfunction occurs resulting in the withdraw bus remaining energized.
Which ONE of the following RMCS protective features prevents a continuous withdrawal event AND how is this accomplished?
Which ONE of the following RMCS protective features prevents a continuous withdrawal event AND how is this accomplished?
A. When a withdrawal signal lasts greater than 2 seconds, the current rod is de
A. When a withdrawal signal lasts greater than 2 seconds, the current rod is de-selected and a select block is generated.
-selected and a select block is generated.
B. When the Rod Movement control switch is held in "withdraw" for greater than 2 seconds, a rod out block is generated.
B. When the Rod Movement control switch is held in "withdraw" for greater than 2 seconds, a rod out block is generated.
C. When the Rod Movement control switch is momentarily placed in "withdraw
C. When the Rod Movement control switch is momentarily placed in "withdraw," any stopping of the rod sequence timer generates a select block.
," any stopping of the rod sequence timer generates a select block.
D. When a single notch withdrawal signal is generated, the rod position indication system initiates a rod block if the control rod moves beyond one notch.
D. When a single notch withdrawal signal is generated
Proposed Answer:         A Explanation (Optional):
, the rod position indication system initiates a rod block if the control rod moves beyond one notch. Proposed Answer:
A. Correct - The operation of the RMCS solid state timer is monitored in the rod withdrawal mode to protect against unrequested continuous rod withdrawal should the timer fail, holding in the withdraw time interval. If the drive out time interval during notch withdrawal is actuated for a period of approximately 2 seconds (normal interval is 1.5 seconds) the timer malfunction circuit de-energizes the rod select relays (enforces a select block). Actuation of the timer malfunction circuit energizes the amber SELECT BLOCK indicator light.
A Explanation (Optional):
B. Incorrect - The Rod Movement control switch may be held in "withdraw" indefinably only the time the timer is energized is monitored.
A. Correct - The operation of the RMCS solid state timer is monitored in the rod withdrawal mode to protect against unrequested continuous rod withdrawal should the timer fail, holding in the withdraw time interval. If the drive out time interval during notch withdrawal is actuated for a period of approximately 2 seconds (normal interval is 1.5 seconds) the timer malfunction circuit de
C. Incorrect - Rod withdrawal accidents are prevented by monitoring the amount of time the rod sequence timer energizes the withdraw bus.
-energizes the rod select relays (enforces a select block). Actuation of the timer malfunction circuit energizes the amber SELECT BLOCK indicator light.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 62
B. Incorrect  
- The Rod Movement control switch may be held in "withdraw" indefinably only the time the timer is energized is monitored.
C. Incorrect  
- Rod withdrawal accidents are prevented by monitoring the amount of time the r od sequence timer energizes the withdraw bus.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 63 D. Incorrect  
D. Incorrect - Rod withdrawal accidents are prevented by monitoring the amount of time the rod sequence timer energizes the withdraw bus, the RPIS does not cause this block or prevent this event.
- Rod withdrawal accidents are prevented by monitoring the amount of time the r od sequence timer energizes the withdraw bus, the RPIS does not cause this block or prevent this event.
Technical Reference(s): SD 856.1, pg 11                     (Attach if not previously provided)
Technical Reference(s):
Proposed References to be provided to applicants during examination:       None Learning Objective:                                             (As available)
SD 856.1, pg 11 (Attach if not previously provided)
DAEC Bank #
Proposed References to be provided to applicants during examination:
Question Source:     Bank #
None Learning Objective:
19307 Modified Bank #                       (Note changes or attach parent)
(As available) Question Source:
New Question History:                       Last NRC Exam:             Not Used Question Cognitive Level:     Memory or Fundamental Knowledge         X Comprehension or Analysis 10 CFR Part 55 Content:       55.41   6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Bank # DAEC Bank #
19307   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 64 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 63
-reference:
Level RO  SRO  Tier # 2    Group # 2    K/A # 202002  K5.01  Importance Rating 2.8    Knowledge of the operational implications of the following concepts as they apply to RECIRCULATION FLOW CONTROL SYSTEM: Fluid coupling:  BWR
-3,4 Proposed Question:
RO Question # 31 Regarding the operation of a Recirc MG Se t scoop tube
:  With the Scoop Tube fully withdrawn ,  ___(1)___ (more / less) oil is present in the fluid coupler, resulting in


Examination Outline Cross-reference:        Level                      RO              SRO Tier #                      2 Group #                    2 K/A #                      202002    K5.01 Importance Rating          2.8 Knowledge of the operational implications of the following concepts as they apply to RECIRCULATION FLOW CONTROL SYSTEM: Fluid coupling: BWR-3,4 Proposed Question:        RO Question # 31 Regarding the operation of a Recirc MG Set scoop tube:
With the Scoop Tube fully withdrawn,
___(1)___ (more / less) oil is present in the fluid coupler, resulting in
___ (2) ___ (raising / lowering) Recirc pump speed.
___ (2) ___ (raising / lowering) Recirc pump speed.
A. (1) less (2) raising B. (1) more (2) lowering C. (1) less (2) lowering D. (1) more (2) raising   Proposed Answer:
A.     (1) less (2) raising B.     (1) more (2) lowering C.     (1) less (2) lowering D.     (1) more (2) raising Proposed Answer:         C Explanation (Optional):
C Explanation (Optional):
A. Incorrect: When there is less oil in the coupler, recirc speed lowers.
A. Incorrect: When there is less oil in the coupler, recirc speed lowers.
B. Incorrect: Withdrawing the scoop tube reduces the amount of oil.
B. Incorrect: Withdrawing the scoop tube reduces the amount of oil.
C. Correct: When the scoop tube moves away from the shaft, the amount of oil being removed increases. This decreases the amount of oil in the working circuit. The lower amount of oil decreases the hydraulic coupling and decreases the generator speed.
C. Correct: When the scoop tube moves away from the shaft, the amount of oil being removed increases. This decreases the amount of oil in the working circuit. The lower amount of oil decreases the hydraulic coupling and decreases the generator speed.
D. Incorrect: Withdrawing the scoop tube reduces the amount of oil. This in turn will cause speed to lower.
D. Incorrect: Withdrawing the scoop tube reduces the amount of oil. This in turn will cause speed to lower.
Technical Reference(s):
Technical Reference(s): SD 264, pages 24 & 25, Figure 8         (Attach if not previously provided)
SD 264, pages 24 & 25, Figure 8 (Attach if not previously provided)
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                        Page 64


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 65        Proposed References to be provided to applicants during examination:
Proposed References to be provided to applicants during examination:     None Learning Objective:                                             (As available)
None Learning Objective:
DAEC Bank #
(As available) Question Source:
Question Source:   Bank #
Bank # DAEC Bank #
48329 Modified Bank #                         (Note changes or attach parent)
48329   Modified Bank #
New Question History:                       Last NRC Exam:             Not used Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:     55.41     6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
Not used Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 66  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 65
-reference:
 
Level RO SRO Tier # 2   Group # 2   K/A # 216000 K6.03 Importance Rating 2.8   Knowledge of the effect that a loss or malfunction of the following will have on the NUCLEAR BOILER INSTRUMENTATION: Temperature Compensation KA Justification: Pressure Compensation compensates for changes in the density of the coolant in the RPV across the spectrum of operating pressures. Since the vessel is saturated temperature and pressure compensation are equivalent.
Examination Outline Cross-reference:     Level                       RO               SRO Tier #                     2 Group #                     2 K/A #                       216000       K6.03 Importance Rating           2.8 Knowledge of the effect that a loss or malfunction of the following will have on the NUCLEAR BOILER INSTRUMENTATION: Temperature Compensation KA Justification: Pressure Compensation compensates for changes in the density of the coolant in the RPV across the spectrum of operating pressures. Since the vessel is saturated temperature and pressure compensation are equivalent.
Proposed Question:
Proposed Question:     RO Question # 32 The RPV pressure instruments used to pressure compensate the Nuclear Boiler Instrumentation are not available.
RO Question #
3 2  The RPV pressure instruments used to pressure compensate the Nuclear Boiler Instrumentation are not available.
Which range of RPV Level indicators will be affected?
Which range of RPV Level indicators will be affected?
A. Fuel Zone B. Wide Range Yarway C. Narrow Range Yarway D. Narrow Range GEMAC Proposed Answer:
A. Fuel Zone B. Wide Range Yarway C. Narrow Range Yarway D. Narrow Range GEMAC Proposed Answer:       A Explanation (Optional):
A Explanation (Optional):
A. Correct: A modification was installed to pressure-compensate the fuel zone detectors to correct the inaccuracies caused by the difference in variable leg density from the calibrated cold condition to normal operating and accident pressures. Two amber lights on 1C-03, located next to the fuel zone level indicators, will illuminate if sensed RPV pressure is not within 0-1500#.
A. Correct: A modification was installed to pressure
B. Incorrect: The Wide Range Yarways are not pressure compensated by sensing RPV pressure. Plausible in that they do have heated reference legs to reduce the error imparted by changes in coolant density between shutdown and operating conditions.
-compensate the fuel zone detectors to correct the inaccuracies caused by the difference in variable leg density from the calibrated cold condition to normal operating and accident pressures. Two amber lights on 1C-03, located next to the fuel zone level indicators, will illuminate if sensed RPV pressure is not within 0
-1500#. B. Incorrect: The Wide Range Yarways are not pressure compensated by sensing RPV pressure. Plausible in that they do have heated reference legs to reduce the error imparted by changes in coolant density between shutdown and operating conditions.
C. Incorrect: The Narrow Range Yarways are not pressure compensated by sensing RPV pressure. Plausible in that the Wide Range Yarways (but not the Narrow Range) do have heated reference legs to reduce the error imparted by changes in coolant density between shutdown and operating conditions.
C. Incorrect: The Narrow Range Yarways are not pressure compensated by sensing RPV pressure. Plausible in that the Wide Range Yarways (but not the Narrow Range) do have heated reference legs to reduce the error imparted by changes in coolant density between shutdown and operating conditions.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                        Page 66


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 67 D. Incorrect: The GEMACs are not pressure compensated.
D. Incorrect: The GEMACs are not pressure compensated.
Technical Reference(s):
Technical Reference(s): SD 880, page 17                     (Attach if not previously provided)
SD 880, page 17 (Attach if not previously provided)
P&ID M115 Proposed References to be provided to applicants during examination:       None Learning Objective:                                             (As available)
P&ID M115     Proposed References to be provided to applicants during examination:
Question Source:       Bank #
None Learning Objective:
Modified Bank #                       (Note changes or attach parent)
(As available)
New             X Question History:                         Last NRC Exam:             Not Used Question Cognitive Level:     Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:       55.41   7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 68  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 67
-reference:
 
Level RO SRO Tier # 2   Group # 2   K/A # 201003 A1.02 Importance Rating 2.8   Ability to predict and/or monitor changes in parameters associated with operating the CONTROL ROD AND DRIVE MECHANISM controls including: CRD drive pressure Proposed Question:
Examination Outline Cross-reference:       Level                   RO               SRO Tier #                   2 Group #                 2 K/A #                   201003     A1.02 Importance Rating       2.8 Ability to predict and/or monitor changes in parameters associated with operating the CONTROL ROD AND DRIVE MECHANISM controls including: CRD drive pressure Proposed Question:         RO Question # 33 The plant is operating at rated conditions.
RO Question # 33 The plant is operating at rated conditions.
Which ONE of the following identifies the component manipulations that will raise CRD drive water header differential pressure indication at Panel 1C05?
Which ONE of the following identifies the component manipulations that will raise CRD drive water header differential pressure indication at Panel 1C05?
A. Adjust CRD SYSTEM FLOW CONTROL FC
A.       Adjust CRD SYSTEM FLOW CONTROL FC-1814 to open the flow control valve or throttle open DRIVE WATER P CONTROL MO-1830 B.       Adjust CRD SYSTEM FLOW CONTROL FC-1814 to open the flow control valve or throttle closed DRIVE WATER P CONTROL MO-1830 C.       Adjust CRD SYSTEM FLOW CONTROL FC-1814 to close the flow control valve or throttle open DRIVE WATER P CONTROL MO-1830 D.       Adjust CRD SYSTEM FLOW CONTROL FC-1814 to close the flow control valve or throttle closed DRIVE WATER P CONTROL MO-1830 Proposed Answer:           B Explanation (Optional):
-1814 to open the flow control valve or throttle open -1830 B. Adjust CRD SYSTEM FLOW CONTROL FC
A.       Incorrect. Throttling open MO-1830 will lower CRD drive pressure differential.
-1814 to open the flow control valve or throttle closed -1830 C. Adjust CRD SYSTEM FLOW CONTROL FC
B.       Correct - To raise drive water pressure close MO-1830 or open FC-1814.
-1814 to close the flow control valve or throttle open DRIVE -1830 D. Adjust CRD SYSTEM FLOW CONTROL FC
C.       Incorrect. Throttling closed FC-1814 will lower CRD drive pressure differential.
-1814 to close the flow control valve or throttle closed -1830   Proposed Answer:
D.       Incorrect. Throttling closed FC-1814 will lower CRD drive pressure differential.
B Explanation (Optional):
OI 255, pg 9 Technical Reference(s):                                       (Attach if not previously provided)
A. Incorrect. Throttling open MO
SD 255, pg 6 & 32 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 68
-1830 will lower CRD drive pressure differential.
B. Correct - To raise drive water pressure clos e MO-1830 or open FC-1814. C. Incorrect. Throttling closed FC
-1814 will lower CRD drive pressure differential.
D. Incorrect. Throttling closed FC
-1814 will lower CRD drive pressure differential.
Technical Reference(s):
OI 255, pg 9 SD 255, pg 6 & 32 (Attach if not previously provided)


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 69 Proposed References to be provided to applicants during examination:
Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
None Learning Objective:
Question Source:     Bank #               WTSI 4396 Modified Bank #                           (Note changes or attach parent)
(As available)
New Question History:                         Last NRC Exam:       2008   Brunswick Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41     5 55.43 Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.
Question Source:
Bank # WTSI 4396   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
2008 Brunswick Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Conten t: 55.41 5 55.43 Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 70 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 69
-reference:
 
Level RO SRO Tier # 2   Group # 2   K/A # 271000 A2.11 Importance Rating 2.8   Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Offgas system low flow Proposed Question:
Examination Outline Cross-reference:         Level                   RO             SRO Tier #                   2 Group #                 2 K/A #                   271000     A2.11 Importance Rating       2.8 Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Offgas system low flow Proposed Question:         RO Question # 34 With the plant operating at 100% power the following conditions occur:
RO Question # 34 With the plant operating at 100% power the following conditions occur:
* SJAE flow on FR-1374 has lowered
SJAE flow on FR
* Off Gas flow rates on FR-4132 have become erratic
-1374 has lowered Off Gas flow rates on FR
* Annunciator 1C34, C-1, RECOMBINER HI/LO TEMP is in alarm
-4132 have become erratic Annunciator 1C34, C
* Reactor power has been lowered to 25%
-1, RECOMBINER HI/LO TEMP is in alarm Reactor power has been lowered to 25%
Which ONE of the following is (1) the cause of these conditions and besides monitoring critical parameters (2) what other action is required?
Which ONE of the following is (1) the cause of these conditions and besides monitoring critical parameters (2) what other action is required?
A. (1) An Offgas premature recombination event has occurred
A.       (1) An Offgas premature recombination event has occurred.
. (2) Shutdown the hydrogen water chemistry system.
(2) Shutdown the hydrogen water chemistry system.
B. (1) An Offgas premature recombination event has occurred
B.       (1) An Offgas premature recombination event has occurred.
. (2) Start the mechanical vacuum pump and shutdown the steam jet air ejectors.
(2) Start the mechanical vacuum pump and shutdown the steam jet air ejectors.
C. (1) Steam supply pressure to the Offgas Jet Compressor has lowered to 2 90 psig. (2) Start the mechanical vacuum pump to stabilize condenser vacuum.
C.       (1) Steam supply pressure to the Offgas Jet Compressor has lowered to 290 psig.
D. (1) Steam supply pressure to the Offgas Jet Compressor has lowered to 2 90 psig. (2) Place the second set of SJAE in service in parallel with the operating SJAE.
(2) Start the mechanical vacuum pump to stabilize condenser vacuum.
Proposed Answer:
D.       (1) Steam supply pressure to the Offgas Jet Compressor has lowered to 290 psig.
A Explanation (Optional):
(2) Place the second set of SJAE in service in parallel with the operating SJAE.
A. Correct - In the event of Offgas premature recombination, off gas flow and recombiner temperature would lower. Action must be taken to stop the premature recombination to prevent damage to other off gas equipment and piping. To limit H2 the hydrogen water chemistry system must be secured.
Proposed Answer:           A Explanation (Optional):
B. Incorrect  
A.       Correct - In the event of Offgas premature recombination, off gas flow and recombiner temperature would lower. Action must be taken to stop the premature recombination to prevent damage to other off gas equipment and piping. To limit H2 the hydrogen water chemistry system must be secured.
- This is plausible, because with a Offgas premature recombination with power <10% the procedure directs start the mechanical vacuum pump to stabilize condenser vacuum, however in this case power level is 25%.
B.       Incorrect - This is plausible, because with a Offgas premature recombination with power <10% the procedure directs start the mechanical vacuum pump to stabilize condenser vacuum, however in this case power level is 25%.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 71 C. Incorrect  
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 70
- The low SJAE flow and erratic offgas flow indicate a H2 event NOT an offgas isolation. This distracter is plausible, because with a Offgas isolation with power <10% the procedure directs starting the mechanical vacuum pump to stabilize condenser vacuum, however in this case power level is 25%. D. Incorrect  
 
- The low SJAE flow and erratic offgas flow indicate a H2 event NOT an offgas isolation. This distracter is plausible, because with the low off
C. Incorrect - The low SJAE flow and erratic offgas flow indicate a H2 event NOT an offgas isolation. This distracter is plausible, because with a Offgas isolation with power
-gas flow another set of air ejectors would provide additional flow.
      <10% the procedure directs starting the mechanical vacuum pump to stabilize condenser vacuum, however in this case power level is 25%.
Technical Reference(s):
D. Incorrect - The low SJAE flow and erratic offgas flow indicate a H2 event NOT an offgas isolation. This distracter is plausible, because with the low off-gas flow another set of air ejectors would provide additional flow.
AOP-672.3 (Attach if not previously provided)
Technical Reference(s): AOP-672.3                             (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
Proposed References to be provided to applicants during examination:         None Learning Objective:                                                 (As available)
None Learning Objective:
Question Source:     Bank #
(As available)
Modified Bank #                           (Note changes or attach parent)
Question Source:
New               X Question History:                           Last NRC Exam:               Not Used Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:       55.41     10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 72  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 71
-reference:
Level RO  SRO  Tier # 2    Group # 2    K/A # 214000  A3.02  Importance Rating 3.2    Ability to monitor automatic operations of the ROD POSITION INFORMATION SYSTEM including: Alarm and indicating lights Proposed Question:
RO Question # 35 A control rod is being withdrawn from position 24 to position 26.
Which of the following conditions will result in a Control Rod Drift alarm?  Consider all conditions separately.
Condition 1:
The reed switch for position 25 fails to close.
Condition 2:
The reed switch for position 25 fails to open.
Condition 3:
The reed switch for position 26 fails to close.
A. Condition 2 ONLY  B. Conditi on 3 ONLY  C. Conditions 1 and 2 ONLY  D. Conditions 2 and 3 ONLY  Proposed Answer:
D  Explanation (Optional):
A. Incorrect: Condition 3 will also cause a rod drift alarm. Once the timer times out a rod drift alarm will occur for that rod if an even numbered reed switch is not closed.
B. Incorrect:  Condition 2 will also cause a rod drift alarm. A rod drift alarm will occur if after the timer times out an odd numbered reed switch is closed, as this may be indicative of a rod drifting.
C. Incorrect: Condition 1 will not cause a rod drift alarm. Odd numbered reed switches are normally open.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 73 D. Correct: If an even numbered (latched position) reed switch is not closed and the rod is not being driven, a drift alarm will be generated. A drift alarm will be also be generated if an odd numbered (between latched positions) reed switch closes without the rod being driven. As soon as the timer times out, i.e., not being selected and driving, a drift alarm will occur from either condition 2 or 3.
Examination Outline Cross-reference:            Level                  RO                SRO Tier #                2 Group #                2 K/A #                  214000      A3.02 Importance Rating      3.2 Ability to monitor automatic operations of the ROD POSITION INFORMATION SYSTEM including: Alarm and indicating lights Proposed Question:          RO Question # 35 A control rod is being withdrawn from position 24 to position 26.
Technical Reference(s):
Which of the following conditions will result in a Control Rod Drift alarm? Consider all conditions separately.
SD 856.1, page 28 (Attach if not previously provided)
Condition 1:        The reed switch for position 25 fails to close.
Proposed References to be provided to applicants during examination:
Condition 2:        The reed switch for position 25 fails to open.
None Learning Objective:
Condition 3:        The reed switch for position 26 fails to close.
(As available)
A.      Condition 2 ONLY B.      Condition 3 ONLY C.      Conditions 1 and 2 ONLY D.      Conditions 2 and 3 ONLY Proposed Answer:            D Explanation (Optional):
Question Source:
A.      Incorrect: Condition 3 will also cause a rod drift alarm. Once the timer times out a rod drift alarm will occur for that rod if an even numbered reed switch is not closed.
Bank #   Modified Bank #
B.      Incorrect: Condition 2 will also cause a rod drift alarm. A rod drift alarm will occur if after the timer times out an odd numbered reed switch is closed, as this may be indicative of a rod drifting.
(Note changes or attach parent)
C.      Incorrect: Condition 1 will not cause a rod drift alarm. Odd numbered reed switches are normally open.
New X   Question History:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                         Page 72
Last NRC Exam:
 
N/A Question Cognitive Level:
D. Correct: If an even numbered (latched position) reed switch is not closed and the rod is not being driven, a drift alarm will be generated. A drift alarm will be also be generated if an odd numbered (between latched positions) reed switch closes without the rod being driven. As soon as the timer times out, i.e., not being selected and driving, a drift alarm will occur from either condition 2 or 3.
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
Technical Reference(s): SD 856.1, page 28                       (Attach if not previously provided)
55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
Question Source:     Bank #
Modified Bank #                           (Note changes or attach parent)
New               X Question History:                           Last NRC Exam:               N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41     6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 74 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 73
-reference:
 
Level RO SRO Tier # 2   Group # 2   K/A # 241000 A4.13 Importance Rating 2.9   Ability to manually operate and/or monitor in the control room: Turbine inlet pressure Proposed Question:
Examination Outline Cross-reference:         Level                     RO             SRO Tier #                     2 Group #                   2 K/A #                     241000     A4.13 Importance Rating         2.9 Ability to manually operate and/or monitor in the control room: Turbine inlet pressure Proposed Question:         RO Question # 36 The plant is operating at 98% power with the "A" EHC Pressure Regulator in service.
RO Question # 36 The plant is operating at 98% power with the "A" EHC Pressure Regulator in service.
A steam leak occurs on the sensing line for the "A" Pressure Regulator such that "Steam Throttle Pressure A" is slowly failing DOWNSCALE.
A steam leak occurs on the sensing line for the "A" Pressure Regulator such that "Steam Throttle Pressure A" is slowly failing DOWNSCALE.
Assuming NO operator action is taken, which ONE of the following correctly describes the expected response of turbine throttle pressure?
Assuming NO operator action is taken, which ONE of the following correctly describes the expected response of turbine throttle pressure?
Turbine throttle pressure will-A. slowly rise until the reactor scrams on either high flux or high pressure.
Turbine throttle pressure will A.       slowly rise until the reactor scrams on either high flux or high pressure.
B. stabilize a few psig lower controlled by the "B" EHC Pressure Regulator.
B.       stabilize a few psig lower controlled by the "B" EHC Pressure Regulator.
C. slowly lower resulting in a reactor scram on an automatic MSIV closure.
C.       slowly lower resulting in a reactor scram on an automatic MSIV closure.
D. stabilize a few psig higher controlled by the "B" EHC Pressure Regulator.
D.       stabilize a few psig higher controlled by the "B" EHC Pressure Regulator.
Proposed Answer:
Proposed Answer:           D Explanation (Optional):
D Explanation (Optional):
A.       Incorrect - As the A side pressure error signal goes down, the B pressure error signal will go up. This will eventually cause the B regulator to take over and control pressure.
A. Incorrect  
No scram will occur.
- As the "A" side pressure error signal goes down, the "B" pressure error signal will go up. This will eventually cause the "B" regulator to take over and control pressure
B.       Incorrect - The B regulator will take over at a slightly elevated reactor and throttle pressure.
. No scram will occur.
C.       Incorrect - As the A side pressure error signal goes down, the B pressure error signal will go up. This will eventually cause the B regulator to take over and control pressure.
B. Incorrect  
No scram will occur.
- The "B" regulator will take over at a slightly elevated reactor and throttle pressure. C. Incorrect  
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                          Page 74
- As the "A" side pressure error signal goes down, the "B" pressure error signal will go up. This will eventually cause the "B" regulator to take over and control pressure
. No scram will occur.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 75 D. Correct - As the "A" steam throttle pressure falls, the "A" side pressure error signal will go down. This will cause the CVs to begin to close. As the CVs close, reactor pressure (and hence throttle pressure) will begin to rise. This rise will be seen by the "B" regulator. So as the "A" side pressure error signal goes down, the "B" pressure error signal will go up. This will eventually cause the "B" regulator to take over at a slightly elevated reactor and throttle pressure.
D. Correct - As the A steam throttle pressure falls, the A side pressure error signal will go down. This will cause the CVs to begin to close. As the CVs close, reactor pressure (and hence throttle pressure) will begin to rise. This rise will be seen by the B regulator. So as the A side pressure error signal goes down, the B pressure error signal will go up. This will eventually cause the B regulator to take over at a slightly elevated reactor and throttle pressure.
Technical Reference(s):
Technical Reference(s): AOP 262, pg 3                           (Attach if not previously provided)
AOP 262, pg 3 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
Proposed References to be provided to applicants during examination:
DAEC Bank #
None Learning Objective:
Question Source:     Bank #
(As available)
19235 Modified Bank #                           (Note changes or attach parent)
Question Source:
New Question History:                         Last NRC Exam:                 Not Used Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41     6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Bank # DAEC Bank #
19235   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 76 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                         Page 75
-reference:
 
Level RO SRO Tier # 2   Group # 2   K/A # 256000 2.4.31 Importance Rating 4.2   Emergency Procedures / Plan: Knowledge of annunciator alarms, indications, or response procedures.
Examination Outline Cross-reference:       Level                   RO             SRO Tier #                   2 Group #                 2 K/A #                   256000     2.4.31 Importance Rating       4.2 Emergency Procedures / Plan: Knowledge of annunciator alarms, indications, or response procedures.
Proposed Question:
Proposed Question:       RO Question # 37 Following a failure to scram, the RO is performing RIP 103.2, Increase CRD Cooling Flow and Pressure. The RO has placed both CRD pumps in service when the following annunciators alarm and remain in alarm:
RO Question # 37 Following a failure to scram
* 1C06A (A-12) A CONDENSATE PUMP 1P-8A TRIP OR MOTOR OVERLOAD
, the RO is performing RIP 103.2, Increase CRD Cooling Flow and Pressure. The RO has placed both CRD pumps in service when the following annunciators alarm and remain in alarm:
* 1C06A (A-13) B CONDENSATE PUMP 1P-8A TRIP OR MOTOR OVERLOAD Which ONE of the following describes the effects of these annunciators on RIP 103.2?
1C06A (A-12) "A" CONDENSATE PUMP 1P
A. The CRD pumps will trip on a loss of suction pressure; the RIP must be exited.
-8A TRIP OR MOTOR OVERLOAD 1C06A (A-13) "B" CONDENSATE PUMP 1P
-8A TRIP OR MOTOR OVERLOAD Which ONE of the following describes the effects of these annunciators on RIP 103.2
A. The CRD pumps will trip on a loss of suction pressure
; the RIP must be exited.
B. Continue in the RIP securing one CRD pump to prevent both pumps tripping on a loss of suction.
B. Continue in the RIP securing one CRD pump to prevent both pumps tripping on a loss of suction.
C. Continue in the RIP
C. Continue in the RIP; the CRD pump suction source will automatically shift to the condensate storage tanks.
; the CRD pump suction source will automatically shift to the condensate storage tanks.
D. Exit the RIP, manually shift the CRD pump suction to the condensate storage tanks, and re-enter the RIP.
D. Exit the RIP, manually shift the CRD pump suction to the condensate storage tanks
Proposed Answer:         C Explanation (Optional):
, and re-enter the RIP.
A. Incorrect - The CRD pumps will NOT trip on a loss of suction. The CST suction is always lined up to the CRD pump suction. If CV-1497 closes the CRD pump suction will automatically shift to the CSTs. Plausible because the normal suction source is isolated on a trip of both condensate pumps.
Proposed Answer:
B. Incorrect - There is no reason to secure a CRD pump. Plausible because the normal suction source is isolated on a trip of both condensate pumps and the normal source has a higher pressure than the alternate source from the CSTs.
C Explanation (Optional): A. Incorrect  
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 76
- The CRD pumps will NOT trip on a loss of suction. The CST suction is always lined up to the CRD pump suction. If CV
-1497 closes the CRD pump suction will automatically shift to the CSTs. Plausible because the normal suction source is isolated on a trip of both condensate pumps.
B. Incorrect  
- There is no reason to secure a CRD pump. Plausible because the normal suction source is isolated on a trip of both condensate pumps and the normal source has a higher pressure than the alternate source from the CSTs.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 77 C. Correct - The CRD pumps will NOT trip on a loss of suction. These annunciators indicate the condensate pump has tripped or is about to trip. The condensate pump breaker closed position provides an interlock to CV
C. Correct - The CRD pumps will NOT trip on a loss of suction. These annunciators indicate the condensate pump has tripped or is about to trip. The condensate pump breaker closed position provides an interlock to CV-1497 through which condensate flows from the reject line to the Control Rod Drive Hydraulic System. However the CST suction is always lined up to the CRD pump suction. If CV-1497 closes the CRD pump suction will automatically shift to the CSTs.
-1497 through which condensate flows from the reject line to the Control Rod Drive Hydraulic System. However the CST suction is always lined up to the CRD pump suction. If CV
-1497 closes the CRD pump suction will automatically shift to the CSTs.
D. Incorrect - There is no reason to exit the RIP both CRD pumps will remain running with the CSTs as their suction. Plausible because the normal suction source is isolated on a trip of both condensate pumps.
D. Incorrect - There is no reason to exit the RIP both CRD pumps will remain running with the CSTs as their suction. Plausible because the normal suction source is isolated on a trip of both condensate pumps.
Technical Reference(s):
1C06A, C-12 & C-13 RIP 103.2 Technical Reference(s):                                      (Attach if not previously provided)
1C06A, C-12 & C-13 RIP 103.2 SD 639, pg 9 SD 255, pg 6 (Attach if not previously provided)
SD 639, pg 9 SD 255, pg 6 Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
Proposed References to be provided to applicants during examination:
Question Source:     Bank #
None Learning Objective:
Modified Bank #                         (Note changes or attach parent)
(As available)
New               X Question History:                           Last NRC Exam:             N/A Question Cognitive Level:     Memory or Fundamental Knowledge         X Comprehension or Analysis 10 CFR Part 55 Content:       55.41       10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent) New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 78 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 77
-reference:
Level RO  SRO  Tier # 2    Group # 2    K/A # 201006  K5.10  Importance Rating 3.2    Knowledge of ROD WORTH MINIMIZER SYSTEM (RWM) (PLANT SPECIFIC) design feature(s) and/or interlocks which provide for the following: Withdraw error:  P
-Spec(Not-BWR6) Proposed Question:
RO Question # 38 Given the following:
A reactor startup is in progress with reactor power in the source range The RWM is in OPERATE enforcing the Rod Sequence There are NO Rod Worth Minimizer (RWM) errors currently existing The control rod sequence directs that control rod 26
-15 be selected and withdrawn from position 10 to position 12 Control rod 26
-15 is the 2 nd rod in rod step 27 Rod step 27 contains 8 control rods Step 27 control rods o Insert Limit: 8 o Withdraw Limit: 12 When control rod 26-15 is withdrawn, the rod "double
-notches" and settles at position 14.


Examination Outline Cross-reference:      Level                    RO              SRO Tier #                    2 Group #                  2 K/A #                    201006    K5.10 Importance Rating        3.2 Knowledge of ROD WORTH MINIMIZER SYSTEM (RWM) (PLANT SPECIFIC) design feature(s) and/or interlocks which provide for the following: Withdraw error: P-Spec(Not-BWR6)
Proposed Question:        RO Question # 38 Given the following:
* A reactor startup is in progress with reactor power in the source range
* The RWM is in OPERATE enforcing the Rod Sequence
* There are NO Rod Worth Minimizer (RWM) errors currently existing
* The control rod sequence directs that control rod 26-15 be selected and withdrawn from position 10 to position 12
* Control rod 26-15 is the 2nd rod in rod step 27
* Rod step 27 contains 8 control rods
* Step 27 control rods o Insert Limit: 8 o Withdraw Limit: 12 When control rod 26-15 is withdrawn, the rod "double-notches" and settles at position 14.
Which ONE of the following is correct regarding further control rod movement?
Which ONE of the following is correct regarding further control rod movement?
The RWM will automatically block-A. ANY control rods from being withdrawn. ALL control rods can be inserted until three insert errors are created.
The RWM will automatically block A. ANY control rods from being withdrawn. ALL control rods can be inserted until three insert errors are created.
B. ANY control rods from being inserted or withdrawn. Control rod 26
B. ANY control rods from being inserted or withdrawn. Control rod 26-15 can ONLY be repositioned after bypassing the RWM.
-15 can ONLY be repositioned after bypassing the RWM.
C. control rod 26-15 from further withdrawal, but it can be inserted back to position 12 to clear the rod block. NO other control rod movement is possible unless the RWM is bypassed.
C. control rod 26
D. control rod 26-15 from further withdrawal. The remaining rods in step 27 can be withdrawn within the limits of the step. Control rod 26-15 must be inserted before leaving Step 27.
-15 from further withdrawal, but it can be inserted back to position 12 to clear the rod block. NO other control rod movement is possible unless the RWM is bypassed. D. control ro d 26-15 from further withdrawal. The remaining rods in step 27 can be withdrawn within the limits of the step.
Proposed Answer:         C DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 78
Control rod 26
 
-15 must be inserted before leaving Step 27
Explanation (Optional):
. Proposed Answer:
A. Incorrect: All rod movement is inhibited unless the withdraw error is corrected.
C DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 79 Explanation (Optional):
Plausible in that normally, operation can continue if an insert error is made provided that there are no more than three insert errors.
A. Incorrect: All rod movement is inhibited unless the withdraw error is corrected. Plausible in that normally, operation can continue if an insert error is made provided that there are no more than three insert errors.
B. Incorrect: The error rod can be inserted to correct the withdrawal error.
B. Incorrect: The error rod can be inserted to correct the withdrawal error.
C. Correct: A withdrawal error was generated when rod 26
C. Correct: A withdrawal error was generated when rod 26-15 was withdrawn past it's withdraw limit. Until the error is corrected, all other control rod motion is inhibited.
-15 was withdrawn past it's withdraw limit. Until the error is corrected, all other control rod motion is inhibited.
D. Incorrect: A withdrawal error was generated when rod 26-15 was withdrawn past it's withdraw limit. Until the error is corrected, all other rod motion is inhibited. Plausible in that the RWM does not enforce how the rods are withdrawn or inserted within the step provided the insert and withdrawal limits are not violated.
D. Incorrect: A withdrawal error was generated when rod 26
Technical Reference(s): SD 878.8, pg 16                           (Attach if not previously provided)
-15 was withdrawn past it's withdraw limit. Until the error is corrected, all other rod motion is inhibited. Plausible in that the RWM does not enforce how the rods are withdrawn or inserted within the step provided the insert and withdrawal limits are not violated.
Proposed References to be provided to applicants during examination:             None Learning Objective:                                                   (As available)
Technical Reference(s):
Question Source:     Bank #                 WTSI 12965 Modified Bank #                             (Note changes or attach parent)
SD 878.8, pg 16 (Attach if not previously provided)
New Question History:                           Last NRC Exam:       2011     Pilgrim Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41       6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Proposed References to be provided to applicants during examination:
None Learning Objective:
(As available)
Question Source:
Bank # WTSI 12965 Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
2011 Pilgrim Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 80  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                         Page 79
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 295025 EK1.02   Importance Rating 4.1   Knowledge of the operational implications of the following concepts as they apply to HIGH REACTOR PRESSURE: Reactor vessel integrity Proposed Question:
Examination Outline Cross-reference:       Level                     RO           SRO Tier #                     1 Group #                   1 K/A #                     295025   EK1.02 Importance Rating         4.1 Knowledge of the operational implications of the following concepts as they apply to HIGH REACTOR PRESSURE: Reactor vessel integrity Proposed Question:       RO Question # 39 Which ONE of the following is the highest steam dome pressure that will ensure that the reactor coolant system will remain intact at its most limiting location?
RO Question # 39 Which ONE of the following is the highest steam dome pressure that will ensure that the reactor coolant system will remain intact at its most limiting location?   A. 1250 psig B. 1335 psig C. 1380 psig D. 1590 psig   Proposed Answer:
A. 1250 psig B. 1335 psig C. 1380 psig D. 1590 psig Proposed Answer:         B Explanation (Optional):
B Explanation (Optional):
A. Incorrect: Plausible in that this is the design pressure of the RPV.
A. Incorrect: Plausible in that this is the design pressure of the RPV.
B. Correct: The Tech Spec Safety Limit on reactor steam dome pressure protects the reactor coolant system against over-pressurization. The most limiting transient location is the recirc suction piping which has a design pressure of 1150 psig. USAS, Nuclear Power Piping Code, Section B31.1, 1967 Edition (Ref. 6) permits a maximum pressure transient of 120% of design pressure or 1380 psig (120% x 1150 psig = 1380 psig). This value is adjusted to account for the added pressure due to elevation sensed at the lowest points in the reactor pressure vessel and reactor coolant system piping in order to determine the most limiting steam dome pressure. This results in a safety limit of 1335 psig steam dome pressure.
B. Correct: The Tech Spec Safety Limit on reactor steam dome pressure protects the reactor coolant system against over
C. Incorrect: Plausible in that 1380 psig is the maximum allowed transient pressure allowed for in the recirc loop suction piping. However it does not take into account the weight of the water above the lowest section of the reactor coolant system piping in order to determine the required steam dome pressure.
-pressurization. The most limiting transient location is the recirc suction piping which has a design pressure of 1150 psig. USAS, Nuclear Power Piping Code, Section B31.1, 1967 Edition (Ref. 6) permits a maximum pressure transient of 120% of design pressure or 1380 psig (120% x 1150 psig = 1380 psig). This value is adjusted to account for the added pressure due to elevation sensed at the lowest points in the reactor pressure vessel and reactor coolant system piping in order to determine the most limiting steam dome pressure. This results in a safety limit of 1335 psig steam dome pressure.
D. Incorrect: Plausible in that 1590 is the maximum allowed transient pressure rating of the recirc discharge piping. However it is not the most limiting pressure within the reactor coolant system.
C. Incorrect: Plausible in that 1380 psig is the maximum allowed transient pressure allowed for in the recirc loop suction piping. However it does not take into account the weight of the water above the lowest section of the reactor coolant system piping in order to determine the required steam dome pressure.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 80
D. Incorrect: Plausible in that 1590 is the maximum allowed transient pressure rating of the recirc discharge piping. However it is not the most limiting pressure within the reactor coolant system.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 81 Technical Reference(s):
Safety Limit 2.1.2 and associated Technical Reference(s):                                    (Attach if not previously provided) bases.
Safety Limit 2.1.2 and associated bases. (Attach if not previously provide d)       Proposed References to be provided to applicants during examination:
Proposed References to be provided to applicants during examination:     None Learning Objective:                                           (As available)
None Learning Objective:
WTS Bank #
(As available)
Question Source:   Bank #                                 Adjusted for DAEC 295025 Modified Bank #                       (Note changes or attach parent)
Question Source:
New Question History:                       Last NRC Exam:   2010     NMP2 Question Cognitive Level:   Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:     55.41     3 55.43 Mechanical components and design features of reactor primary system.
Bank # WTS Bank #
295025 Adjusted for DAEC Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
2010 NMP2 Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 3 55.43 Mechanical components and design features of reactor primary system.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 82  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 81
-reference:
Level RO  SRO  Tier # 1    Group # 1    K/A # 295026  EK1.01  Importance Rating 3.0    Knowledge of the operational implications of the following concepts as they apply to SUPPRESSION POOL HIGH WATER TEMPERATURE: Pump NPSH Proposed Question:
RO Question # 40 Following a loss of coolant accident the following conditions exist:
  "A" RHR Pump is in Torus cooling at 3300 gpm "B" RHR Pump is in Torus cooling at 4700 gpm Torus pressure is 5 psig Torus water temperature is 215 &deg;F    NPSH limits are currently being exceeded for-A. Both RHR Pumps B. Neither RHR Pump C.  "A" RHR pump ONLY  D.  "B" RHR pump ONLY  Proposed Answer:
D  Explanation (Optional):
A. Incorrect: The limit for "A" RHR pump is ~ 217 degrees. Plausible if the candidate sums the 2 flows and uses the "2 pumps" values for the bottom axis of the curve. If so, the limit for 8000 gpm at 5 psig torus pressure would be 215 degrees. This would be incorrect in that the two pumps are in different loops.
B. Incorrect: The "B" pump is exceeding its limit. At 4700 gpm and with a torus pressure of 5 psig, the limit is ~ 214 degrees. Plausible if the candidate again uses the "2 pump" values on the horizontal axis but considers the flow rates individually. In this case the limits for both pumps would be around 220 degrees.
C. Incorrect: The "A" RHR pump limit is ~ 217 degrees. Plausible if the candidate misinterprets the graph for the two flow rates.
D. Correct:  The "B" pump is exceeding its limit. At 4700 gpm and with a torus pressure of 5 psig, the limit is ~ 214 degrees. The "A" RHR pump is < its limit of ~ 217 degrees.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 83  Technical Reference(s):
Examination Outline Cross-reference:      Level                      RO              SRO Tier #                    1 Group #                    1 K/A #                      295026      EK1.01 Importance Rating          3.0 Knowledge of the operational implications of the following concepts as they apply to SUPPRESSION POOL HIGH WATER TEMPERATURE: Pump NPSH Proposed Question:        RO Question # 40 Following a loss of coolant accident the following conditions exist:
EOP Graph 8 (Attach if not previously provided)
* A RHR Pump is in Torus cooling at 3300 gpm
Bases EOP Curves and Limits Pgs. 60-61      Proposed References to be provided to applicants during examination:
* B RHR Pump is in Torus cooling at 4700 gpm
EOP Graph # 8, RHR NPSH Learning Objective:
* Torus pressure is 5 psig
LP 95.01, LO 95.00.00.17 (As available)
* Torus water temperature is 215 &deg;F NPSH limits are currently being exceeded for A. Both RHR Pumps B. Neither RHR Pump C. A RHR pump ONLY D. B RHR pump ONLY Proposed Answer:           D Explanation (Optional):
Question Source:
A. Incorrect: The limit for A RHR pump is ~ 217 degrees. Plausible if the candidate sums the 2 flows and uses the 2 pumps values for the bottom axis of the curve. If so, the limit for 8000 gpm at 5 psig torus pressure would be 215 degrees. This would be incorrect in that the two pumps are in different loops.
Bank #    Modified Bank #
B. Incorrect: The B pump is exceeding its limit. At 4700 gpm and with a torus pressure of 5 psig, the limit is ~ 214 degrees. Plausible if the candidate again uses the 2 pump values on the horizontal axis but considers the flow rates individually. In this case the limits for both pumps would be around 220 degrees.
(Note changes or attach parent)
C. Incorrect: The A RHR pump limit is ~ 217 degrees. Plausible if the candidate misinterprets the graph for the two flow rates.
New X  Question History:
D. Correct: The B pump is exceeding its limit. At 4700 gpm and with a torus pressure of 5 psig, the limit is ~ 214 degrees. The A RHR pump is < its limit of ~ 217 degrees.
Last NRC Exam:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 82
N/A  Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41 8  55.43  Components, capacity, and functions of emergency systems.
Comments:


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 84  Examination Outline Cross
Technical Reference(s): EOP Graph 8                        (Attach if not previously provided)
-reference:
Bases EOP Curves and Limits Pgs. 60-61 EOP Graph # 8, Proposed References to be provided to applicants during examination:
Level RO  SRO  Tier # 1    Group # 1    K/A # 295021  AK1.02  Importance Rating 3.3    Knowledge of the operational implications of the following concepts as they apply to LOSS OF SHUTDOWN COOLING: Thermal stratification Proposed Question:
RHR NPSH Learning Objective:      LP 95.01, LO 95.00.00.17              (As available)
RO Question # 41 The plant is in MODE 4 with "A" loop of RHR in Shutdown Cooling (SDC).
Question Source:    Bank #
Both Recirc pumps are secured and unavailable The "B" Loop of RHR is tagged out for maintenance Then-  (1) A leak on the discharge of "A" Loop of RHR occurs (2) RPV level lowers and SDC isolates
Modified Bank #                        (Note changes or attach parent)
New            X Question History:                      Last NRC Exam:              N/A Question Cognitive Level:  Memory or Fundamental Knowledge Comprehension or Analysis                X 10 CFR Part 55 Content:    55.41    8 55.43 Components, capacity, and functions of emergency systems.
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 83


IAW with AOP 149, Loss of Decay Heat Removal, which ONE of the following is required to ensure adequate mixing of the coolant in the core?
Examination Outline Cross-reference:      Level                    RO              SRO Tier #                  1 Group #                  1 K/A #                    295021      AK1.02 Importance Rating        3.3 Knowledge of the operational implications of the following concepts as they apply to LOSS OF SHUTDOWN COOLING: Thermal stratification Proposed Question:      RO Question # 41 The plant is in MODE 4 with A loop of RHR in Shutdown Cooling (SDC).
Raise and control reactor water level between-A. 170 and 211 inches.
* Both Recirc pumps are secured and unavailable
* The B Loop of RHR is tagged out for maintenance Then (1) A leak on the discharge of A Loop of RHR occurs (2) RPV level lowers and SDC isolates IAW with AOP 149, Loss of Decay Heat Removal, which ONE of the following is required to ensure adequate mixing of the coolant in the core?
Raise and control reactor water level between A. 170 and 211 inches.
B. 186 and 195 inches.
B. 186 and 195 inches.
C. 230 and 240 inches.
C. 230 and 240 inches.
D. 258 and 270 inches.
D. 258 and 270 inches.
Proposed Answer:
Proposed Answer:       C Explanation (Optional):
C Explanation (Optional):
A. Incorrect: AOP-149 requires level to be raised and controlled between 230 and 240 inches. Plausible in that an EOP 1 entry condition has occurred and this is the initial control band.
A. Incorrect: AOP
B. Incorrect: AOP-149 requires level to be raised and controlled between 230 and 240 inches. Plausible in that this range is between the low and high level alarm setpoints.
-149 requires level to be raised and controlled between 230 and 240 inches. Plausible in that an EOP 1 entry condition has occurred and this is the initial control band.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 84
B. Incorrect: AOP
-149 requires level to be raised and controlled between 230 and 240 inches. Plausible in that this range is between the low and high level alarm setpoints.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 85 C. Cor rect: Insufficient RHR flow while in SDC can result in RPV thermal stratification. To prevent thermal stratification a natural circulation flow path must be established that allows the hotter water in the reactor core to flow upwards out the steam separators into the annulus region. AOP 149, Follow
C. Correct: Insufficient RHR flow while in SDC can result in RPV thermal stratification. To prevent thermal stratification a natural circulation flow path must be established that allows the hotter water in the reactor core to flow upwards out the steam separators into the annulus region. AOP 149, Follow-up Action # 4 requires level to be raised and controlled between 230 and 240 inches. Insufficient RHR flow while in SDC can result in RPV stratification. AOP 264, pg 8 states If RWCU System is not available OR Recirc Pumps are not available, raise RPV level to greater than (>) 214" (preferably between 230" and 240") to improve natural circulation. T.S. Bases 3.4.8 RHR Shutdown Cooling System also states Alternate methods of reactor coolant circulation that can be used include (but are not limited to) raising reactor water level above the minimum natural circulation level (i.e., lowest turnaround point for water in the steam separator).
-up Action # 4 requires level to be raised and controlled betwee n 230 and 240 inches. Insufficient RHR flow while in SDC can result in RPV stratification. AOP 264, pg 8 states If RWCU System is not available OR Recirc Pumps are not available, raise RPV level to greater than (>) 214" (preferably between 230" and 240") to improve natural circulation. T.S. Bases 3.4.8 RHR Shutdown Cooling System also states "Alternate methods of reactor coolant circulation that can be used include (but are not limited to) raising reactor water level above the minimum natural circulation level (i.e., lowest turnaround point for water in the steam separator)
D. Incorrect: AOP-149 requires level to be raised and controlled between 230 and 240 inches. Plausible in that the higher the level the more the natural circulation. However this would flood the main steam lines.
."  D. Incorrect: AOP
AOP 149, Follow-up Action # 4 RHR lesson plan pg 29 Technical Reference(s):                                          (Attach if not previously provided)
-149 requires level to be raised and controlled between 230 and 240 inches. Plausible in that the higher the level the more the natural circulation. However this would flood the main steam lines.
AOP 264, Pg 8 T.S. Bases 3.4.8 Proposed References to be provided to applicants during examination:           None Learning Objective:         STG AOP 149, 94.01.01.03                 (As available)
Technical Reference(s):
Question Source:     Bank #
AOP 149, Follow
Modified Bank #                             (Note changes or attach parent)
-up Action # 4 RHR lesson plan pg 29 AOP 264, Pg 8 T.S. Bases 3.4.8 (Attach if not previously provided)
New                 X Question History:                           Last NRC Exam:               NA Question Cognitive Level:       Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:         55.41     10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Proposed References to be provided to applicants during examination:
None Learning Objective:
STG AOP 149, 94.01.01.03 (As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
NA Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 86  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                         Page 85
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 295031 EK2.13   Importance Rating 4.1   Knowledge of the interrelations between REACTOR LOW WATER LEVEL and the following: ARI/RPT/ATWS: Plant
Examination Outline Cross-reference:     Level                       RO               SRO Tier #                     1 Group #                     1 K/A #                       295031     EK2.13 Importance Rating           4.1 Knowledge of the interrelations between REACTOR LOW WATER LEVEL and the following:
-Specific Proposed Question:
ARI/RPT/ATWS: Plant-Specific Proposed Question:       RO Question # 42 Which ONE of the following is the effect of tripping the Alternate Rod Insertion (ARI) system reactor water level A and C detectors?
RO Question # 42 Which ONE of the following is the effect of tripping the Alternate Rod Insertion (ARI) system reactor water level A and C detectors?
A. One ARI system valve will open, and both recirculation pumps trip immediately.
A. One ARI system valve will open
B. Both ARI system valves will open, and one recirculation pump trips immediately.
, and both recirculation pumps trip immediately.
C. One ARI system valve will open, and both recirculation pumps trip after a 9 second time delay.
B. Both ARI system valves will open
D. Both ARI system valves will open, and one recirculation pump trips after a 9 second time delay.
, and one recirculation pump trips immediately.
Proposed Answer:         C Explanation (Optional):
C. One ARI system valve will open
A. Incorrect: The recirculation pumps trip after a 9 second time delay.
, and both recirculation pumps trip after a 9 second time delay. D. Both ARI system valves will open
B. Incorrect: Only one ARI valve will open and the recirculation pumps trip after a 9 second time delay.
, and one recirculation pump trips after a 9 second time delay.
C. Correct: The two ATWS-RPT/ARI logics are arranged such that a trip of either logic trips both recirculation pumps (one RPT breaker per pump) and energizes one ARI solenoid valve.
Proposed Answer:
C Explanation (Optional):
A. Incorrect: The recirculation pumps trip after a 9 second time delay.
B. Incorrect: Only one ARI valve will open and the recirculation pumps trip after a 9 second time delay.
C. Correct: The two ATWS
-RPT/ARI logics are arranged such that a trip of either logic trips both recirculation pumps (one RPT breaker per pump) and energizes one ARI solenoid valve.
D. Incorrect: Only one ARI valve will open. Additionally both recirc pumps will trip.
D. Incorrect: Only one ARI valve will open. Additionally both recirc pumps will trip.
Technical Reference(s):
Technical Reference(s): SD-358, pg 23                           (Attach if not previously provided)
SD-358, pg 23 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:           None DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 86
Proposed References to be provided to applicants during examination:
 
None DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 87  Learning Objective: LP 358 - Reactor Protection, 22.00.00.05 (As available)
LP 358 - Reactor Protection, Learning Objective:                                            (As available) 22.00.00.05 Question Source:   Bank #
Question Source:
Modified Bank #                         (Note changes or attach parent)
Bank #   Modified Bank #
New             X Question History:                       Last NRC Exam:             N/A Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:     55.41     6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 88  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 87
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 295019 AK2.08   Importance Rating 2.8   Knowledge of the interrelations between PARTIAL OR COMPLETE LOSS OF INSTRUMENT AIR and the following: Plant ventilation Proposed Question:
Examination Outline Cross-reference:       Level                   RO               SRO Tier #                 1 Group #                 1 K/A #                   295019     AK2.08 Importance Rating       2.8 Knowledge of the interrelations between PARTIAL OR COMPLETE LOSS OF INSTRUMENT AIR and the following: Plant ventilation Proposed Question:       RO Question # 43 Which ONE of the following describes an effect of a loss of instrument air to the Standby Gas Treatment (SBGT) system?
RO Question # 43 Which ONE of the following describes an effect of a loss of instrument air to the Standby Gas Treatment (SBGT) system?   As a result of the loss of instrument air, SBGT... A. will automatically start and establish rated flow.
As a result of the loss of instrument air, SBGT...
B. will NOT automatically start; however , it can be manually started. C. will NOT automatically start and can NOT be started manually.
A. will automatically start and establish rated flow.
D. will automatically start
B. will NOT automatically start; however, it can be manually started.
; however , the suction and discharge dampers will NOT open
C. will NOT automatically start and can NOT be started manually.
. Proposed Answer:
D. will automatically start; however, the suction and discharge dampers will NOT open.
B Explanation (Optional):
Proposed Answer:         B Explanation (Optional):
A. Incorrect: SBGT will NOT auto start. SBGT will only auto start on the following signals:
A. Incorrect: SBGT will NOT auto start. SBGT will only auto start on the following signals:
Reactor Building ventilation exhaust high radiation of 8 mR/hr (inc) or downscale.
Reactor Building ventilation exhaust high radiation of 8 mR/hr (inc) or downscale.
Refueling Pool exhaust high radiation of 8 mR/hr (inc), or INOP.
Refueling Pool exhaust high radiation of 8 mR/hr (inc), or INOP.
Primary containment (Drywell) high pressure of 2 psig. Reactor vessel low water level of 170 inches.
Primary containment (Drywell) high pressure of 2 psig.
Offgas Vent Pipe (Stack) HI
Reactor vessel low water level of 170 inches.
-HI radiation.
Offgas Vent Pipe (Stack) HI-HI radiation.
Plausible in that the candidate may feel that SBGT will automatically start to maintain RX building D/P when RX building ventilation dampers fail closed as a result of the loss of air. B. Correct: SBGT will NOT automatically start as a result of the loss of air. SBGT can be manually started and is normally manually started on a loss of IA (see AOP 518).
Plausible in that the candidate may feel that SBGT will automatically start to maintain RX building D/P when RX building ventilation dampers fail closed as a result of the loss of air.
C. Incorrect: SBGT can be manually started and is normally manually started on a loss of IA (see AOP 518). Plausible in that the candidate may feel that SBGT will automatically start to maintain RX building D/P when RX building ventilation dampers fail closed as a result of the loss of air.
B. Correct: SBGT will NOT automatically start as a result of the loss of air. SBGT can be manually started and is normally manually started on a loss of IA (see AOP 518).
C. Incorrect: SBGT can be manually started and is normally manually started on a loss of IA (see AOP 518). Plausible in that the candidate may feel that SBGT will automatically start to maintain RX building D/P when RX building ventilation dampers fail closed as a result of the loss of air.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 88


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 89 D. Incorrect: SBGT will NOT automatically start as a result of the loss of air. Plausible in that a loss of IOA to the RBHVAC system will cause a loss of reactor building D/P. However SBGT is designed to operate in this condition to maintain building D/P. Flow will be established because the suction and discharge dampers fail open and the cool down air damper fails closed.
D. Incorrect: SBGT will NOT automatically start as a result of the loss of air. Plausible in that a loss of IOA to the RBHVAC system will cause a loss of reactor building D/P.
Technical Reference(s):
However SBGT is designed to operate in this condition to maintain building D/P. Flow will be established because the suction and discharge dampers fail open and the cool down air damper fails closed.
SD 170, SBGT, page 18 AOP 518, pg 3 (Attach if not previously provided)
SD 170, SBGT, page 18 Technical Reference(s):                                        (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
AOP 518, pg 3 Proposed References to be provided to applicants during examination:         None Learning Objective:       LP 730, LO 67.01.01.10, e               (As available)
None Learning Objective:
Question Source:     Bank #
LP 730, LO 67.01.01.10, e (As available)
Modified Bank #                         (Note changes or attach parent)
Question Source:
New             X Question History:                       Last NRC Exam:                 NA Question Cognitive Level:     Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:       55.41   4 55.43 Secondary coolant and auxiliary systems that affect the facility.
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
NA Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 4 55.43 Secondary coolant and auxiliary systems that affect the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 90  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 89
-reference:
Level RO  SRO  Tier # 1    Group # 1    K/A # 295004  AK2.01  Importance Rating 3.1    Knowledge of the interrelations between PARTIAL OR COMPLETE LOSS OF D.C. POWER and the following: Battery charger Proposed Question:
RO Question # 44 DAEC was operating at 100% power when an event occurred, resulting in the following:
Breaker 1D10 ckt 4, supply to 125VDC Distribution Panel 1D13 tripped.
10 seconds later, a complete loss of Offsite power occurred. Which of the following correctly describes the SOURCE of power to the remaining station 125 VDC loads one minute later?
A. A battery is supplying Division 1 DC loads A battery is supplying Division 2 DC loads  B. A battery is supplying Division 1 DC loads A charger is supplying Division 2 DC loads  C. A charger is supplying Division 1 DC loads A battery is supplying Division 2 DC loads  D. A charger is supplying Division 1 DC loads A charger is supplying Division 2 DC loads    Proposed Answer:
B  Explanation (Optional):
A. Incorrect: 1A4 will be re
-energized by 1G21 "B" SBDG, and therefore 1D22, Div 2 125VDC Charger will supply the Div 2 125VDC loads.
B. Correct: The complete loss of offsite power results in loss of both essential busses and start signals to both SBDGs. The loss of 1D13 results in loss of control power to the 1A3 Bus supply breakers including 1G31 "A" SBDG Output Breaker. This results in 1A3 failing to re
-energize, therefore 1B32, which supplies 1D12, Div 1 125VDC Charger, is also de-energized, resulting in Div 1 loads being supplied by the battery. 1A4 will be re
-energized by 1G21 "B" SBDG, and therefore 1D22, Div 2 125VDC Charger will supply the Div 2 125VDC loads.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 91 C. Incorrect: Div 1 125VDC Charger is de
Examination Outline Cross-reference:      Level                    RO              SRO Tier #                    1 Group #                  1 K/A #                    295004    AK2.01 Importance Rating        3.1 Knowledge of the interrelations between PARTIAL OR COMPLETE LOSS OF D.C. POWER and the following: Battery charger Proposed Question:      RO Question # 44 DAEC was operating at 100% power when an event occurred, resulting in the following:
-energized, resulting in Div 1 loads being supplied by the battery. 1A4 will be re
* Breaker 1D10 ckt 4, supply to 125VDC Distribution Panel 1D13 tripped.
-energized by 1G21 "B" SBDG, and therefore 1D22, Div 2 125VDC Charger will supply the Div 2 125VDC loads.
* 10 seconds later, a complete loss of Offsite power occurred.
D. Incorrect: Div 1 125VDC Charger is de
Which of the following correctly describes the SOURCE of power to the remaining station 125 VDC loads one minute later?
-energized, resulting in Div 1 loads being supplied by the battery.
A. A battery is supplying Division 1 DC loads A battery is supplying Division 2 DC loads B. A battery is supplying Division 1 DC loads A charger is supplying Division 2 DC loads C. A charger is supplying Division 1 DC loads A battery is supplying Division 2 DC loads D. A charger is supplying Division 1 DC loads A charger is supplying Division 2 DC loads Proposed Answer:        B Explanation (Optional):
Technical Reference(s
A. Incorrect: 1A4 will be re-energized by 1G21 B SBDG, and therefore 1D22, Div 2 125VDC Charger will supply the Div 2 125VDC loads.
): AOP 302.1, rev 52, p 12 (Attach if not previously provided)
B. Correct: The complete loss of offsite power results in loss of both essential busses and start signals to both SBDGs. The loss of 1D13 results in loss of control power to the 1A3 Bus supply breakers including 1G31 A SBDG Output Breaker. This results in 1A3 failing to re-energize, therefore 1B32, which supplies 1D12, Div 1 125VDC Charger, is also de-energized, resulting in Div 1 loads being supplied by the battery. 1A4 will be re-energized by 1G21 B SBDG, and therefore 1D22, Div 2 125VDC Charger will supply the Div 2 125VDC loads.
AOP 301, rev 59, p 28 SD-375, rev 8, p 16 Proposed References to be provided to applicants during examination:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 90
None Learning Objective:
 
13.00.00.05 & 94.06.01.06 (As available)
C. Incorrect: Div 1 125VDC Charger is de-energized, resulting in Div 1 loads being supplied by the battery. 1A4 will be re-energized by 1G21 B SBDG, and therefore 1D22, Div 2 125VDC Charger will supply the Div 2 125VDC loads.
Question Source:
D. Incorrect: Div 1 125VDC Charger is de-energized, resulting in Div 1 loads being supplied by the battery.
Bank #   Modified Bank #
Technical Reference(s): AOP 302.1, rev 52, p 12             (Attach if not previously provided)
(Note changes or attach parent)
AOP 301, rev 59, p 28 SD-375, rev 8, p 16 Proposed References to be provided to applicants during examination:       None Learning Objective:         13.00.00.05 & 94.06.01.06           (As available)
New X   Question History:
Question Source:       Bank #
Last NRC Exam:
Modified Bank #                       (Note changes or attach parent)
NA Question Cognitive Level:
New             X Question History:                         Last NRC Exam:             NA Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:       55.41     7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 92  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 91
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 295006 AK3.01   Importance Rating 3.8   Knowledge of the reasons for the following responses as they apply to SCRAM: Reactor water level response Proposed Question:
Examination Outline Cross-reference:     Level                   RO               SRO Tier #                 1 Group #                 1 K/A #                   295006       AK3.01 Importance Rating       3.8 Knowledge of the reasons for the following responses as they apply to SCRAM: Reactor water level response Proposed Question:         RO Question # 45 The plant has been operating at 100% power with the reference leg backfill system out of service. These conditions have existed for the last 30 days.
RO Question # 45 The plant has been operating at 100% power with the reference leg backfill system out of service. These conditions have existed for the last 30 days.
Then the following sequence occurs:
Then the following sequence occurs:
A SRV fails partially open and cannot be closed A manual scram is inserted Reactor pressure is 900 psig and lowering slowly As required by IPOI 5, Reactor Scram, Enhanced Reactor Vessel Level Monitoring is initiated IAW OI 880
* A SRV fails partially open and cannot be closed
, Non-Nuclear Instrumentation System.
* A manual scram is inserted
As RPV pressure continues to lower, RPV level perturbations are noted on various level indicators.
* Reactor pressure is 900 psig and lowering slowly
 
* As required by IPOI 5, Reactor Scram, Enhanced Reactor Vessel Level Monitoring is initiated IAW OI 880, Non-Nuclear Instrumentation System.
* As RPV pressure continues to lower, RPV level perturbations are noted on various level indicators.
Based on the above:
Based on the above:
Water is being displaced in the reference leg by gases coming out of solution, causing indicated level to ____ (1) ____. The condensing chamber then refills the reference leg resulting in a return to actual level.
Under these conditions the _________ (2) _______ should be used to determine actual vessel level.
A.      (1) INCREASE (2) Narrow Range Gemacs B.      (1) DECREASE (2) Narrow Range Gemacs C.      (1) INCREASE (2) Wide Range Yarways D.      (1) DECREASE (2) Wide Range Yarways Proposed Answer:          C DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                  Page 92


Water is being displaced in the reference leg by gases coming out of solution, causing indicated level to
Explanation (Optional):
____ (1) ____. The condensing chamber then refills the reference leg resulting in a return to actual level.
A. Incorrect: The Wide Range Yarways are to be used. Plausible in that non-condensable gas build up occurs in the GEMAC reference leg. However the Narrow Range Gemacs also use this reference leg.
Under these conditions t he ________
B. Incorrect: Water displacement in the reference leg causes an increase in indicated level. Additionally, the Wide Range Yarways are to be used.
_ (2) _______ should be used to determine actual vessel level. A.  (1) INCREASE  (2) Narrow Range Gemacs  B.  (1) DECREASE (2) Narrow Range Gemacs  C.  (1) INCREASE (2) Wide Range Yarway s  D.  (1) DECREASE (2) Wide Range Yarways  Proposed Answer:
C DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 93  Explanation (Optional): A. Incorrect: The Wide Range Yarways are to be used. Plausible in that non
-condensable gas build up occurs in the "GEMAC" reference leg. However the Narrow Range Gemacs also use this reference leg.
B. Incorrect: Water displacement in the reference leg causes an increase in indicated level. Additionally, the Wide Range Yarways are to be used.
C. Correct: With the Reference Leg Back Fill System out of service, gases will accumulate in the reference legs. As gases come out of solution in the reference leg as the vessel depressurizes, water is displaced. This results in a lowering differential pressure between the reference leg and the variable leg. The lowering differential pressure results in an indicated level rise. The condensing pot then restores the level of the reference leg resulting in a return to actual level.
C. Correct: With the Reference Leg Back Fill System out of service, gases will accumulate in the reference legs. As gases come out of solution in the reference leg as the vessel depressurizes, water is displaced. This results in a lowering differential pressure between the reference leg and the variable leg. The lowering differential pressure results in an indicated level rise. The condensing pot then restores the level of the reference leg resulting in a return to actual level.
IAW Section 6.1 of OI 880 (J
IAW Section 6.1 of OI 880 (J-1), page 17, the Wide Range Yarways are to be used to determine actual level.
-1), page 17, the Wide Range Yarways are to be used to determine actual level.
D. Incorrect: Water displacement in the reference leg causes an increase in indicated level.
D. Incorrect: Water displacement in the reference leg causes an increase in indicated level. Technical Reference(s):
Technical Reference(s): SD 880, page 20                       (Attach if not previously provided)
SD 880, page 20 (Attach if not previously provided)
Section 6.1 of OI 880 (J-1), page 17 Proposed References to be provided to applicants during examination:         None Learning Objective:       88.00.00.05                             (As available)
Section 6.1 of OI 880 (J
Question Source:     Bank #
-1), page 17       Proposed References to be provided to applicants during examination:
Modified Bank #                         (Note changes or attach parent)
None Learning Objective: 88.00.00.05 (As available)
New               X Question History:                           Last NRC Exam:             NA Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41       5 55.43 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 93
Question Source:
 
Bank #   Modified Bank #
Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
NA Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 5 55.43 DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 94 Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 95  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 94
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 295001 AK3.05   Importance Rating 3.2   Knowledge of the reasons for the following responses as they apply to PARTIAL OR COMPLETE LOSS OF FORCED CORE FLOW CIRCULATION: Reduced loop operating requirements: Plant
Examination Outline Cross-reference:       Level                   RO             SRO Tier #                   1 Group #                 1 K/A #                   295001   AK3.05 Importance Rating       3.2 Knowledge of the reasons for the following responses as they apply to PARTIAL OR COMPLETE LOSS OF FORCED CORE FLOW CIRCULATION: Reduced loop operating requirements: Plant-Specific Proposed Question:       RO Question # 46 The plant is operating in single loop. The running Recirc Pump speed is 45%.
-Specific Proposed Question:
(1)   Which one of the following instruments is used to determine core flow?
RO Question # 46 The plant is operating in single loop. The running Recirc Pump speed is 45%. (1) Which one of the following instruments is used to determine core flow
AND (2)   Why is this instrument used?
AND (2) Why is this instrument used?
A.     (1) 1C05 Total Core Flow recorder FR-4635.
A. (1) 1C05 Total Core Flow recorder FR
(2) Because there is reverse flow in the idle jet pumps at this pump speed.
-4635. (2) Because there is reverse flow in the idle jet pumps at this pump speed.
B.     (1) 1C05 Core Plate Differential Pressure recorder PDR/FR-4528.
B. (1) 1C05 Core Plate Differential Pressure recorder PDR/FR
(2) Because there is forward flow in the idle jet pumps at this pump speed.
-4528. (2) Because there is forward flow in the idle jet pumps at this pump speed.
C.     (1) 1C38 Jet Pump Total Head indication PDI-4567.
C. (1) 1C38 Jet Pump Total Head indication PDI
(2) Because there is forward flow in the idle jet pumps at this pump speed.
-4567. (2) Because there is forward flow in the idle jet pumps at this pump speed.
D.     (1) 1C05 Core Plate Differential Pressure recorder PDR/FR-4528.
D. (1) 1C05 Core Plate Differential Pressure recorder PDR/FR
(2) Because there is reverse flow in the idle jet pumps at this pump speed.
-4528. (2) Because there is reverse flow in the idle jet pumps at this pump speed.
Proposed Answer:         B Explanation (Optional):
Proposed Answer:
A. Incorrect: At recirc pump speeds < 50% flow shifts in the idle jet pumps from reverse to forward and the Total Core Flow indication becomes inaccurate because the loop flow summers subtract the idle loop flow from the operating loop when in single loop.
B Explanation (Optional):
Plausible if the candidate believes this happens at a lower pump speed because then there would still be reverse flow in the idle loop.
A. Incorrect: At recirc pump speeds < 50% flow shifts in the idle jet pumps from reverse to forward and the Total Core Flow indication becomes inaccurate because the loop flow summers subtract the idle loop flow from the operating loop when in single loop. Plausible if the candidate believes this happens at a lower pump speed because the n there would still be reverse flow in the idle loop.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 95


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 96 B. Correct: The Total core flow indication becomes inaccurate at running pump speeds < 50% because the loop flow summers subtract the idle loop flow from the operating loop when in single loop. However at low running pump speeds the flow in the idle loop jet pumps shifts from reverse to forward flow. At speed less than 50% procedures direct that core plate delta P indications be used to determine core flow.
B.     Correct: The Total core flow indication becomes inaccurate at running pump speeds <
C. Incorrect: Core plate dp indication is used at speeds < 50%. Plausible because this indication could be converted into a core flow determination if the correlation was provided to the operator.
50% because the loop flow summers subtract the idle loop flow from the operating loop when in single loop. However at low running pump speeds the flow in the idle loop jet pumps shifts from reverse to forward flow. At speed less than 50% procedures direct that core plate delta P indications be used to determine core flow.
D. Incorrect: At this pump speed there is forward flow in the idle jet pumps. Plausible if the candidate recalls that a different indication must be used at this pump speed but does not recall why.
C.     Incorrect: Core plate dp indication is used at speeds < 50%. Plausible because this indication could be converted into a core flow determination if the correlation was provided to the operator.
Technical Reference(s):
D.     Incorrect: At this pump speed there is forward flow in the idle jet pumps. Plausible if the candidate recalls that a different indication must be used at this pump speed but does not recall why.
AOP 255.2, Note on page 4 (Attach if not previously provided)
Technical Reference(s): AOP 255.2, Note on page 4               (Attach if not previously provided)
OI 264, section 6.1, 1st two notes.
OI 264, section 6.1, 1st two notes.
Proposed References to be provided to applicants during examination:
Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
None Learning Objective:
Question Source:     Bank #
(As available)
Modified Bank #                           (Note changes or attach parent)
Question Source:
New               X Question History:                           Last NRC Exam:               N/A Question Cognitive Level:     Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:       55.41     5 55.43 Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.
Bank #   Modified Bank #
Comments:
(Note changes or attach parent)
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                         Page 96
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Leve l: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 5 55.43 Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.
Comments:  
 
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 97  Examination Outline Cross
-reference:
Level RO  SRO  Tier # 1    Group # 1    K/A # 295024  EK3.07  Importance Rating 3.5    Knowledge of the reasons for the following responses as they apply to HIGH DRYWELL PRESSURE: Drywell venting Proposed Question:
RO Question # 47 Primary containment pressure is rising following a large RCS break inside the primary containment. Primary containment parameters are as follows:
Drywell Pressure indication is 49 psig and slowly rising Torus pressure indication is 48 psig and slowly rising Narrow Range Torus level indication is pegged high at 16 feet IAW EOP 2, Primary Containment Control, which ONE of the following is correct regarding the vent path that should be used and why?
A. Torus vent through CV
-4301, OUTBD TORUS VENT ISOL, CV
-4309 INBD TORUS VENT BYPASS ISOL and CV
-4300 INBD TORUS VENT ISOL as required. The filtering of the SBGT system will reduce the offsite release rate.
B. Drywell vent through CV
-4303, OUTBD DRYWELL VENT ISOL, CV
-4310, INBD DW VENT BYPASS ISOL and CV
-4302, INBD DRYWELL VENT ISOL as required. 
 
This is the ONLY vent path available due to the level in the Torus. C. The hardened vent path via CV
-4300, INBD TORUS VENT ISOL and CV
-4357, HARD PIPE VENT. 


Examination Outline Cross-reference:      Level                      RO              SRO Tier #                      1 Group #                    1 K/A #                      295024      EK3.07 Importance Rating          3.5 Knowledge of the reasons for the following responses as they apply to HIGH DRYWELL PRESSURE: Drywell venting Proposed Question:        RO Question # 47 Primary containment pressure is rising following a large RCS break inside the primary containment. Primary containment parameters are as follows:
* Drywell Pressure indication is 49 psig and slowly rising
* Torus pressure indication is 48 psig and slowly rising
* Narrow Range Torus level indication is pegged high at 16 feet IAW EOP 2, Primary Containment Control, which ONE of the following is correct regarding the vent path that should be used and why?
A. Torus vent through CV-4301, OUTBD TORUS VENT ISOL, CV-4309 INBD TORUS VENT BYPASS ISOL and CV-4300 INBD TORUS VENT ISOL as required.
The filtering of the SBGT system will reduce the offsite release rate.
B. Drywell vent through CV-4303, OUTBD DRYWELL VENT ISOL, CV-4310, INBD DW VENT BYPASS ISOL and CV-4302, INBD DRYWELL VENT ISOL as required.
This is the ONLY vent path available due to the level in the Torus.
C. The hardened vent path via CV-4300, INBD TORUS VENT ISOL and CV-4357, HARD PIPE VENT.
This path eliminates the potential for duct work or SBGT failure during venting which would significantly increase radioactivity levels in the reactor building.
This path eliminates the potential for duct work or SBGT failure during venting which would significantly increase radioactivity levels in the reactor building.
D. Drywell vent through CV
D. Drywell vent through CV-4303, OUTBD DRYWELL VENT ISOL, CV-4310, INBD DW VENT BYPASS ISOL and CV-4302, INBD DRYWELL VENT ISOL as required.
-4303, OUTBD DRYWELL VENT ISOL, CV
-4310, INBD DW VENT BYPASS ISOL and CV
-4302, INBD DRYWELL VENT ISOL as required.
Drywell venting is always preferred while in the EOPs because it has the most immediate and direct effect on Drywell pressure.
Drywell venting is always preferred while in the EOPs because it has the most immediate and direct effect on Drywell pressure.
Proposed Answer:
Proposed Answer:         B DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 97
B DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 98 Explanation (Optional):
 
A. Incorrect: Torus vent paths are not allowed when torus water level is above 16 feet. Plausible in that torus venting is normally preferred du e to the scrubbing provided by the torus and this path also utilizes SBGT.
Explanation (Optional):
B. Correct: With torus level above 16 feet the drywell must be vented because the torus vent paths are now flooded or at least must be assumed to be flooded.
A. Incorrect: Torus vent paths are not allowed when torus water level is above 16 feet.
C. Incorrect: This vent path is also via the torus and Torus vent paths are not allowed when Narrow Range torus water level is above 16 feet.
Plausible in that torus venting is normally preferred due to the scrubbing provided by the torus and this path also utilizes SBGT.
D. Incorrect: If available, torus venting is preferred. The reason why the drywell vent is used in this case is because the level in the torus precludes the use of torus vent paths. Plausible in that venting the drywell will have more of an immediate effect on drywell pressure than venting the torus but is still normally less preferred than the torus venting because of the scrubbing by the Torus. Technical Reference(s):
B. Correct: With torus level above 16 feet the drywell must be vented because the torus vent paths are now flooded or at least must be assumed to be flooded.
EOP-2 step PC/P
C. Incorrect: This vent path is also via the torus and Torus vent paths are not allowed when Narrow Range torus water level is above 16 feet.
-10 (Attach if not previously provided)
D. Incorrect: If available, torus venting is preferred. The reason why the drywell vent is used in this case is because the level in the torus precludes the use of torus vent paths.
Plausible in that venting the drywell will have more of an immediate effect on drywell pressure than venting the torus but is still normally less preferred than the torus venting because of the scrubbing by the Torus.
Technical Reference(s): EOP-2 step PC/P-10                       (Attach if not previously provided)
LP 95.59, Primary Containment Control, page 15.
LP 95.59, Primary Containment Control, page 15.
Proposed References to be provided to applicants during examination:
Proposed References to be provided to applicants during examination:           None LP 95.59, Objective 95.64.16.01 Learning Objective:                                                  (As available)
None Learning Objective:
Question Source:     Bank #
LP 95.59, Objective 95.64.16.01 (As available)
Modified Bank #                           (Note changes or attach parent)
Question Source:
New               X Question History:                           Last NRC Exam:               NA Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41     9 55.43 Shielding, isolation, and containment design features, including access limitations.
Bank #   Modified Bank #
Comments:
(Note changes or attach parent)
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                        Page 98
New X   Question History:
Last NRC Exam:
NA Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 9 55.43 Shielding, isolation, and containment design features, including access limitations.
Comments:  


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 99  Examination Outline Cross
Examination Outline Cross-reference:       Level                   RO             SRO Tier #                 1 Group #                 1 K/A #                   295028     EA1.03 Importance Rating       3.9 Ability to operate and/or monitor the following as they apply to HIGH DRYWELL TEMPERATURE: Drywell cooling system Proposed Question:         RO Question # 48 The plant was operating at 100% power with the Drywell Cooling system in its normal full power configuration when a small steam leak in the Drywell occurred. The sequence of events that occurred is as follows:
-reference:
* T= 0 minutes : EOP 2 is entered when Drywell temperature exceeds 150&deg;F
Level RO SRO Tier # 1   Group # 1   K/A # 295028 EA1.03 Importance Rating 3.9   Ability to operate and/or monitor the following as they apply to HIGH DRYWELL TEMPERATURE: Drywell cooling system Proposed Question:
* T= 5 minutes: Drywell pressure exceeds 2 psig and the reactor scrams
RO Question # 48 The plant was operating at 100% power with the Drywell Cooling system in its normal full power configuration when a small steam leak in the Drywell occurred. The sequence of events that occurred is as follows
* T= 15 minutes: Drywell spray was initiated to maintain Drywell temperature < 280&deg;F Note: RPV level lowered to 150 inches on the SCRAM and is now being maintained 170-211 with Condensate and Feed.
T= 0 minutes : EOP 2 is entered when Drywell temperature exceeds 150&deg;F T= 5 minutes:   Drywell pressure exceed s 2 psig and the reactor scrams T= 15 minutes: Drywell spray was initiated to maintain Drywell temperature < 280&deg;F Note: RPV level lowered to 150 inches on the SCRAM and is now being maintained 170
-211 with Condensate and Feed.
Assuming no other operator action has been taken, which ONE of the following is correct regarding the automatic response of the drywell cooling fans to the above sequence?
Assuming no other operator action has been taken, which ONE of the following is correct regarding the automatic response of the drywell cooling fans to the above sequence?
All running fans-A. tripped when Drywell pressure exceeded 2 psig.
All running fans A.       tripped when Drywell pressure exceeded 2 psig.
No other automatic action occurred.
No other automatic action occurred.
B. shifted to slow speed when Drywell pressure exceeded 2 psig.
B.       shifted to slow speed when Drywell pressure exceeded 2 psig.
No other automatic action occurred.
No other automatic action occurred.
C. shifted to slow speed when Drywell pressure exceeded 2 psig.
C.       shifted to slow speed when Drywell pressure exceeded 2 psig.
All fans tripped when Drywell spray was initiated.
All fans tripped when Drywell spray was initiated.
D. remain ed at their original speed when Drywell pressure exceeded 2 psig.
D.       remained at their original speed when Drywell pressure exceeded 2 psig.
All fans tripped when Drywell spray was initiated.
All fans tripped when Drywell spray was initiated.
Proposed Answer:
Proposed Answer:           C Explanation (Optional):
C Explanation (Optional):
A.       Incorrect: Fans shift to slow speed when drywell pressure exceeds 2 psig. Additionally the fans tripped when drywell spray was initiated.
A. Incorrect: Fans shift to slow speed when drywell pressure exceeds 2 psig. Additionally the fans tripped when drywell spray was initiated.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 99


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 100 B. Incorrect: Drywell fans all tripped once drywell spray was initiated.
B. Incorrect: Drywell fans all tripped once drywell spray was initiated.
C. Correct: All fans shift to slow speed when drywell pressure exceeds 2 psig. All fans trip when drywell sprays are initiated.
C. Correct: All fans shift to slow speed when drywell pressure exceeds 2 psig. All fans trip when drywell sprays are initiated.
D. Incorrect: All drywell fans are normally running in fast speed. Fans shift to slow speed when drywell pressure exceeds 2 psig. Additionally all drywell fans trip when drywell sprays are initiated.
D. Incorrect: All drywell fans are normally running in fast speed. Fans shift to slow speed when drywell pressure exceeds 2 psig. Additionally all drywell fans trip when drywell sprays are initiated.
Technical Reference(s):
Technical Reference(s): SD 760, page 7                         (Attach if not previously provided)
SD 760, page 7 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:           None LP 573 - Primary Containment, Learning Objective:        Control, and Monitoring, objective     (As available) 42.01.01.02 Question Source:       Bank #
Proposed References to be provided to applicants during examination:
Modified Bank #                         (Note changes or attach parent)
None Learning Objective:
New             X Question History:                         Last NRC Exam:               N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41     7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
LP 573 - Primary Containment, Control, and Monitoring, objective 42.01.01.02 (As available)
Comments:
Question Source:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 100
Bank #   Modified Bank # (Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:  


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 101  Examination Outline Cross
Examination Outline Cross-reference:       Level                   RO             SRO Tier #                   1 Group #                 1 K/A #                   295005   AA1.01 Importance Rating       3.1 Ability to operate and/or monitor the following as they apply to MAIN TURBINE GENERATOR TRIP: Recirculation system: Plant-Specific Proposed Question:       RO Question # 49 The plant is operating at 100% power when a turbine trip occurs. Additional information is as follows:
-reference:
* A RPS trip system actuates as designed
Level RO SRO Tier # 1   Group # 1   K/A # 295005 AA1.01   Importance Rating 3.1   Ability to operate and/or monitor the following as they apply to MAIN TURBINE GENERATOR TRIP: Recirculation system: Plant
* B RPS trip system fails to automatically actuate
-Specific Proposed Question:
* Division 1 EOC-RPT actuates as designed
RO Question # 49 The plant is operating at 100% power when a turbine trip occurs. Additional information is as follows:   "A" RPS trip system actuates as designed "B" RPS trip system fails to automatically actuate Division 1 EOC-RPT actuates as designed Division 2 EOC-RPT fails to actuate Two minutes later, "B" RPS is manually tripped. Based on the above, what is the response of the Recirculation System?
* Division 2 EOC-RPT fails to actuate Two minutes later, B RPS is manually tripped.
A. Both Recirc Pumps trip.
Based on the above, what is the response of the Recirculation System?
B. "A" Recirc Pump trips.
A.       Both Recirc Pumps trip.
"B" Recirc Pump runs back to minimum speed following control rod insertion.
B.       A Recirc Pump trips.
C. Neither Recirc Pump trips.
B Recirc Pump runs back to minimum speed following control rod insertion.
Both Recirc Pumps run back to minimum speed following control rod insertion via the trip of "B" RPS.
C.       Neither Recirc Pump trips.
D. Neither Recirc Pump trips.
Both Recirc Pumps run back to minimum speed following control rod insertion via the trip of B RPS.
Both Recirc Pumps run back to minimum speed following control rod insertion due to lowering feedwater flow
D.       Neither Recirc Pump trips.
. Proposed Answer: A Explanation (Optional):
Both Recirc Pumps run back to minimum speed following control rod insertion due to lowering feedwater flow.
A. Correct: Each division can perform the ATWS function. Each division controls one RPT for each Recirc Pump.
Proposed Answer:         A Explanation (Optional):
A.       Correct: Each division can perform the ATWS function. Each division controls one RPT for each Recirc Pump.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                  Page 101


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 102 B. Incorrect: Both pumps trip. Plausible if the candidate thinks that Division 1 will only trip the "A" recirc pump but understands that only one ARI valve is required to insert the control rods. If so, the candidate would conclude that "
B. Incorrect: Both pumps trip. Plausible if the candidate thinks that Division 1 will only trip the A recirc pump but understands that only one ARI valve is required to insert the control rods. If so, the candidate would conclude that B Recirc pump would run back to minimum speed when feed flow lowers.
B" Recirc pump would run back to minimum speed when feed flow lowers.
C. Incorrect: Both Recirc pumps trip. Plausible if the candidate believes that both divisions are required to trip the recirc pumps and open the ARI valves. If so, the candidate would conclude that the recirc pumps would run back to minimum speed when feed flow lowers following the RPS trip.
C. Incorrect: Both Recirc pumps trip. Plausible if the candidate believes that both divisions are required to trip the recirc pumps and open the ARI valves. If so, the candidate would conclude that the recirc pumps would run back to minimum speed when feed flow lowers following the RPS trip.
D. Incorrect: Both Recirc pumps trip. Plausible if the candidate believes that both divisions are required to trip the recirc pumps but only one division is required to open an ARI valve. If so, the candidate would conclude that both Recirc pumps would run back to minimum speed when feed flow lowers.
D. Incorrect: Both Recirc pumps trip. Plausible if the candidate believes that both divisions are required to trip the recirc pumps but only one division is required to open an ARI valve. If so, the candidate would conclude that both Recirc pumps would run back to minimum speed when feed flow lowers.
Technical Reference(s):
Technical Reference(s): SD 358, pages 24 - 26                   (Attach if not previously provided)
SD 358, pages 24  
Proposed References to be provided to applicants during examination:           None Learning Objective:         LP 264, 12.00.00.02.C                   (As available)
- 26 (Attach if not previously provided)
Question Source:     Bank #
Proposed References to be provided to applicants during examination:
Modified Bank #                           (Note changes or attach parent)
None Learning Objective:
New               X Question History:                           Last NRC Exam:               NA Question Cognitive Level:     Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:       55.41     6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
LP 264, 12.00.00.02.C (As available)
Comments:
Question Source:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 102
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
NA Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Comments:  


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 103  Examination Outline Cross
Examination Outline Cross-reference:       Level                     RO               SRO Tier #                     1 Group #                   1 K/A #                     600000     AA1.06 Importance Rating         3.0 Ability to operate and / or monitor the following as they apply to PLANT FIRE ON SITE: Fire alarm Proposed Question:         RO Question # 50 The plant is operating at 100% power when annunciator 1C40A (F-3) MAIN GEN EXCITER SMOKE DETECTOR OR EXCITER CARDOX SYS INITIATED alarms in the control room.
-reference:
Which ONE of the following describes the Cardox System response and action(s) required for this alarm condition? Assume that a fire exists in the Main Generator Exciter.
Level RO SRO Tier # 1   Group # 1   K/A # 600000 AA1.06 Importance Rating 3.0   Ability to operate and / or monitor the following as they apply to PLANT FIRE ON SITE: Fire alarm Proposed Question:
The Cardox System ___ (1) ___.
RO Question # 50 The plant is operating at 100% power when annunciator 1C40A (F
Following closure of the exciter vent exhaust dampers, the Main Turbine must be tripped
-3) MAIN GEN EXCITER SMOKE DETECTOR OR EXCITER CARDOX SYS INITIATED alarms in the control room.
Which ONE of the following describes the Cardox System response and action(s) required for this alarm condition?
Assume that a fire exists in the Main Generator Exciter. The Cardox System ___ (1) ___.
Following closure of the exciter vent exhaust dampers
, the Main Turbine must be tripped
___ (2) ___.
___ (2) ___.
A. (1) will automatically initiate (2) immediately B. (1) will automatically initiate (2) within 2 minutes C. (1) must be manually initiated (2) immediately D. (1) must be manually initiated (2) within 2 minutes Proposed Answer:
A.       (1)   will automatically initiate (2)   immediately B.       (1)   will automatically initiate (2)   within 2 minutes C.       (1)   must be manually initiated (2)   immediately D.       (1)   must be manually initiated (2)   within 2 minutes Proposed Answer:           D Explanation (Optional):
D Explanation (Optional):
A.       Incorrect: The Cardox requires manual initiation. Additionally IAW OI 513 the main turbine shall be tripped within 2 minutes of the closure of the exciter vent exhaust dampers.
A. Incorrect: The Cardox requires manual initiation. Additionally IAW OI 513 the main turbine shall be tripped within 2 minutes of the closure of the exciter vent exhaust dampers. B. Incorrect: The Cardox requires manual initiation.
B.       Incorrect: The Cardox requires manual initiation.
C. Incorrect: IAW OI 513 the main turbine shall be tripped within 2 minutes of the closure of the exciter vent exhaust dampers.
C.       Incorrect: IAW OI 513 the main turbine shall be tripped within 2 minutes of the closure of the exciter vent exhaust dampers.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 103


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 104 D. Correct: IAW the ARP the system must be manually initiated. Additionally the turbine must be tripped within two minutes of damper closure.
D. Correct: IAW the ARP the system must be manually initiated. Additionally the turbine must be tripped within two minutes of damper closure.
Technical Reference(s):
ARP 1C40A (F-3)
ARP 1C40A (F
Technical Reference(s):                                       (Attach if not previously provided)
-3) OI 513, P7L #15 and 17 (Attach if not previously provided)
OI 513, P7L #15 and 17 Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
Proposed References to be provided to applicants during examination:
Question Source:   Bank #
None Learning Objective:
Modified Bank #                           (Note changes or attach parent)
(As available)
New               X Question History:                       Last NRC Exam:                 N/A Question Cognitive Level:   Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:     55.41   4 55.43 Secondary coolant and auxiliary systems that affect the facility Comments:
Question Source:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 104
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 4 55.43 Secondary coolant and auxiliary systems that affect the facility Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 105  Examination Outline Cross
-reference:
Level RO  SRO  Tier # 1  1  Group #    K/A # 295 037  EA2.06  Importance Rating 4.0    Ability to determine and/or interpret the following as they apply to SCRAM CONDITION PRESENT AND REACTOR POWER ABOVE APRM DOWNSCALE OR UNKNOWN: Reactor pressure Proposed Question:
RO Question # 51 An ATWS is in progress following an inadvertent Group 1 isolation.
RPV pressure is currently cycling between 1080 and 1135 psig Reactor power is cycling between 30
% and 40%  Standby Liquid is injecting Based on the above and IAW ATWS - RPV Control , what action is now required for RPV pressure control
?  A. Open additional SRVs as required and stabilize pressure below 880 psig. B. Open additional SRVs as required and stabilize pressure below 1055 psig.
C. Open additional SRVs manually and commence a plant cooldown not to exceed 100&deg;F per hour.
D. Operate SRVs manually while maintaining pressure between 1080 and 1135 psig
. Alternate SRVs to help prevent localized Torus heatup.
Proposed Answer:
B  Explanation (Optional):
A. Incorrect:  The required action is to stabilize below 1055 psig. Plausible in that if the bypass valves were available EHC pressure set would be lowered to this pressure.
B. Correct:  IAW EOP steps P2 through P
-4, if SRVs are cycling the required action is to terminate the cycling by manually opening SRVs and stabilizing pressure below 1055 psig. C. Incorrect:  A plant cooldown is not authorized until the cold shutdown boron weight has been injected.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 106 D. Incorrect: The required action is to terminate the SRV cycling by opening additional SRVs. Plausible in that ATWS
Examination Outline Cross-reference:        Level                    RO              SRO Tier #                    1                1 Group #
-RPV control in general does not allow a pressure reduction/cooldown unless the reactor is shutdown. It also directs that if SRVs are being manually operated to alternate the SRVs being used to prevent localized heatup. However terminating the cycling of the SRVs takes priority.
K/A #                    295037    EA2.06 Importance Rating        4.0 Ability to determine and/or interpret the following as they apply to SCRAM CONDITION PRESENT AND REACTOR POWER ABOVE APRM DOWNSCALE OR UNKNOWN: Reactor pressure Proposed Question:        RO Question # 51 An ATWS is in progress following an inadvertent Group 1 isolation.
Technical Reference(s):
* RPV pressure is currently cycling between 1080 and 1135 psig
ATWS - RPV Control, steps P
* Reactor power is cycling between 30% and 40%
-2 and P-4. (Attach if not previously provided)
* Standby Liquid is injecting Based on the above and IAW ATWS - RPV Control, what action is now required for RPV pressure control?
Proposed References to be provided to applicants during examination:
A.      Open additional SRVs as required and stabilize pressure below 880 psig.
None Learning Objective:
B.      Open additional SRVs as required and stabilize pressure below 1055 psig.
LP 50007-95, LO 95.56.08.04 (As available)
C.      Open additional SRVs manually and commence a plant cooldown not to exceed 100&deg;F per hour.
Question Source:
D.      Operate SRVs manually while maintaining pressure between 1080 and 1135 psig.
Bank #   Modified Bank #
Alternate SRVs to help prevent localized Torus heatup.
(Note changes or attach parent)
Proposed Answer:          B Explanation (Optional):
New X   Question History:
A.      Incorrect: The required action is to stabilize below 1055 psig. Plausible in that if the bypass valves were available EHC pressure set would be lowered to this pressure.
Last NRC Exam:
B.      Correct: IAW EOP steps P2 through P-4, if SRVs are cycling the required action is to terminate the cycling by manually opening SRVs and stabilizing pressure below 1055 psig.
NA Question Cognitive Level:
C.      Incorrect: A plant cooldown is not authorized until the cold shutdown boron weight has been injected.
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 105
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
 
D. Incorrect: The required action is to terminate the SRV cycling by opening additional SRVs. Plausible in that ATWS-RPV control in general does not allow a pressure reduction/cooldown unless the reactor is shutdown. It also directs that if SRVs are being manually operated to alternate the SRVs being used to prevent localized heatup.
However terminating the cycling of the SRVs takes priority.
ATWS - RPV Control, steps P-2 Technical Reference(s):                                      (Attach if not previously provided) and P-4.
Proposed References to be provided to applicants during examination:         None Learning Objective:         LP 50007-95, LO 95.56.08.04           (As available)
Question Source:       Bank #
Modified Bank #                       (Note changes or attach parent)
New             X Question History:                         Last NRC Exam:             NA Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:       55.41   7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 107  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 106
-reference:
Level RO  SRO  Tier # 1    Group # 1    K/A # 295018  AA2.04  Importance Rating 2.9    Ability to determine and/or interpret the following as they apply to PARTIAL OR COMPLETE LOSS OF COMPONENT COOLING WATER: System flow Proposed Question:
RO Question # 52 RHR Loop "A" is aligned for Torus Cooling during accident conditions. RHRSW conditions are as follows:
RHRSW pumps "A" and "C" are in service "A" RHRSW TO RHR P indicator PDI
-2046 is indicating 25 psid "A" RHRSW INLET FLOW indicator FI
-2050 is indicating 5000 gpm Then, RHRSW pump "A" trips and parameters change as follows:
  "A" RHRSW TO RHR P indicator PDI
-2046 lowers to 18 psid "A" RHRSW INLET FLOW indicator FI
-2050 lowers to 2800 gpm Based on the above, which ONE of the following is correct?
  "C" RHRSW pump is-A. exceeding runout limits.
B. exceeding cavitation limits.
C. within all flow limits
,  D. within all flow limits
,    Proposed Answer:
A  Explanation (Optional):
A. Correct:  Per precaution 15 of OI 416, RHRSW pump flow must be limited to < 2600 gpm to prevent runout.
B. Incorrect:  Per precaution 15 of OI 416, RHRSW pump flow must be above 1200 gpm to prevent cavitation.
C. Incorrect: The RHRSW pump is exceeding runout limitations.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 108 D. Incorrect: The RHRSW pump is exceeding runacross the heat exchanger must be above 20 psid (precaution #3).
Examination Outline Cross-reference:          Level                    RO              SRO Tier #                  1 Group #                  1 K/A #                    295018      AA2.04 Importance Rating        2.9 Ability to determine and/or interpret the following as they apply to PARTIAL OR COMPLETE LOSS OF COMPONENT COOLING WATER: System flow Proposed Question:         RO Question # 52 RHR Loop A is aligned for Torus Cooling during accident conditions. RHRSW conditions are as follows:
Technical Reference(s):
* RHRSW pumps A and C are in service
OI 416 RHR SERVICE WATER SYSTEM, pages 3 and 4 (Attach if not previously provided)
* A RHRSW TO RHR P indicator PDI-2046 is indicating 25 psid
Proposed References to be provided to applicants during examination:
* A RHRSW INLET FLOW indicator FI-2050 is indicating 5000 gpm Then, RHRSW pump A trips and parameters change as follows:
None  Learning Objective:
* A RHRSW TO RHR P indicator PDI-2046 lowers to 18 psid
LP 416, objective 30.01.01.01 (As available)
* A RHRSW INLET FLOW indicator FI-2050 lowers to 2800 gpm Based on the above, which ONE of the following is correct?
Question Source:
C RHRSW pump is A.      exceeding runout limits.
Bank #    Modified Bank #
B.      exceeding cavitation limits.
(Note changes or attach parent)
C.      within all flow limits, but the P across the heat exchanger is too low.
New X  Question History:
D.       within all flow limits, and the P across the heat exchanger is also within limits.
Last NRC Exam:
Proposed Answer:           A Explanation (Optional):
NA  Question Cognitive Level:
A.      Correct: Per precaution 15 of OI 416, RHRSW pump flow must be limited to < 2600 gpm to prevent runout.
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
B.      Incorrect: Per precaution 15 of OI 416, RHRSW pump flow must be above 1200 gpm to prevent cavitation.
55.41 8  55.43  Components, capacity, and functions of emergency systems.
C.      Incorrect: The RHRSW pump is exceeding runout limitations.
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                        Page 107


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 109  Examination Outline Cross
D. Incorrect: The RHRSW pump is exceeding runout limitations. Additionally the P across the heat exchanger must be above 20 psid (precaution #3).
-reference:
OI 416 RHR SERVICE WATER Technical Reference(s): SYSTEM, pages 3 and 4              (Attach if not previously provided)
Level RO SRO Tie r # 1   Group # 1   K/A # 295023 AA2.01 Importance Rating 3.6   Ability to determine and/or interpret the following as they apply to REFUELING ACCIDENTS: Area radiation levels Proposed Question:
Proposed References to be provided to applicants during examination:      None Learning Objective:      LP 416, objective 30.01.01.01        (As available)
RO Question # 53 The plant is operating at 100% power with spent fuel being moved in the spent fuel pool when the control room is notified that the spent fuel pool water level is lowering.
Question Source:    Bank #
Modified Bank #                        (Note changes or attach parent)
New              X Question History:                      Last NRC Exam:              NA Question Cognitive Level:  Memory or Fundamental Knowledge Comprehension or Analysis                X 10 CFR Part 55 Content:    55.41    8 55.43 Components, capacity, and functions of emergency systems.
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 108
 
Examination Outline Cross-reference:       Level                     RO           SRO Tier #                     1 Group #                   1 K/A #                     295023   AA2.01 Importance Rating         3.6 Ability to determine and/or interpret the following as they apply to REFUELING ACCIDENTS:
Area radiation levels Proposed Question:       RO Question # 53 The plant is operating at 100% power with spent fuel being moved in the spent fuel pool when the control room is notified that the spent fuel pool water level is lowering.
Additional conditions are as follows:
Additional conditions are as follows:
SPENT FUEL STORAGE AREA ARM HI RAD annunciator has alarmed. RI
* SPENT FUEL STORAGE AREA ARM HI RAD annunciator has alarmed. RI-9178 is indicating 500 mR/hr and rising slowly.
-9178 is indicating 500 mR/hr and rising slowly.
* REFUELING FLOOR NORTH END HI RADIATION annunciator has alarmed. RI-9163 is pegged high at > 100 mR/hr.
REFUELING FLOOR NORTH END HI RADIATION annunciator has alarmed. RI
* REFUELING FLOOR SOUTH END HI RADIATION annunciator has alarmed. RI-9164 is pegged high at > 100 mR/hr.
-9163 is pegged high at > 100 mR/hr.
* CONTROL BLDG INTAKE AIR RAD MON RIM-6101A and B HI/TROUBLE annunciators have both alarmed. RIM-6101A and B are both reading 5 mR/hr and rising slowly.
REFUELING FLOOR SOUTH END HI RADIATION annunciator has alarmed. RI
* A and B Control Building Standby Filter Units are in standby readiness.
-9164 is pegged high at > 100 mR/hr.
* EOP 3, Secondary Containment Control, has been entered.
CONTROL BLDG INTAKE AIR RAD MON RIM
Based on the above:
-6101A and B HI/TROUBLE annunciators have both alarmed. RIM
-6101A and B are both reading 5 mR/hr and rising slowly. "A" and "B" Control Building Standby Filter Units are in standby readiness. EOP 3, Secondary Containment Control, has been entered. Based on the above:
IAW EOP 3, entry into EOP 1 RPV Control and its associated manual scram is ___ (1) ____.
IAW EOP 3, entry into EOP 1 RPV Control and its associated manual scram is ___ (1) ____.
Manual starting of the Control Building Standby Filter Unit is ___ (2) ____.
Manual starting of the Control Building Standby Filter Unit is ___ (2) ____.
A. (1) required (2) required B. (1) required (2) NOT yet required C. (1) NOT yet required (2) required D. (1) NOT yet required (2) NOT yet required     Proposed Answer:
A.       (1) required (2) required B.       (1) required (2) NOT yet required C.       (1) NOT yet required (2) required D.       (1) NOT yet required (2) NOT yet required Proposed Answer:         C DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 109
C DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 110  Explanation (Optional):
 
A. Incorrect: Entry into EOP 1 is Not required. EOP 3 directs that EOP 1 be entered if a pressure reduction will reduce the leak rate (steps SC 4 and 5). Given that the conditions describe a spent fuel pool leak, this is not the case. Plausible in that EOP 3 also asks whether a parameter has exceeded its Max Safe Value, and if the leaking system is a primary system then EOP 1 entry is required. Two ARMs have exceeded their Max Safe Values in that they are pegged high
Explanation (Optional):
. B. Incorrect: Entry into EOP 1 is Not required. Also a manual start of the Control Building Standby Filter Unit (SFU) is required. The Control Building SFUs are designed to auto start when RIM
A. Incorrect: Entry into EOP 1 is Not required. EOP 3 directs that EOP 1 be entered if a pressure reduction will reduce the leak rate (steps SC 4 and 5). Given that the conditions describe a spent fuel pool leak, this is not the case. Plausible in that EOP 3 also asks whether a parameter has exceeded its Max Safe Value, and if the leaking system is a primary system then EOP 1 entry is required. Two ARMs have exceeded their Max Safe Values in that they are pegged high.
-6101A and B exceed 3.5 mR/hr. Since they failed to auto start, they are required to be manually started.
B. Incorrect: Entry into EOP 1 is Not required. Also a manual start of the Control Building Standby Filter Unit (SFU) is required. The Control Building SFUs are designed to auto start when RIM-6101A and B exceed 3.5 mR/hr. Since they failed to auto start, they are required to be manually started.
C. Correct: Entry into EOP 1 is Not required as described above. Also manual starting of the SFU is required.
C. Correct: Entry into EOP 1 is Not required as described above. Also manual starting of the SFU is required.
D. Incorrect: Manual starting of the SFU is required.
D. Incorrect: Manual starting of the SFU is required.
Technical Reference(s):
Technical Reference(s): EOP 3                                   (Attach if not previously provided)
EOP 3 (Attach if not previously provided)
ARP 1C26A[B], C-2 Proposed References to be provided to applicants during examination:           None Learning Objective:       LP 95.68, objective 95.70.07.02           (As available)
ARP 1C26A[B], C
Question Source:     Bank #
-2     Proposed References to be provided to applicants during examination:
Modified Bank #                             (Note changes or attach parent)
None Learning Objective: LP 95.68, objective 95.70.07.02 (As available)
New               X Question History:                         Last NRC Exam:                 NA Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41     10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
NA Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 111  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 110
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 295001   2.1.1 Importance Rating 3.8   Conduct of Operations: Knowledge of conduct of operations requirements (Partial or Complete Loss of Forced Core Flow Circulation)
Examination Outline Cross-reference:       Level                   RO             SRO Tier #                 1 Group #                 1 K/A #                   295001     2.1.1 Importance Rating       3.8 Conduct of Operations: Knowledge of conduct of operations requirements (Partial or Complete Loss of Forced Core Flow Circulation)
Proposed Question:
Proposed Question:       RO Question # 54 The plant was operating at 15% power when an inadvertent closing of the A Recirc Pump discharge valve occurs. The CRS has directed the ATC operator to attempt to open the discharge valve. The BOP operator has gone to the EHC controls to adjust the EHC setpoint.
RO Question # 54 The plant was operating at 15% power when an inadvertent closing of the "A" Recirc Pump discharge valve occurs. The CRS has directed the ATC operator to attempt to open the discharge valve. The BOP operator has gone to the EHC controls to adjust the EHC setpoint. Which ONE of the following applies to these conditions?
Which ONE of the following applies to these conditions?
A. The simultaneous performance of these activities is permitted because the "A" Recirc Pump has tripped. B. The simultaneous performance of these activities is permitted because reactor pressure will NOT be affected.
A. The simultaneous performance of these activities is permitted because the A Recirc Pump has tripped.
B. The simultaneous performance of these activities is permitted because reactor pressure will NOT be affected.
C. The simultaneous performance of these activities is NOT permitted because of the potential for a reactor scram.
C. The simultaneous performance of these activities is NOT permitted because of the potential for a reactor scram.
D. The simultaneous performance of these activities is NOT permitted because of the possible addition of positive reactivity.
D. The simultaneous performance of these activities is NOT permitted because of the possible addition of positive reactivity.
Proposed Answer: D Explanation (Optional):
Proposed Answer:         D Explanation (Optional):
A. Incorrect: Performance of these activities is NOT permitted because of the possible addition of positive reactivity from two sources. Plausible because the candidate may assume closing the discharge valve in this condition would trip the pump. However at this power the recirc pumps will be on minimum speed and no pump trips will occur.
A. Incorrect: Performance of these activities is NOT permitted because of the possible addition of positive reactivity from two sources. Plausible because the candidate may assume closing the discharge valve in this condition would trip the pump. However at this power the recirc pumps will be on minimum speed and no pump trips will occur.
B. Incorrect: Performance of these activities is NOT permitted because of the possible addition of positive reactivity from two sources. Plausible because the candidate may believe that the actions taken will NOT increase reactor power, however any closure of the bypass valves will cause a positive reactivity addition.
B. Incorrect: Performance of these activities is NOT permitted because of the possible addition of positive reactivity from two sources. Plausible because the candidate may believe that the actions taken will NOT increase reactor power, however any closure of the bypass valves will cause a positive reactivity addition.
C. Incorrect: Because the reactor mode switch is in RUN at this power level actions performed will NOT cause a reactor scram.  
C. Incorrect: Because the reactor mode switch is in RUN at this power level actions performed will NOT cause a reactor scram.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                  Page 111


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 112 D. Correct - Opening the recirc pump discharge valve will raise recirculation flow, while operating the EHC controls may affect bypass valve position affecting reactor pressure and also adding positive reactivity. IAW OP
D. Correct - Opening the recirc pump discharge valve will raise recirculation flow, while operating the EHC controls may affect bypass valve position affecting reactor pressure and also adding positive reactivity. IAW OP-AA-103-1000 Reactivity Control, positive reactivity additions shall not be made via simultaneous use of control rods and dilution on lowering Tavg for PWRs or via simultaneous use of control rods, recirc flow, or EHC Pressure for BWRs.
-AA-103-1000 Reactivity Control, positive reactivity additions shall not be made via simultaneous use of control rods and dilution on lowering Tavg for PWRs or via simultaneous use of control rods, recirc flow, or EHC Pressure for BWRs.
Technical Reference(s): OP-AA-103-1000 pg.13                 (Attach if not previously provided)
Technical Reference(s):
Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
OP-AA-103-1000 pg.13 (Attach if not previously provided)
Question Source:     Bank #
Proposed References to be provided to applicants during examination:
Modified Bank #                         (Note changes or attach parent)
None Learning Objective:
New               X Question History:                         Last NRC Exam:             NA Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41     10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
(As available)
Question Source:
Ban k #    Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
NA Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 113  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 112
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 295003 2.1.20 Importance Rating 2.7   Ability to interpret and execute procedure steps: Partial or Complete Loss of AC Proposed Question:
Examination Outline Cross-reference:     Level                       RO               SRO Tier #                     1 Group #                     1 K/A #                       295003       2.1.20 Importance Rating           2.7 Ability to interpret and execute procedure steps: Partial or Complete Loss of AC Proposed Question:         RO Question # 55 The plant is operating at 100% power with the electric plant configured for normal full power operation.
RO Question # 55 The plant is operating at 100% power with the electric plant configured for normal full power operation.
Then, the following alarms and indications are received:
Then, the following alarms and indications are received:
1C08A (A-6), S/U XFMR TO 1A3 BREAKER 1A302 TRI P  1C08A (A-5), BUS 1A3 LOCKOUT TRIP 1C08A (C-6), BUS 1A3 LOSS OF VOLTAGE Breaker 1A301, STANDBY TRANSFORMER TO BUS 1A3, indicates open Breaker 1A302, STARTUP TRANSFORMER TO BUS 1A3, indicates open Breaker 1A311, A DIESEL GENERATOR 1G
* 1C08A (A-6), S/U XFMR TO 1A3 BREAKER 1A302 TRIP
-31, indicates open "A" SBDG 1G-31 is running at rated voltage and frequency Given the above information, which ONE of the following immediate actions is required by AOP 301 and why?   A. Manually close "A" SBDG output breaker, 1A311. The breaker should have closed.
* 1C08A (A-5), BUS 1A3 LOCKOUT TRIP
B. Manually close the Standby Transformer to bus 1A3, 1A301. A fast transfer should have occurred.
* 1C08A (C-6), BUS 1A3 LOSS OF VOLTAGE
C. Manually close the Standby Transformer to bus 1A3, 1A301. A slow transfer should have occurred.
* Breaker 1A301, STANDBY TRANSFORMER TO BUS 1A3, indicates open
D. Manually trip the "A" SBDG by placing its control switch in pull
* Breaker 1A302, STARTUP TRANSFORMER TO BUS 1A3, indicates open
-to-lock. The diesel is running without cooling water.
* Breaker 1A311, A DIESEL GENERATOR 1G-31, indicates open
Proposed Answer:
* A SBDG 1G-31 is running at rated voltage and frequency Given the above information, which ONE of the following immediate actions is required by AOP 301 and why?
D Explanation (Optional):
A.       Manually close A SBDG output breaker, 1A311. The breaker should have closed.
A. Incorrect: The BUS 1A3 LOCKOUT TRIP alarm indicates that the bus lockout relay tripped LOR 186
B.       Manually close the Standby Transformer to bus 1A3, 1A301. A fast transfer should have occurred.
-3 due to a bus fault. This relay prevents 'A' SBDG output breaker, 1A311 from auto closing.
C.       Manually close the Standby Transformer to bus 1A3, 1A301. A slow transfer should have occurred.
D.       Manually trip the A SBDG by placing its control switch in pull-to-lock. The diesel is running without cooling water.
Proposed Answer:           D Explanation (Optional):
A.       Incorrect: The BUS 1A3 LOCKOUT TRIP alarm indicates that the bus lockout relay tripped LOR 186-3 due to a bus fault. This relay prevents A SBDG output breaker, 1A311 from auto closing.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 113


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 114 B. Incorrect: The BUS 1A3 LOCKOUT TRIP alarm indicates that the bus lockout relay tripped LOR 186
B. Incorrect: The BUS 1A3 LOCKOUT TRIP alarm indicates that the bus lockout relay tripped LOR 186-3 due to a bus fault. This relay prevents Standby Transformer to bus 1A3, 1A301 from auto closing.
-3 due to a bus fault. This relay prevents Standby Transformer to bus 1A3, 1A301 from auto closing.
C. Incorrect: The BUS 1A3 LOCKOUT TRIP alarm indicates that the bus lockout relay tripped LOR 186-3 due to a bus fault. This relay prevents Standby Transformer to bus 1A3, 1A301 from auto closing.
C. Incorrect: The BUS 1A3 LOCKOUT TRIP alarm indicates that the bus lockout relay tripped LOR 186
D. Correct: The BUS 1A3 LOCKOUT TRIP alarm indicates that the bus lockout relay tripped LOR 186-3 due to a bus fault. The automatic actions associated with this relay tripping are:
-3 due to a bus fault. This relay prevents Standby Transformer to bus 1A3, 1A301 from auto closing.
D. Correct: The BUS 1A3 LOCKOUT TRIP alarm indicates that the bus lockout relay tripped LOR 186
-3 due to a bus fault. The automatic actions associated with this relay tripping are:
Breakers 1A301 and 1A302 trip open and are interlocked from manually or automatically closing Bus 1A3 load sheds.
Breakers 1A301 and 1A302 trip open and are interlocked from manually or automatically closing Bus 1A3 load sheds.
"A" SBDG 1G
      "A" SBDG 1G-31 auto starts on Bus 1A3 undervoltage, then runs up to speed and frequency.
-31 auto starts on Bus 1A3 undervoltage, then runs up to speed and frequency.
Breaker 1A311 does NOT auto close and cannot be manually closed.
Breaker 1A311 does NOT auto close and cannot be manually closed.
With the diesel running with a bus lockout, there is no ESW to the diesel. AOP 301 directs that the diesel be shutdown by placing the HS3231A in pull
With the diesel running with a bus lockout, there is no ESW to the diesel. AOP 301 directs that the diesel be shutdown by placing the HS3231A in pull-to-lock.
-to-lock. Technical Reference(s):
Technical Reference(s): ARP 1C08A A-5                         (Attach if not previously provided)
ARP 1C08A A
ARP 1C08A A-6 AOP 301, Immediate Action Proposed References to be provided to applicants during examination:         None Learning Objective:         LP 304.1, 15.00.00.03                 (As available)
-5 (Attach if not previously provided)
Question Source:       Bank #
ARP 1C08A A
Modified Bank #                         (Note changes or attach parent)
-6   AOP 301, Immediate Action Proposed References to be provided to applicants during examination:
New             X Question History:                         Last NRC Exam:               NA Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41     7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
None Learning Objective:
LP 304.1, 15.00.00.03 (As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X Question History:
Last NRC Exam:
NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 115  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 114
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 295038   2.4.45 Importance Rating 4.1   Emergency Procedures / Plan: Ability to prioritize and interpret the significance of each annunciator or alarm: High Off
Examination Outline Cross-reference:         Level                     RO               SRO Tier #                   1 Group #                   1 K/A #                     295038     2.4.45 Importance Rating         4.1 Emergency Procedures / Plan: Ability to prioritize and interpret the significance of each annunciator or alarm: High Off-site Release Rate Proposed Question:         RO Question # 56 The plant is operating at 100% power with plant ventilation systems in a normal full power configuration.
-site Release Rate Proposed Question:
RO Question # 56 The plant is operating at 100% power with plant ventilation systems in a normal full power configuration.
Then the plant scrams following a plant transient. Both SBGT trains start and a complete Group 3 isolation occurs. The following indications are then noted:
Then the plant scrams following a plant transient. Both SBGT trains start and a complete Group 3 isolation occurs. The following indications are then noted:
Alarm REACTOR BUILDING KAMAN 3, 4, 5, 6, 7 & 8 RAD TROUBLE (IC35A C
* Alarm REACTOR BUILDING KAMAN 3, 4, 5, 6, 7 & 8 RAD TROUBLE (IC35A C-3) annunciates.
-3) annunciates.
* The alarm is determined to be due to rising radiation levels on the KAMAN monitors.
The alarm is determined to be due to rising radiation levels on the KAMAN monitors.
IAW with ARP IC35A C-3 and OI 170, STANDBY GAS TREATMENT SYSTEM, which ONE of the following identifies the earliest point where operator action is required?
IAW with ARP IC35A C
When the KAMAN monitors reach the A.      High-High (red) setpoint, ALL running Main Plant Exhaust Fans must be secured.
-3 and OI 170, STANDBY GAS TREATMENT SYSTEM, which ONE of the following identifies the earliest point where operator action is required?
B.      High level (yellow) setpoint, ALL running Main Plant Exhaust Fans must be secured.
C.      High-High (red) setpoint, the number of running Main Plant Exhaust Fans must be reduced down to ONE fan.
D.      High level (yellow) setpoint, the number of running Main Plant Exhaust Fans must be reduced down to ONE fan.
Proposed Answer:          A Explanation (Optional):
A.      Correct: IAW ARP IC35A C-3 and OI 170 precaution #10, Main Plant Exhaust Fans 1V-EF-1, 1V-EF-2, and 1V-EF-3 have to be shutdown if SBGT A[B] is running due to a Group III isolation signal and Reactor Building KAMAN red alarm condition exists. The red alarm corresponds to the High-High setpoint. This is done to prevent bypass of the SGTS filter units by air from the reactor building via the main plant ventilation stack and precludes or limits an untreated release to the environs.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                        Page 115


When the KAMAN monitors reach the-A. High-High (red) setpoint, ALL running Main Plant Exhaust Fans must be secured.
B. Incorrect: This action is required at the High-High setpoint.
B. High level (yellow) setpoint, ALL running Main Plant Exhaust Fans must be secured.
C. High-High (red) setpoint, the number of running Main Plant Exhaust Fans must be reduced down to ONE fan.
D. High level (yellow) setpoint, the number of running Main Plant Exhaust Fans must be reduced down to ONE fan.
Proposed Answer:
A  Explanation (Optional):
A. Correct: IAW ARP IC35A C
-3 and OI 170 precaution #10, Main Plant Exhaust Fans 1V-EF-1, 1V-EF-2, and 1V-EF-3 have to be shutdown if SBGT A[B] is running due to a Group III isolation signal and Reactor Building KAMAN red alarm condition exists. The "red" alarm corresponds to the High
-High setpoint. This is done to prevent bypass of the SGTS filter units by air from the reactor building via the main plant ventilation stack and precludes or limits an untreated release to the environs.
 
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 116 B. Incorrect: This action is required at the High
-High setpoint.
C. Incorrect: All fans must be secured. Plausible if the operator believes that reducing the number of running fans would reduce the total amount of radioactivity released.
C. Incorrect: All fans must be secured. Plausible if the operator believes that reducing the number of running fans would reduce the total amount of radioactivity released.
D. Incorrect:
D. Incorrect: Action is not required to the High-High setpoint is reached. Additionally, the required action is to secure all fans.
Action is not required to the High
ARP IC35A C-3 and OI 170 Technical Reference(s):                                        (Attach if not previously provided) precaution #10 Proposed References to be provided to applicants during examination:         None Learning Objective:       LP 879.3, objective 87.01.01.01         (As available)
-High setpoint is reached. Additionally, the required action is to secure all fans.
Question Source:     Bank #               DAEC # 47017 Modified Bank #                         (Note changes or attach parent)
Technical Reference(s):
New Question History:                         Last NRC Exam:               Not Used Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41     11 55.43 Purpose and operation of radiation monitoring systems, including alarms and survey equipment.
ARP IC35A C
-3 and OI 170 precaution #10 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
None Learning Objective:
LP 879.3, objective 87.01.01.01 (As availabl e) Question Source:
Bank # DAEC # 47017 Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 11 55.43 Purpose and operation of radiation monitoring systems, including alarms and survey equipment.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 117  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 116
-reference:
Level RO  SRO  Tier # 1    Group # 1    K/A # 700000  AA2.02  Importance Rating 3.5    Ability to determine and/or interpret the following as they apply to GENERATOR VOLTAGE AND ELECTRIC GRID DISTURBANCES: Voltage outside the generator capability curve.
K/A Justification:  The DAEC generator capability curve is a function of Megavar loading and Megawatt electric loading. Main Generator voltage is not plotted on this curve. However there is a direct correlation between grid voltage and the amount of Megavar loading on the DAEC generator and therefore on generator capability curve limits.
Proposed Question:
RO Question # 57 The plant is operating at 100% power with the Main Generator in its normal full power configuration, when ITC MIDWEST notifies DAEC of potential grid instabilities over the next few hours.


Examination Outline Cross-reference:        Level                    RO            SRO Tier #                    1 Group #                  1 K/A #                    700000    AA2.02 Importance Rating        3.5 Ability to determine and/or interpret the following as they apply to GENERATOR VOLTAGE AND ELECTRIC GRID DISTURBANCES: Voltage outside the generator capability curve.
K/A Justification: The DAEC generator capability curve is a function of Megavar loading and Megawatt electric loading. Main Generator voltage is not plotted on this curve. However there is a direct correlation between grid voltage and the amount of Megavar loading on the DAEC generator and therefore on generator capability curve limits.
Proposed Question:        RO Question # 57 The plant is operating at 100% power with the Main Generator in its normal full power configuration, when ITC MIDWEST notifies DAEC of potential grid instabilities over the next few hours.
Current Main Generator conditions are as follows:
Current Main Generator conditions are as follows:
640 MWe Gross 150 MVARS, lagging (out) 45 psig Hydrogen pressure One hour later grid voltage is observed to be slowly lowering.
* 640 MWe Gross
* 150 MVARS, lagging (out)
* 45 psig Hydrogen pressure One hour later grid voltage is observed to be slowly lowering.
If uncorrected, the lowering grid voltage will result in the Main Generator exceeding the Main Generator Estimated Capability Curve when A.      MVAR loading exceeds -240 MVAR leading.
B.      MVAR loading exceeds 260 MVAR lagging.
C.      MVAR loading reaches 210 MVAR lagging based on exceeding the rated PF.
D.      MVAR loading reaches -100 MVAR leading based on exceeding the URAL limit.
Proposed Answer:          B Explanation (Optional):
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 117


If uncorrected, the lowering grid voltage will result in the Main Generator exceeding the Main Generator Estimated Capability Curve when-A. MVAR loading exceeds
A. Incorrect: DAEC MVAR loading increases in the Lagging direction as grid voltage lowers relative to main generator terminal voltage. Plausible if the candidate is unsure of how MVAR loading varies with changes in grid voltage. (For 640 MWe and 45 psig H2, the curve is exceeded in the leading direction at -240 MVARs)
-240 MVAR leading.
B. Correct: As grid voltage lowers, the DAEC generator will tend to pickup additional reactive loading. Using the Estimated Capability Curve, the curve will be exceeded when MVAR loading increase to 260 MVAR, Lagging.
B. MVAR loading exceeds 260 MVAR lagging.
C. Incorrect: The curve will not be exceeded until MVAR loading increase to 260 MVAR, Lagging. 210 MVAR is when the .95 PF (power factor) line is exceeded for a real loading of 640 MWe. Plausible if the candidate believes the .95 PF (power factor) is a limit. This is plausible in that the generator ratings are based on a .95 PF - see the ratings at the top of the curve. However the individual power factors are not limits but merely define the relationship between MWe and MVAR loading.
C. MVAR loading reaches 210 MVAR lagging based on exceeding the rated PF.
D. Incorrect: DAEC MVAR loading increases in the Lagging direction as grid voltage lowers relative to main generator terminal voltage. The URAL limit is only applicable when MVAR loading is in the Lead direction. Plausible if the candidate is unsure of how MVAR loading varies with changes in grid voltage.
D. MVAR loading reaches
Technical Reference(s): OI 698, Appendix 1                      (Attach if not previously provided)
-100 MVAR leading based on exceeding the URAL limit.
Proposed References to be provided to applicants during examination:            OI 698, Appendix 1 Learning Objective:       LP 698, 57.00.00.04                      (As available)
Proposed Answer:
Question Source:      Bank #
B  Explanation (Optional):
Modified Bank #                            (Note changes or attach parent)
New                X Question History:                            Last NRC Exam:               NA Question Cognitive Level:      Memory or Fundamental Knowledge Comprehension or Analysis                  X 10 CFR Part 55 Content:        55.41      10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 118


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 118 A. Incorrect:  DAEC MVAR loading increases in the Lagging direction as grid voltage lowers relative to main generator terminal voltage. Plausible if the candidate is unsure of how MVAR loading varies with changes in grid voltage.  (For 640 MWe and 45 psig H2, the curve is exceeded in the leading direction at
Examination Outline Cross-reference:       Level                       RO             SRO Tier #                     1 Group #                     1 K/A #                       295016     AK3.03 Importance Rating           3.5 Knowledge of the reasons for the following responses as they apply to CONTROL ROOM ABANDONMENT: Disabling control room controls Proposed Question:       RO Question # 58 The control room has been evacuated due to a fire in the main control room.
-240 MVARs)
B. Correct:  As grid voltage lowers, the DAEC generator will tend to "pickup" additional reactive loading. Using the Estimated Capability Curve, the curve will be exceeded when MVAR loading increase to 260 MVAR, Lagging.
C. Incorrect: The curve will not be exceeded until MVAR loading increase to 260 MVAR, Lagging. 210 MVAR is when the .95 PF (power factor) line is exceeded for a real loading of 640 MWe. Plausible if the candidate believes the .95 PF (power factor) is a limit. This is plausible in that the generator ratings are based on a .95 PF
- see the ratings at the top of the curve.
However the individual power factors are not limits but merely define the relationship between MWe and MVAR loading.
D. Incorrect:  DAEC MVAR loading increases in the Lagging direction as grid voltage lowers relative to main generator terminal voltage.
The URAL limit is only applicable when MVAR loading is in the Lead direction. Plausible if the candidate is unsure of how MVAR loading varies with changes in grid voltage.
Technical Reference(s):
OI 698, Appendix 1 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
OI 698, Appendix 1 Learning Objective:
LP 698, 57.00.00.04 (As available)
Question Source:
Bank #    Modified Bank #
(Note changes or attach parent)
New X  Question History:  Last NRC Exam:
NA  Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41 10  55.43  Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 119  Examination Outline Cross
-reference:
Level RO SRO Tier # 1   Group # 1   K/A # 295016 AK3.03   Importance Rating 3.5   Knowledge of the reasons for the following responses as they apply to CONTROL ROOM ABANDONMENT: Disabling control room controls Proposed Question:
RO Question # 58 The control room has been evacuated due to a fire in the main control room.
Regarding RHR operation via the Remote Shutdown System:
Regarding RHR operation via the Remote Shutdown System:
What is the reason for placing the RHR related Remote Shutdown System transfer switches in the EMER position following a control room evacuation?
What is the reason for placing the RHR related Remote Shutdown System transfer switches in the EMER position following a control room evacuation?
 
These switches A. install separate auto isolation circuits to ensure that fire damage will NOT prevent an automatic isolation on low vessel level.
These switches
B. install separate auto initiation circuits to ensure that fire damage will NOT prevent an automatic LPCI injection on Low-Low-Low vessel level.
A. install separate auto isolation circuits to ensure that fire damage will NOT prevent an automatic isolation on low vessel level.
B. install separate auto initiation circuits to ensure that fire damage will NOT prevent an automatic LPCI injection on L ow-L ow-Low vessel level.
C. ensure that fire induced circuit faults associated with normal control circuits are isolated and will NOT prevent RHR operation from the Remote Shutdown panels.
C. ensure that fire induced circuit faults associated with normal control circuits are isolated and will NOT prevent RHR operation from the Remote Shutdown panels.
D. ensure that fire induced faults in control power circuits will NOT prevent RHR operation by transferring RHR pump and valve power supplies to alternate power supplies.
D. ensure that fire induced faults in control power circuits will NOT prevent RHR operation by transferring RHR pump and valve power supplies to alternate power supplies.
Proposed Answer:
Proposed Answer:         C Explanation (Optional):
C Explanation (Optional):
A. Incorrect: The low level isolation for SDC is bypassed when the transfer switches are in EMER.
A. Incorrect: The low level isolation for SDC is bypassed when the transfer switches are in EMER. B. Incorrect: LPCI initiation signals and LPCI valve logics are bypassed when the transfer switches are in EMER.
B. Incorrect: LPCI initiation signals and LPCI valve logics are bypassed when the transfer switches are in EMER.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 119


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 120 C. Correct: The design basis scenario for the adequacy of the Remote Shutdown Panel System assumes that normal control circuits may either short circuit or open circuit due to the fire. Therefore, to take credit for having equipment available, fire damaged circuits must be isolated and replaced by non
C. Correct: The design basis scenario for the adequacy of the Remote Shutdown Panel System assumes that normal control circuits may either short circuit or open circuit due to the fire. Therefore, to take credit for having equipment available, fire damaged circuits must be isolated and replaced by non-damaged control circuits. This is the function of the transfer switches.
-damaged control circuits. This is the function of the transfer switches.
D. Incorrect: Power to the pumps and valves is not transferred. Plausible in that the yellow transfer switches will transfer components to the emergency fuses in case a normal control circuit has blown due to fire damage. However the power supply remains the same.
D. Incorrect:
Technical Reference(s): SD 925, page 24                       (Attach if not previously provided)
Power to the pumps and valves is not transferred. Plausible in that the "yellow" transfer switches will transfer components to the emergency fuses in case a normal control circuit has blown due to fire damage. However the power supply remains the same.
SD 925, Functional description of transfer switch operation on REMOTE SHUTDOWN PANEL 1C-388 (page 10)
Technical Reference(s):
Proposed References to be provided to applicants during examination:         None Learning Objective:         STG AOP 915, 94.28.06.02               (As available)
SD 925, page 24 (Attach if not previously provided)
Question Source:       Bank #
SD 925, Functional description of transfer switch operation on REMOTE SHUTDOWN PANEL 1C-388 (page 10)
Modified Bank #                         (Note changes or attach parent)
Proposed References to be provided to applicants during examination:
New               X Question History:                           Last NRC Exam:             NA Question Cognitive Level:     Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:       55.41     7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
None Learning Objective:
STG AOP 915, 94.28.06.02 (As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
NA Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 121  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 120
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 295009 AK1.05   Importance Rating 3.3   Knowledge of the operational implications of the following concepts as they apply to LOW REACTOR WATER LEVEL: Natural circulation Proposed Question:
Examination Outline Cross-reference:       Level                   RO             SRO Tier #                 1 Group #                 1 K/A #                   295009     AK1.05 Importance Rating       3.3 Knowledge of the operational implications of the following concepts as they apply to LOW REACTOR WATER LEVEL: Natural circulation Proposed Question:       RO Question # 59 During ATWS conditions Boron was injected and RPV level intentionally lowered to reduce reactor power.
RO Question # 59 During ATWS conditions Boron was injected and RPV level intentionally lowered to reduce reactor power.
RPV level is now being controlled between -25 inches and +15 inches.
RPV level is now being controlled between  
-25 inches and +15 inches.
Based on the above:
Based on the above:
(1) When can RPV level FIRST be raised to the normal control band of +170 inches to +211 inches AND (2) Why is water level raised at this time?
A.      (1)  When the Hot Shutdown Boron Weight is injected (2)  So that a controlled plant cooldown can be commenced without challenging adequate core cooling.
B.      (1)  When the Cold Shutdown Boron Weight is injected (2)  So that a controlled plant cooldown can be commenced without challenging adequate core cooling.
C.      (1)  When the Hot Shutdown Boron Weight is injected (2)  To mix the Boron that has accumulated below the core plate with the water in the core by increasing natural circulation flow.
D.      (1)  When the Cold Shutdown Boron Weight is injected (2)  To mix the Boron that has accumulated below the core plate with the water in the core by increasing natural circulation flow.
Proposed Answer:        C Explanation (Optional):
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                  Page 121


(1) When can RPV level FIRST be raised to the normal control band of +170 inches to +211 inches AND  (2) Why is water level raised at this time?
A. Incorrect: Level is raised to mix the boron that may have accumulated in the lower plenum. Plausible in that a plant cooldown is contingent upon how much boron has been injected.
A. (1) W hen the Hot Shutdown Boron Weight is injected (2) So that a controlled plant cooldown can be commenced without challenging adequate core cooling.
B. Incorrect: Level is raised to mix the boron that may have accumulated in the lower plenum. Additionally level is raised as soon as the hot shutdown boron weight is injected.
B. (1) W hen the Cold Shutdown Boron Weight is injected (2) So that a controlled plant cooldown can be commenced without challenging adequate core cooling.
C. Correct: IAW with the ATWS EOP, steps L-7 and L-8, level is raised when the Hot Shutdown Boron Weight is injected. When level was lowered to below TAF, little if any natural circulation was occurring. The boron that was being injecting was accumulating in the lower plenum due to the low flow conditions. Once the Hot Shutdown Boron Weight has been injected it is necessary to raise level and re-establish natural circulation in order to mix the boron.
C. (1) W hen the Hot Shutdown Boron Weight is injected (2) To mix the Boron that has accumulated below the core plate with the water in the core by increasing natural circulation flow.
D. Incorrect: IAW with the ATWS EOP, steps L-7 and L-8, level is raised when the Hot Shutdown Boron Weight is injected. Plausible in that other EOP actions are contingent on the Cold Shutdown Boron Weight Being injected.
D. (1) W hen the Cold Shutdown Boron Weight is injected (2) To mix the Boron that has accumulated below the core plate with the water in the core by increasing natural circulation flow.
Technical Reference(s): ATWS EOP, steps L-7 and L-8            (Attach if not previously provided)
Proposed Answer:
ATWS Bases document Proposed References to be provided to applicants during examination:         None Learning Objective:        LP 95-50, EO 95.51.01.01                (As available)
C  Explanation (Optional):
Question Source:     Bank #
Modified Bank #
New              X Question History:                          Last NRC Exam:              NA Question Cognitive Level:      Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:        55.41    10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 122


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 122 A. Incorrect:  Level is raised to mix the boron that may have accumulated in the lower plenum. Plausible in that a plant cooldown is contingent upon how much boron has been injected.
Examination Outline Cross-reference:       Level                     RO             SRO Tier #                   1 Group #                   1 K/A #                     295014     AK2.01 Importance Rating         3.9 Knowledge of the interrelations between INADVERTENT REACTIVITY ADDITION and the following: RPS Proposed Question:         RO Question # 60 With the plant operating at 100% power, CV-4416, B OUTBOARD MSIV and CV-4419, C OUTBOARD MSIV fail SHUT.
B. Incorrect: Level is raised to mix the boron that may have accumulated in the lower plenum. Additionally level is raised as soon as the hot shutdown boron weight is injected. C. Correct:  IAW with the ATWS EOP, steps L
-7 and L-8, level is raised when the Hot Shutdown Boron Weight is injected. When level was lowered to below TAF, little if any natural circulation was occurring.
The boron that was being injecting was accumulating in the lower plenum due to the low flow conditions. Once the Hot Shutdown Boron Weight has been injected it is necessary to raise level and re
-establish natural circulation in order to mix the boron.
D. Incorrect:  IAW with the ATWS EOP, steps L
-7 and L-8, level is raised when the Hot Shutdown Boron Weight is injected. Plausible in that other EOP actions are contingent on the Cold Shutdown Boron Weight Being injected.
Technical Reference(s):
ATWS EOP, steps L
-7 and L-8 (Attach if not previously provided)
ATWS Bases document Proposed References to be provided to applicants during examination:
None  Learning Objective:
LP 95-50, EO 95.51.01.01 (As available)
Question Source:
Bank #    Modified Bank #
New X  Question History:
Last NRC Exam:
NA  Question Cognitive Level:
Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10  55.43  Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 123  Examination Outline Cross
-reference:
Level RO SRO Tier # 1   Group # 1   K/A # 295014 AK2.01 Importance Rating 3.9   Knowledge of the interrelations between INADVERTENT REACTIVITY ADDITION and the following: RPS Proposed Question:
RO Question # 60 With the plant operating at 100% power, CV-4416, "B" OUTBOARD MSIV and CV
-4419, "C" OUTBOARD MSIV fail SHUT.
Which ONE of the following will be the impact of this failure?
Which ONE of the following will be the impact of this failure?
This condition will result in-A. NO automatic actions
This condition will result in A.     NO automatic actions.
. B. a half scram initiated by the "B" and "C" MSIV position
B.     a half scram initiated by the "B" and "C" MSIV position.
. C. a full scram initiated by reactor pressure.
C.     a full scram initiated by reactor pressure.
D. a full scram initiated by the "B" and "C" MSIV position.
D.     a full scram initiated by the "B" and "C" MSIV position.
Proposed Answer:
Proposed Answer:           C Explanation (Optional):
C Explanation (Optional):
A.     Incorrect: Plausible; would be true for an initial low power condition. With Mode Switch in STARTUP, no automatic actions occur. 75% is the normal power limitation with 3 Main Steam Lines.
A. Incorrect:
B.     Incorrect: Plausible; would be true for A and B, C and D, A and C, or B and D with a lower initial power. B and C MSIV do NOT cause a Half Scram based on valve positions.
Plausible; would be true for an initial low power condition. With Mode Switch in STARTUP, no automatic actions occur. 75% is the normal power limitation with 3 Main Steam Lines.
C.     Correct: Closure of one MSIV at full power raises reactor pressure to the alarm point, and power >120%. (Steam flow in the remaining lines also rises to near the MSL Hi Flow Group 1 isolation setpoint.). The sudden closure described causes transient power and pressure above the scram setpoints. This transient results in a full scram. It is required to enter IPOI-5 and place the Reactor Mode Switch in SHUTDOWN.
B. Incorrect: Plausible; would be true for A and B, C and D, A and C, or B and D with a lower initial power. B and C MSIV do NOT cause a Half Scram based on valve positions.
D.     Incorrect: Plausible because closure of the two valves does cause a scram and MSIV position does cause a scram, however B and C MSIV do NOT cause a Full Scram based on valve positions, they would cause a half scram.
C. Correct: Closure of one MSIV at full power raises reactor pressure to the alarm point, and power >120%. (Steam flow in the remaining lines also rises to near the MSL Hi Flow Group 1 isolation setpoint.). The sudden closure described causes transient power and pressure above the scram setpoints. This transient results in a full scram.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 123
It is required to enter IPOI
 
-5 and place the Reactor Mode Switch in SHUTDOWN.
SD 358, pg 20 50000_683-0_lp page 26, 27, 34 Technical Reference(s):                                    (Attach if not previously provided)
D. Incorrect: Plausible because closure of the two valves does cause a scram and MSIV position does cause a scram, however B and C MSIV do NOT cause a Full Scram based on valve positions, they would cause a half scram
Validated in DAEC Simulator 1/9/12 Proposed References to be provided to applicants during examination:       None Learning Objective:     LP 358, 22.02.01.03                   (As available)
.
DAEC Bank #
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 124  Technical Reference(s):
Question Source:   Bank #
SD 358, pg 20 50000_683-0_lp page 26, 27, 34 Validated in DAEC Simulator 1/9/12 (Attach if not previously provided)
47907 Modified Bank #                         (Note changes or attach parent)
Proposed References to be provided to applicants during examination:
New Question History:                       Last NRC Exam:             NA Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:     55.41     6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
None Learning Objective:
LP 358, 22.02.01.03 (As available)
Question Source:
Bank # DAEC Bank #
47907   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
NA Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 125  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 124
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 295015 AK3.01 Importance Rating 3.4   Knowledge of the reasons for the following responses as they apply to INCOMPLETE SCRAM: Bypassing rod insertion blocks Proposed Question:
Examination Outline Cross-reference:       Level                     RO             SRO Tier #                     1 Group #                   1 K/A #                     295015     AK3.01 Importance Rating         3.4 Knowledge of the reasons for the following responses as they apply to INCOMPLETE SCRAM:
RO Question # 61 Following a reactor scram, 6 control rods failed to fully insert.
Bypassing rod insertion blocks Proposed Question:       RO Question # 61 Following a reactor scram, 6 control rods failed to fully insert.
The CRS has authorized the use of RIP 103.3, MANUALLY DRIVE CONTROL RODS, to complete the control rod insertion.
The CRS has authorized the use of RIP 103.3, MANUALLY DRIVE CONTROL RODS, to complete the control rod insertion.
Which ONE of the following actions is directed by RIP 103.3 in order to prevent control rod blocks from interfering with manually inserting the rods?
Which ONE of the following actions is directed by RIP 103.3 in order to prevent control rod blocks from interfering with manually inserting the rods?
A. Bypass the RWM to prevent any RWM insert blocks from interfering with rod insertion.
A. Bypass the RWM to prevent any RWM insert blocks from interfering with rod insertion.
B. Bypass the RWM to prevent any RPIS Inoperative select blocks from interfering with rod insertion.
B. Bypass the RWM to prevent any RPIS Inoperative select blocks from interfering with rod insertion.
C. Bypass the SRM closest to the control rods being inserted to prevent SRM associated rod blocks
C. Bypass the SRM closest to the control rods being inserted to prevent SRM associated rod blocks.
. D. Insert rods using ONLY the EMER ROD IN/NOTCH OVERRIDE switch because this will bypass all insert blocks.
D. Insert rods using ONLY the EMER ROD IN/NOTCH OVERRIDE switch because this will bypass all insert blocks.
Proposed Answer:
Proposed Answer:         A Explanation (Optional):
A Explanation (Optional):
A. Correct: RIP 103.3, step 3, directs that the RWM be bypassed. This is to prevent any RWM insert blocks from preventing rod insertion. Following a scram multiple insert errors would be indicated when one of the problem rods was selected for insertion resulting in a RWM insert block.
A. Correct: RIP 103.3, step 3, directs that the RWM be bypassed. This is to prevent any RWM insert blocks from preventing rod insertion. Following a scram multiple insert errors would be indicated when one of the problem rods was selected for insertion resulting in a RWM insert block.
B. Incorrect: The RWM is bypassed in order to prevent insert blocks. An RPIS Inop condition would still result in a select block preventing rod insertion regardless of the position of the RWM bypass switch.
B. Incorrect: The RWM is bypassed in order to prevent insert blocks. An RPIS Inop condition would still result in a select block preventing rod insertion regardless of the position of the RWM bypass switch.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 125


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 126 C. Incorrect: Bypassing an SRM will not prevent a RWM insert block. Plausible in that SRM reading near the control rods will change, however with the SRMs inserted lowering counts will NOT cause a rod block.
C. Incorrect: Bypassing an SRM will not prevent a RWM insert block. Plausible in that SRM reading near the control rods will change, however with the SRMs inserted lowering counts will NOT cause a rod block.
D. Incorrect: The EMER ROD IN/NOTCH OVERRIDE switch will not prevent a RWM insert block. Plausible in that use of this switch is directed in RIP 103.3 and it also acts directly on the directional control valves of the HCUs, bypassing the timer circuits.
D. Incorrect: The EMER ROD IN/NOTCH OVERRIDE switch will not prevent a RWM insert block. Plausible in that use of this switch is directed in RIP 103.3 and it also acts directly on the directional control valves of the HCUs, bypassing the timer circuits.
Technical Reference(s):
Technical Reference(s): LP 95-03, page 17                       (Attach if not previously provided)
LP 95-03, page 17 (Attach if not previously provided)
RIP 103.3 Proposed References to be provided to applicants during examination:           None Learning Objective:       LP 95-03, EO 95.09.01.04                 (As available)
RIP 103.3     Proposed References to be provided to applicants during examination:
Question Source:     Bank #
None Learning Objective:
Modified Bank #                             (Note changes or attach parent)
LP 95-03, EO 95.09.01.04 (As available)
New               X Question History:                           Last NRC Exam:               N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41     10 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 10 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 127  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 126
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 295008 AA1.02   Importance Rating 3.3   Ability to operate and/or monitor the following as they apply to HIGH REACTOR WATER LEVEL: Reactor water cleanup (ability to drain): Plant
Examination Outline Cross-reference:       Level                     RO         SRO Tier #                   1 Group #                   1 K/A #                     295008 AA1.02 Importance Rating         3.3 Ability to operate and/or monitor the following as they apply to HIGH REACTOR WATER LEVEL: Reactor water cleanup (ability to drain): Plant-Specific Proposed Question:       RO Question # 62 Following a reactor scram, Reactor Water Cleanup (RWCU) is being used to assist in RPV level control. Additional information is as follows:
-Specific Proposed Question:
* RPV pressure is 920 psig, maintained via turbine bypass valves
RO Question # 62 Following a reactor scram, Reactor Water Cleanup (RWCU) is being used to assist in RPV level control. Additional information is as follows:
* RPV level is 205 inches and slowly rising
RPV pressure is 920 psig, maintained via turbine bypass valves RPV level is 205 inches and slowly rising RWCU is currently draining to the main condenser IAW OI 261, section 7.1 RWCU SYSTEM VESSEL DRAIN WITH A RWCU PUMP IN OPERATION MO 2731, CLEANUP DRAIN TO MN COND is open Current drain flow to the Main Condenser is 40 gpm Based on the above and IAW OI 261, which of the following actions is authorized in order to raise the drain flow rate and stabilize RPV level?
* RWCU is currently draining to the main condenser IAW OI 261, section 7.1 RWCU SYSTEM VESSEL DRAIN WITH A RWCU PUMP IN OPERATION
Action 1: Open CV-2729, Cleanup System Drain Header Control Valve further, using HC-2729 DRAIN FLOW REGULATOR Action 2: Open MO-2727, DRAIN FLOW ORIFICE BYP Action 3: Open MO-2732, CLEANUP DRAIN TO RW A. Action 1 ONLY B. Action 1 or 2 ONLY C. Action 1 or 3 ONLY D. Action 1, 2 or 3 Proposed Answer:
* MO 2731, CLEANUP DRAIN TO MN COND is open
A Explanation (Optional):
* Current drain flow to the Main Condenser is 40 gpm Based on the above and IAW OI 261, which of the following actions is authorized in order to raise the drain flow rate and stabilize RPV level?
A. Correct: Given the current conditions only action 1 is authorized
Action 1:     Open CV-2729, Cleanup System Drain Header Control Valve further, using HC-2729 DRAIN FLOW REGULATOR Action 2:     Open MO-2727, DRAIN FLOW ORIFICE BYP Action 3:     Open MO-2732, CLEANUP DRAIN TO RW A.       Action 1 ONLY B.       Action 1 or 2 ONLY C.       Action 1 or 3 ONLY D.       Action 1, 2 or 3 Proposed Answer:         A Explanation (Optional):
A.       Correct: Given the current conditions only action 1 is authorized DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                Page 127


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 128 B. Incorrect: Per the caution in OI 261, section 7.1, when reactor pressure is above 600 psig, MO-2727 DRAIN FLOW ORIFICE BYP valve should be closed (protects low pressure piping downstream).
B. Incorrect: Per the caution in OI 261, section 7.1, when reactor pressure is above 600 psig, MO-2727 DRAIN FLOW ORIFICE BYP valve should be closed (protects low pressure piping downstream).
C. Incorrect: Per precaution 7 of OI 261, MO
C. Incorrect: Per precaution 7 of OI 261, MO-2731 CLEANUP DRAIN TO MN COND valve and MO-2732 CLEANUP DRAIN TO RW valve should not be opened at the same time when there is a vacuum on the condenser. This can provide a path through Radwaste with a resultant loss of condenser vacuum. Since the bypass valve is open, there is a vacuum in the main condenser.
-2731 CLEANUP DRAIN TO MN COND valve and MO-2732 CLEANUP DRAIN TO RW valve should not be opened at the same time when there is a vacuum on the condenser. This can provide a path through Radwaste with a resultant loss of condenser vacuum. Since the bypass valve is open, there is a vacuum in the main condenser.
D. Incorrect: Opening MO-2727 or MO-2732 is not authorized.
D. Incorrect: Opening MO
Technical Reference(s): OI 261, section 7.1                   (Attach if not previously provided)
-2727 or MO
Proposed References to be provided to applicants during examination:         None Learning Objective:       LP 261 RO objective 11.01.01.06       (As available)
-2732 is not authorized.
Question Source:     Bank #
Technical Reference(s):
Modified Bank #                         (Note changes or attach parent)
OI 261, section 7.1 (Attach if not previously provided)
New             X Question History:                         Last NRC Exam:               NA Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41     10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Proposed References to be provided to applicants during examination:
None Learning Objective:
LP 261 RO objective 11.01.01.06 (As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
NA Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 129  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 128
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 295035 EA2.02 Importance Rating 2.8   Ability to determine and/or interpret the following as they apply to SECONDARY CONTAINMENT HIGH DIFFERENTIAL PRESSURE: Off
Examination Outline Cross-reference:       Level                     RO             SRO Tier #                   1 Group #                   1 K/A #                     295035     EA2.02 Importance Rating         2.8 Ability to determine and/or interpret the following as they apply to SECONDARY CONTAINMENT HIGH DIFFERENTIAL PRESSURE: Off-site release rate: Plant-Specific Proposed Question:       RO Question # 63 The plant is operating at 100% power when the following occur:
-site release rate: Plant
* A steam line break in the steam tunnel which could NOT be isolated has caused a reactor scram
-Specific Proposed Question:
* Fuel failures have occurred
RO Question # 63 The plant is operating at 100% power when the following occur:
* RPV pressure is 420 psig and lowering
A steam line break in the steam tunnel which could NOT be isolated has caused a reactor scram Fuel failures have occurred RPV pressure is 420 psig and lowering The steam tunnel blowout panels have released Steam tunnel temperatures have exceed their max safe values The main steam line radiation levels have exceed their Hi
* The steam tunnel blowout panels have released
-Hi setpoints An ALERT has just been declared based on Offsite Rad levels (1) Which ONE of the following is the most significant release pathway
* Steam tunnel temperatures have exceed their max safe values
AND   (2) When is emergency depressuriz ation required?
* The main steam line radiation levels have exceed their Hi-Hi setpoints
A. (1)  (2) Emergency depressurization is currently required B. (1)  (2) Before offsite release rates exceed that level requiring a General Emergency C. (1)  (2) Emergency depressurization is currently required D. (1)  (2) Before offsite release rates exceed that level requiring a General Emergency Proposed Answer:
* An ALERT has just been declared based on Offsite Rad levels (1) Which ONE of the following is the most significant release pathway?
B Explanation (Optional):
AND (2) When is emergency depressurization required?
A.       (1) Steam tunnel  Turbine building  Turbine building exhaust fans environment.
(2) Emergency depressurization is currently required B.       (1) Steam tunnel Turbine building  Turbine building exhaust fans  environment.
(2) Before offsite release rates exceed that level requiring a General Emergency C.       (1) Steam tunnel  Reactor Building Vent Shaft Standby Gas Treatment  Offgas stack environment.
(2) Emergency depressurization is currently required D.       (1) Steam tunnel  Reactor Building Vent Shaft Standby Gas Treatment Offgas stack  environment.
(2) Before offsite release rates exceed that level requiring a General Emergency Proposed Answer:         B Explanation (Optional):
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 129


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 130 A. Incorrect: An entry condition to EOP 4 was exceeded when offsite release rates exceeded that requiring an Alert. EOP 4 requires an emergency depressurization be performed before release rates exceed that requiring a General Emergency. Although EOP 3 entry conditions have also been exceeded there are no conditions currently requiring an ED since the max safe temperature is limited to one area.
A. Incorrect: An entry condition to EOP 4 was exceeded when offsite release rates exceeded that requiring an Alert. EOP 4 requires an emergency depressurization be performed before release rates exceed that requiring a General Emergency. Although EOP 3 entry conditions have also been exceeded there are no conditions currently requiring an ED since the max safe temperature is limited to one area.
B. Correct: A blowout panel in the steam tunnel will vent the steam tunnel to the turbine building when pressure in the steam tunnel exceeds 7 inches of water. An entry condition to EOP 4 was exceeded when offsite release rates exceeded that requiring an Alert. EOP 4 requires an emergency depressurization be performed before release rates exceed that requiring a General Emergency.
B. Correct: A blowout panel in the steam tunnel will vent the steam tunnel to the turbine building when pressure in the steam tunnel exceeds 7 inches of water. An entry condition to EOP 4 was exceeded when offsite release rates exceeded that requiring an Alert. EOP 4 requires an emergency depressurization be performed before release rates exceed that requiring a General Emergency.
C. Incorrect: A blowout panel in the steam tunnel will vent the steam tunnel to the turbine building when pressure in the steam tunnel exceeds 7 inches of water. Plausible if the candidate does not recognize that the blowout panel will vent the steam tunnel as this would then be the correct flow path. Also there are no conditions currently requiring an ED. D. Incorrect: A blowout panel in the steam tunnel will vent the steam tunnel to the turbine building when pressure in the steam tunnel exceeds 7 inches of water.
C. Incorrect: A blowout panel in the steam tunnel will vent the steam tunnel to the turbine building when pressure in the steam tunnel exceeds 7 inches of water. Plausible if the candidate does not recognize that the blowout panel will vent the steam tunnel as this would then be the correct flow path. Also there are no conditions currently requiring an ED.
Technical Reference(s):
D. Incorrect: A blowout panel in the steam tunnel will vent the steam tunnel to the turbine building when pressure in the steam tunnel exceeds 7 inches of water.
SD 170-1, page 7 (Attach if not previously provided)
Technical Reference(s): SD 170-1, page 7                     (Attach if not previously provided)
EOP 4, step RR
EOP 4, step RR-4 Proposed References to be provided to applicants during examination:         None Learning Objective:       LP 95.71, objective 95.71.01.04         (As available)
-4   Proposed References to be provided to applicants during examination:
Question Source:     Bank #
None Learning Objective:
Modified Bank #                         (Note changes or attach parent)
LP 95.71, objective 95.71.01.04 (As available)
New               X Question History:                         Last NRC Exam:               NA Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:     55.41     13 55.43 Procedures and equipment available for handling and disposal of radioactive materials and effluents.
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
NA Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 13 55.43 Procedures and equipment available for handling and disposal of radioactive materials and effluents.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 131  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 130
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 295034 2.4.2 Importance Rating 4.5   Emergency Procedures / Plan: Knowledge of system set points, interlocks and automatic actions associated with EOP entry conditions: Secondary Containment Ventilation High Radiation Proposed Question:
Examination Outline Cross-reference:       Level                     RO               SRO Tier #                   1 Group #                   1 K/A #                     295034     2.4.2 Importance Rating         4.5 Emergency Procedures / Plan: Knowledge of system set points, interlocks and automatic actions associated with EOP entry conditions: Secondary Containment Ventilation High Radiation Proposed Question:         RO Question # 64 The plant is shut down and cooling down for a forced outage. A Drywell air purge has been established using A SBGT train.
RO Question # 64 The plant is shut down and cooling down for a forced outage. A Drywell air purge has b een established using "A" SBGT train.
Then, both RB Vent Shaft Rad Monitors, RIM 7606A and B, rise to the EOP 3, Secondary Containment Control entry condition.
Then, both RB Vent Shaft Rad Monitors, RIM 7606A and B, rise to the EOP 3, Secondary Containment Control entry condition.
 
Which ONE of the following is correct regarding the impact on SBGT and the drywell air purge lineup?
Which ONE of the following is correct regarding the impact on SBGT and the drywell air purge lineup? "B" SBGT will -.
B SBGT will .
A. not automatically start but should be started manually.
A.     not automatically start but should be started manually.
The drywell air purge valves will NOT isolate.
The drywell air purge valves will NOT isolate.
B. not automatically start but should be started manually.
B.     not automatically start but should be started manually.
The drywell air purge Valves will isolate.
The drywell air purge Valves will isolate.
C. automatically start.
C.     automatically start.
The drywell air purge valves will NOT isolate.
The drywell air purge valves will NOT isolate.
D. automatically start.
D.     automatically start.
The drywell air purge valves will isolate.
The drywell air purge valves will isolate.
Proposed Answer:
Proposed Answer:           D Explanation (Optional):
D Explanation (Optional):
A.     Incorrect: The EOP 3 entry condition on RB Vent Shaft Rad high radiation is also the setpoint for the Group 3 isolation. Both radiation monitors reaching this setpoint will result in a Channel A and Channel B trips within the Group 3 logic. This will result in the B train of SBGT starting and drywell air purge lineup isolating. Plausible if the candidate is not aware of the correlation between the entry condition and the Group 3 setpoints.
A. Incorrect: The EOP 3 entry condition on RB Vent Shaft Rad high radiation is also the setpoint for the Group 3 isolation. Both radiation monitors reaching this setpoint will result in a Channel 'A' and Channel 'B' trips within the Group 3 logic. This will result in the 'B' train of SBGT starting and drywell air purge lineup isolating. Plausible if the candidate is not aware of the correlation between the entry condition and the Group 3 setpoints.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 131


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 132 B. Incorrect: Both radiation monitors reaching this setpoint will result in a Channel 'A' and Channel 'B' trips within the Group 3 logic. This will result in the 'B' train of SBGT starting and drywell air purge lineup isolating.
B. Incorrect: Both radiation monitors reaching this setpoint will result in a Channel A and Channel B trips within the Group 3 logic. This will result in the B train of SBGT starting and drywell air purge lineup isolating.
C. Incorrect: Both radiation monitors reaching this setpoint will result in a Channel 'A' and Channel 'B' trips within the Group 3 logic. This will result in SBGT starting and drywell air purge lineup isolating.
C. Incorrect: Both radiation monitors reaching this setpoint will result in a Channel A and Channel B trips within the Group 3 logic. This will result in SBGT starting and drywell air purge lineup isolating.
D. Correct: The EOP 3 entry condition on RB Vent Shaft Rad high radiation is also the setpoint for the Group 3 isolation. Both radiation monitors reaching this setpoint will result in a Channel 'A' and Channel 'B' trips within the Group 3 logic. This will result in the 'B' train of SBGT starting and drywell air purge lineup isolating.
D. Correct: The EOP 3 entry condition on RB Vent Shaft Rad high radiation is also the setpoint for the Group 3 isolation. Both radiation monitors reaching this setpoint will result in a Channel A and Channel B trips within the Group 3 logic. This will result in the B train of SBGT starting and drywell air purge lineup isolating.
Technical Reference(s):
Technical Reference(s): ARP 1C05B, C-8                         (Attach if not previously provided)
ARP 1C05B, C
EOP 3 entry conditions Proposed References to be provided to applicants during examination:             None Learning Objective:         LP 95.68, objective 95.00.00.22           (As available)
-8 (Attach if not previously provided)
Question Source:       Bank #
EOP 3 entry conditions     Proposed References to be provided to applicants during examination:
Modified Bank #                           (Note changes or attach parent)
None Learning Objective:
New             X Question History:                         Last NRC Exam:                 N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41     7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
LP 95.68, objective 95.00.00.22 (As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 133  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 132
-reference:
 
Level RO SRO Tier # 1   Group # 1   K/A # 295020 AK2.12   Importance Rating 3.1   Knowledge of the interrelations between INADVERTENT CONTAINMENT ISOLATION and the following: Instrument air/nitrogen Proposed Question:
Examination Outline Cross-reference:         Level                     RO             SRO Tier #                   1 Group #                   1 K/A #                     295020     AK2.12 Importance Rating         3.1 Knowledge of the interrelations between INADVERTENT CONTAINMENT ISOLATION and the following: Instrument air/nitrogen Proposed Question:         RO Question # 65 The plant is operating at 100% power with the Drywell pneumatic system aligned for normal full power operation.
RO Question # 65 The plant is operating at 100% power with the Drywell pneumatic system aligned for normal full power operation.
Then, an inadvertent Group 3 isolation occurs.
Then, an inadvertent Group 3 isolation occurs.
Which ONE of the following is correct regarding the impact o f the isolation on the Drywell pneumatics and Drywell components?
Which ONE of the following is correct regarding the impact of the isolation on the Drywell pneumatics and Drywell components?
A. The Drywell pneumatic supply line will isolate. Local accumulators inside the Drywell will provide for 5 actuations of the inboard MSIVs.
A.     The Drywell pneumatic supply line will isolate. Local accumulators inside the Drywell will provide for 5 actuations of the inboard MSIVs.
B. The Drywell pneumatic supply line will isolate. Local accumulators inside the Drywell will provide for 5 actuations of the ADS valve s until the isolation can be corrected.
B.     The Drywell pneumatic supply line will isolate. Local accumulators inside the Drywell will provide for 5 actuations of the ADS valves until the isolation can be corrected.
C. The Drywell N2 compressor will trip when Compressor Suction Isolation Valves, CV-4378A & CV
C.     The Drywell N2 compressor will trip when Compressor Suction Isolation Valves, CV-4378A & CV-4378B close. Emergency N2 Backup Supply Valve CV-4377 will open to maintain the pneumatic supply to the Drywell.
-4378B close. Emergency N2 Backup Supply Valve CV
D.     The Drywell N2 compressor will trip when Compressor Suction Isolation Valves, CV-4378A & CV-4378B close. Nitrogen Accumulator 1T128 will maintain the pneumatic supply to the Drywell until the isolation can be corrected.
-4377 will open to maintain the pneumatic supply to the Drywell. D. The Drywell N2 compressor will trip when Compressor Suction Isolation Valves, CV-4378A & CV
Proposed Answer:           B Explanation (Optional):
-4378B close. Nitrogen Accumulator 1T128 will maintain the pneumatic supply to the Drywell until the isolation can be corrected.
A.     Incorrect: The MSIVs are not assured of remaining open for this period of time.
Proposed Answer:
Plausible in that there are accumulators associated with the MSIVs. However the accumulator volume is adequate to provide full stroking of the valve, (NOT five) for only one half cycle (open to close) when supply gas to the accumulator has failed.
B Explanation (Optional):
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 133
A. Incorrect: The MSIVs are not assured of remaining open for this period of time. Plausible in that there are accumulators associated with the MSIVs. However the accumulator volume is adequate to provide full stroking of the valve, (NOT five) for only one half cycle (open to close) when supply gas to the accumulator has failed.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 134 B. Correct: In addition to the compressor suction valves, compressor isolation valve, CV-4371A also closes, isolating the pneumatic supply line. The accumulator on each ADS valve provides pneumatic pressure for valve actuation. The design pneumatic supply pressure requirements for the accumulator are such that following a failure of the pneumatic supply to the accumulator; each ADS valve can be actuated at least 5 times up to 100 days following a LOCA.
B. Correct: In addition to the compressor suction valves, compressor isolation valve, CV-4371A also closes, isolating the pneumatic supply line. The accumulator on each ADS valve provides pneumatic pressure for valve actuation. The design pneumatic supply pressure requirements for the accumulator are such that following a failure of the pneumatic supply to the accumulator; each ADS valve can be actuated at least 5 times up to 100 days following a LOCA.
C. Incorrect: In addition to the compressor suction valves, compressor isolation valve, CV-4371A also closes, isolating the pneumatic supply line. Although Emergency N2 Backup Supply Valve CV
C. Incorrect: In addition to the compressor suction valves, compressor isolation valve, CV-4371A also closes, isolating the pneumatic supply line. Although Emergency N2 Backup Supply Valve CV-4377 will open as accumulator pressure lowers, the drywell will remain isolated.
-4377 will open as accumulator pressure lowers, the drywell will remain isolate
D. Incorrect: In addition to the compressor suction valves, compressor isolation valve, CV-4371A also closes, isolating the pneumatic supply line. Accumulator 1T128 is upstream of these isolation valves and will have no bearing on maintaining drywell pneumatics.
: d. D. Incorrect: In addition to the compressor suction valves, compressor isolation valve, CV-4371A also closes, isolating the pneumatic supply line. Accumulator 1T128 is upstream of these isolation valves and will have no bearing on maintaining drywell pneumatics.
Technical Reference(s): SD 183-1, pages 7 -12                 (Attach if not previously provided)
Technical Reference(s):
Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
SD 183-1, pages 7  
Question Source:       Bank #
-12 (Attach if not previously provided)
Modified Bank #                       (Note changes or attach parent)
Proposed References to be provided to applicants during examination:
New             X Question History:                         Last NRC Exam:               N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:       55.41   7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
None Learning Objective:
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 135  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 134
-reference:
 
Level RO SRO Tier # 3   Group # 1   K/A # G1 2.1.17 Importance Rating 3.9   Conduct of Operations: Ability to make accurate, clear and concise verbal reports.
Examination Outline Cross-reference:         Level                     RO             SRO Tier #                   3 Group #                   1 K/A #                     G1         2.1.17 Importance Rating         3.9 Conduct of Operations: Ability to make accurate, clear and concise verbal reports.
Proposed Question:
Proposed Question:       RO Question # 66 Which ONE of the following statements describes the annunciator reporting requirements after the CRS has announced entry into abnormal or emergency operating procedures?
RO Question # 66 Which ONE of the following statements describes the annunciator reporting requirements after the CRS has announced entry into abnormal or emergency operating procedures?
A. Do NOT announce any alarms unless directed by the CRS.
A. Do NOT announce any alarms unless directed by the CRS.
B. ALL alarms shall be announced unless given specific instructions from the CRS.
B. ALL alarms shall be announced unless given specific instructions from the CRS.
C. Announce ONLY alarms which represent Emergency Operating Procedure entry conditions.
C. Announce ONLY alarms which represent Emergency Operating Procedure entry conditions.
D. Announce ONLY those significant alarms needed to implement Emergency Operating Procedures and Abnormal Operating Procedures.
D. Announce ONLY those significant alarms needed to implement Emergency Operating Procedures and Abnormal Operating Procedures.
Proposed Answer:
Proposed Answer:         D Explanation (Optional):
D Explanation (Optional):
A. Incorrect -Because during EOP operations there are too many alarms and alarm prioritization can be difficult, it is plausible the CRS could direct which alarms they wish to monitor.
A. Incorrect  
B. Incorrect - This is plausible because the normal alarm response requires announcing ALL unexpected alarms.
-Because during EOP operations there are too many alarms and alarm prioritization can be difficult, it is plausible the CRS could direct which alarms they wish to monitor.
C. Incorrect - This is plausible because these alarms are announced, however all annunciators significant to implementing EOPs and AOPs must be announced.
B. Incorrect  
- This is plausible because the normal alarm response requires announcing ALL unexpected alarms.
C. Incorrect  
- This is plausible because these alarms are announced, however all annunciators significant to implementing EOPs and AOPs must be announced.
D. Correct - Under transient conditions, the CRS will announce entry into abnormal or emergency operating procedures. The operators are then allowed to announce only those significant alarms needed to implement those procedures.
D. Correct - Under transient conditions, the CRS will announce entry into abnormal or emergency operating procedures. The operators are then allowed to announce only those significant alarms needed to implement those procedures.
Technical Reference(s):
OP-AA-100-1000, Att. 1, step 9, Technical Reference(s):                                          (Attach if not previously provided) pg 13-14 Proposed References to be provided to applicants during examination:           None DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 135
OP-AA-100-1000, Att. 1, step 9, pg 13-14 (Attach if not previously provided
 
) Proposed References to be provided to applicants during examination:
Learning Objective:                                           (As available)
None DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 1 36 Learning Objective:
DAEC Bank #
(As available)
Question Source:   Bank #
Question Source:
47329(1412)
Bank # DAEC Bank # 47329(1412)
Modified Bank #                       (Note changes or attach parent)
Modified Bank #
New Question History:                       Last NRC Exam:             Not Used Question Cognitive Level:   Memory or Fundamental Knowledge       X Comprehension or Analysis 10 CFR Part 55 Content:     55.41     10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
(Note changes or attach parent)
New   Question History:
Last NRC Exam: Not Used Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 137 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 136
-reference:
Level RO  SRO  Tier # 3    Group # 1    K/A # G1  2.1.20  Importance Rating 4.6    Conduct of Operations: Ability to interpret and execute procedure steps.
Proposed Question:
RO Question # 67 A control room operator is running a Standby Diesel Generator Surveillance Test Procedure (STP). After the Operator completes each step of the surveillance, the Operator places their initials beside the step.
While conducting the test
, an unexpected alarm is received in the Control Room. The Operator acknowledges and announces the alarm, ensures that the Diesel Generator is in a stable condition, flags the current step in the STP, lays the STP to the side, and pulls out the Annunciator Response Procedure (ARP) for the alarm.
The operator reviews the steps in the ARP, sets it down, and without any further reference to the ARP , begins taking the stated actions. 


Examination Outline Cross-reference:        Level                    RO            SRO Tier #                    3 Group #                  1 K/A #                    G1        2.1.20 Importance Rating        4.6 Conduct of Operations: Ability to interpret and execute procedure steps.
Proposed Question:        RO Question # 67 A control room operator is running a Standby Diesel Generator Surveillance Test Procedure (STP). After the Operator completes each step of the surveillance, the Operator places their initials beside the step.
While conducting the test, an unexpected alarm is received in the Control Room. The Operator acknowledges and announces the alarm, ensures that the Diesel Generator is in a stable condition, flags the current step in the STP, lays the STP to the side, and pulls out the Annunciator Response Procedure (ARP) for the alarm.
The operator reviews the steps in the ARP, sets it down, and without any further reference to the ARP, begins taking the stated actions.
The Operator then gets permission from shift supervision and returns to the STP flagged step, performs a Job Site Review, and continues on with the STP performance.
The Operator then gets permission from shift supervision and returns to the STP flagged step, performs a Job Site Review, and continues on with the STP performance.
Which ONE of the following is correct regarding the operator's compliance with the requirements for procedural adherence?
Which ONE of the following is correct regarding the operators compliance with the requirements for procedural adherence?
A. NO, the operator has NOT complied. STPs cannot be suspended in order to take other actions. B. YES, the operator has complied. STPs are continuous use procedures
A.       NO, the operator has NOT complied. STPs cannot be suspended in order to take other actions.
, and ARPs are reference use procedures.
B.       YES, the operator has complied. STPs are continuous use procedures, and ARPs are reference use procedures.
C. NO, the operator has NOT complied. The ARP is a reference use procedure and must be either place kept
C.       NO, the operator has NOT complied. The ARP is a reference use procedure and must be either place kept, or periodically reviewed and reviewed upon completion.
, or periodically reviewed and reviewed upon completion.
D.       YES, the operator has complied. Operators are allowed to take any actions deemed necessary to respond to the alarm even if it conflicts with an approved procedure (STP).
D. YES, the operator has complied. Operators are allowed to take any actions deemed necessary to respond to the alarm even if it conflicts with an approved procedure (STP).
Proposed Answer:         C Explanation (Optional):
Proposed Answer:
A.       Incorrect - The procedure may be exited procedure if it will be resumed in a timely manner. Plausible if the candidate believes exiting the procedure requires exiting the procedure.
C Explanation (Optional):
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 137
A. Incorrect  
- The procedure may be exited procedure if it will be resumed in a timely manner. Plausible if the candidate believes exiting the procedure requires exiting the procedure.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 138 B. Incorrect  
B. Incorrect - Reference use procedures require place keeping and reviewing the actions taken. Plausible because the candidate may not realize the actions required for a reference use procedure and literally treat the procedure as a reference.
- Reference use procedures require place keeping and reviewing the actions taken. Plausible because the candidate may not realize the actions required for a reference use procedure and literally treat the procedure as a reference.
C. Correct - The ARP is a Reference Use procedure, requiring the CRO to complete each step in the sequence specified unless the procedure specifically allows otherwise.
C. Correct - The ARP is a "Reference Use" procedure, requiring the CRO to complete each step in the sequence specified unless the procedure specifically allows otherwise. Then mark off steps when completed and review the procedure upon completion to verify required actions were completed.
Then mark off steps when completed and review the procedure upon completion to verify required actions were completed.
D. Incorrect - Reference use procedures require place keeping and reviewing the actions taken. Plausible because the candidate may not realize the actions required for a reference use procedure and literally treat the procedure as a reference.
D. Incorrect - Reference use procedures require place keeping and reviewing the actions taken. Plausible because the candidate may not realize the actions required for a reference use procedure and literally treat the procedure as a reference.
Technical Reference(s): AD-AA-100-1006, Sect 4.2, pg s 13-15 (Attach if not previously provided)
AD-AA-100-1006, Sect 4.2, pgs Technical Reference(s):                                      (Attach if not previously provided) 13-15 Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
Proposed References to be provided to applicants during examination:
DAEC Bank #
None Learning Objective:
Question Source:     Bank #
(As available)
19661(1412)
Question Source:
Modified Bank #                         (Note changes or attach parent)
Bank # DAEC Bank # 19661(1412)
New Question History:                       Last NRC Exam:               Not Used Question Cognitive Level:     Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:       55.41   10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 139  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 138
-reference:
 
Level RO SRO Tier # 3   Group # 2   K/A # G2 2.2.39 Importance Rating 3.9   Equipment Control: Knowledge of less than or equal to one hour technical specification action statements for systems.
Examination Outline Cross-reference:       Level                     RO               SRO Tier #                   3 Group #                   2 K/A #                     G2         2.2.39 Importance Rating         3.9 Equipment Control: Knowledge of less than or equal to one hour technical specification action statements for systems.
Proposed Question:
Proposed Question:       RO Question # 68 The plant is operating at 100% power when the CRS determines the A Standby Diesel Generator (SBDG) is inoperable.
RO Question # 68 The plant is operating at 100% power when the CRS determines the "A" Standby Diesel Generator (SBDG) is inoperable.
Which ONE of the following is required by Technical Specifications?
Which ONE of the following is required by Technical Specifications
Within 1 hour A. determine that the Offsite Circuits are operable.
?
B. determine that the B SBDG is not inoperable due to common cause failure.
Within 1 hour-A. determine that the Offsite Circuits are operable
C. demonstrate that the B SBDG is operable by running its operability surveillance test.
. B. determine that the "B" SBDG is not inoperable due to common cause failure.
D. declare the required feature(s) supported by the A SBDG inoperable when redundant required feature(s) are inoperable.
C. demonstrate that the "B" SBDG is operable by running its operability surveillance test. D. declare the required feature (s) supported by the "A" SBDG inoperable when redundant required feature(s) are inoperable.
Proposed Answer:         A Explanation (Optional):
Proposed Answer:
A. Correct. - With one DG inoperable T.S. 3.8.1.B.1 requires performing SR 3.8.1.1 for OPERABLE offsite circuit(s). This STP verifies correct breaker alignment and indicated power availability for each offsite circuit capable of supplying the onsite Class 1E AC Electrical Distribution System.
A Explanation (Optional):
B. Incorrect. - T.S. 3.8.1.B.3, requires determining the OPERABLE DG is not inoperable due to common cause failure.
A. Correct. - With one DG inoperable T.S. 3.8.1.B.1 requires performing SR 3.8.1.1 for OPERABLE offsite circuit(s). This STP verifies correct breaker alignment and indicated power availability for each offsite circuit capable of supplying the onsite Class 1E AC Electrical Distribution System. B. Incorrect. - T.S. 3.8.1.B.3, requires determining the OPERABLE DG is not inoperable due to common cause failure.
C. Incorrect. - T.S. 3.8.1.B.3, requires performing SR 3.8.1.2 for the operable DG once per 72 hours.
C. Incorrect.  
D. Incorrect. - T.S. 3.8.1.B.2, requires declaring the required features(s) supported by inoperable DG inoperable when redundant required feature(s) are inoperable within 4 hours of the discovery of the SBDG being inoperable.
- T.S. 3.8.1.B.3, requires performing SR 3.8.1.2 for the operable DG once per 72 hours. D. Incorrect.  
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 139
- T.S. 3.8.1.B.2, requires declaring the required features(s) supported by inoperable DG inoperable when redundant required feature(s) are inoperable within 4 hours of the discovery of the SBDG being inoperable.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 140 Technical Reference(s):
TS 3.8.1 Technical Reference(s):                                   (Attach if not previously provided)
TS 3.8.1 STP 3.8.1-01, pg 2 (Attach if not previously provided)
STP 3.8.1-01, pg 2 Proposed References to be provided to applicants during examination:     None Learning Objective:                                           (As available)
Proposed References to be provided to applicants during examination:
Question Source:   Bank #
None Learning Objective:
Modified Bank #                       (Note changes or attach parent)
(As available)
New             X Question History:                       Last NRC Exam:             Not Used Question Cognitive Level:   Memory or Fundamental Knowledge         X Comprehension or Analysis 10 CFR Part 55 Content:     55.41     10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 141 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 140
-reference:
 
Level RO SRO Tier # 3   Group # 2   K/A # G2 2.2.22 Importance Rating 4.0   Equipment Control: Knowledge of limiting conditions for operations and safety limits.
Examination Outline Cross-reference:     Level                       RO             SRO Tier #                     3 Group #                     2 K/A #                       G2         2.2.22 Importance Rating           4.0 Equipment Control: Knowledge of limiting conditions for operations and safety limits.
Proposed Question: RO Question # 69 Which ONE of the following constitutes a Technical Specifications safety limit violation?   A. Reactor Water level is currently 25 inches above TAF.
Proposed Question:     RO Question # 69 Which ONE of the following constitutes a Technical Specifications safety limit violation?
B. Core flow is 20% of rated and thermal power is % RTP. C. Reactor steam dome pressure reaches the safety valves lift setpoint.
A. Reactor Water level is currently 25 inches above TAF.
B. Core flow is 20% of rated and thermal power is 21.7% RTP.
C. Reactor steam dome pressure reaches the safety valves lift setpoint.
D. Reactor steam dome pressure 800 psig, 25% rated core flow, and MCPR is 1.10 during single loop operation.
D. Reactor steam dome pressure 800 psig, 25% rated core flow, and MCPR is 1.10 during single loop operation.
Proposed Answer:
Proposed Answer:       D Explanation (Optional):
D Explanation (Optional):
A. Incorrect - the RPV water level safety limit is reactor vessel water level shall be greater than 15 inches above the top of active irradiated fuel.
A. Incorrect  
B. Incorrect - Fuel Cladding Integrity - With the core flow < 10% rated core flow:
- the RPV water level safety limit is reactor vessel water level shall be greater than 15 inches above the top of active irradiated fuel.
THERMAL POWER shall be  21.7% RTP.
B. Incorrect  
C. Incorrect - Fuel Cladding Integrity - The safety valves lift at 1240 psig vs. the safety limit of 1335 psig.
- Fuel Cladding Integrity  
D. Correct - The MCPR safety limit is that with the reactor steam dome pressure  785 psig and core flow  10% rated core flow: MCPR shall be  1.10 for two recirculation loop operation or  1.12 for single recirculation loop operation.
- With the core flow < 10% rated core flow: THERMAL POWER shall b    C. Incorrect  
Technical Reference(s): Tech Spec Sect. 2.1.1 and 2.1.2       (Attach if not previously provided)
- Fuel Cladding Integrity  
Proposed References to be provided to applicants during examination:         None DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 141
- The safety valves lift at 1240 psig vs. the safety limit of 1335 psig
 
. D. Correct -     Technical Reference(s):
Learning Objective:                                               (As available)
Tech Spec Sect. 2.1
Question Source:     Bank #
.1 and 2.1.2 (Attach if not previously provided)
Modified Bank #                           (Note changes or attach parent)
Proposed References to be provided to applicants during examination:
New                 X Question History:                         Last NRC Exam:               N/A Question Cognitive Level:     Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:       55.41     5 55.43 Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.
None DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 142 Learning Objective:
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 5 55.43 Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 143 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 142
-reference:
 
Level RO SRO Tier # 3   Group # 3   K/A # G3 2.3.11 Importance Rating 3.8   Radiation Control: Ability to control radiation releases.
Examination Outline Cross-reference:       Level                   RO               SRO Tier #                 3 Group #                 3 K/A #                   G3         2.3.11 Importance Rating       3.8 Radiation Control: Ability to control radiation releases.
Proposed Question:
Proposed Question:       RO Question # 70 The plant is operating at 100% power with the following conditions:
RO Question # 70 The plant is operating at 100% power with the following conditions
* Annunciator 1C03A (C-2) POST TREAT RM 4101A/B HI RAD has alarmed
Annunciator 1C03A (C-2) POST TREAT RM 4101A/B HI RAD has alarmed MODE SELECT Handswitch HS-4103 is verified to be in the AUTO Position Based on these conditions , which of the following is the expected position of the Offgas Treatment valves?
* MODE SELECT Handswitch HS-4103 is verified to be in the AUTO Position Based on these conditions, which of the following is the expected position of the Offgas Treatment valves?
: 1. CV4134A, OG PREFILTERS 1F
: 1. CV4134A, OG PREFILTERS 1F-213A/B OUTLET ISOLATION
-213A/B OUTLET ISOLATION
: 2. CV4134B, OFFGAS CHARCOAL ADSORBER TRAIN BYPASS A. 1. Open
: 2. CV4134B, OFFGAS CHARCOAL ADSORBER TRAIN BYPASS A. 1. Open 2. Open B. 1. Open 2. Closed C. 1. Closed
: 2. Open B. 1. Open
: 2. Open D. 1. Closed
: 2. Closed C. 1. Closed
: 2. Closed Proposed Answer:
: 2. Open D. 1. Closed
B Explanation (Optional):
: 2. Closed Proposed Answer:         B Explanation (Optional):
A. Incorrect  
A. Incorrect - CV-4134B closes to the place the charcoal adsorbers in the treatment mode B. Correct - When the gamma radiation level in the treated offgas reaches this value, (if the auto mode of the offgas system is used), the system provides for automatic switching from the bypass mode (CV-4134B closes) to the treatment mode (CV-4134A opens).
- CV-4134B closes to the place the charcoal adsorbers in the treatment mode B. Correct - When the gamma radiation level in the treated offgas reaches this value, (if the auto mode of the offgas system is used), the system provides for automatic switching from the bypass mode (CV
C. Incorrect - CV-4134A opens and CV-4134B closes to the place the charcoal adsorbers in the treatment mode.
-4134B closes) to the treatment mode (CV
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 143
-4134A opens). C. Incorrect  
 
- CV-4134A opens and CV-4134B closes to the place the charcoal adsorbers in the treatment mode
D. Incorrect - CV-4134A opens and CV-4134B closes to the place the charcoal adsorbers in the treatment mode.
.
1C03A, C-2 Technical Reference(s):                                     (Attach if not previously provided)
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 144 D. Incorrect  
SD 879-1, pg 22 Proposed References to be provided to applicants during examination:       None Learning Objective:                                             (As available)
- CV-4134A opens and CV
DAEC Bank #
-4134B closes to the place the charcoal adsorbers in the treatment mode.
Question Source:     Bank #
Technical Reference(s):
19383 Modified Bank #                         (Note changes or attach parent)
1C03A, C-2 SD 879-1, pg 22 (Attach if not previously provided)
New Question History:                       Last NRC Exam:               Not Used Question Cognitive Level:   Memory or Fundamental Knowledge         X Comprehension or Analysis 10 CFR Part 55 Content:     55.41   11 55.43 Purpose and operation of radiation monitoring systems, including alarms and survey equipment.
Proposed References to be provided to applicants during examination:
None Learning Objective:
(As available)
Question Source:
Bank # DAEC Bank #
19383   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
Not Used Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 11 55.43 Purpose and operation of radiation monitoring systems, including alarms and survey equipment.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 145  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 144
-reference:
 
Level RO SRO Tier # 3   Group # 3   K/A # G3 2.3.12 Importance Rating 3.2   Radiation Control: Knowledge of Radiological Safety Principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.
Examination Outline Cross-reference:         Level                   RO             SRO Tier #                 3 Group #                 3 K/A #                   G3         2.3.12 Importance Rating       3.2 Radiation Control: Knowledge of Radiological Safety Principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.
Proposed Question:
Proposed Question:       RO Question # 71 Actions of IPOI 2, Plant Startup, are being performed. The Plant Manager has directed that all requirements of IPOI 7, Special Operations, are to be adhered to.
RO Question # 71 Actions of IPOI 2, Plant Startup, are being performed. The Plant Manager has directed that all requirements of IPOI 7, Special Operations, are to be adhered to.
You have been directed to vent 1P-201A, A Recirc Pump while the Drywell is accessible, per OI 264, Section 10.2.
You have been directed to vent 1P
Which ONE of the following is the MAXIMUM power level permitted for this Drywell entry?
-201A, "A" Recirc Pump while the Drywell is accessible, per OI 264 , Section 10.2.
Reactor power must be A.     below range 1 on the IRMs B.     below the point of adding heat, approximately 2% power C.     stable and below approximately 7% power D.     stable and below 30% power Proposed Answer:         C Explanation (Optional):
Which ONE of the following is the MAXIMUM power level permitted for this Drywell entry
A.     Incorrect - Reactor power must be below Approximately 7% power. This is plausible if the candidate assumes that the reactor must be almost subcritical to enter the drywell.
?
B.     Incorrect - Reactor power must be below Approximately 7% power. This is plausible if The candidate assumes the limit is based on drywell temperature conditions as well as reactor power and radiation levels.
Reactor power must be -
C.     Correct - To protect against the radiological hazards of an operating reactor a drywell entry can be made with reactor power stable and <30 on IRM Range 10, (~7%).
A. below range 1 on the IRMs B. below the point of adding heat, approximately 2% power C. stable and below approximately 7% power D. stable and below 30% power Proposed Answer:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 145
C Explanation (Optional):
A. Incorrect  
- Reactor power must be below Approximately 7% power. This is plausible if the candidate assumes that the reactor must be almost subcritical to enter the drywell.
B. I ncorrect - Reactor power must be below Approximately 7% power. This is plausible if The candidate assumes the limit is based on drywell temperature conditions as well as reactor power and radiation levels.
C. Correct - To protect against the radiological hazards of an operating reactor a drywell entry can be made with reactor power stable and <30 on IRM Range 10, (~7%).


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 146 D. Incorrect  
D. Incorrect - Reactor power must be below Approximately 7% power unless permission is granted to exceed 7% by the Plant Manager. In this question the stem states The Plant Manager has directed that all requirements of IPOI 7, Special Operations, are to be adhered to. Therefore, the 7% limit applies. Plausible be because the actual limit is
- Reactor power must be below Approximately 7% power unless permission is granted to exceed 7% by the Plant Manager.
      <30 on range 10 of the IRMs (~ 7% power) and that IPOI 2 raises power level up to 35%.
In this question the stem states "The Plant Manager has directed that all requirements of IPOI 7, Special Operations, are to be adhered to.
IPOI 7, Att 1, pg 4 Technical Reference(s):                                      (Attach if not previously provided)
Therefore , the 7% limit applies. Plausible be because the actual limit is <30 on range 10 of the IRMs (~ 7% powe r) and that IPOI 2 raises power level up to 35%. Technical Reference(s):
HPP 3104, pgs 5 & 6 Proposed References to be provided to applicants during examination:       None Learning Objective:                                             (As available)
IPOI 7, Att 1, pg 4 HPP 3104, pg s 5 & 6 (Attach if not previously provided)
Question Source:     Bank #               20492(1410)
Proposed References to be provided to applicants during examination:
Modified Bank #                         (Note changes or attach parent)
None Learning Objective: (As available)
New               X Question History:                         Last NRC Exam:             N/A Question Cognitive Level:     Memory or Fundamental Knowledge       X Comprehension or Analysis 10 CFR Part 55 Content:       55.41     12 55.43 Radiological safety principles and procedures.
Question Source:
Bank # 20492(1410)
Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 12 55.43 Radiological safety principles and procedures.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 147 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 146
-reference:
Level RO  SRO  Tier # 3    Group # 4    K/A # G4  2.4.34  Importance Rating 4.2    Emergency Procedures / Plan: Knowledge of RO tasks performed outside the main control room during an emergency and the resultant operational effects.
Proposed Question:
RO Question # 72 Following a fire in the Control Room the crew entered AOP 915, Shutdown Outside the Control Room , and immediately evacuated the Control Room without inserting a Manual Reactor SCRAM. In accordance with AOP 915, which ONE of the following methods is used to:


Examination Outline Cross-reference:      Level                    RO              SRO Tier #                    3 Group #                  4 K/A #                    G4        2.4.34 Importance Rating        4.2 Emergency Procedures / Plan: Knowledge of RO tasks performed outside the main control room during an emergency and the resultant operational effects.
Proposed Question:      RO Question # 72 Following a fire in the Control Room the crew entered AOP 915, Shutdown Outside the Control Room, and immediately evacuated the Control Room without inserting a Manual Reactor SCRAM.
In accordance with AOP 915, which ONE of the following methods is used to:
(1) shutdown the reactor?
(1) shutdown the reactor?
(2) determine if the SCRAM was successful?
(2) determine if the SCRAM was successful?
A. (1) Turn OFF the RPS breakers supplying Power Range Neutron Monitoring
A.     (1) Turn OFF the RPS breakers supplying Power Range Neutron Monitoring-Buses A and B.
-Buses A and B. (2) At any available computer terminal
(2) At any available computer terminal, check the control rod position printout by depressing the OD3 keys.
, check the control rod position printout by depressing the OD3 keys.
B.     (1) Turn OFF the EPA-A1, EPA-A2, EPA-B1 and EPA-B2 circuit breakers.
B. (1) Turn OFF the EPA
(2) Locally verifying all the scram valves are open using the CRD HCU Location
-A1, EPA-A2, EPA-B1 and EPA
            /Scram Valve Checklist.
-B2 circuit breakers.
C.     (1) Turn OFF the RPS breakers supplying Power Range Neutron Monitoring-Buses A and B.
(2) Locally verifying all the scram valves are open using the CRD HCU Location /Scram Valve Checklist.
(2) Locally verifying all the scram valves are open using the CRD HCU Location
C. (1) Turn OFF the RPS breakers supplying Power Range Neutron Monitoring
            /Scram Valve Checklist.
-Buses A and B. (2) Locally verifying all the scram valves are open using the CRD HCU Location /Scram Valve Checklist.
D.     (1) Turn OFF the EPA-A1, EPA-A2, EPA-B1 and EPA-B2 circuit breakers.
D. (1) Turn OFF the EPA
(2) At any available computer terminal, check the control rod position printout by depressing the OD3 keys.
-A1, EPA-A2, EPA-B1 and EPA
Proposed Answer:         C Explanation (Optional):
-B2 circuit breakers.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                  Page 147
(2) At any available computer terminal
 
, check the control rod position printout by depressing the OD3 keys.
A. Incorrect - Demanding an OD3 would determine control rod position after a Scram and before the Scram reset, some control rods will go to an overtravel condition. This is a position beyond the full-in "00" indication. A control rod printout will display these overtravel positions as "-99". This display cannot be distinguished from a control rod in any other mid-stroke position where the position reed switch is not picked up. Plausible because this is an accepted way to determine control rod position.
Proposed Answer:
B. Incorrect - Tripping the EPA breakers will remove power from the RPS buses and cause unnecessary isolations and is NOT used in AOP 915. Plausible because this is a quick way to scram the reactor from outside the control room.
C Explanation (Optional):
C. Correct - IAW AOP 915; Open the door of Panel 1Y30 with a screwdriver and turn off the circuit breakers on for Power Range Neutron Monitoring System A and B. Then locally verify all scram valves open. Use Attachment 4 (CRD HCU Location /Scram Valve Checklist) for check off.
D. Incorrect - Tripping the EPA breakers will remove power from the RPS buses and cause unnecessary isolations and is NOT used in AOP 915. Plausible because this is a quick way to scram the reactor from outside the control room.
Demanding an OD3 would determine control rod position after a Scram and before the Scram reset, some control rods will go to an overtravel condition. This is a position beyond the full-in "00" indication. A control rod printout will display these overtravel positions as "-99". This display cannot be distinguished from a control rod in any other mid-stroke position where the position reed switch is not picked up. Plausible because this is an accepted way to determine control rod position.
Technical Reference(s): AOP 915, pg 23                          (Attach if not previously provided)
Proposed References to be provided to applicants during examination:            None Learning Objective:                                                  (As available)
Question Source:      Bank #
Modified Bank #                            (Note changes or attach parent)
New                X Question History:                          Last NRC Exam:                  N/A Question Cognitive Level:      Memory or Fundamental Knowledge            X Comprehension or Analysis 10 CFR Part 55 Content:        55.41    10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                        Page 148


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 148 A. Incorrect
Examination Outline Cross-reference:     Level                     RO             SRO Tier #                   3 Group #                   4 K/A #                     G4         2.4.13 Importance Rating         4.0 Emergency Procedures / Plan: Knowledge of crew roles and responsibilities during EOP usage.
- Demanding an OD3 would determine control rod position after a Scram and before the Scram reset, some control rods will go to an overtravel condition. This is a position beyond the full
Proposed Question:       RO Question # 73 The plant is operating at 100% when the following occurs:
-in "00" indication. A control rod printout will display these overtravel positions as "-99". This display cannot be distinguished from a control rod in any other mid
* Drywell pressure reaches 1.25 psig and slowly rising
-stroke position where the position reed switch is not picked up. Plausible because this is an accepted way to determine control rod position.
* Reactor water level is +165" and slowly lowering
B. Incorrect
* No automatic scram has occurred Per OP-AA-103-1000, Reactivity Management, how should the RO respond?
- Tripping the EPA breakers will remove power from the RPS buses and cause unnecessary isolations and is NOT used in AOP 915. Plausible because this is a quick way to scram the reactor from outside the control room.
C. Correct - IAW AOP 915; Open the door of Panel 1Y30 with a screwdriver and turn off the circuit breakers on for Power Range Neutron Monitoring System A and B. Then locally verify all scram valves open. Use Attachment 4 (CRD HCU Location /Scram Valve Checklist) for check o ff. D. Incorrect
- Tripping the EPA breakers will remove power from the RPS buses and cause unnecessary isolations and is NOT used in AOP 915. Plausible because this is a quick way to scram the reactor from outside the control room.
Demanding an OD3 would determine control rod position after a Scram and before the Scram reset, some control rods will go to an overtravel condition. This is a position beyond the full
-in "00" indication. A control rod printout will display these overtravel positions as "-99". This display cannot be distinguished from a control rod in any other mid-stroke position where the position reed switch is not picked up. Plausible because this is an accepted way to determine control rod position.
Technical Reference(s):
AOP 915, pg 23  (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
None  Learning Objective:
(As available)
Question Source:
Bank #    Modified Bank #
(Note changes or attach parent)
New  X  Question History:
Last NRC Exam:
N/A  Question Cognitive Level:
Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10  55.43  Administrative, normal, abnormal, and emergency operating procedures for the facility. Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 149 Examination Outline Cross
-reference:
Level RO SRO Tier # 3   Group # 4   K/A # G4 2.4.13 Importance Rating 4.0   Emergency Procedures / Plan: Knowledge of crew roles and responsibilities during EOP usage. Proposed Question:
RO Question # 73 The plant is operating at 100% when the following occurs:
Drywell pressure reaches 1.25 psig and slowly rising Reactor water level is +165" and slowly lowering No automatic scram has occurred Per OP-AA-103-1000, Reactivity Management, how should the RO respond?
A. Notify the CRS of the condition, request direction and await direction.
A. Notify the CRS of the condition, request direction and await direction.
B. Notify the CRS of the condition, recommend a manual scram, and await direction
B. Notify the CRS of the condition, recommend a manual scram, and await direction.
. C. Perform a fast power reduction using Recirc and/or control rods and announce the action to the CRS.
C. Perform a fast power reduction using Recirc and/or control rods and announce the action to the CRS.
D. Time permitting , obtain a peer check, then initiate a manual scram and announce the action to the CRS.
D. Time permitting, obtain a peer check, then initiate a manual scram and announce the action to the CRS.
Proposed Answer:
Proposed Answer:         D Explanation (Optional):
D Explanation (Optional):
A. Incorrect - The CRO has the responsibility for obtaining a peer check and initiating a reactor scram. Plausible because there is no immediate challenge to core cooling.
A. Incorrect  
B. Incorrect - Because there is no immediate challenge to core cooling the CRO has the time to obtain a peer check. Plausible because in an emergency a peer check is NOT required.
- The CRO has the responsibility for obtaining a peer check and initiating a reactor scram. Plausible because there is no immediate challenge to core cooling.
C. Incorrect - The CRO has the responsibility for obtaining a peer check and initiating a reactor scram. Plausible because there is no immediate challenge to core cooling.
B. Incorrect  
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 149
- Because there is no immediate challenge to core cooling the CRO has the time to obtain a peer check. Plausible because in an emergency a peer check is NOT required. C. Incorrect  
- The CRO has the responsibility for obtaining a peer check and initiating a reactor scram. Plausible because there is no immediate challenge to core cooling.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 150 D. Correct - IAW OP-AA-10 3-1000, Each licensed operator shall be responsible for reducing power or initiating a manual reactor scram if a key reactor safety parameter deviates from an expected condition or if it is believed necessary to assure nuclear safety. Due to time considerations, peer checking is desired but not required in these conditions.
D. Correct - IAW OP-AA-103-1000, Each licensed operator shall be responsible for reducing power or initiating a manual reactor scram if a key reactor safety parameter deviates from an expected condition or if it is believed necessary to assure nuclear safety. Due to time considerations, peer checking is desired but not required in these conditions.
Technical Reference(s):
Technical Reference(s): OP-AA-103-1000, pg 14                   (Attach if not previously provided)
OP-AA-103-1000, pg 14 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
Proposed References to be provided to applicants during examination:
Question Source:   Bank #
None Learning Objective: (As available)
Modified Bank #                             (Note changes or attach parent)
Question Source:
New               X Question History:                       Last NRC Exam:                 N/A Question Cognitive Level:   Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:     55.41     10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 151  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 150
-reference:
Level RO  SRO  Tier # 3    Group # 3    K/A # G3  2.3.14  Importance Rating 3.4    Radiation Control: Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities.
Proposed Question:
RO Question # 74 Which ONE of the following actions requires the Control Room to notify Health Physics that areas in both Reactor Building and Radwaste may require upgrading their radiation area postings?  A. Placing a RWCU Filter Demineralizer in service B. Operation of the Traversing In
-Core Probe system C. Swapping Fuel Pool Cooling Filter Demineralizer "A" to "B" D. Flushing the Residual Heat Removal System for Shutdown Cooling startup Proposed Answer:
D  Explanation (Optional):
A. Incorrect
- It's plausible that backwashing a Reactor Water Cleanup filter demineralizer may affect radiation levels, however there are no precautions about changes in radiation levels during this procedure.
B. Incorrect
- Plausible because operation of the Traversing In
-Core Probe system may affect radiation levels in the Reactor Building. However they will NOT affect radiation levels in Radwaste C. Incorrect
- Plausible because backwashing a Fuel Pool Cooling Filter/Demineralizer requires the operator to notify HP prior and after backwashing. However there are no requirements for reposting of Rad areas when conducting this evolution.
D. Correct - The Control Room must notify Health Physics that the A[B] Loop of RHR will be warmed by flushing Reactor Water to Radwaste, followed by the startup of the A[B] Loop of RHR in the Shutdown Cooling Mode. The affected areas may require upgrading their radiation area postings.
Technical Reference(s):
OI 149, pg 40 (Attach if not previously provided)


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 152        Proposed References to be provided to applicants during examination
Examination Outline Cross-reference:      Level                    RO              SRO Tier #                  3 Group #                  3 K/A #                    G3          2.3.14 Importance Rating        3.4 Radiation Control: Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities.
: None Learning Objective:
Proposed Question:        RO Question # 74 Which ONE of the following actions requires the Control Room to notify Health Physics that areas in both Reactor Building and Radwaste may require upgrading their radiation area postings?
(As available)
A. Placing a RWCU Filter Demineralizer in service B. Operation of the Traversing In-Core Probe system C. Swapping Fuel Pool Cooling Filter Demineralizer A to B D. Flushing the Residual Heat Removal System for Shutdown Cooling startup Proposed Answer:          D Explanation (Optional):
Question Source:
A. Incorrect - Its plausible that backwashing a Reactor Water Cleanup filter demineralizer may affect radiation levels, however there are no precautions about changes in radiation levels during this procedure.
Bank #   Modified Bank #
B. Incorrect - Plausible because operation of the Traversing In-Core Probe system may affect radiation levels in the Reactor Building. However they will NOT affect radiation levels in Radwaste C. Incorrect - Plausible because backwashing a Fuel Pool Cooling Filter/Demineralizer requires the operator to notify HP prior and after backwashing. However there are no requirements for reposting of Rad areas when conducting this evolution.
(Note changes or attach parent)
D. Correct - The Control Room must notify Health Physics that the A[B] Loop of RHR will be warmed by flushing Reactor Water to Radwaste, followed by the startup of the A[B]
New X   Question History:
Loop of RHR in the Shutdown Cooling Mode. The affected areas may require upgrading their radiation area postings.
Last NRC Exam:
Technical Reference(s): OI 149, pg 40                        (Attach if not previously provided)
N/A Question Cognitive Level:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 151
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
 
55.41 12 55.43 Radiological safety principles and procedures.
Proposed References to be provided to applicants during examination:   None Learning Objective:                                           (As available)
Question Source:     Bank #
Modified Bank #                       (Note changes or attach parent)
New             X Question History:                       Last NRC Exam:           N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis           X 10 CFR Part 55 Content:       55.41   12 55.43 Radiological safety principles and procedures.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 153 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                               Page 152
-reference:
Level RO  SRO  Tier # 3    Group # 2    K/A # G2  2.2.6  Importance Rating 3.0    Equipment Control: Knowledge of the process for making changes to procedures.
Proposed Question:
RO Question # 75 A plant startup is in progress following a refueling outage. A Control Room Operator is performing the initial startup of the Reactor Building Closed Cooling Water (RBCCW) system using OI 414, Reactor Building Closed Cooling Water. The operator notices the step to start the "A" RBCCW pump is incorrect as shown below:
Description Handswitch A TBCCW PUMP 1P
-81A HS-4829  B RBCCW PUMP 1P
-81B HS-483 3  C RBCCW PUMP 1P
-81C HS-4837  Which ONE of the following statements is correct regarding the error in the procedure?
A. The RO must exit the procedure, place all equipment in a safe condition, and then discuss the error with the OSM/CRS.
Until th e procedure is revised
, the "A" RBCCW pump may NOT be started
. B. The RO may make a field change to the procedure and start the "A" RBCCW pump. When the procedure is completed
, the RO must notify the OSM/CRS of the field change for further corrective action. C. The startup of the RBCCW system must be stopped and the error brought to the attention of the OSM/CRS. The OSM/CRS authorizes an editorial change to the procedure to permit starting the "A" RBCCW pump.
D. The startup of the RBCCW system may continue the RO must obtain concurrence from another licensed operator prior to completing the step. The editorial change must be discussed with the OSM/CRS before the end of the shift.
Proposed Answer:
C Explanation (Optional):
A. Incorrect
- Typical editorial correction(s) are processed administratively and typically 'in the field'. As such, they do not require formal reviews (i.e. no PCR or Temp Change and none of the typical forms or screenings required of a permanent change. Therefore there is NO need to wait to start the pump. Plausible because most procedure changes do require submitting a procedure change request or CR which would could stop completing the procedure as written.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 154 B. Incorrect  
Examination Outline Cross-reference:        Level                      RO              SRO Tier #                    3 Group #                    2 K/A #                      G2        2.2.6 Importance Rating          3.0 Equipment Control: Knowledge of the process for making changes to procedures.
- The work must be stopped (in this case starting the "A" RBCCW pump) and the error brought to the attention of the OSM/CRS. The OSM/CRS must authorize starting the "A" RBCCW pump. Plausible because the RO would proceed with the procedure AFTER making a field change authorized by the CRS/OSM.
Proposed Question:        RO Question # 75 A plant startup is in progress following a refueling outage. A Control Room Operator is performing the initial startup of the Reactor Building Closed Cooling Water (RBCCW) system using OI 414, Reactor Building Closed Cooling Water. The operator notices the step to start the A RBCCW pump is incorrect as shown below:
C. Correct - The work must be stopped (in this case starting the "A" RBCCW pump). IAW AD-AA-100-1006, For obvious minor typographical errors, minor discrepancies in nomenclature or discrepancies involving equivalence (i.e. handswitch in STOP versus OFF, START versus HAND or MAN, etc), the OSM/CRS may, after review, allow the procedure to continue. Since the pump identification number (1P
Description                    Handswitch A TBCCW PUMP 1P-81A                      HS-4829 B RBCCW PUMP 1P-81B                      HS-4833 C RBCCW PUMP 1P-81C                      HS-4837 Which ONE of the following statements is correct regarding the error in the procedure?
-81A ) and switch identification number (HS
A.      The RO must exit the procedure, place all equipment in a safe condition, and then discuss the error with the OSM/CRS. Until the procedure is revised, the A RBCCW pump may NOT be started.
-4829) are correct this is a typographical error. Based on this the procedure can be performed as written. Typical editorial correction(s) are processed administratively and typically 'in the field'. As such, they do not require formal reviews (i.e. no PCR or Temp Change and none of the typical forms or screenings required of a permanent change.
B.      The RO may make a field change to the procedure and start the A RBCCW pump.
D. Incorrect  
When the procedure is completed, the RO must notify the OSM/CRS of the field change for further corrective action.
- The work must be stopped (in this case starting the "A" RBCCW pump) and the error brought to the attention of the OSM/CRS. The OSM/CRS must authorize starting the "A" RBCCW pump, NOT another licensed operator which may be an RO. Plausible because the RO would proceed with the procedure AFTER making a field change authorized by the CRS/OSM.
C.      The startup of the RBCCW system must be stopped and the error brought to the attention of the OSM/CRS. The OSM/CRS authorizes an editorial change to the procedure to permit starting the A RBCCW pump.
Technical Reference(s):
D.      The startup of the RBCCW system may continue the RO must obtain concurrence from another licensed operator prior to completing the step. The editorial change must be discussed with the OSM/CRS before the end of the shift.
ACP 106.1, Att 5 AD-AA-100-1006, pgs 29 & 30 (Attach if not previously provided)
Proposed Answer:          C Explanation (Optional):
Proposed References to be provided to applicants during examination:
A.      Incorrect - Typical editorial correction(s) are processed administratively and typically in the field. As such, they do not require formal reviews (i.e. no PCR or Temp Change and none of the typical forms or screenings required of a permanent change. Therefore there is NO need to wait to start the pump. Plausible because most procedure changes do require submitting a procedure change request or CR which would could stop completing the procedure as written.
None Learning Objective:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 153
(As available)
 
Question Source:
B. Incorrect - The work must be stopped (in this case starting the A RBCCW pump) and the error brought to the attention of the OSM/CRS. The OSM/CRS must authorize starting the A RBCCW pump. Plausible because the RO would proceed with the procedure AFTER making a field change authorized by the CRS/OSM.
Bank #   Modified Bank #
C. Correct - The work must be stopped (in this case starting the A RBCCW pump). IAW AD-AA-100-1006, For obvious minor typographical errors, minor discrepancies in nomenclature or discrepancies involving equivalence (i.e. handswitch in STOP versus OFF, START versus HAND or MAN, etc), the OSM/CRS may, after review, allow the procedure to continue. Since the pump identification number (1P-81A ) and switch identification number (HS-4829) are correct this is a typographical error. Based on this the procedure can be performed as written. Typical editorial correction(s) are processed administratively and typically in the field. As such, they do not require formal reviews (i.e. no PCR or Temp Change and none of the typical forms or screenings required of a permanent change.
(Note changes or attach parent)
D. Incorrect - The work must be stopped (in this case starting the A RBCCW pump) and the error brought to the attention of the OSM/CRS. The OSM/CRS must authorize starting the A RBCCW pump, NOT another licensed operator which may be an RO.
New X Question History:
Plausible because the RO would proceed with the procedure AFTER making a field change authorized by the CRS/OSM.
Last NRC Exam:
ACP 106.1, Att 5 Technical Reference(s):                                         (Attach if not previously provided)
N/A Question Cognitive Level:
AD-AA-100-1006, pgs 29 & 30 Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
Question Source:     Bank #
55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Modified Bank #                           (Note changes or attach parent)
New               X Question History:                         Last NRC Exam:                 N/A Question Cognitive Level:     Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:       55.41     10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 155  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 154
-reference:
 
Level RO SRO Tie r #   1 Group #   1 K/A # 295021 AA2.01 Importance Rating 3.6 Ability to determine and/or interpret the following as they apply to LOSS OF SHUTDOWN COOLING: Reactor water heatup/cooldown rate Proposed Question:
Examination Outline Cross-reference:       Level                     RO             SRO Tier #                                   1 Group #                                 1 K/A #                     295021   AA2.01 Importance Rating                       3.6 Ability to determine and/or interpret the following as they apply to LOSS OF SHUTDOWN COOLING: Reactor water heatup/cooldown rate Proposed Question:       SRO Question # 76 The plant was shutdown ten (10) days ago following an extended high power run to replace a core spray pump. Plant conditions are as follows:
SRO Question # 76 The plant was shutdown ten (10) days ago following an extended high power run to replace a core spray pump. Plant conditions are as follows:
* A loop of RHR is aligned for shutdown cooling (SDC)
  "A" loop of RHR is aligned for shutdown cooling (SDC)
* The Recirculation pumps are shutdown and unavailable
The Recirculation pumps are shutdown and unavailable Average reactor coolant temperature is160&deg;F Reactor water level is 190 inches The Drywell has NOT been entered Secondary containment is NOT established Then,   SDC was isolated following an RHR system leak and cannot be re
* Average reactor coolant temperature is160&deg;F
-established RPV Level is restored and stabilized at 235 inches utilizing Core Spray "B" Assuming that shutdown cooling CANNOT be restored: (1) When does the plant enter Mode 3?
* Reactor water level is 190 inches
AND (2) After entering Mode 3 what is the maximum amount of time before the plant is required to be in Mode 4?
* The Drywell has NOT been entered
A. (1) 2.2 hours (2) 24 hours B. (1) 2.2 hours (2) 40 hours C. (1) 11.5 hours (2) 24 hours D. (1) 11.5 hours (2) 40 hours DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 156 Proposed Answer:
* Secondary containment is NOT established
A Explanation (Optional):
: Then,
A. Correct: using appendix 1 of AOP 149, the heatup rate is 25 degrees per hour. With this heatup rate, the coolant will reach 212 degrees in 2.2 hours. At 212&deg;F Mode 3 is entered. This results in a failure to meet LCO 3.4.7. Condition A required action A.3 Be in Mode 4 within 24 hours. Condition B is also applicable but not information that is requested in the question
* SDC was isolated following an RHR system leak and cannot be re-established
. B. Incorrect: 40 hours is not correct for placing the plant in Mode 4. This is plausible if the candidate incorrectly applies the Secondary Containment LCO to determine the Mode 4 time requirement.
* RPV Level is restored and stabilized at 235 inches utilizing Core Spray B Assuming that shutdown cooling CANNOT be restored:
C. Incorrect: Plausible if the candidate uses Appendix 1 of AOP 149 (vice Appendix 2) a heatup rate of 4.5 degrees per hour is obtained. In this case, Mode 3 is entered in 11.5 hours. D. Incorrect: Plausible if the candidate uses Appendix 1 of AOP 149 (vice Appendix 2) a heatup rate of 4.5 degrees per hour is obtained. In this case, Mode 3 is entered in 11.5 hours. In addition, 40 hours is not correct for placing the plant in Mode 4. This is plausible if the candidate incorrectly applies the Secondary Containment LCO to determine the Mode 4 time requirement. Technical Reference(s):
(1) When does the plant enter Mode 3?
T.S 3.4.7 T.S 3.4.8 (Attach if not previously provided)
AND (2) After entering Mode 3 what is the maximum amount of time before the plant is required to be in Mode 4?
AOP 149, App 2     Proposed References to be provided to applicants during examination:
A.       (1) 2.2 hours (2) 24 hours B.       (1) 2.2 hours (2) 40 hours C.       (1) 11.5 hours (2) 24 hours D.       (1) 11.5 hours (2) 40 hours DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 155
T.S 3.4.7 T.S 3.4.8 T.S. 3.6.4.1 AOP 149, Appendix 1 & 2 Learning Objective:
 
(As available)
Proposed Answer:         A Explanation (Optional):
Question Source:
A. Correct: using appendix 1 of AOP 149, the heatup rate is 25 degrees per hour. With this heatup rate, the coolant will reach 212 degrees in 2.2 hours. At 212&deg;F Mode 3 is entered. This results in a failure to meet LCO 3.4.7. Condition A required action A.3 Be in Mode 4 within 24 hours. Condition B is also applicable but not information that is requested in the question.
Bank #   Modified Bank #
B. Incorrect: 40 hours is not correct for placing the plant in Mode 4. This is plausible if the candidate incorrectly applies the Secondary Containment LCO to determine the Mode 4 time requirement.
(Note changes or attach parent)
C. Incorrect: Plausible if the candidate uses Appendix 1 of AOP 149 (vice Appendix 2) a heatup rate of 4.5 degrees per hour is obtained. In this case, Mode 3 is entered in 11.5 hours.
New X   Question History:
D. Incorrect: Plausible if the candidate uses Appendix 1 of AOP 149 (vice Appendix 2) a heatup rate of 4.5 degrees per hour is obtained. In this case, Mode 3 is entered in 11.5 hours. In addition, 40 hours is not correct for placing the plant in Mode 4. This is plausible if the candidate incorrectly applies the Secondary Containment LCO to determine the Mode 4 time requirement.
Last NRC Exam:
T.S 3.4.7 Technical Reference(s):                                          (Attach if not previously provided)
NA Question Cognitive Level:
T.S 3.4.8 AOP 149, App 2 T.S 3.4.7 T.S 3.4.8 Proposed References to be provided to applicants during examination:            T.S. 3.6.4.1 AOP 149, Appendix 1&2 Learning Objective:                                                 (As available)
Memory or Fundamental Knowledge Comprehension or Analysis X
Question Source:     Bank #
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 157 10 CFR Part 55 Content:
Modified Bank #                           (Note changes or attach parent)
55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
New               X Question History:                           Last NRC Exam:               NA Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 156
 
10 CFR Part 55 Content:     55.41 55.43     5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 158  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 157
-reference:
 
Level RO SRO Tier #   1 Group #   1 K/A # 295028 EA2.02   Importance Rating 3.9 Ability to determine and/or interpret the following as they apply to HIGH DRYWELL TEMPERATURE: Reactor pressure Proposed Question:
Examination Outline Cross-reference:         Level                   RO             SRO Tier #                                   1 Group #                                 1 K/A #                   295028         EA2.02 Importance Rating                       3.9 Ability to determine and/or interpret the following as they apply to HIGH DRYWELL TEMPERATURE: Reactor pressure Proposed Question:         SRO Question # 77 An Emergency Depressurization is in progress following high drywell air temperature conditions. Current plant conditions are as follows:
SRO Question # 77 An Emergency Depressurization is in progress following high drywell air temperature conditions. Current plant conditions are as follows:
* All Control Rods are fully inserted
All Control Rods are fully inserted Four SRVs were originally opened, but two have just failed closed No other SRVs can be open ed  Reactor pressure is 75 psig, lowering slowly Torus pressure is 1 0 psig and lowering slowly Drywell air temperature is 325&deg;F, rising slowly Core Spray is injecting at rated flow RHR injection is NOT available RPV level indicator response during the depressurization was as follows:
* Four SRVs were originally opened, but two have just failed closed
o Floodup Range indication pegged low but has been rising steadily and is now +190 inches and steady o Wide Range Yarway indication lowered steadily to +15 inches but then began rising steadily and is now +22 inches and steady o Fuel Zone indication lowered steadily to  
* No other SRVs can be opened
-40 inches but then began oscillating o Fuel Zone indication is now +10 inches and continuing to rise slowly.
* Reactor pressure is 75 psig, lowering slowly
o Water level oscillations have stopped.
* Torus pressure is 10 psig and lowering slowly
* Drywell air temperature is 325&deg;F, rising slowly
* Core Spray is injecting at rated flow
* RHR injection is NOT available
* RPV level indicator response during the depressurization was as follows:
o   Floodup Range indication pegged low but has been rising steadily and is now +190 inches and steady o   Wide Range Yarway indication lowered steadily to +15 inches but then began rising steadily and is now +22 inches and steady o   Fuel Zone indication lowered steadily to -40 inches but then began oscillating o   Fuel Zone indication is now +10 inches and continuing to rise slowly.
o   Water level oscillations have stopped.
Using the information provided:
Using the information provided:
(1) What is RPV Water Level?
(1) What is RPV Water Level?
AND (2) What action is required for RPV pressure control?
A.      (1) +10 inches (2) Continue depressurizing with the 2 SRVs ONLY until the plant is in cold shutdown B.      (1) +22 inches (2) Alternate Depressurization Systems of Table 8 of ED - Emergency Depressurization must be aligned to complete the depressurization.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 158


AND  (2) What action is required for RPV pressure control?  A. (1) +10 inches (2) Continue depressurizing with the 2 SRVs ONLY until the plant is in cold shutdown B. (1) +22 inches (2) Alternate Depressurization Systems of Table 8 of ED  
C.   (1) -13 inches (2) Continue depressurizing with the 2 SRVs ONLY until the plant is in cold shutdown D.   (1) -13 inches (2) Alternate Depressurization Systems of Table 8 of ED - Emergency Depressurization must be aligned to complete the depressurization.
- Emergency Depressurization must be aligned to complete the depressurization.
Proposed Answer:        D Explanation (Optional):
A. Incorrect: RPV level is -13 inches. RPV parameters are above the Saturation Curve of graph 1. Additionally indication was received of boiling as the vessel depressurized.
Per Caution 1, if boiling is suspected, 23 inches is to be subtracted from the fuel zone indication. Plausible if the candidate discounts the fuel zone indication due to the oscillations and relies on the Wide Range indication or the candidate believes that the Fuel Zone level of +10 inches is accurate because the level oscillations have stopped.
If 2 of the 4 SRVs have gone closed prior to RPV pressure being within 50 psig of the torus pressure the crew must continue the depressurization with alternate depressurization systems. Plausible if the candidate assumes that the two SRVs will continue the emergency depressurization.
B. Incorrect: RPV level is -13 inches. Plausible if the candidate discounts the fuel zone indication due to the oscillations and relies on the Wide Range indication or the candidate believes that the Fuel Zone level of +10 inches is accurate because the level oscillations have stopped. However this instrument cannot be used because indication of boiling has occurred.
C. Incorrect: RPV parameters are above the Saturation Curve of graph 1 and indications of reference leg boiling has occurred. Per Caution 1, if boiling is suspected, 23 inches is to be subtracted from the fuel zone indication. This would result in a level of -13 inches.
However if 2 of the 4 SRVs have gone closed prior to RPV pressure being within 50 psig of the torus pressure the crew must continue the depressurization with alternate blowdown systems. Plausible if the candidate assumes that the two SRVs will continue the emergency depressurization.
D. Correct: RPV parameters are above the Saturation Curve of graph 1 and indications of reference leg boiling has occurred. Per Caution 1, if boiling is suspected, 23 inches is to be subtracted from the fuel zone indication. This would result in a level of -13 inches.
Because 2 of the 4 SRVs have gone closed, and no other SRVs will open; prior to RPV pressure being within 50 psig of the torus pressure, the crew must continue the depressurization with alternate depressurization systems.
EOP 1, Caution 1 Technical Reference(s): EOP ED, Continuous Recheck            (Attach if not previously provided)
Statement above step ED-13.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 159


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 159 C. (1) -13 inches (2) Continue depressurizing with the 2 SRVs ONLY until the plant is in cold shutdown D. (1) -13 inches (2) Alternate Depressurization Systems of Table 8 of ED
EOP Caution 1 and associated RPV Proposed References to be provided to applicants during examination:        Saturation Temperature Curve EOP-ED LP 95.00 - EOP Introduction, objective Learning Objective:                                              (As available) 95.00.00.14 Question Source:    Bank #
- Emergency Depressurization must be aligned to complete the depressurization.
Modified Bank #                          (Note changes or attach parent)
Proposed Answer: D  Explanation (Optional):
New              X Question History:                       Last NRC Exam:               NA Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis                X 10 CFR Part 55 Content:     55.41 55.43    5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
A. Incorrect: RPV level is
Comments:
-13 inches. RPV parameters are above the Saturation Curve of graph 1. Additionally indication was received of boiling as the vessel depressurized. Per Caution 1, if boiling is suspected, 23 inches is to be subtracted from the fuel zone indication. Plausible if the candidate discounts the fuel zone indication due to the oscillations and relies on the Wide Range indication or the candidate believes that the Fuel Zone level of +10 inches is accurate because the level oscillations have stopped. If 2 of the 4 SRVs have gone closed prior to RPV pressure being within 50 psig of the torus pressure the crew must continue the depressurization with alternate depressurization systems. Plausible if the candidate assumes that the two SRVs will continue the emergency depressurization.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                  Page 160
B. Incorrect: RPV level is
-13 inches. Plausible if the candidate discounts the fuel zone indication due to the oscillations and relies on the Wide Range indication or the candidate believes that the Fuel Zone level of +10 inches is accurate because the level oscillations have stopped. However this instrument cannot be used because indication of boiling has occurred.
C. Incorrect: RPV parameters are above the Saturation Curve of graph 1 and indications of reference leg boiling has occurred. Per Caution 1, if boiling is suspected, 23 inches is to be subtracted from the fuel zone indication. This would result in a level of
-13 inches. However if 2 of the 4 SRVs have gone closed prior to RPV pressure being within 50 psig of the torus pressure the crew must continue the depressurization with alternate blowdown systems. Plausible if the candidate assumes that the two SRVs will continue the emergency depressurization.
D. Correct:  RPV parameters are above the Saturation Curve of graph 1 and indications of reference leg boiling has occurred. Per Caution 1, if boiling is suspected, 23 inches is to be subtracted from the fuel zone indication. This would result in a level of -13 inches. Because 2 of the 4 SRVs have gone closed, and no other SRVs will open; prior to RPV pressure being within 50 psig of the torus pressure, the crew must continue the depressurization with alternate depressurization systems.
Technical Reference(s):
EOP 1, Caution 1 EOP ED, Continuous Recheck Statement above step ED
-13. (Attach if not previously provided)


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 160 Proposed References to be provided to applicants during examination:
Examination Outline Cross-reference:        Level                    RO          SRO Tier #                                1 Group #                              1 K/A #                    295016  AA2.03 Importance Rating                    4.4 Ability to determine and/or interpret the following as they apply to CONTROL ROOM ABANDONMENT: Reactor pressure Proposed Question:        SRO Question # 78 AOP 915, Shutdown Outside the Control Room, has been entered. The Reactor was scrammed and the following conditions exist:
EOP Caution 1 and associated RPV Saturation Temperature Curve EOP-ED  Learning Objective:
* RPV water level has been stabilized at +190 inches using the Feed and Condensate system
LP 95.00 - EOP Introduction, objective 95.00.00.14 (As available)
* The outboard MSIVs all indicate closed on Remote Shutdown Panel 1C-388
Question Source:
* RPV pressure is 900 psig and slowly rising
Bank #   Modified Bank #
* Personnel are at their assigned locations and communications established Given the above, as the Control Room Supervisor:
(Note changes or attach parent)
: 1) What actions should be directed to perform a plant cooldown?
New X   Question History:
AND
Last NRC Exam:
: 2) Which of the following is correct regarding plant cooldown rate?
NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis 10 CFR Part 55 Content:
A.        (1)  Manually operate SRVs and determine cooldown rate using AOP 915, Attachments 5 and 6.
55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
(2)  The cooldown rate should be maintained <80&deg;F per hour.
B.        (1)  Manually operate SRVs and determine cooldown rate using AOP 915, Attachments 5 and 6.
(2)  Maintaining a cooldown rate is NOT required.
C.        (1)  Establish RCIC in pressure control mode per OI 150; Section "10.0 RCIC Operation from Outside the Control Room and determine cooldown rate using AOP 915, Section 2, RPV Pressure/Level Control.
(2)  The cooldown rate should be maintained <80&deg;F per hour.
D.        (1)  Establish RCIC in pressure control mode per OI 150; Section "10.0 RCIC Operation from Outside the Control Room and determine cooldown rate using AOP 915, Section 2, RPV Pressure/Level Control.
(2)  Maintaining a cooldown rate is NOT required.
Proposed Answer:          A DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 161
 
Explanation (Optional):
A. Correct - IAW AOP 915, if reactor water level can be controlled above 119.5 inches reactor pressure is maintained and the cooldown rate controlled using SRVs. A NOTE that appears in AOP 015 states While it is desirable to limit cooldown rate to <80&deg; F/Hr, cooldown rate cannot be controlled during Emergency Depressurization or HPCI/RCIC injection. The Technical Specification cooldown rate limit of 100&deg; F in any 1 hr. period applies to normal plant cooldown only. Because there is NO reason stated for Emergency Depressurization or HPCI/RCIC injection the desirable cooldown rate is
      <80&deg; F/Hr.
B. Incorrect - A NOTE that appears in AOP 015 states While it is desirable to limit cooldown rate to <80&deg; F/Hr, cooldown rate cannot be controlled during Emergency Depressurization or HPCI/RCIC injection. The Technical Specification cooldown rate limit of 100&deg; F in any 1 hr. period applies to normal plant cooldown only. Because there is NO reason stated for Emergency Depressurization or HPCI/RCIC injection the desirable cooldown rate is <80&deg; F/Hr.
C. Incorrect - Plausible because RCIC is cited in AOP 915, Shutdown Outside the Control Room. However, RCIC is only used for RPV water makeup and its specific operation is directed in AOP 915, NOT OI 150.
D. Incorrect - Plausible because RCIC is cited in AOP 915, Shutdown Outside the Control Room. However, RCIC is only used for RPV water makeup and its specific operation is directed in AOP 915, NOT OI 150.
Technical Reference(s): AOP 915, Section 2                      (Attach if not previously provided)
Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
Question Source:     Bank #
Modified Bank #                           (Note changes or attach parent)
New               X Question History:                           Last NRC Exam:               NA Question Cognitive Level:     Memory or Fundamental Knowledge         X Comprehension or Analysis 10 CFR Part 55 Content:       55.41 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 162
 
55.43     5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 161  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 163
-reference:
 
Level RO  SRO  Tier #  1  Group #  1  K/A # 295016  AA2.03  Importance Rating 4.4  Ability to determine and/or interpret the following as they apply to CONTROL ROOM ABANDONMENT: Reactor pressure Proposed Question: SRO Question # 78 AOP 915, Shutdown Outside the Control Room, has been entered. The Reactor was scrammed and the following conditions exist:
Examination Outline Cross-reference:         Level                     RO             SRO Tier #                                   1 Group #                                   1 K/A #                     295031     2.2.12 Importance Rating                         4.1 Knowledge of surveillance procedures. Reactor Low Water Level Proposed Question:         SRO Question # 79 The plant is operating at 100% power.
RPV water level has been stabilized at +190 inches using the Feed and Condensate system  The outboard MSIVs all indicate closed on Remote Shutdown Panel 1C
The B Core Spray pump was declared inoperable earlier in the shift.
-388  RPV pressure is 900 psig and slowly rising Personnel are at their assigned locations and communications established Given the above, as the Control Room Supervisor:
Functional Testing of the HPCI LO-LO instrumentation is also scheduled for the shift as required by SR 3.3.5.1.3.
: 1) What actions should be directed to perform a plant cooldown?  AND  2) Which of the following is correct regarding plant cooldown rate?
A.  (1) Manually operate SRVs and determine cooldown rate using AOP 915, Attachments 5 and 6.
(2) The cooldown rate should be maintained <80&deg;F per hour.
B.  (1) Manually operate SRVs and determine cooldown rate using AOP 915, Attachments 5 and 6.
(2) Maintaining a cooldown rate is NOT required.
C.  (1) Establish RCIC in pressure control mode per OI 150; Section "10.0 RCIC Operation from Outside the Control Room" and determine cooldown rate using AOP 915, Section 2, RPV Pressure/Level Control
.  (2) The cooldown rate should be maintained <80&deg;F per hour.
D.  (1) Establish RCIC in pressure control mode per OI 150; Section "10.0 RCIC Operation from Outs ide the Control Room" and determine cooldown rate using AOP 915, Section 2, RPV Pressure/Level Control. (2) Maintaining a cooldown rate is NOT required.
Proposed Answer:
A DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 162  Explanation (Optional):
A. Correct - IAW AOP 915, if reactor water level can be controlled above 119.5 inches reactor pressure is maintained and the cooldown rate controlled using SRVs. A NOTE that appears in AOP 015 states "While it is desirable to limit cooldown rate to <80&deg; F/Hr, cooldown rate cannot be controlled during Emergency Depressurization or HPCI/RCIC injection. The Technical Specification cooldown rate limit of 100&deg; F in any 1 hr. period applies to normal plant cooldown only."  Because there is NO reason stated for Emergency Depressurization or HPCI/RCIC injection the desirable cooldown rate is <80&deg; F/Hr. B. Incorrect
- A NOTE that appears in AOP 015 states "While it is desirable to limit cooldown rate to <80&deg; F/Hr, cooldown rate cannot be controlled during Emergency Depressurization or HPCI/RCIC injection. The Technical Specification cooldown rate limit of 100&deg; F in any 1 hr. period applies to normal plant cooldown only."  Because there is NO reason stated for Emergency Depressurization or HPCI/RCIC injection the desirable cooldown rate is <80&deg; F/Hr.
C. Incorrect
- Plausible because RCIC is cited in AOP 915, Shutdown Outside the Control Room. However, RCIC is only used for RPV water makeup and its specific operation is directed in AOP 915, NOT OI 150.
D. Incorrect
- Plausible because RCIC is cited in AOP 915, Shutdown Outside the Control Room. However, RCIC is only used for RPV water makeup and its specific operation is directed in AOP 915, NOT OI 150.
Technical Reference(s):
AOP 915, Section 2 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
None  Learning Objective:
(As available)
Question Source:
Bank #    Modified Bank #
(Note changes or attach parent)
New X  Question History:
Last NRC Exam:
NA  Question Cognitive Level:
Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content:
55.41 DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 163 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 164  Examination Outline Cross
-reference:
Level RO SRO Tier #   1 Group #   1 K/A # 295031 2.2.12 Importance Rating 4.1 Knowledge of surveillance procedures. Reactor Low Water Level Proposed Question:
SRO Question # 79 The plant is operating at 100% power. The "B" Core Spray pump was declared inoperable earlier in the shift.
Functional Testing of the HPCI LO
-LO instrumentation is also scheduled for the shift as required by SR 3.3.5.1.3.
If the functional testing of the HPCI instrumentation commences as scheduled which ONE of the following is correct?
If the functional testing of the HPCI instrumentation commences as scheduled which ONE of the following is correct?
In addition to declaring the instrument channel being tested inoperable, A.      within one hour RCIC must be verified to be operable.
B.      HPCI must be declared inoperable and a 72 hour LCO must be entered.
C.      if the functional test of each channel is completed within 6 hours, no additional action is required.
D.      HPCI must be declared inoperable within one hour and the channel tripped if the testing is not completed within 24 hours.
Proposed Answer:            C Explanation (Optional):
A.      Incorrect: Plausible if the candidate believes that HPCI must be declared inoperable to perform the test.
B.      Incorrect: Plausible if the candidate believes that HPCI must be declared inoperable to perform the test. If so then LCO 3.5.1, condition H would be entered.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 164


In addition to declaring the instrument channel being tested inoperable, -
C.      Correct: Per note 2 on page 3-3-39 (TS Section 3.3.5.1, Surveillance Requirements):
A. within one hour RCIC must be verified to be operable.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours for Functions 1.d, 2.f, 3.c, 3.d, 3.e, and 3.f; and (b) for up to 6 hours for Functions other than 1.d, 2.f, 3.c, 3.d, 3.e, and 3.f provided the associated Function (or the redundant Function for Functions 4 and 5) maintains ECCS initiation or loop selection capability.
B. HPCI must be declared inoperable and a 72 hour LCO must be entered.
D.     Incorrect: Plausible if the candidate believes that HPCI must be declared inoperable to perform the test. As discussed above up to 6 hours is allowed to test each channel.
C. if the functional test of each channel is completed within 6 hours
Plausible if the candidate does not apply the note and applies the actions for each channel being inop and adds the total time allowed for the 4 instrument channels being tested (4 x 6 = 24).
, no additional action is required. D. HPCI must be declared inoperable within one hour and the channel tripped if the testing is not completed within 24 hours.
TS section 3.3.5.1, pg.39 Technical Reference(s): TS section 3.5.1                          (Attach if not previously provided)
Proposed Answer:
STP 3.3.5.1-01, pg.3 Proposed References to be provided to applicants during                Tech Spec Table 3.3.5.1-1 examination:                                                          pages 1 through 3 only (White out all of the Allowable Values)
C  Explanation (Optional):
TS section 3.3.5.1, NO BASES TS section 3.5.1, NO BASES Learning Objective:                                                    (As available)
A. Incorrect: Plausible if the candidate believes that HPCI must be declared inoperable to perform the test.
Question Source:        Bank #
B. Incorrect: Plausible if the candidate believes that HPCI must be declared inoperable to perform the test. If so then LCO 3.5.1, condition H would be entered.
Modified Bank #                            (Note changes or attach parent)
New              X Question History:                            Last NRC Exam:                N/A Question Cognitive Level:      Memory or Fundamental Knowledge Comprehension or Analysis                    X 10 CFR Part 55 Content:        55.41 55.43    2 Facility operating limitations in the technical specifications and their bases.
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                          Page 165


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 165 C. Correct: Per note 2 on page 3 39 (TS Section 3.3.5.1, Surveillance Requirements): When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours for Functions 1.d, 2.f, 3.c, 3.d, 3.e, and 3.f; and (b) for up to 6 hours for Functions other than 1.d, 2.f, 3.c, 3.d, 3.e, and 3.f provided the associated Function (or the redundant Function for Functions 4 and 5) maintains ECCS initiation or loop selection capability.
Examination Outline Cross-reference:       Level                     RO             SRO Tier #                                     1 Group #                                   1 K/A #                     295037     2.4.6 Importance Rating                         4.7 Conduct of Operations: 2.4.6, Knowledge of EOP mitigation strategies. (SCRAM Condition Present and Reactor Power Above APRM Downscale or Unknown)
D. Incorrect: Plausible if the candidate believes that HPCI must be declared inoperable to perform the test. As discussed above up to 6 hours is allowed to test each channel. Plausible if the candidate does not apply the note and applies the actions for each channel being inop and adds the total time allowed for the 4 instrument channels being tested (4 x 6 = 24).
Proposed Question:       SRO Question # 80 An ATWS is in progress. The following conditions exist:
Technical Reference(s):
* Bypass valves failed to open and cannot be opened
TS section 3.3.5.1 , pg.39 TS section 3.5.1 STP 3.3.5.1
* Reactor pressure is being maintained 800-1000 psig and 2 SRVs are open
-01, pg.3 (Attach if not previously provided)
* Torus water temperature is 120&deg;F
Proposed References to be provided to applicants during examination:
* Torus water level is 12.8 feet
Tech Spec Table 3.3.5.1
* Control rod insertion has NOT been established
-1 pages 1 through 3 only (White out all of the Allowable Values) TS section 3.3.5.1, NO BASES TS section 3.5.1, NO BASES Learning Objective:
* SBLC failed to inject and cannot be started
(As available)
* No alternate Boron injection system is injecting When RPV level reaches -10 inches, direction is given to re-establish injection and maintain indicated level -25 to +15 inches.
Question Source:
With RPV water level at -15 inches, RPV injection is re-established. Twenty (20) seconds later RPV water level is +17 inches and reactor power is 6%.
Bank #    Modified Bank #
(Note changes or attach parent)
New X  Question History:
Last NRC Exam:
N/A  Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X  10 CFR Part 55 Content:
55.41  55.43 2 Facility operating limitations in the technical specifications and their bases.
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 166  Examination Outline Cross
-reference:
Level RO SRO Tier #   1 Group #   1 K/A # 295037 2.4.6   Importance Rating 4.7 Conduct of Operations: 2.4.6, Knowledge of EOP mitigation strategies. (SCRAM Condition Present and Reactor Power Above APRM Downscale or Unknown)
Proposed Question:
SRO Question # 80 An ATWS is in progress. The following conditions exist:
Bypass valves failed to open and cannot be opened Reactor pressure is being maintained 800
-1000 psig and 2 SRVs are open Torus water temperature is 120&deg;F Torus water level is 12.8 feet Control rod insertion has NOT been established SBLC failed to inject and cannot be started No alternate Boron injection system is injecting When RPV level reaches  
-10 inches, direction is given to re
-establish injection and maintain indicated level  
-25 to +1 5 inches. With RPV water level at  
-15 inches, RPV injection is re
-established. Twenty (20) seconds later RPV water level is +1 7 inches and reactor power is 6%
.
Which ONE of the following is the correct action in response to this transient?
Which ONE of the following is the correct action in response to this transient?
A. Terminate and prevent injection again
A.     Terminate and prevent injection again.
. B. Perform a RPV Blowdown per EOP
B.     Perform a RPV Blowdown per EOP-ED.
-ED. C. Direct a new level control band of  
C.     Direct a new level control band of -10 to +15 inches.
-10 to +15 inches. D. Reduce the injection rate until reactor power falls below 5%.
D.     Reduce the injection rate until reactor power falls below 5%.
Proposed Answer:
Proposed Answer:         A Explanation (Optional):
A Explanation (Optional):
A.     Correct - Level rise outside the assigned level band (above +15) will cause reactor power to increase and exceed 5%. Override conditions are met ( Power above 5%,
A. Correct - Level rise outside the assigned level band (above +15) will cause reactor power to increase and exceed 5%. Override conditions are met ( Power above 5%, Level above +15 inches, Torus water temp above 110&deg;F, and an SRV is open) this requires returning to terminate and prevent injection until reactor power lowers below 5% or level is at +15 inches or the SRVs remain closed.
Level above +15 inches, Torus water temp above 110&deg;F, and an SRV is open) this requires returning to terminate and prevent injection until reactor power lowers below 5% or level is at +15 inches or the SRVs remain closed.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 166


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 167 B. Incorrect  
B. Incorrect - There is initially a 28&deg;F margin to HCTL (120&deg;F is the lower line on the HCTL graph), and rise in suppression pool temperature will not require RPV Blowdown at this time. Torus water level is 1 foot below the level that would require RPV Blowdown.
- There is initially a 28&deg;F margin to HCTL (120&deg;F is the lower line on the HCTL graph), and rise in suppression pool temperature will not require RPV Blowdown at this time. Torus water level is 1 foot below the level that would require RPV Blowdown.
C. Incorrect - Level rise has caused reactor power to increase and exceed 5%. This new level band could permit power to remain at 6%. Override conditions are met to terminate and prevent injection until reactor power lowers below 5% or level is at +15 inches or the SRVs remain closed.
C. Incorrect  
D. Incorrect - Override conditions are met to terminate and prevent injection again EOP 2 Technical Reference(s):                                       (Attach if not previously provided)
- Level rise has caused reactor power to increase and exceed 5%. This new level band could permit power to remain at 6%. Override conditions are met to terminate and prevent injection until reactor power lowers below 5% or level is at +15 inches or the SRVs remain closed.
ATWS Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available) 2009 Nine Mile Question Source:     Bank #
D. Incorrect  
Point Modified Bank #                           (Note changes or attach parent)
- Override conditions are met to terminate and prevent injection again Technical Reference(s):
New Question History:                           Last NRC Exam:     2009     Nine Mile Point Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41 55.43       5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
EOP 2 ATWS (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
None Learning Objective:
(As available)
Question Source:
Bank # 2009 Nine Mile Point   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
2009 Nine Mile Point Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 168  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 167
-reference:
 
Level RO SRO Tier #   1 Group #   1 K/A # 295003 2.4.4   Importance Rating 4.7 Emergency Procedures / Plan: Ability to recognize abnormal indications for system operating parameters that are entry
Examination Outline Cross-reference:         Level                       RO             SRO Tier #                                     1 Group #                                     1 K/A #                       295003   2.4.4 Importance Rating                           4.7 Emergency Procedures / Plan: Ability to recognize abnormal indications for system operating parameters that are entry-level conditions for emergency and abnormal operating procedures.
-level conditions for emergency and abnormal operating procedures. (Partial or Complete Loss of AC)
(Partial or Complete Loss of AC)
Proposed Question:
Proposed Question:       SRO Question # 81 The plant is operating at 78% power with the Turbine Generator on line when DAEC switchyard voltage slowly lowers from 100% to 90% of normal voltages over a 5 minute time period.
SRO Question  
Which of the following procedures are required to be entered as voltage lowers?
# 81 The plant is operating at 78% power with the Turbine Generator on line when DAEC switchyard voltage slowly lowers from 100% to 90% of normal voltages over a 5 minute time period
A.     Enter AOP 304, Grid Instability; NO other procedures are required during this event.
. Which of the following procedures are required to be entered as voltage lowers?   A. Enter AOP 30 4 , Grid Instability; N O other procedures are required during this event. B. Enter AOP 301, Loss of Essential Electrical Power
B.     Enter AOP 301, Loss of Essential Electrical Power; NO other procedures are required during this event.
; NO other procedures are required during this event.
C.     Enter AOP 304, Grid Instability, AOP 301, Loss of Essential Electrical Power, IPOI 5 Reactor Scram, and EOP 1 - RPV Control.
C. Enter AOP 30 4 , Grid Instability, AOP 301, Loss of Essential Electrical Power, IPOI 5 Reactor Scram
D.     Enter AOP 304, Grid Instability, AOP 301, Loss of Essential Electrical Power, and IPOI 5, Reactor Scram. There is NO need to enter EOPs at this time.
, and EOP 1 - RPV Control
Proposed Answer:         C Explanation (Optional):
. D. Enter AOP 30 4 , Grid Instability, AOP 301, Loss of Essential Electrical Power, and IPOI 5, Reactor Scram. There is NO need to enter EOPs at this time.
A.     Incorrect - Plausible because AOP 304 is entered for these conditions, however with voltage this low the vital buses will trip resulting in a reactor scram as the RPS buses are de-energized.
Proposed Answer:
B.     Incorrect - Entry conditions are met for AOP 304, which is only exited when the essential buses 1A3 and 1A4 trip when the voltages lowers to 91.3%. When the essential buses trip it is an entry condition for AOP 301. Plausible if the candidate fails to recognize the degraded grid conditions and focuses on the loss of essential Bus power.
C Explanation (Optional):
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                         Page 168
A. Incorrect  
 
- Plausible because AOP 304 is entered for these conditions, however with voltage this low the vital buses will trip resulting in a reactor scram as the RPS buses are de-energized.
C. Correct - Entry conditions are met for AOP 304, which is only exited when the essential buses 1A3 and 1A 4 trip when the voltages lowers to 91.3%. When the essential buses trip it is an entry condition for AOP 301. A reactor scram will occur because of a loss of power to the RPS buses when the vital buses de-energize so the crew must enter IPOI
B. Incorrect  
: 5. The resultant reactor SCRAM will cause RPV level to lower below the entry requirements for EOP-1 necessitating its entry.
- Entry condition s are met for AOP 304, which is only exited when the essential buses 1A3 and 1A4 trip when the voltages lowers to 91.3%. When the essential buses trip it is an entry condition for AOP 301. Plausible if the candidate fails to recognize the degraded grid conditions and focuses on the loss of essential Bus power.
D. Incorrect - AOP 304 is entered on the low voltage condition but is exited when the loss of the essential buses occurs and the crew must enter AOP 301. The reactor scrams because of a loss of power to the RPS buses when the vital buses de-energize so the crew must enter IPOI 5. The non-essential buses will remain energized and the essential buses are powered from the SBDGs so no loss of feedwater occurs and there is no need to enter an EOP at this time. Plausible if the candidate determines that reactor water level will be maintained through the use of Condensate and Feedwater since the non-essential busses remain energized throughout this event. The candidate may incorrectly determine that EOP-1 has no entry conditions on a loss of electrical power. However, the SCRAM from 78% power would result in exceeding the Low-Level trip setpoint requiring entry to EOP-1.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 169 C. Correct - Entry conditions are met for AOP 304, which is only exited when the essential buses 1A3 and 1A 4 trip when the voltages lowers to 91.3%. When the essential buses trip it is an entry condition for AOP 301. A reactor scram will occur because of a loss of power to the RPS buses when the vital buses de
AOP 301 pg. 18-19, AOP 304, Technical Reference(s):                                        (Attach if not previously provided) pg.4 Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
-energize so the crew must enter IPOI 5. The resultant reactor SCRAM will cause RPV level to lower below the entry requirements for EOP
Question Source:       Bank #
-1 necessitating its entry.
Modified Bank #                         (Note changes or attach parent)
D. Incorrect - AOP 304 is entered on the low voltage condition but is exited when the loss of the essential buses occurs and the crew must enter AOP 301. The reactor scrams because of a loss of power to the RPS buses when the vital buses de
New               X Question History:                           Last NRC Exam:             N/A Question Cognitive Level:       Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:         55.41 55.43     5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
-energize so the crew must enter IPOI 5. The non-essential buses will remain energized and the essential buses are powered from the SBDGs so no loss of feedwater occurs and there is no need to enter an EOP at this time.
Plausible if the candidate determines that reactor water level will be maintained through the use of Condensate and Feedwater since the non
-essential busses remain energized throughout this event. The candidate may incorrectly determine that EOP
-1 has no entry conditions on a loss of electrical power. However, the SCRAM from 78% power would result in exceeding the Low
-Level trip setpoint requiring entry to EOP
-1. Technical Reference(s):
AOP 301 pg. 18-19 , AOP 304 , pg.4 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
None Learning Objective:
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 170  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 169
-reference:
Level RO  SRO  Tier #  1  Group #  1  K/A # 295006  2.4.35  Importance Rating 4.0  Emergency Procedures / Plan: Knowledge of local auxiliary operator tasks during emergency and the resultant operational effects. SCRAM  SRO Level Justification: IPOI 5, Reactor Scram states that If all control rods are not fully inserted, EOP Support Rod Insertion Procedures may be used as authorized by the CRS. The SRO must know the operational effects of the local actions associated with each procedure in order to select the correct procedure.
Proposed Question:
SRO Question # 82 The plant was at 10% power starting up, when a manual scram was inserted following an equipment failure. Conditions are as follows:
Eight control rods failed to insert The Blue Scram lights are on for ALL control rods All scram signals have been cleared
, but the scram CANNOT be reset The RO reports that there is insufficient cooling water pressure to drift the rods after fully opening the CRD Flow Control Valve Which ONE of the following procedures should you direct be performed
?  A. RIP 103.1, Individual Scram Test Switches
. B. RIP 103.3, Manually Drive Control Rods
. C. RIP 101.3, Vent Scram Air Header
. D. RIP 101.2, RPS Fuse Removal. Proposed Answer:
B  Explanation (Optional):
A. Incorrect:  The scram signal has already caused the scram inlets and outlets for the 8 rods to open as evidenced by the blue scram lights being illuminated. Plausible if the candidate does not understand what will cause the blue scram light to turn on.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 171 B. Correct: RIP 103.3 directs that if the scram cannot be reset and there are difficulties inserting the rods with CRD hydraulic pressure then an AO must be sent into the plant to close the CRD Charging Water Isolation Valve. This will shut off flow to the accumulators resulting in an increase in CRD drive pressure.
Examination Outline Cross-reference:        Level                    RO                SRO Tier #                                      1 Group #                                    1 K/A #                    295006        2.4.35 Importance Rating                          4.0 Emergency Procedures / Plan: Knowledge of local auxiliary operator tasks during emergency and the resultant operational effects. SCRAM SRO Level Justification: IPOI 5, Reactor Scram states that If all control rods are not fully inserted, EOP Support Rod Insertion Procedures may be used as authorized by the CRS. The SRO must know the operational effects of the local actions associated with each procedure in order to select the correct procedure.
Proposed Question:      SRO Question # 82 The plant was at 10% power starting up, when a manual scram was inserted following an equipment failure. Conditions are as follows:
* Eight control rods failed to insert
* The Blue Scram lights are on for ALL control rods
* All scram signals have been cleared, but the scram CANNOT be reset
* The RO reports that there is insufficient cooling water pressure to drift the rods after fully opening the CRD Flow Control Valve Which ONE of the following procedures should you direct be performed?
A.      RIP 103.1, Individual Scram Test Switches.
B.      RIP 103.3, Manually Drive Control Rods.
C.      RIP 101.3, Vent Scram Air Header.
D.      RIP 101.2, RPS Fuse Removal.
Proposed Answer:        B Explanation (Optional):
A.      Incorrect: The scram signal has already caused the scram inlets and outlets for the 8 rods to open as evidenced by the blue scram lights being illuminated. Plausible if the candidate does not understand what will cause the blue scram light to turn on.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 170
 
B. Correct: RIP 103.3 directs that if the scram cannot be reset and there are difficulties inserting the rods with CRD hydraulic pressure then an AO must be sent into the plant to close the CRD Charging Water Isolation Valve. This will shut off flow to the accumulators resulting in an increase in CRD drive pressure.
C. Incorrect: The air header is already vented. The scram inlets and outlets for the 8 rods have repositioned as evidenced by the blue scram lights being illuminated. Plausible if the candidate does not understand what will cause the blue scram light to turn on.
C. Incorrect: The air header is already vented. The scram inlets and outlets for the 8 rods have repositioned as evidenced by the blue scram lights being illuminated. Plausible if the candidate does not understand what will cause the blue scram light to turn on.
D. Incorrect: Pulling the fuses will de
D. Incorrect: Pulling the fuses will de-energize the scram trip logic. This would be an appropriate action for an electrical ATWS. This action would prevent the RPS from resetting.
-energize the scram trip logic. This would be an appropriate action for an electrical ATWS. This action would prevent the RPS from resetting.
RIP 103.3, Manually Drive Control Technical Reference(s):                                      (Attach if not previously provided)
Technical Reference(s):
Rods Proposed References to be provided to applicants during examination:         None Learning Objective:       LP SEG 6, objective, 6.07.01           (As available)
RIP 103.3, Manually Drive Control Rods (Attach if not previously provided)
Question Source:     Bank #
Proposed References to be provided to applicants during examination:
Modified Bank #                         (Note changes or attach parent)
None Learning Objective:
New               X Question History:                         Last NRC Exam:               N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41 55.43     5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
LP SEG 6, objective, 6.07.01 (As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 172  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 171
-reference:
 
Level RO SRO Tier #   1 Group #   2 K/A # 295029 EA2.01   Importance Rating 3.9 Ability to determine and/or interpret the following as they apply to HIGH SUPPRESSION POOL WATER LEVEL: Suppression pool water level Proposed Question:
Examination Outline Cross-reference:         Level                   RO             SRO Tier #                                   1 Group #                                 2 K/A #                   295029   EA2.01 Importance Rating                       3.9 Ability to determine and/or interpret the following as they apply to HIGH SUPPRESSION POOL WATER LEVEL: Suppression pool water level Proposed Question:         SRO Question # 83 Following a loss of coolant accident the following conditions exist:
SRO Question # 83 Following a loss of coolant accident the following conditions exist:
* RPV level is +170 inches, rising slowly
RPV level is +170 inches, rising slowly Condensate is injecting and maintaining level RPV pressure is 200 psig, lowering slowly RHR "A" and "B" are aligned for both Torus and Drywell sprays Core Spray is in standby Drywell pressure is 16 psig, lowering slowly Drywell temperature is 240&deg;F lowering slowly Torus pressure is 15 psig lowering slowly Torus water temperature is 120&deg;F, rising slowly Torus water level is 13.5 feet rising slowly IAW EOP 2, Primary Containment Control, which of the following actions is required
* Condensate is injecting and maintaining level
A. Secure Drywell sprays and emergency depressurize B. Emergency depressurize while continuing Drywell sprays C. Secure Drywell sprays and terminate injection from condensate and inject with low pressure ECCS D. Terminate injection from condensate and inject with low pressure ECCS while continuing Drywell sprays Proposed Answer:
* RPV pressure is 200 psig, lowering slowly
C Explanation (Optional):
* RHR A and B are aligned for both Torus and Drywell sprays
A. Incorrect: Emergency Depressurization is not required at this time. Plausible in that Torus parameters are close to exceeding the PSP curve. The required action to secure injection from condensate and shift injection to the low pressure ECCS will terminate the torus level rise and prevent exceeding the PSP curve.
* Core Spray is in standby
* Drywell pressure is 16 psig, lowering slowly
* Drywell temperature is 240&deg;F lowering slowly
* Torus pressure is 15 psig lowering slowly
* Torus water temperature is 120&deg;F, rising slowly
* Torus water level is 13.5 feet rising slowly IAW EOP 2, Primary Containment Control, which of the following actions is required?
A.       Secure Drywell sprays and emergency depressurize B.       Emergency depressurize while continuing Drywell sprays C.       Secure Drywell sprays and terminate injection from condensate and inject with low pressure ECCS D.       Terminate injection from condensate and inject with low pressure ECCS while continuing Drywell sprays Proposed Answer:           C Explanation (Optional):
A.       Incorrect: Emergency Depressurization is not required at this time. Plausible in that Torus parameters are close to exceeding the PSP curve. The required action to secure injection from condensate and shift injection to the low pressure ECCS will terminate the torus level rise and prevent exceeding the PSP curve.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 172


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 173 B. Incorrect: Emergency Depressurization is not required at this time.
B. Incorrect: Emergency Depressurization is not required at this time.
C. Correct: When Torus level cannot be maintained below 13.5 feet, step T/L
C. Correct: When Torus level cannot be maintained below 13.5 feet, step T/L-11 requires that the drywell sprays be secured. This action is required because the torus to drywell vacuum breakers are covered and continued spraying could result in exceeding the negative design pressure rating of the containment. Additionally, step T/L 12 requires that injection from sources external to the primary containment be terminated if not required for core cooling. Since RPV pressure is within the capacity of low pressure ECCS, RPV level control should be shifted to LP ECCS to stop the torus level rise.
-11 requires that the drywell sprays be secured. This action is required because the torus to drywell vacuum breakers are covered and continued spraying could result in exceeding the negative design pressure rating of the containment. Additionally, step T/L 12 requires that injection from sources external to the primary containment be terminated if not required for core cooling. Since RPV pressure is within the capacity of low pressure ECCS, RPV level control should be shifted to LP ECCS to stop the torus level rise.
D. Incorrect: Step T/L-11 requires that the drywell sprays be secured.
D. Incorrect: Step T/L
EOP 2 step T/L-11 and 12 Technical Reference(s):                                        (Attach if not previously provided)
-11 requires that the drywell sprays be secured.
Print in COLOR Proposed References to be provided to applicants during examination:         EOP Graph 5 Learning Objective:       SEG 108, LO 95.59                       (As available)
Technical Reference(s):
Question Source:     Bank #
EOP 2 step T/L
Modified Bank #                         (Note changes or attach parent)
-11 and 12 Print in COLOR (Attach if not previously provided)
New             X Question History:                         Last NRC Exam:               N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41 55.43     5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Proposed References to be provided to applicants during examination:
EOP Graph 5 Learning Objective:
SEG 108, LO 95.59 (As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 174  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 173
-reference:
 
Level RO SRO Tier #   1 Group #   2 K/A # 2950 09  2.4.45 Importance Rating 4.3 Emergency Procedures / Plan: Ability to prioritize and interpret the significance of each annunciator or alarm: Low Reactor Water Level Proposed Question:
Examination Outline Cross-reference:     Level                     RO               SRO Tier #                                     1 Group #                                     2 K/A #                     295009      2.4.45 Importance Rating                           4.3 Emergency Procedures / Plan: Ability to prioritize and interpret the significance of each annunciator or alarm: Low Reactor Water Level Proposed Question:       SRO Question # 84 During a major loss of coolant accident the following conditions exist:
SRO Question # 84 During a major loss of coolant accident the following conditions exist:
* All control rods are inserted
All control rods are inserted RPV level is steady at  
* RPV level is steady at -30
-30Core Spray pump "B" is injecting at 3 100 gpm RHR pumps "A" and "B" are aligned for Torus and Drywell sprays Torus pressure is 3 1 psig and slowly lowering ALL other injection sources are unavailable Then, alarm 1C03C (A-2) "B" CORE SPRAY PUMP 1P
* Core Spray pump B is injecting at 3100 gpm
-211B TRIP OR MOTOR OVERLOAD, annunciates. Operators report that Core Spray Pump "B" amps pegged immediately prior to the pump trip.
* RHR pumps A and B are aligned for Torus and Drywell sprays
* Torus pressure is 31 psig and slowly lowering
* ALL other injection sources are unavailable Then, alarm 1C03C (A-2) B CORE SPRAY PUMP 1P-211B TRIP OR MOTOR OVERLOAD, annunciates. Operators report that Core Spray Pump B amps pegged immediately prior to the pump trip.
Which ONE of the following is required by the EOPs?
Which ONE of the following is required by the EOPs?
A. SAG entry is required. Coordinate with the TSC to exit BOTH EOP 1 AND EOP 2 and enter SAGs.
A. SAG entry is required. Coordinate with the TSC to exit BOTH EOP 1 AND EOP 2 and enter SAGs.
B. SAG entry is required. Coordinate with the TSC to exit EOP 1 and enter SAGs Continue Torus and Drywell Sprays in accordance with EOP 2.
B. SAG entry is required. Coordinate with the TSC to exit EOP 1 and enter SAGs Continue Torus and Drywell Sprays in accordance with EOP 2.
C. Secure all containment sprays and direct all RHR flow to the RPV to restore RPV level greater than  
C. Secure all containment sprays and direct all RHR flow to the RPV to restore RPV level greater than -25 inches. Make preparations to vent the containment in accordance with EOP 2.
-25 inches. Make preparations to vent the containment in accordance with EOP 2. D. Continue Torus and Drywell Sprays in accordance with EOP 2. If RPV level lowers to  
D. Continue Torus and Drywell Sprays in accordance with EOP 2. If RPV level lowers to
-39 inches, secure all containment sprays and direct all RHR flow to the RPV to restore RPV level greater than  
      -39 inches, secure all containment sprays and direct all RHR flow to the RPV to restore RPV level greater than -39 inches. Make preparations to vent the containment in accordance with EOP 2.
-39 inches. Make preparations to vent the containment in accordance with EOP 2.
Proposed Answer:         C Explanation (Optional):
Proposed Answer:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 174
C Explanation (Optional):
 
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 175 A. Incorrect: Once the Core Spray pump tripped, adequate core cooling via spray cooling was lost. EOP 1 step RC/L
A. Incorrect: Once the Core Spray pump tripped, adequate core cooling via spray cooling was lost. EOP 1 step RC/L-12 directs that injection be maximized with all available injection systems in an attempt to restore level to above -25 inches. Only after this attempt has been proven unsuccessful is SAG entry required. Additionally, once SAG entry is required, all EOPs are exited.
-12 directs that injection be maximized with all available injection systems in an attempt to restore level to above  
B. Incorrect: Once the Core Spray pump tripped, adequate core cooling via spray cooling was lost. EOP 1 step RC/L-12 directs that injection be maximized with all available injection systems in an attempt to restore level to above -25 inches. Only after this attempt has proven unsuccessful is SAG entry required.
-25 inches. Only after this attempt has been proven unsuccessful is SAG entry required. Additionally, once SAG entry is required, all EOPs are exited.
C. Correct: Once the Core Spray pump tripped, adequate core cooling via spray cooling was lost. EOP 1 step RC/L-12 directs that injection be maximized with all available injection systems in an attempt to restore level to above -25 inches. Additionally, EOP 2 directs that only those pumps not required for core cooling be utilized for containment sprays. Since torus pressure was 31 psig, it will begin to rise once sprays are secured.
B. Incorrect: Once the Core Spray pump tripped, adequate core cooling via spray cooling was lost. EOP 1 step RC/L
The only available action then is to vent the containment to maintain pressure less than the limit of 53 psig.
-12 directs that injection be maximized with all available injection systems in an attempt to restore level to above  
D. Incorrect: Once the Core Spray pump tripped, adequate core cooling via spray cooling was lost. EOP 1 step RC/L-12 directs that injection be maximized with all available injection systems in an attempt to restore level to above -25 inches.
-25 inches. Only after this attempt has proven unsuccessful is SAG entry required.
Technical Reference(s): EOP 1 step RC/L-12                     (Attach if not previously provided)
C. Correct: Once the Core Spray pump tripped, adequate core cooling via spray cooling was lost. EOP 1 step RC/L
EOP 2 steps PC/P-9 and 10 Proposed References to be provided to applicants during examination:         None Learning Objective:       LP SEG 98, objective 6.74.08           (As available)
-12 directs that injection be maximized with all available injection systems in an attempt to restore level to above  
Question Source:     Bank #
-25 inches. Additionally, EOP 2 directs that only those pumps not required for core cooling be utilized for containment sprays. Since torus pressure was 31 psig, it will begin to rise once sprays are secured. The only available action then is to vent the containment to maintain pressure less than the limit of 53 psig.
Modified Bank #                         (Note changes or attach parent)
D. Incorrect: Once the Core Spray pump tripped, adequate core cooling via spray cooling was lost. EOP 1 step RC/L
New             X Question History:                         Last NRC Exam:               N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41 55.43   5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
-12 directs that injection be maximized with all available injection systems in an attempt to restore level to above  
-25 inches.
Technical Reference(s): EOP 1 step RC/L
-12 (Attach if not previously provided)
EOP 2 steps PC/P
-9 and 10   Proposed References to be provided to applicants during examination:
None Learning Objective:
LP SEG 98, objective 6.74.08 (As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 176  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 175
-reference:
 
Level RO SRO Tier #   1 Group #   2 K/A # 295012 AA2.01   Importance Rating 3.9 Ability to determine and/or interpret the following as they apply to HIGH DRYWELL TEMPERATURE: Drywell temperature Proposed Question:
Examination Outline Cross-reference:       Level                     RO             SRO Tier #                                   1 Group #                                   2 K/A #                     295012     AA2.01 Importance Rating                         3.9 Ability to determine and/or interpret the following as they apply to HIGH DRYWELL TEMPERATURE: Drywell temperature Proposed Question:       SRO Question # 85 A LOCA is in progress with the following conditions:
SRO Question # 85 A LOCA is in progress with the following conditions:
* RPV water level is being maintained at +180 inches with Condensate and Feedwater
RPV water level is being maintained at +180 inches with Condensate and Feedwater Both recirc pumps are tripped Containment sprays are currently unavailable Drywell temperature reaches 280&deg;F and continues to rise slowly.
* Both recirc pumps are tripped
* Containment sprays are currently unavailable
* Drywell temperature reaches 280&deg;F and continues to rise slowly.
Ten (10) minutes later Drywell temperature and pressure are now reported to be 290&deg;F and 12 psig, both slowly rising and within the bounds of the Drywell Spray Initiation Limit.
Ten (10) minutes later Drywell temperature and pressure are now reported to be 290&deg;F and 12 psig, both slowly rising and within the bounds of the Drywell Spray Initiation Limit.
Which ONE of the following describes the actions that are to be taken to control primary containment temperature if Drywell sprays become available per EOP 2?
A.      Enter ED-Emergency Depressurization; after the reactor is depressurized Drywell sprays are NOT required.
B.      Enter ED-Emergency Depressurization, spray the Drywell to lower Drywell temperature.
If Drywell temperature lowers below 280&deg;F, exit ED-Emergency Depressurization and re-enter EOP-1 pressure control.
C.      IAW EOP 2, Primary Containment Control, spray the Drywell to lower Drywell temperature and pressure. If Drywell temperature and pressure do NOT lower, exit EOP 1 Pressure Control and enter ED-Emergency Depressurization D.      IAW EOP 2, Primary Containment Control, spray the Drywell to lower Drywell temperature and pressure. Exit EOP 1 Pressure Control and enter ED-Emergency Depressurization regardless of Drywell temperature response.
Proposed Answer:          C Explanation (Optional):
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 176


Which ONE of the following describes the actions that are to be taken to control primary containment temperature if Drywell sprays become available per EOP 2?  A. Enter ED-Emergency Depressurization
A. Incorrect: An immediate Emergency Depressurization is not required. Plausible in that temperature is above the value associated with the Emergency Depressurization step.
; after the reactor is depressurized Drywell sprays are NOT required. B. Enter ED-Emergency Depressurization
Additionally the decision not to spray the drywell is also plausible if the candidate does not understand the meaning of a Before step. The direction to spray the drywell is Before the drywell temperature reaches 280&deg;F.
, spray the Drywell to lower Drywell temperature. If Drywell temperature lowers below 280
B. Incorrect: An immediate Emergency Depressurization is not required. Plausible in that temperature is above the value associated with the RPV ED step.
&deg;F, exit E D-Emergency Depressurization and re-enter EOP-1 pressure control.
C. Correct: Drywell and temperature and pressure are within the DSIL curve. Although drywell temperature is above the value requiring a blow down, the associated step directs that when temperature cannot be restored and maintained below 280&deg;F, only then is a blow down performed. As discussed in the EOP bases, the step allows the operator to attempt to restore the drywell temperature below 280&deg;F. Since not all the steps have been performed to prevent the blow down the action of initiating drywell sprays should first be attempted. If after attempting drywell sprays, drywell temperature cannot be restored below 280&deg;F, then Emergency Depressurization is required.
C. IAW EOP 2, Primary Containment Control, spray the Drywell to lower Drywell temperature and pressure. If Drywell temperature and pressure do NOT lower, exit EOP 1 Pressure Control and enter ED-Emergency Depressurization D. IAW EOP 2, Primary Containment Control, spray the Drywell to lower Drywell temperature and pressure. Exit EOP 1 Pressure Control and enter ED
D. Incorrect: Emergency Depressurization is not immediately required after spraying the drywell. Plausible in that temperature is above the value associated with the Emergency Depressurization step.
-Emergency Depressurization regardless of Drywell temperature response. Proposed Answer:
Technical Reference(s): EOP 2 step DWT-6                       (Attach if not previously provided)
C  Explanation (Optional):
EOP 2 Bases page 39 Proposed References to be provided to applicants during examination:           None Learning Objective:       SEG 108, objective 6.63.08               (As available)
 
Question Source:     Bank #               WTS # 11851 Modified Bank #                           (Note changes or attach parent)
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 177 A. Incorrect: An immediate Emergency Depressurization is not required. Plausible in that temperature is above the value associated with the Emergency Depressurization step. Additionally the decision not to spray the drywell is also plausible if the candidate does not understand the meaning of a "Before" step. The direction to spray the drywell is "Before" the drywell temperature reaches 280
New Question History:                         Last NRC Exam:       2010     NMP2 Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41 55.43     5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
&deg;F. B. Incorrect: An immediate Emergency Depressurization is not required. Plausible in that temperature is above the value associated with the RPV ED step.
C. Correct: Drywell and temperature and pressure are within the DSIL curve. Although drywell temperature is above the value requiring a blow down, the associated step directs that when temperature "cannot be restored and maintained" below 280
&deg;F, only then is a blow down performed. As discussed in the EOP bases, the step allows the operator to attempt to restore the drywell temperature below 280&deg;F. Since not all the steps have been performed to prevent the blow down the action of initiating drywell sprays should first be attempted. If after attempting drywell sprays, drywell temperature cannot be restored below 280&deg;F, then Emergency Depressurization is required. D. Incorrect: Emergency Depressurization is not immediately required after spraying the drywell. Plausible in that temperature is above the value associated with the Emergency Depressurization step.
Technical Reference(s):
EOP 2 step DWT
-6 (Attach if not previously provided)
EOP 2 Bases page 39 Proposed References to be provided to applicants during examination:
None Learning Objective:
SEG 108, objective 6.63.08 (As available)
Question Source:
Bank # WTS # 11851 Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
2010 NMP2 Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 178  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 177
-reference:
Level RO  SRO  Tier #  2  Group #  1  K/A # 215005  A2.08  Importance Rating 3.2  Ability to (a) predict the impacts of the following on the AVERAGE POWER RANGE MONITOR/LOCAL POWER RANGE MONITOR SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions Faulty or erratic operation of detectors/systems Proposed Question:
SRO Question # 86 The plant is at 100% power with the following initial conditions:
APRM "A" has failed upscale and is bypassed APRM "D" is bypassed for normal operation IAW OI 878.4, APRM System Several LPRM detectors associated with APRM "E" have failed and have been bypassed 


Then, LPRM 5A-32-17 fails downscale.
Examination Outline Cross-reference:          Level                    RO              SRO Tier #                                    2 Group #                                  1 K/A #                    215005      A2.08 Importance Rating                        3.2 Ability to (a) predict the impacts of the following on the AVERAGE POWER RANGE MONITOR/LOCAL POWER RANGE MONITOR SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions Faulty or erratic operation of detectors/systems Proposed Question:          SRO Question # 86 The plant is at 100% power with the following initial conditions:            APRM E Detectors LPRM     (Status)
The current status of the APRM "E" detectors is as shown on the chart to the right.
* APRM A has failed upscale and is bypassed                            2A-16-33   Bypassed
(1) Prior to any operator action, what will be the impact of the LPRM failure on APRM "E"?  AND  (2) Which of the below actions is required for this condition?
* APRM D is bypassed for normal operation IAW OI 878.4,                5A-32-17 Downscale APRM System                                                            3A-16-25     OK 6A-32-09   Bypassed
APRM E Detectors LPRM (Status) 2A-16-33 Bypassed 5A-32-17 Downscale 3A-16-25 OK 6A-32-09 Bypassed 3B-24-25 OK 4B-08-09 OK 4B-08-17 Bypassed 5B-40-17 OK 3B-24-33 OK 3C-32-33 Bypassed 4C-16-17 OK 1C-16-41 OK 4C-32-25 OK 5C-16-09 OK 1D-24-41 Bypassed 2D-08-25 Bypassed 3D-40-25 OK 4D-24-09 OK 2D-08-33 OK 4D-24-17 OK   A. (1) APRM "E" output will lower.
* Several LPRM detectors associated with APRM E have failed 3B-24-25     OK and have been bypassed                                                  4B-08-09     OK 4B-08-17   Bypassed Then, LPRM 5A-32-17 fails downscale.                                        5B-40-17     OK 3B-24-33     OK The current status of the APRM E detectors is as shown on the            3C-32-33   Bypassed chart to the right.                                                        4C-16-17     OK 1C-16-41     OK (1) Prior to any operator action, what will be the impact of the        4C-32-25     OK LPRM failure on APRM "E"?                                          5C-16-09     OK 1D-24-41   Bypassed AND                                                                2D-08-25   Bypassed 3D-40-25     OK 4D-24-09     OK (2) Which of the below actions is required for this condition?
2D-08-33     OK 4D-24-17     OK A.         (1) APRM E output will lower.
(2) Enter OI 878.3, LPRM System, bypass LPRM 5A-32-17, verify or adjust AGAFs as required and continue plant operation without any additional restrictions.
(2) Enter OI 878.3, LPRM System, bypass LPRM 5A-32-17, verify or adjust AGAFs as required and continue plant operation without any additional restrictions.
B. (1) APRM "E" output will remain the same.
B.         (1) APRM E output will remain the same.
(2) Enter OI 878.3, LPRM System, bypass LPRM 5A 17, verify or adjust AGAFs as required and continue plant operation without any additional restrictions.
(2) Enter OI 878.3, LPRM System, bypass LPRM 5A-32-17, verify or adjust AGAFs as required and continue plant operation without any additional restrictions.
C. (1) APRM "E" output will lower
C.         (1) APRM E output will lower.
(2) Enter Tech Spec LCO 3.3.1.1, RPS Instrumentation. If APRM "A" or " E" is not restored within the required completion time , insert a trip on RPS "A".
(2) Enter Tech Spec LCO 3.3.1.1, RPS Instrumentation. If APRM "A" or "E" is not restored within the required completion time, insert a trip on RPS A.
D. (1) APRM "E" output will remain the same.
D.         (1) APRM E output will remain the same.
(2) Enter Tech Spec LCO 3.3.1.1, RPS Instrumentation.
(2) Enter Tech Spec LCO 3.3.1.1, RPS Instrumentation. If APRM "A" or "E" is not restored within the required completion time, insert a trip on RPS A.
If APRM "A" or " E" is not restored within the required completion time, insert a trip on RPS "A".
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                        Page 178


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 179  Proposed Answer:
Proposed Answer: C Explanation (Optional):
C Explanation (Optional):
A. Incorrect: APRM E is inoperable due to having only one operable LPRM at the A level. IAW OI 878.4 to be considered operable, APRM E must have at least 13 LPRM inputs. Each APRM must have at least 2 LPRM inputs per level. Plausible in that the APRM does satisfy the requirement for the overall number of LPRMs in that 13 of the 20 assigned LPRMs is operable. If the candidate believes that the APRM is operable then the required action would be to bypass the LPRM and adjust gains as required.
A. Incorrect: APRM "E" is inoperable due to having only one operable LPRM at the "A" level. IAW OI 878.4 to be considered operable, APRM E must have at least 13 LPRM inputs. Each APRM must have at least 2 LPRM inputs per level. Plausible in that the APRM does satisfy the requirement for the overall number of LPRMs in that 13 of the 20 assigned LPRMs is operable. If the candidate believes that the APRM is operable then the required action would be to bypass the LPRM and adjust gains as required.
B. Incorrect: The APRM output would lower. Plausible in that, unlike the Rod Block Monitor, there are no input trip units that monitor the status of the LPRMs inputting into the APRM. Therefore the output of the downscale LPRM would be included into the overall average causing the APRM output to lower. Additionally the APRM would be inoperable as described in explanation A.
B. Incorrect: The APRM output would lower. Plausible in that, unlike the Rod Block Monitor, there are no input trip units that monitor the status of the LPRMs inputting into the APRM. Therefore the output of the downscale LPRM would be included into the overall average causing the APRM output to lower. Additionally the APRM would be inoperable as described in explanation "A".
C. Correct: The output of the APRM would lower as described in explanation B. IAW OI 878.4 to be considered operable, APRM E must have at least 13 LPRM inputs. Each APRM must have at least 2 LPRM inputs per level. Therefore APRM E is inoperable.
C. Correct: The output of the APRM would lower as described in explanation "B". IAW OI 878.4 to be considered operable, APRM E must have at least 13 LPRM inputs.
With APRM A also inoperable only one APRM is operable for RPS A. TS LCO3.3.1.1, RPS Instrumentation and associated table requires a minimum of 2.
Each APRM must have at least 2 LPRM inputs per level. Therefore APRM "E" is inoperable. With APRM "A" also inoperable only one APRM is operable for RPS "A". TS LCO3.3.1.1, RPS Instrumentation and associated table requires a minimum of 2. Therefore Condition "A" of the LCO is not satisfied and the required action is to place the channel or trip system in trip within 12 hours.
Therefore Condition A of the LCO is not satisfied and the required action is to place the channel or trip system in trip within 12 hours.
D. Incorrect: The output of the APRM would lower as described in explanation "B".
D. Incorrect: The output of the APRM would lower as described in explanation B.
Technical Reference(s):
TS LCO 3.3.1.1 and associated Technical Reference(s):                                          (Attach if not previously provided)
TS LCO 3.3.1.1 and associated TS Table. (Attach if not previously provided)
TS Table.
APRM System Description pages 17 through 19 OI 87 8.4, P&L # 6 Proposed References to be provided to applicants during examination:
APRM System Description pages 17 through 19 OI 878.4, P&L # 6 Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
None Learning Objective:
Question Source:   Bank #                 WTSI Bank 12910 Modified Bank #                             (Note changes or attach parent)
(As available)
New Question History:                         Last NRC Exam:       2011     Pilgrim Question Cognitive Level:     Memory or Fundamental Knowledge DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 179
Question Source: Bank # WTSI Bank 12910 Modified Bank #
(Note changes or attach parent)
New     Question History:
Last NRC Exam:
2011 Pilgrim Question Cognitive Level:
Memory or Fundamental Knowledge


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 180  Comprehension or Analysis X 10 CFR Part 55 Content: 55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comprehension or Analysis               X 10 CFR Part 55 Content:     55.41 55.43     5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 181 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 180
-reference:
Level RO  SRO  Tier #  2  Group #  1  K/A # 223 002  A2.03  Importance Rating 3.0  Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT ISOLATION SYSTEM/NUCLEAR STEAM SUPPLY SHUT
-OFF; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: System Logic Failures K/A Justification:  Although not an obvious two part question, part (a) of the K/A is tested in that the SRO must predict the impact of the trip settings on the PCIS and then determine what action is required per Tech Specs to mitigate the effects as required by part (b) of the K/A.
Proposed Question:
SRO Question # 87 The plant is at 100% power. I & C then reports that the A1 Trip Channel for the Group 1 and Group 2 PCIS are currently set to trip at:
Group 1 A1 (Reactor Vessel Water Level Low Low Low
) Trip Channel: 35 inches Group 2 A1 (Reactor Vessel Water Level Low) Trip Channel: 160 inches Assuming all other trip channels are set to trip at their nominal values
, what is the maximum time allowed before the A1 Trip Channels must be tripped in order to restore operability?
A. Group 1: 12 hours Group 2: 12 hours B. Group 1: 12 hours Group 2: 24 hours C. Group 1: 24 hours Group 2: 12 hours D. Group 1: 24 hours Group 2: 24 hours Proposed Answer:
C  Explanation (Optional):


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 182 A. Incorrect: Group 1 Channel A1 isolation logic initiates MSIV closure on Low
Examination Outline Cross-reference:          Level                  RO              SRO Tier #                                  2 Group #                                1 K/A #                  223002      A2.03 Importance Rating                      3.0 Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT ISOLATION SYSTEM/NUCLEAR STEAM SUPPLY SHUT-OFF; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: System Logic Failures K/A Justification: Although not an obvious two part question, part (a) of the K/A is tested in that the SRO must predict the impact of the trip settings on the PCIS and then determine what action is required per Tech Specs to mitigate the effects as required by part (b) of the K/A.
-Low-Low level. Per TS Table 3.3.6.1
Proposed Question:          SRO Question # 87 The plant is at 100% power. I & C then reports that the A1 Trip Channel for the Group 1 and Group 2 PCIS are currently set to trip at:
-1, this function is identified as Function 1.a. and must be set to trthen that channel must be placed in trip within 24 hours if it is associated with any function other than 2.a, 2.b, 6.b, and 6.c.
* Group 1 A1 (Reactor Vessel Water Level Low Low Low) Trip Channel: 35 inches
B. Incorrect: The completion time for tripping the Group 1 Channel A1 trip channel is 24 hours as described above. Additionally, Group 2 Channel A1 isolation logic initiates a Primary Containment Isolation on Low level. Per TS Table 3.3.6.1
* Group 2 A1 (Reactor Vessel Water Level Low) Trip Channel: 160 inches Assuming all other trip channels are set to trip at their nominal values, what is the maximum time allowed before the A1 Trip Channels must be tripped in order to restore operability?
-1, this function is identified as Function 2.a. and one or more required channels are inoperable, then that channel must be placed in trip within 12 hours if it is associated with function 2.a.
A.      Group 1: 12 hours Group 2: 12 hours B.      Group 1: 12 hours Group 2: 24 hours C.      Group 1: 24 hours Group 2: 12 hours D.      Group 1: 24 hours Group 2: 24 hours Proposed Answer:            C Explanation (Optional):
C. Correct: The completion time for tripping the Group 1 Channel A1 trip channel is 24 hours as described above. The completion time for tripping the Group 2 Channel A1 trip channel is 12 hours as described above.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 181
D. Incorrect: The completion time for tripping the Group 2 Channel A1 trip channel is 12 hours as described above.
 
Technical Reference(s):
A.     Incorrect: Group 1 Channel A1 isolation logic initiates MSIV closure on Low-Low-Low level. Per TS Table 3.3.6.1-1, this function is identified as Function 1.a. and must be set to trip  38.3 inches. IAW LCO 3.3.61 if one or more required channels are inoperable, then that channel must be placed in trip within 24 hours if it is associated with any function other than 2.a, 2.b, 6.b, and 6.c.
TS LCO 3.3.6.1 and Table 3.3.6.1
B.     Incorrect: The completion time for tripping the Group 1 Channel A1 trip channel is 24 hours as described above. Additionally, Group 2 Channel A1 isolation logic initiates a Primary Containment Isolation on Low level. Per TS Table 3.3.6.1-1, this function is identified as Function 2.a. and must be set to trip  165.6 inches. IAW LCO 3.3.61 if one or more required channels are inoperable, then that channel must be placed in trip within 12 hours if it is associated with function 2.a.
-1 (Attach if not previously provided)
C.     Correct: The completion time for tripping the Group 1 Channel A1 trip channel is 24 hours as described above. The completion time for tripping the Group 2 Channel A1 trip channel is 12 hours as described above.
Proposed References to be provided to applicants during examination:
D.     Incorrect: The completion time for tripping the Group 2 Channel A1 trip channel is 12 hours as described above.
TS LCO 3.3.6.1 and Table 3.3.6.1
TS LCO 3.3.6.1 and Technical Reference(s):                                           (Attach if not previously provided)
-1 Learning Objective:
Table 3.3.6.1-1 TS LCO 3.3.6.1 and Proposed References to be provided to applicants during examination:
LP 94.18, objective 5.18.01.01 (As available)
Table 3.3.6.1-1 Learning Objective:         LP 94.18, objective 5.18.01.01           (As available)
Question Source:
Question Source:       Bank #
Bank #   Modified Bank #
Modified Bank #                           (Note changes or attach parent)
(Note changes or attach parent)
New               X Question History:                           Last NRC Exam:               N/A Question Cognitive Level:       Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:         55.41 55.43     2 Facility operating limitations in the technical specifications and their bases.
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41   55.43 2 Facility operating limitations in the technical specifications and their bases.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 183  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 182
-reference:
 
Level RO SRO Tier #   2 Group #   1 K/A # 239002 2.4.18 Importance Rating 4.0 Emergency Procedures / Plan: Knowledge of the specific bases for EOPs.
Examination Outline Cross-reference:       Level                   RO             SRO Tier #                                 2 Group #                               1 K/A #                   239002   2.4.18 Importance Rating                     4.0 Emergency Procedures / Plan: Knowledge of the specific bases for EOPs.
Proposed Question:
Proposed Question:       SRO Question # 88 RPV Flooding is being executed following a complete loss of RPV level indication.
SRO Question # 88 RPV Flooding is being executed following a complete loss of RPV level indication.
Plant conditions are as follows:
Plant conditions are as follows
* Many control rods are still fully withdrawn
Many control rods are still fully withdrawn The switches for four (4) ADS valves have been placed in OPEN Reactor pressure is 7 00 psig and lowering Given these conditions what action is required?
* The switches for four (4) ADS valves have been placed in OPEN
Wait until RPV pressure is below the Minimum Steam Cooling Pressure (MSCP), thenA. slowly raise injection to maintain at least one SRV open and reactor pressure above
* Reactor pressure is 700 psig and lowering Given these conditions what action is required?
, but as close to the MSCP as possible
Wait until RPV pressure is below the Minimum Steam Cooling Pressure (MSCP), then A. slowly raise injection to maintain at least one SRV open and reactor pressure above, but as close to the MSCP as possible.
. B. slowly raise injection to the RPV to maintain all four SRVs open and reactor pressure below , but as close to the MSCP as possible
B. slowly raise injection to the RPV to maintain all four SRVs open and reactor pressure below, but as close to the MSCP as possible.
. C. maximize injection to the RPV to maintain all four SRVs open with reactor pressure above , but as close to the MSCP as possible. D. maximize injection to the RPV to maintain at least one SRV open with reactor pressure below , but as close to the MSCP as possible.
C. maximize injection to the RPV to maintain all four SRVs open with reactor pressure above, but as close to the MSCP as possible.
Proposed Answer:
D. maximize injection to the RPV to maintain at least one SRV open with reactor pressure below, but as close to the MSCP as possible.
A Explanation (Optional):
Proposed Answer:         A Explanation (Optional):
A. Correct - When RPV pressure is below the Minimum Steam Cooling Pressure (MSCP) injection flow must be slowly raised. With 4 ADS valves opened, the Minimum Steam Cooling Pressure is 160 psig. With one SRV open the MSCP is 680 psig. As long as RPV pressure is maintained above the MSCP for the number of SRVs open the core will be cooled by submergence or steam cooling.
A. Correct - When RPV pressure is below the Minimum Steam Cooling Pressure (MSCP) injection flow must be slowly raised. With 4 ADS valves opened, the Minimum Steam Cooling Pressure is 160 psig. With one SRV open the MSCP is 680 psig. As long as RPV pressure is maintained above the MSCP for the number of SRVs open the core will be cooled by submergence or steam cooling.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                  Page 183


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 184 B. Incorrect  
B. Incorrect - When RPV pressure drops below the Minimum Steam Cooling Pressure, steam flow may no longer be sufficient to provide adequate core cooling. All four SRVs are NOT required to be open.
- When RPV pressure drops below the Minimum Steam Cooling Pressure, steam flow may no longer be sufficient to provide adequate core cooling. All four SRVs are NOT required to be open.
C. Incorrect - If injection is maximized RPV water level, reactor power, and RPV pressure will rise. Injection must be throttled to reduce pressure and the subsequent power increase. Injection must NOT be maximized and all injection must be from ATWS preferred flooding systems. All four SRVs are NOT required to be open.
C. Incorrect  
D. Incorrect - If injection is increased, RPV water level, reactor power, and RPV pressure will rise. Injection must be throttled to reduce pressure and the subsequent power increase. Injection must NOT be maximized and all injection must be from ATWS preferred flooding systems. As long as RPV pressure is maintained above MSCP the core will be cooled by submergence or steam cooling.
- If injection is maximized RPV water level, reactor power, and RPV pressure will rise. Injection must be throttled to reduce pressure and the subsequent power increase. Injection must NOT be maximized and all injection must be from ATWS preferred flooding systems. All four SRVs are NOT required to be open.
RPV/F - RPV Flooding RPV/F-8 Technical Reference(s):                                          (Attach if not previously provided)
D. Incorrect - If injection is increased, RPV water level, reactor power, and RPV pressure will rise. Injection must be throttled to reduce pressure and the subsequent power increase. Injection must NOT be maximized and all injection must be from ATWS preferred flooding systems.
RPV/F EOP Bases pgs 16, 17, 18 Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
As long as RPV pressure is maintained above MSCP the core will be cooled by submergence or steam cooling.
Question Source:       Bank #
Technical Reference(s):
Modified Bank #                           (Note changes or attach parent)
RPV/F - RPV Flooding RPV/F-8 RPV/F EOP Bases pg s 16, 17, 18 (Attach if not previously provided)
New               X Question History:                           Last NRC Exam:               N/A Question Cognitive Level:       Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:         55.41 55.43     5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Proposed References to be provided to applicants during examination:
None Learning Objective:
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 185 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 184
-reference:
 
Level RO SRO Tier #   2 Group #   1 K/A # 211000 2.2.25 Importance Rating 4.2 Equipment Control: Knowledge of bases in technical specifications for limiting conditions for operations and safety limits.
Examination Outline Cross-reference:     Level                     RO             SRO Tier #                                   2 Group #                                   1 K/A #                     211000     2.2.25 Importance Rating                         4.2 Equipment Control: Knowledge of bases in technical specifications for limiting conditions for operations and safety limits.
Proposed Question:
Proposed Question:       SRO Question # 89 During operation at 100% power an operator reports the heat tracing on the suction side of the Standby Liquid Control (SBLC) pumps is damaged and inoperable. The following conditions exist:
SRO Question # 89 During operation at 100% power an operator reports the heat tracing on the suction side of the Standby Liquid Control (SBLC) pumps is damaged and inoperable. The following conditions exist:   SBLC Tank Concentration is 14%.
* SBLC Tank Concentration is 14%.
SBLC Tank Volume 3200 gallons.
* SBLC Tank Volume 3200 gallons.
Reactor Building Ambient Temperature at SBLC Pumps is 72&deg;F.
* Reactor Building Ambient Temperature at SBLC Pumps is 72&deg;F.
Which ONE of the following describes the condition of the SBLC system per Technical Specifications?
Which ONE of the following describes the condition of the SBLC system per Technical Specifications?
A. OPERABLE as long as Reactor Building Temperature remains at its current value which is based on preventing Boron from precipitating out of solution inside system components
A. OPERABLE as long as Reactor Building Temperature remains at its current value which is based on preventing Boron from precipitating out of solution inside system components.
. B. INOPERABLE because the Boron Solution Concentration is below the minimum allowable. A 7 day LCO is required, which is based on injecting 780 ppm of Boron solution into the reactor core
B. INOPERABLE because the Boron Solution Concentration is below the minimum allowable. A 7 day LCO is required, which is based on injecting 780 ppm of Boron solution into the reactor core.
. C. INOPERABLE because the Boron Solution Concentration is below the minimum allowable. An 8 hour LCO is required, which is based on injecting 780 ppm of Boron solution into the reactor core
C. INOPERABLE because the Boron Solution Concentration is below the minimum allowable. An 8 hour LCO is required, which is based on injecting 780 ppm of Boron solution into the reactor core.
. D. OPERABLE because Technical Specifications allows 24 hours to restore the heat tracing to operability as long as Reactor Building Temperature is above the minimum. Based on preventing Boron from precipitating out of solution and lowering the effective Boron concentration.
D. OPERABLE because Technical Specifications allows 24 hours to restore the heat tracing to operability as long as Reactor Building Temperature is above the minimum.
Proposed Answer:
Based on preventing Boron from precipitating out of solution and lowering the effective Boron concentration.
A Explanation (Optional):
Proposed Answer:         A Explanation (Optional):
A. Correct - SR 3.1.7.3 (verify solution and piping temps >70&deg;F) WILL be met with RB Temperature at 72
A. Correct - SR 3.1.7.3 (verify solution and piping temps >70&deg;F) WILL be met with RB Temperature at 72&deg;F in the vicinity of SBLC components. Heat Trace functionality is not specified as a Surveillance Requirement.
&deg;F in the vicinity of SBLC components. Heat Trace functionality is not specified as a Surveillance Requirement
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 185
.
 
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 186 B. Incorrect  
B.     Incorrect - The SBLC is operable, plausible; with ONE subsystem INOPERABLE, a 7 day LCO would be applicable C.     Incorrect - The SBLC is operable, plausible; with BOTH subsystems INOPERABLE, an 8 hour LCO would be applicable D.     Incorrect - There is no Technical Specifications requirement for the heat tracing to be operable. Plausible because surveillance testing for suction piping temperatures must be taken every 24 hours. Additionally the tank heat is required to maintain SBLC tank temperature which prevents tank temperature from lowering and permitting boron to precipitate out of solution within the tank.
- The SBLC is operable, plausible; with ONE subsystem INOPERABLE, a 7 day LCO would be applicable C. Incorrect  
T.S. Bases 3.1.7 Technical Reference(s):                                         (Attach if not previously provided)
- The SBLC is operable, plausible; with BOTH subsystems INOPERABLE, an 8 hour LCO would be applicable D. Incorrect  
T.S. 3.1.7 T.S. 3.1.7 Figures Proposed References to be provided to applicants during examination:
- There is no Technical Specifications requirement for the heat tracing to be operable. Plausible because surveillance testing for suction piping temperatures must be taken every 24 hours. Additionally the tank heat is required to maintain SBLC tank temperature which prevents tank temperature from lowering and permitting boron to precipitate out of solution within the tank.
3.1.71 and 3.1.7. Learning Objective:                                                 (As available)
Technical Reference(s):
Question Source:     Bank #                 WTSI Bank Modified Bank #                             (Note changes or attach parent)
T.S. Bases 3.1.7 T.S. 3.1.7 (Attach if not previously provided)
New Question History:                           Last NRC Exam:       2008     Nine Mile Point 2 Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:       55.41 55.43       2 Facility operating limitations in the technical specifications and their bases.
Proposed References to be provided to applicants during examination:
T.S. 3.1.7 Figures 3.1.71 and 3.1.7. Learning Objective:
(As available)
Question Source:
Bank # WTSI Bank   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
2008 Nine Mile Point 2 Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41   55.43 2 Facility operating limitations in the technical specifications and their bases.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 187 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 186
-reference:
Level RO  SRO  Tier #  2  Group #  1  K/A # 217000  A2.15  Importance Rating 3.8  Ability to (a) predict the impacts of the following on the REACTOR CORE ISOLATION COOLING SYSTEM (RCIC); and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Steam line break Proposed Question:
SRO Question # 90 Given the following conditions:
A RCIC steam leak has occurred in the Reactor Building Efforts to isolate the leak are unsuccessful Water level in the RCIC Room (LI 3769) is 4 inches  RCIC Emergency Cooler outlet temp (TR/TDR 2425 Ch 1) is 301&deg;F  RCIC Room ambient (TR/TDR 2425 Ch 2) is 325&deg;F  Which ONE of the following correctly completes the following statement?


Based on the conditions above, entry into Emergency Depressurization-A. is currently required because the integrity of the secondary containment is threatened.
Examination Outline Cross-reference:          Level                  RO              SRO Tier #                                  2 Group #                                1 K/A #                  217000      A2.15 Importance Rating                      3.8 Ability to (a) predict the impacts of the following on the REACTOR CORE ISOLATION COOLING SYSTEM (RCIC); and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Steam line break Proposed Question:          SRO Question # 90 Given the following conditions:
B. is currently required because the continued operability of safety related equipment is threatened.
* A RCIC steam leak has occurred in the Reactor Building
C. will be required if Torus East Catwalk Ambient temperature exceeds 165&deg;F because the continued operability of safety related equipment is threatened.
* Efforts to isolate the leak are unsuccessful
D. will be required if the water level in the "A" RHR & CS SECR rises above its Max safe limit because the integrity of the secondary containment is threatened.
* Water level in the RCIC Room (LI 3769) is 4 inches
Proposed Answer:
* RCIC Emergency Cooler outlet temp (TR/TDR 2425 Ch 1) is 301&deg;F
C Explanation (Optional):
* RCIC Room ambient (TR/TDR 2425 Ch 2) is 325&deg;F Which ONE of the following correctly completes the following statement?
A. Incorrect: Emergency Depressurization is not currently required. Plausible in that both temperatures are above their Max Safe Operating Values but they are within the same area. Emergency Depressurization is performed if Max Safe values are exceeded in 2 different areas.
Based on the conditions above, entry into Emergency Depressurization A.       is currently required because the integrity of the secondary containment is threatened.
B.       is currently required because the continued operability of safety related equipment is threatened.
C.       will be required if Torus East Catwalk Ambient temperature exceeds 165&deg;F because the continued operability of safety related equipment is threatened.
D.       will be required if the water level in the "A" RHR & CS SECR rises above its Max safe limit because the integrity of the secondary containment is threatened.
Proposed Answer:             C Explanation (Optional):
A.       Incorrect: Emergency Depressurization is not currently required. Plausible in that both temperatures are above their Max Safe Operating Values but they are within the same area. Emergency Depressurization is performed if Max Safe values are exceeded in 2 different areas.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                      Page 187


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 188 B. Incorrect: Emergency Depressurization is not currently required. Plausible in that both temperatures are above their Max Safe Operating Values but they are within the same area. Emergency Depressurization is performed if Max Safe values are exceeded in 2 different areas.
B. Incorrect: Emergency Depressurization is not currently required. Plausible in that both temperatures are above their Max Safe Operating Values but they are within the same area. Emergency Depressurization is performed if Max Safe values are exceeded in 2 different areas.
C. Correct: When the Torus East Catwalk Ambient temperature exceeds 165&deg;F, Max Safe limit are now exceeded in two different areas and Emergency Depressurization is required. Maximum Safe Limits are defined as the highest parameter value at which neither: (1) equipment necessary for the safe shutdown of the plant will fail nor (2) personnel access necessary for the safe shutdown of the plant will be precluded.
C. Correct: When the Torus East Catwalk Ambient temperature exceeds 165&deg;F, Max Safe limit are now exceeded in two different areas and Emergency Depressurization is required. Maximum Safe Limits are defined as the highest parameter value at which neither: (1) equipment necessary for the safe shutdown of the plant will fail nor (2) personnel access necessary for the safe shutdown of the plant will be precluded.
IAW NUREG 1021, Section 401 2.a. When selecting or writing questions for K/As that test coupled knowledge or abilities (e.g., the A.2 K/A statements in Tiers 1 and 2 and a number of generic K/A statements, such as 2.4.1, in Tier 3), try to test both aspects of the K/A statement. If that is not possible without expending an inordinate amount of resources, limit the scope of the question to that aspect of the K/A statement requiring the highest cognitive level (e.g., the (b) portion of the A.2 K/A statements) or substitute another randomly selected K/A. Predicting the impact of a steam line break on the RCIC system would be an RO knowledge. Rather than complicate the question Because we felt this was a valid K/A to test on we have only tested the second part of the K/A. D. Incorrect: Emergency Depressurization is required when the same parameter exceeds the Max Safe Values in 2 or more areas. Plausible in that a Max Safe value has been exceeded in but a different parameter.
IAW NUREG 1021, Section 401 2.a. When selecting or writing questions for K/As that test coupled knowledge or abilities (e.g., the A.2 K/A statements in Tiers 1 and 2 and a number of generic K/A statements, such as 2.4.1, in Tier 3), try to test both aspects of the K/A statement. If that is not possible without expending an inordinate amount of resources, limit the scope of the question to that aspect of the K/A statement requiring the highest cognitive level (e.g., the (b) portion of the A.2 K/A statements) or substitute another randomly selected K/A. Predicting the impact of a steam line break on the RCIC system would be an RO knowledge. Rather than complicate the question Because we felt this was a valid K/A to test on we have only tested the second part of the K/A.
Technical Reference(s):
D. Incorrect: Emergency Depressurization is required when the same parameter exceeds the Max Safe Values in 2 or more areas. Plausible in that a Max Safe value has been exceeded in but a different parameter.
EOP-03 EOP-03, Bases, pg 20 (Attach if not previously provided)
EOP-03 Technical Reference(s):                                           (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
EOP-03, Bases, pg 20 EOP 3, Table 6 Proposed References to be provided to applicants during examination:
EOP 3, Table 6 (Table only)
(Table only)
Learning Objective:
Learning Objective:                                                   (As available)
(As available)
Question Source:     Bank #               WTSI 12939 Modified Bank #                             (Note changes or attach parent)
Question Source:
New Question History:                           Last NRC Exam:       2004     Nine Mile Point 1 Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                     X 10 CFR Part 55 Content:       55.41 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 188
Bank # WTSI 12939 Modified Bank #
 
(Note changes or attach parent)
55.43     5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
New   Question History:
Last NRC Exam:
2004 Nine Mile Point 1 Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41 DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 189  55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 190 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                 Page 189
-reference:
Level RO  SRO  Tier #  2  Group #  2  K/A # 223001  A2.11  Importance Rating 3.8  Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Abnormal suppression pool level Proposed Question:
SRO Question # 91 The plant was operating normally at power when a loss of coolant accident occurred. Conditions after the scram are as follows:
All control rods are inserted Drywell pressure is 5.5 psig and rising slowly Drywell temperature is 250&deg;F and rising slowly RPV water level is 45 inches and slowly lowering Torus water level is 7.1 feet and slowly lowering RPV pressure 700 psig and slowly lowering Torus water temperature is 120&deg;F and rising slowly Per the EOPs, which ONE of the following is required AND why?    A. Secure Core Spray pumps to prevent cavitation damage of the pumps.
B. Place RHR in Drywell Spray to lower Drywell temperature and pressure.
C. Emergency depressurize due to compromise of pressure suppression capability.
D. Cycle SRV's to maintain RPV pressure below the heat capacity limit.
Proposed Answer:
C  Explanation (Optional):
A. Incorrect
- Plausible because with the torus level so low high core spray flows would be limited by the vortex limits. However if the flow was affected by the vortex limits core spray flow should be lowered. With reactor water level lowering the core spray pumps should NOT be secured.
B. Incorrect
- Drywell pressure is too low to allow drywell sprays in that drywell temperature and pressure are not within the bounds of the Drywell Spray Initiation Limit (DSIL). Plausible in that the EOP action to initiate drywell spray would be appropriate if within the bounds of the DSIL.


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 191 C. Correct - Per EOP bases Torus water level must be maintained above the bottom of the downcomer vent openings (7.1 feet) to ensure that steam discharged from the drywell into the torus following a primary system break will be adequately condensed. If a primary system break were to occur with torus water level below the bottom of the downcomers, pressure suppression capability would be unavailable and torus pressure could exceed the Primary Containment Pressure Limit.
Examination Outline Cross-reference:          Level                    RO              SRO Tier #                                    2 Group #                                  2 K/A #                    223001      A2.11 Importance Rating                        3.8 Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Abnormal suppression pool level Proposed Question:          SRO Question # 91 The plant was operating normally at power when a loss of coolant accident occurred.
D. Incorrect  
Conditions after the scram are as follows:
- Plausible if the candidate does NOT realize that HCL is substantially higher for this reactor pressure. With RPV pressure between 700 and 800 psig, HCL limit is ~150&deg;F even when including the low torus water level.
* All control rods are inserted
Technical Reference(s):
* Drywell pressure is 5.5 psig and rising slowly
EOP-2 EOP-2, Bases, pg 12 Print in COLOR (Attach if not previously provided)
* Drywell temperature is 250&deg;F and rising slowly
Proposed References to be provided to applicants during examination:
* RPV water level is 45 inches and slowly lowering
None Learning Objective:
* Torus water level is 7.1 feet and slowly lowering
(As available)
* RPV pressure 700 psig and slowly lowering
Question Source:
* Torus water temperature is 120&deg;F and rising slowly Per the EOPs, which ONE of the following is required AND why?
Bank #   Modified Bank #
A.      Secure Core Spray pumps to prevent cavitation damage of the pumps.
(Note changes or attach parent)
B.      Place RHR in Drywell Spray to lower Drywell temperature and pressure.
New X   Question History:
C.      Emergency depressurize due to compromise of pressure suppression capability.
Last NRC Exam:
D.      Cycle SRV's to maintain RPV pressure below the heat capacity limit.
N/A Question Cognitive Level:
Proposed Answer:            C Explanation (Optional):
Memory or Fundamental Knowledge   Comprehension or Analysis X 10 CFR Part 55 Content:
A.      Incorrect - Plausible because with the torus level so low high core spray flows would be limited by the vortex limits. However if the flow was affected by the vortex limits core spray flow should be lowered. With reactor water level lowering the core spray pumps should NOT be secured.
55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
B.      Incorrect - Drywell pressure is too low to allow drywell sprays in that drywell temperature and pressure are not within the bounds of the Drywell Spray Initiation Limit (DSIL). Plausible in that the EOP action to initiate drywell spray would be appropriate if within the bounds of the DSIL.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 190
 
C. Correct - Per EOP bases Torus water level must be maintained above the bottom of the downcomer vent openings (7.1 feet) to ensure that steam discharged from the drywell into the torus following a primary system break will be adequately condensed. If a primary system break were to occur with torus water level below the bottom of the downcomers, pressure suppression capability would be unavailable and torus pressure could exceed the Primary Containment Pressure Limit.
D. Incorrect - Plausible if the candidate does NOT realize that HCL is substantially higher for this reactor pressure. With RPV pressure between 700 and 800 psig, HCL limit is
      ~150&deg;F even when including the low torus water level.
EOP-2 Technical Reference(s): EOP-2, Bases, pg 12                   (Attach if not previously provided)
Print in COLOR Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
Question Source:     Bank #
Modified Bank #                         (Note changes or attach parent)
New               X Question History:                         Last NRC Exam:               N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41 55.43     5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 192 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 191
-reference: Level RO SRO Tier #   2 Group #   2 K/A # 288000 2.2.40 Importance Rating 4.7 Equipment Control: Ability to apply technical specifications for a system.
 
(Plant Ventilation)
Examination Outline Cross-reference:                   Level                             RO                   SRO Tier #                                                 2 Group #                                               2 K/A #                             288000         2.2.40 Importance Rating                                     4.7 Equipment Control: Ability to apply technical specifications for a system. (Plant Ventilation)
Proposed Question:
Proposed Question:               SRO Question # 92 With the plant operating at 100% power the fan belts on the B RHR/CS corner room cooler, 1V-AC-11 must be replaced. The Technical Requirements Manual states:
SRO Question # 92 With the plant operating at 100% power the fan belts on the "B" RHR/CS corner room cooler , 1V-AC-11 must be replaced. The Technical Requirements Manual states:
TLCO 3.5.2 The following ECCS and RCIC unit coolers shall be OPERABLE:
TLCO 3.5.2 The following ECCS and RCIC unit coolers shall be OPERABLE:
: a. One RCIC room unit cooler;
: a. One RCIC room unit cooler;
: b. One HPCI room unit cooler; and
: b. One HPCI room unit cooler; and
: c. Two CS/RHR room unit coolers.  
: c. Two CS/RHR room unit coolers.
 
APPLICABILITY: When the associated pumps are required to be OPERABLE.
APPLICABILITY: When the associated pumps are required to be OPERABLE.
ACTIONS ---------------------------------------------------------NOTES------------------------------------------------
ACTIONS
---------------------------------------------------------NOTES------------------------------------------------
: 1. Separate condition entry is allowed for each unit cooler.
: 1. Separate condition entry is allowed for each unit cooler.
: 2. TLCO 3.0.4.b is N/A for HPCI and RCIC Room Coolers.  
: 2. TLCO 3.0.4.b is N/A for HPCI and RCIC Room Coolers.
--------------------------------------------------------------------------------------------------------------------
CONDITION                         REQUIRED ACTION                       COMPLETION TIME Immediately A. Required unit room                 A.1 Declare the associated cooler inoperable.                    pump(s) inoperable.
CONDITION REQUIRED ACTION COMPLETION TIME A. Required unit room cooler inoperable.
Which ONE of the following actions is required by Technical Specifications?
A.1 Declare the associated pump(s) inoperable.
A.        No action is required because room cooler 1V-AC-12 remains operable.
Immediately
B.        1V-AC-11 must be restored to service immediately because ONLY one RHR/CS Room Cooler remains operable.
C.        1V-AC-11 must be restored to service within 72 hours because the B and D RHR and B Core Spray pumps must be declared inoperable D.        Place the plant in Mode 3 within 12 hours because with one cooler inoperable the TRM requirement for two CS/RHR room unit coolers is NOT met and T.S. 3.5.1.E applies.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                                              Page 192


Which ONE of the following actions is required by Technical Specification s?  A. No action is required because room cooler 1V-AC-12 remains operable.
Proposed Answer:           C Explanation (Optional):
B. 1V-AC-11 must be restored to service immediately because ONLY one RHR/CS Room Cooler remains operable.
A.       Incorrect - There are only two RHR/CS Room Coolers, one for each ECCS division.
C. 1V-AC-11 must be restored to service within 72 hours because the "B" and "D" RHR and "B" Core Spray pumps must be declared inoperable D. Place the plant in Mode 3 within 12 hours because with one cooler inoperable the TRM requirement for two CS/RHR room unit coolers is NOT met and T.S. 3.5.1.E applies
With one cooler out of service TRM requires declaring the associated pump(s) inoperable, in this case the B and D RHR and B Core Spray pumps.
.
B.       Incorrect - This would apply if both loops of RHR and Core Spray were affected by the loss of one cooler. It is plausible because the TRM states than two room coolers must be operable and with one inoperable only one remains operable.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 193 Proposed Answer:
C.       Correct - With 1V-AC-11 inoperable the B and D RHR and B Core Spray pumps must be declared inoperable this requires entry into TS 3.5.1.C which requires restoring one of the two systems to operable within 72 hours. Since both these systems must be considered inoperable until the cooler is returned to service the cooler must be returned to service within 72 hours.
C Explanation (Optional):
D.       Incorrect - This would apply if the candidate literally reads the TRM requirement as both (Two) CS/RHR room unit coolers must be operable. This would imply that all the both RHR and CS systems are considered inoperable and therefore T.S. 3.5.1.E would apply. However as stated in the TRM Separate condition entry is allowed for each unit cooler, therefore only one of the coolers and associated RHR/CS systems are considered inoperable.
A. Incorrect - There are only two RHR/CS Room Coolers, one for each ECCS division. With one cooler out of service TRM requires declaring the associated pump(s) inoperable, in this case the B and D RHR and B Core Spray pumps
TRM 3.5.2 Technical Reference(s):                                           (Attach if not previously provided)
. B. Incorrect  
TS 3.5.1 Proposed References to be provided to applicants during examination:             T.S. 3.5.1 Learning Objective:                                                   (As available)
- This would apply if both loops of RHR and Core Spray were affected by the loss of one cooler. It is plausible because the TRM states than two room coolers must be operable and with one inoperable only one remains operable.
Question Source:       Bank #
C. Correct - With 1V-AC-11 inoperable the B and D RHR and B Core Spray pumps must be declared inoperable this requires entry into TS 3.5.1.C which requires restoring one of the two systems to operable within 72 hours. Since both these systems must be considered inoperable until the cooler is returned to service the cooler must be returned to service within 72 hours.
Modified Bank #                             (Note changes or attach parent)
D. Incorrect  
New                 X Question History:                           Last NRC Exam:                 N/A Question Cognitive Level:       Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:         55.41 55.43     2 Facility operating limitations in the technical specifications and their bases.
- This would apply if the candidate literally reads the TRM requirement as both (Two) CS/RHR room unit coolers must be operable. This would imply that all the both RHR and CS systems are considered inoperable and therefore T.S. 3.5.1.E would apply. However as stated in the TRM Separate condition entry is allowed for each unit cooler, therefore only one of the coolers and associated RHR/CS systems are considered inoperable.
Technical Reference(s):
TRM 3.5.2 TS 3.5.1 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
T.S. 3.5.1 Learning Objective:
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41   55.43 2 Facility operating limitations in the technical specifications and their bases.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 194  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                         Page 193
-reference:
 
Level RO SRO Tier #   2 Group #   2 K/A # 215001 2.4.41 Importance Rating 4.6 Emergency Procedures / Plan: Knowledge of the emergency action level thresholds and classifications.
Examination Outline Cross-reference:     Level                       RO             SRO Tier #                                     2 Group #                                     2 K/A #                       215001     2.4.41 Importance Rating                           4.6 Emergency Procedures / Plan: Knowledge of the emergency action level thresholds and classifications. (Traversing In-core Probe)
(Traversing In
Proposed Question:       SRO Question # 93 The plant was operating at 100% power when the following events occurred:
-core Probe)
Time     Event 0100     Traversing Incore Probe (TIP) traces are in progress.
Proposed Question:
0108      Both seals on a Reactor Recirc Pump fail.
SRO Question # 93 The plant was operating at 100% power when the following events occurred
0110      The reactor scrams when Drywell pressure exceeds 2.0 psig.
Time Event 0100 Traversing Incore Probe (TIP) traces are in progress
. 0 108 Both seals on a Reactor Recirc Pump fail
. 01 10 The reactor scrams when Drywell pressure exceeds 2.0 psig.
RPV level lowers to +160 inches before recovering to the normal range.
RPV level lowers to +160 inches before recovering to the normal range.
0115 BOP Operator reports that the Recirc Pump cannot be isolated and that Drywell pressure is now 3.0 psig and rising slowly.
0115     BOP Operator reports that the Recirc Pump cannot be isolated and that Drywell pressure is now 3.0 psig and rising slowly.
Reactor Operator reports the following indications for the TIP system:
Reactor Operator reports the following indications for the TIP system:
Two TIPs have withdrawn to their shields and their ball valves have closed The third detector has NOT withdrawn and its ball valve remains ope n  0120 Reactor Operator reports the detector will not move and the ball valve CANNOT be manually closed.
* Two TIPs have withdrawn to their shields and their ball valves have closed
0125 Reactor Operator reports the shear valve failed to fire.
* The third detector has NOT withdrawn and its ball valve remains open 0120     Reactor Operator reports the detector will not move and the ball valve CANNOT be manually closed.
In accordance with the EAL for the Fission Product Barrier Matrix which ONE of the following contain s ALL of the required Emergency Plan classifications?
0125     Reactor Operator reports the shear valve failed to fire.
A. An UNUSUAL EVENT must be declared by 01 25. B. An ALERT must be declared by 01 25. C. An UNUSUAL EVENT must be declared by 01 25. An ALERT must be declared by 01 40. D. An ALERT must be declared by 01 25. A SITE AREA EMERGENCY must be declared by 0140.
In accordance with the EAL for the Fission Product Barrier Matrix which ONE of the following contains ALL of the required Emergency Plan classifications?
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 195 Proposed Answer:
A.     An UNUSUAL EVENT must be declared by 0125.
D Explanation (Optional):
B.     An ALERT must be declared by 0125.
A. Incorrect: A SITE AREA EMERGENCY was exceeded at time 0125 when the shear valve failed to fire and needed to be declared by 0140 based on EAL FS1.
C.     An UNUSUAL EVENT must be declared by 0125.
Plausible if the candidate only recognizes that the RCS barrier was lost when drywell pressure exceeded 2.0 psig and determines that Unusual Event FU1 was exceeded. This would also be incorrect in that an Alert EAL was also exceeded when the RCS barrier was lost based on EAL FA1.
An ALERT must be declared by 0140.
D.     An ALERT must be declared by 0125.
A SITE AREA EMERGENCY must be declared by 0140.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 194
 
Proposed Answer:         D Explanation (Optional):
A. Incorrect: A SITE AREA EMERGENCY was exceeded at time 0125 when the shear valve failed to fire and needed to be declared by 0140 based on EAL FS1. Plausible if the candidate only recognizes that the RCS barrier was lost when drywell pressure exceeded 2.0 psig and determines that Unusual Event FU1 was exceeded. This would also be incorrect in that an Alert EAL was also exceeded when the RCS barrier was lost based on EAL FA1.
B. Incorrect: A SITE AREA EMERGENCY was exceeded at time 0125 when the shear valve failed to fire and needed to be declared by 0140 based on EAL FS1. Plausible if the candidate only recognizes that the RCS barrier was lost when drywell pressure exceeded 2.0 psig and determines that ALERT EAL FA1 was exceeded.
B. Incorrect: A SITE AREA EMERGENCY was exceeded at time 0125 when the shear valve failed to fire and needed to be declared by 0140 based on EAL FS1. Plausible if the candidate only recognizes that the RCS barrier was lost when drywell pressure exceeded 2.0 psig and determines that ALERT EAL FA1 was exceeded.
C. Incorrect: A SITE AREA EMERGENCY was exceeded at time 0125 when the shear valve failed to fire and needed to be declared by 0140 based on EAL FS1. Plausible if the candidate recognizes that the PC barrier was lost at time 0125 and thinking that the event should be upgraded to an ALERT by 0140 based on the second barrier failing.
C. Incorrect: A SITE AREA EMERGENCY was exceeded at time 0125 when the shear valve failed to fire and needed to be declared by 0140 based on EAL FS1. Plausible if the candidate recognizes that the PC barrier was lost at time 0125 and thinking that the event should be upgraded to an ALERT by 0140 based on the second barrier failing.
D. Correct: The RCS barrier was lost when drywell pressure exceeded 2.0 psig. This resulted in ALERT EAL FA1 being exceeded at time 01
D. Correct: The RCS barrier was lost when drywell pressure exceeded 2.0 psig. This resulted in ALERT EAL FA1 being exceeded at time 0110. The ALERT was required to be declared by 0125.
: 10. The ALERT was required to be declared by 0125.
Then when the shear valve failed to fire, the PC Barrier was lost at time 0125. This resulted in a SITE AREA EMERGENCY EAL being exceeded based on EAL FS1 due to having lost two barriers. The SITE AREA EMERGENCY was required to be declared within the next 15 minutes or time 0140.
Then when the shear valve failed to fire, the PC Barrier was lost at time 0125. This resulted in a SITE AREA EMERGENCY EAL being exceeded based on EAL FS1 due to having lost two barriers. The SITE AREA EMERGENCY was required to be declared within the next 15 minutes or time 0140.
Technical Reference(s):
Technical Reference(s): EAL-01                               (Attach if not previously provided)
EAL-01 (Attach if not previously provided)
EAL-01, only the Proposed References to be provided to applicants during examination:         portion Fission Product Barriers Learning Objective:                                               (As available)
Proposed References to be provided to applicants during examination:
Question Source:     Bank #
EAL-01, only the portion Fission Product Barriers Learning Objective:
Modified Bank #                         (Note changes or attach parent)
(As available)
New               X Question History:                         Last NRC Exam:                 N/A Question Cognitive Level:     Memory or Fundamental Knowledge DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 195
Question Source:
 
Bank #   Modified Bank #
Comprehension or Analysis                X 10 CFR Part 55 Content:      55.41 55.43    5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
(Note changes or attach parent)
Comments:
New X   Question History:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                Page 196
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 196  Comprehension or Analysis X  10 CFR Part 55 Content:
Examination Outline Cross-reference:       Level                     RO             SRO Tier #                                   3 Group #                                   1 K/A #                     G1             2.1.20 Importance Rating                         4.6 Conduct of Operations: Ability to interpret and execute procedure steps.
55.41  55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Proposed Question:       SRO Question # 94 The plant is operating in MODE 1 at 100% power with the following conditions:
Comments: .
* A spurious Group I isolation occurred which cannot be reset.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 197  Examination Outline Cross
* As a result of the pressure spike, a break occurred in the Recirculation system piping.
-reference:
* While executing EOP-2, Primary Containment Control, it is determined that Torus pressure is approaching but has not yet reached the Pressure Suppression Pressure (PSP) Curve.
Level RO SRO Tier #   3 Group #   1 K/A # G1 2.1.20 Importance Rating 4.6 Conduct of Operations: Ability to interpret and execute procedure steps.
Under these conditions, Emergency Depressurization...
Proposed Question: SRO Question # 94 The plant is operating in MODE 1 at 100% power with the following conditions:
A. is required when you make the determination that the PSP limits will be exceeded.
A spurious Group I isolation occurred which cannot be reset.
B. should be anticipated by depressurizing the RPV using Alternate Pressure Control Systems.
As a result of the pressure spike, a break occurred in the Recirculation system pipin
C. is NOT allowed until the PSP curve limits are exceeded but then must be executed regardless of any anticipated trends.
: g. While executing EOP
-2, Primary Containment Control
, it is determined that Torus pressure is approaching but has not yet reached the Pressure Suppression Pressure (PSP) Curve.
Under these conditions, Emergency Depressurization... A. is required when you make the determination that the PSP limits will be exceeded.
B. should be anticipated by depressurizing the RPV using Alternate Pressure Control Systems. C. is NOT allowed until the PSP curve limits are exceeded but then must be executed regardless of any anticipated trends.
D. is NOT required if the PSP limits are exceeded provided you believe you will be able to restore parameters based on anticipated trends.
D. is NOT required if the PSP limits are exceeded provided you believe you will be able to restore parameters based on anticipated trends.
Proposed Answer:
Proposed Answer:         A Explanation (Optional):
A Explanation (Optional):
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                    Page 197


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 198 A. Correct - EOP-2, Step PC/P-7 is a Hold Point Figure regarding the PSP, this step precludes subsequent actions until the conditions listed in the Hold Point (Exceeding PSP) are met. When the conditions in the Hold Point are met, the operator continues to the next step in the flowchart and performs it. This hold point is further clarified by the Point of Emphasis, The logic phrase CAN/CANNOT BE MAINTAINED dictates that the required action should be initiated before or at the identified critical value. The value of the identified parameter(s) is/is not able to be kept above/below specified limits. This determination includes making an evaluation that considers both current and future system performance in relation to the current value and trend of the parameter(s). As specifically regards "cannot," this does not imply that the actual value of the parameter must first pass the specified limit. Proceeding actions in the EOP flow path should be directed prior to or at the stated condition.
A. Correct - EOP-2, Step PC/P-7 is a Hold Point Figure regarding the PSP, this step precludes subsequent actions until the conditions listed in the Hold Point (Exceeding PSP) are met. When the conditions in the Hold Point are met, the operator continues to the next step in the flowchart and performs it. This hold point is further clarified by the Point of Emphasis, The logic phrase CAN/CANNOT BE MAINTAINED dictates that the required action should be initiated before or at the identified critical value. The value of the identified parameter(s) is/is not able to be kept above/below specified limits. This determination includes making an evaluation that considers both current and future system performance in relation to the current value and trend of the parameter(s). As specifically regards "cannot," this does not imply that the actual value of the parameter must first pass the specified limit. Proceeding actions in the EOP flow path should be directed prior to or at the stated condition.
B. Incorrect  
B. Incorrect - Emergency Depressurization can only be anticipated using the turbine bypass valves. Plausible since the MSIVs are closed.
- Emergency Depressurization can only be anticipated using the turbine bypass valves. Plausible since the MSIVs are closed.
C. Incorrect - The logic phrase CAN/CANNOT BE MAINTAINED dictates that the required action should be initiated before or at the identified critical value.
C. Incorrect  
D. Incorrect - There is no provision for restoring PSP, when it is believed PSP cannot be maintained. Emergency Depressurization must be executed.
- The logic phrase CAN/CANNOT BE MAINTAINED dictates that the required action should be initiated before or at the identified critical value. D. Incorrect  
EOP-02, Step PC/P-7 Bases Technical Reference(s): Bases Flowchart Use pg 30                 (Attach if not previously provided)
- There is no provision for restoring PSP, when it is believed PSP cannot be maintained. Emergency Depressurization must be executed.
Proposed References to be provided to applicants during examination:             None Learning Objective:                                                   (As available)
Technical Reference(s):
Question Source:     Bank #               X Modified Bank #                             (Note changes or attach parent)
EOP-02, Step PC/P
New Question History:                           Last NRC Exam:                 N/A Question Cognitive Level:     Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:       55.41 55.43     5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
-7 Bases Bases Flowchart Use pg 30 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
None Learning Objective:
(As available)
Question Source:
Bank # X   Modified Bank #
(Note changes or attach parent)
New   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 199  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 198
-reference:
Level RO  SRO  Tier #  3  Group #  2  K/A # G2  2.2.5  Importance Rating 3.2  Equipment Control: Knowledge of the process for making design or operating changes to the facility. Proposed Question:
SRO Question # 95 When proposing a design change to DAEC, the 10CFR 50.59 process determines if...
A. the change may be accomplished without prior NRC approval.
B. an evaluation for compliance with NRC Reg Guides is required
. C. a Technical Specification revision is required after implementation.
D. a Technical Specification Bases change is required after implementation.
Proposed Answer:
A  Explanation (Optional):
A. Correct: 10 CFR 50.59 establishes the conditions under which licensees may make changes to the facility or procedures and conduct tests or experiments without prior NRC approval.
B. Incorrect
- Plausible because a design change may be in response to a Reg Guide however the 50.59 review does NOT evaluate compliance with NRC Reg Guides.
C. Incorrect
- Plausible because the evaluation may determine that a Technical Specifications is required. It does not, however, always require a TS revision, and it would NOT allow a TS change after the fact for a facility change. An UFSAR change is sometimes allowed to take up to 2 years to make, and this choice is additionally plausible if the candidate transferred this knowledge to TS.
D. Incorrect
- Plausible because a design change may involve a Technical Specification Bases change, however 50.59 evaluates for license (TS) amendment requirements NOT Bases revisions. A Technical Specification Bases is not part of the determination.
Technical Reference(s):
ACP-103.2 rev 39, pg 3,  ACP 103.0, rev 23, page 9 (Attach if not previously provided)


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 200  Proposed References to be provided to applicants during examination:
Examination Outline Cross-reference:          Level                    RO              SRO Tier #                                    3 Group #                                    2 K/A #                    G2          2.2.5 Importance Rating                          3.2 Equipment Control: Knowledge of the process for making design or operating changes to the facility.
None Learning Objective:
Proposed Question:          SRO Question # 95 When proposing a design change to DAEC, the 10CFR 50.59 process determines if...
SRO 1.11.02.06 (As available)
A.        the change may be accomplished without prior NRC approval.
Question Source:
B.        an evaluation for compliance with NRC Reg Guides is required.
Bank # DAEC 50652 Modified Bank #
C.        a Technical Specification revision is required after implementation.
(Note changes or attach parent)
D.        a Technical Specification Bases change is required after implementation.
New   Question History:
Proposed Answer:            A Explanation (Optional):
Last NRC Exam:
A.        Correct: 10 CFR 50.59 establishes the conditions under which licensees may make changes to the facility or procedures and conduct tests or experiments without prior NRC approval.
2011 DAEC (# 95)
B.        Incorrect - Plausible because a design change may be in response to a Reg Guide however the 50.59 review does NOT evaluate compliance with NRC Reg Guides.
Question Cognitive Level:
C.        Incorrect - Plausible because the evaluation may determine that a Technical Specifications is required. It does not, however, always require a TS revision, and it would NOT allow a TS change after the fact for a facility change. An UFSAR change is sometimes allowed to take up to 2 years to make, and this choice is additionally plausible if the candidate transferred this knowledge to TS.
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
D.        Incorrect - Plausible because a design change may involve a Technical Specification Bases change, however 50.59 evaluates for license (TS) amendment requirements NOT Bases revisions. A Technical Specification Bases is not part of the determination.
55.41   55.43 3 Facility licensee procedures required to obtain authority for design and operating changes in the facility.
ACP-103.2 rev 39, pg 3, Technical Reference(s):                                          (Attach if not previously provided)
ACP 103.0, rev 23, page 9 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                         Page 199
 
Proposed References to be provided to applicants during examination:         None Learning Objective:       SRO 1.11.02.06                           (As available)
Question Source:     Bank #               DAEC 50652 Modified Bank #                           (Note changes or attach parent)
New Question History:                         Last NRC Exam:       2011   DAEC (# 95)
Question Cognitive Level:   Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:     55.41 55.43     3 Facility licensee procedures required to obtain authority for design and operating changes in the facility.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 201 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 200
-reference:
 
Level RO SRO Tier #     Group #     K/A # G3 2.3.13 Importance Rating 3.8 Radiation Control: Knowledge of Radiological Safety Procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high radiation areas, aligning filters, etc.
Examination Outline Cross-reference:       Level                   RO                 SRO Tier #
Proposed Question:
Group #
SRO Question # 96 During movement of an irradiated fuel bundle from the reactor to the spent fuel pool
K/A #                   G3           2.3.13 Importance Rating                           3.8 Radiation Control: Knowledge of Radiological Safety Procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high radiation areas, aligning filters, etc.
, a reactor primary system piping break results in Fuel Pool level slowly lowering below 36 feet.
Proposed Question:       SRO Question # 96 During movement of an irradiated fuel bundle from the reactor to the spent fuel pool, a reactor primary system piping break results in Fuel Pool level slowly lowering below 36 feet.
The refueling platform has entered the spent fuel pool area from the reactor cavity.
* The refueling platform has entered the spent fuel pool area from the reactor cavity.
No radiation alarms have occurred at this time.
* No radiation alarms have occurred at this time.
Which ONE of the following actions is required?
Which ONE of the following actions is required?
A. Return the bundle to its original position then suspend all movement of irradiated fuel.
A. Return the bundle to its original position then suspend all movement of irradiated fuel.
B. Immediately stop fuel handling and evacuate via the safest exit to the reactor building 4th floor.
B. Immediately stop fuel handling and evacuate via the safest exit to the reactor building 4th floor.
C. Immediately place the bundle in the spent fuel pool and suspend movement of irradiated fuel.
C. Immediately place the bundle in the spent fuel pool and suspend movement of irradiated fuel.
D. Immediately evacuate nonessential personnel
D. Immediately evacuate nonessential personnel; essential personnel place fuel into its original position and evacuate via the safest exit to the reactor building 4th floor.
; essential personnel place fuel into its original position and evacuate via the safest exit to the reactor building 4th floor.
Proposed Answer:         C Explanation (Optional):
Proposed Answer:
A. Incorrect - The fuel bundle must be taken to the spent fuel pool.
C Explanation (Optional):
B. Incorrect - There is NO requirement to evacuate the refuel floor at this time, Plausible because AOP 981 Fuel Handling Event directs evacuating the floor, however the AOP anticipates high radiation on the refuel floor.
A. Incorrect  
- The fuel bundle must be taken to the spent fuel pool.
B. Incorrect  
- There is NO requirement to evacuate the refuel floor at this time, Plausible because AOP 981 Fuel Handling Event directs evacuating the floor, however the AOP anticipates high radiation on the refuel floor.
C. Correct -Whenever Spent Fuel Pool Level is less than 36 feet, immediately suspend movement of irradiated fuel and place any load suspended in the Spent Fuel Pool into a safe configuration.
C. Correct -Whenever Spent Fuel Pool Level is less than 36 feet, immediately suspend movement of irradiated fuel and place any load suspended in the Spent Fuel Pool into a safe configuration.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                        Page 201


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 202 D. Incorrect  
D. Incorrect - There is NO requirement to evacuate the refuel floor at this time. Plausible because AOP 981 Fuel Handling Event directs evacuating the floor, however the AOP anticipates high radiation on the refuel floor. Additionally the fuel bundle must be taken to the spent fuel pool.
- There is NO requirement to evacuate the refuel floor at this time
Technical Reference(s): RFP 403, P & L 2.27, pg 6               (Attach if not previously provided)
. Plausible because AOP 981 Fuel Handling Event directs evacuating the floor, however the AOP anticipates high radiation on the refuel floor. Additionally the fuel bundle must be taken to the spent fuel pool.
Proposed References to be provided to applicants during examination:           None Learning Objective:                                                 (As available)
Technical Reference(s):
Question Source:     Bank #
RFP 403, P & L 2.27, pg 6 (Attach if not previously provided)
Modified Bank #                           (Note changes or attach parent)
Proposed References to be provided to applicants during examination:
New               X Question History:                         Last NRC Exam:                 N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:       55.41 55.43     5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
None Learning Objective:
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 203  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 202
-reference:
Level RO  SRO  Tier #  3  Group #  4  K/A # G4  2.4.8  Importance Rating 4.5  Emergency Procedures / Plan: Knowledge of how abnormal operating procedures are used in conjunction with EOP's.
Proposed Question:
SRO Question # 97 With the plant at 100% power drywell temperature and pressure begin to rise due to a partial loss of Well Water. The following sequence occurs:
AOP 408 Well Water System Abnormal Operation is entered Annunciator 1C05B (B-1), PRIMARY CONTAINMENT HI/LO PRESSURE alarms  Drywell pressure is reported as 1.55 and rising slowly Drywell temperature is reported as 130 &deg;F and rising slowly Then -  Drywell pressure is reported as 1.70 and rising slowly Drywell temperature is reported as 155 &deg;F and rising slowly Which ONE of the following is correct regarding additional procedures to be used to mitigate the event?
A. EOP 2 Primary Containment Control must be entered. All AOPs must be exited. Response to the event is as directed by the EOP.
B. EOP 2 Primary Containment Control must be entered. AOP 573, Primary Containment Control may also be entered as determined by the Shift Manager. If a conflict arises, the actions of the event specific AOPs take precedence.
C. EOP 2 Primary Containment Control must be entered. AOP 573, Primary Containment Control may also be entered as determined by the Shift Manager. AOP execution may continue provided that the actions do not conflict with EOP actions.
D. EOP 2 Primary Containment Control and AOP 573 Primary Containment Control must be entered. However initial response to the event is IAW AOP 408 and 5
: 73. Execution of EOP actions may be delayed until all applicable actions of the AOPs have been completed.
Proposed Answer:
C  Explanation (Optional):


DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 204 A. Incorrect: The AOP execution can continue provided the actions do not conflict with the EOP actions and it is approved by the shift manager. Plausible in that the EOP is the higher tier document in the hierarchy of procedure
Examination Outline Cross-reference:      Level                    RO            SRO Tier #                                  3 Group #                                  4 K/A #                    G4        2.4.8 Importance Rating                        4.5 Emergency Procedures / Plan: Knowledge of how abnormal operating procedures are used in conjunction with EOP's.
: s. B. Incorrect: If a conflict arises the EOP takes precedent. The Shift Manager is not authorized to deviate from an EOP action.
Proposed Question:      SRO Question # 97 With the plant at 100% power drywell temperature and pressure begin to rise due to a partial loss of Well Water. The following sequence occurs:
C. Correct: IAW ACP 1410.1, EOPs can be used in conjunction with other operating procedures (OIs, ARPs, AOPs, etc.). However, EOPs are higher tier documents and shall direct the primary response to operational transients that require their use. The decision to utilize other approved procedures during EOP execution rests with the Shift Supervisor/Manager. If other plant procedures are used while executing EOPs, actions specified in these procedures shall not contradict or subvert actions described in EOPs or degrade the operability of equipment critical to EOP strategies.
* AOP 408 Well Water System Abnormal Operation is entered
D. Incorrect: There is no allowance to defer EOP actions when in an AOP.
* Annunciator 1C05B (B-1), PRIMARY CONTAINMENT HI/LO PRESSURE alarms
Technical Reference(s):
* Drywell pressure is reported as 1.55 and rising slowly
ACP 1410.1, pg 17 EOP 2 AOP 573 (Attach if not previously provided)
* Drywell temperature is reported as 130 &deg;F and rising slowly Then
Proposed References to be provided to applicants during examination:
* Drywell pressure is reported as 1.70 and rising slowly
None Learning Objective:
* Drywell temperature is reported as 155 &deg;F and rising slowly Which ONE of the following is correct regarding additional procedures to be used to mitigate the event?
(As available)
A.      EOP 2 Primary Containment Control must be entered. All AOPs must be exited.
Question Sourc e: Bank #   Modified Bank #
Response to the event is as directed by the EOP.
(Note changes or attach parent)
B.      EOP 2 Primary Containment Control must be entered. AOP 573, Primary Containment Control may also be entered as determined by the Shift Manager. If a conflict arises, the actions of the event specific AOPs take precedence.
New X   Question History:
C.      EOP 2 Primary Containment Control must be entered. AOP 573, Primary Containment Control may also be entered as determined by the Shift Manager. AOP execution may continue provided that the actions do not conflict with EOP actions.
Last NRC Exam:
D.      EOP 2 Primary Containment Control and AOP 573 Primary Containment Control must be entered. However initial response to the event is IAW AOP 408 and 573. Execution of EOP actions may be delayed until all applicable actions of the AOPs have been completed.
NA Question Cognitive Level:
Proposed Answer:        C Explanation (Optional):
Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 203
55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
 
A. Incorrect: The AOP execution can continue provided the actions do not conflict with the EOP actions and it is approved by the shift manager. Plausible in that the EOP is the higher tier document in the hierarchy of procedures.
B. Incorrect: If a conflict arises the EOP takes precedent. The Shift Manager is not authorized to deviate from an EOP action.
C. Correct: IAW ACP 1410.1, EOPs can be used in conjunction with other operating procedures (OIs, ARPs, AOPs, etc.). However, EOPs are higher tier documents and shall direct the primary response to operational transients that require their use. The decision to utilize other approved procedures during EOP execution rests with the Shift Supervisor/Manager. If other plant procedures are used while executing EOPs, actions specified in these procedures shall not contradict or subvert actions described in EOPs or degrade the operability of equipment critical to EOP strategies.
D. Incorrect: There is no allowance to defer EOP actions when in an AOP.
ACP 1410.1, pg 17 Technical Reference(s): EOP 2                                 (Attach if not previously provided)
AOP 573 Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
Question Source:     Bank #
Modified Bank #                         (Note changes or attach parent)
New                 X Question History:                           Last NRC Exam:             NA Question Cognitive Level:     Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:       55.41 55.43     5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 205  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 204
-reference:
 
Level RO SRO Tier #   3 Group #   2 K/A # G2 2.2.1 Importance Rating 4.4 Equipment Control: Ability to perform pre
Examination Outline Cross-reference:       Level                     RO               SRO Tier #                                     3 Group #                                   2 K/A #                     G2         2.2.1 Importance Rating                         4.4 Equipment Control: Ability to perform pre-startup procedures for the facility, including operating those controls associated with plant equipment that could affect reactivity.
-startup procedures for the facility, including operating those controls associated with plant equipment that could affect reactivity.
Proposed Question:         SRO Question # 98 Today is January 8, 2013. The plant has been shutdown for 5 days following a forced outage.
Proposed Question:
The last plant startup was conducted on November 14, 2011.
SRO Question # 98 Today is January 8, 2013. The plant has been shutdown for 5 days following a forced outage. The last plant startup was conducted on November 14, 2011.
In preparation for todays reactor startup STP 3.3.2.1-05 RWM Control Rod Sequence Verification is being performed. During the performance of the STP the RWM locks-up.
In preparation for today's reactor startup STP 3.3.2.1
Based on the above:
-05 RWM Control Rod Sequence Verification is being performed. During the performance of the STP the RWM "locks
(1) What method specified in OI 878.8, RWM can be used in an attempt to reset the RWM lock-up?
-up". Based on the above
AND (2) If the RWM will not reset, will Tech Specs allow control rod withdrawal?
:    (1) What method specified in OI 878.8, RWM can be used in an attempt to reset the RWM "lock-up"? AND (2) If the RWM will not reset, will Tech Specs allow control rod withdrawal?
A.       (1)   Reset the RWM by de-energizing and then re-energizing its power supply.
A. (1) Reset the RWM by de-energizing and then re
(2)   No, because using a 2nd licensed operator or other qualified individual is only allowed if  12 rods are withdrawn.
-energizing its power supply.
B.       (1)   Reset the RWM by de-energizing and then re-energizing its power supply.
(2) No, because using a 2 nd licensed operator or other qualified individual is only   B. (1) Reset the RWM by de
(2)   Yes, but only if rod movements are verified by a 2nd licensed operator or other qualified individual.
-energizing and then re
C.       (1)   Reset the RWM by placing the RWM keylock Mode Switch on panel 1C05 in TEST then back to the OPERATE position.
-energizing its power supply.
(2)   Yes, but only if rod movements are verified by a 2nd licensed operator or other qualified individual.
(2) Yes, but only if rod movements are verified by a 2 nd licensed operator or other qualified individual.
D.       (1)   Reset the RWM by placing the RWM keylock Mode Switch on panel 1C05 in TEST then back to the OPERATE position.
C. (1) Reset the RWM by placing the RWM keylock Mode Switch on panel 1C05 in TEST then back to the OPERATE position.
(2)   No, because using a 2nd licensed operator or other qualified individual is only allowed if  12 rods are withdrawn.
(2) Yes, but only if rod movements are verified by a 2 nd licensed operator or other qualified individual.
Proposed Answer:           B DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                       Page 205
D. (1) Reset the RWM by placing the RWM keylock Mode Switch on panel 1C05 in TEST then back to the OPERATE position.
 
(2) No, because using a 2 nd licensed operator or other qualified individual is only Proposed Answer:
Explanation (Optional):
B DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 206 Explanation (Optional):
A. Incorrect: Tech Spec 3.3.2.1 required action C.2.2 allows the startup to commence.
A. Incorrect: Tech Spec 3.3.2.1 required action C.2.2 allows the startup to commence. Plausible in that Tech Spec 3.3.2.1 action C.2.1.1 would allow an already in progress startup to continue if 12 rods were withdrawn.
Plausible in that Tech Spec 3.3.2.1 action C.2.1.1 would allow an already in progress startup to continue if 12 rods were withdrawn.
B. Correct: OI 878.8, RWM Precaution and Limitation # 7 states that if, at any point, the RWM is found locked up, then reset the RWM by de
B. Correct: OI 878.8, RWM Precaution and Limitation # 7 states that if, at any point, the RWM is found locked up, then reset the RWM by de-energizing and reenergizing its power per Section 6.2 of the procedure. Tech Spec 3.3.2.1 required actions C2.1.2 and C.2.2 allows rod withdraw if a startup has not been conducted within the last calendar year with the RWM inoperable and a 2nd licensed operator or other qualified individual is verifying control rod movement. Since the last plant startup was conducted on November 14, 2011 this requirement has been met.
-energizing and reenergizing its power per Section 6.2 of the procedure. Tech Spec 3.3.2.1 required actions C2.1.2 and C.2.2 allows rod withdraw if a startup has not been conducted within the last calendar year with the RWM inoperable and a 2nd licensed operator or other qualified individual is verifying control rod movement. Since the last plant startup was conducted on November 14, 2011 this requirement has been met.
C. Incorrect: OI 878.8, RWM Precaution and Limitation # 7 states that if, at any point, the RWM is found locked up, then reset the RWM by de-energizing and reenergizing its power per Section 6.2 of the procedure. Plausible if the candidate is unaware of this procedure requirement and the impact of placing the RWM Mode Switch in TEST.
C. Incorrect: OI 878.8, RWM Precaution and Limitation # 7 states that if, at any point, the RWM is found locked up, then reset the RWM by de
D. Incorrect: OI 878.8, RWM Precaution and Limitation # 7 states that if, at any point, the RWM is found locked up, then reset the RWM by de-energizing and reenergizing its power per Section 6.2 of the procedure. Additionally, Tech Spec 3.3.2.1 required action C.2.2 allows the startup to commence.
-energizing and reenergizing its power per Section 6.2 of the procedure. Plausible if the candidate is unaware of this procedure requirement and the impact of placing the RWM Mode Switch in TEST.
OI 878.8, RWM Precaution and Technical Reference(s):                                      (Attach if not previously provided)
D. Incorrect: OI 878.8, RWM Precaution and Limitation # 7 states that if, at any point, the RWM is found locked up, then reset the RWM by de
Limitation # 7 Tech Spec 3.3.2.1 Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
-energizing and reenergizing its power per Section 6.2 of the procedure. Additionally, Tech Spec 3.3.2.1 required action C.2.2 allows the startup to commence.
Question Source:     Bank #
Technical Reference(s):
Modified Bank #                         (Note changes or attach parent)
OI 878.8, RWM Precaution and Limitation # 7 (Attach if not previously provided)
New               X Question History:                         Last NRC Exam:               N/A Question Cognitive Level:     Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:       55.41 55.43     6 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                   Page 206
Tech Spec 3.3.2.1 Proposed References to be provided to applicants during examination:
 
None Learning Objective:
Procedures and limitations involved in initial core loading, alterations in core configuration, control rod programming, and determination of various internal and external effects on core reactivity.
(As available)
Question Source:
Ban k #    Modified Bank #
(Note changes or attach parent)
New X   Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41   55.43 6 DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 207 Procedures and limitations involved in initial core loading, alterations in core configuration, control rod programming, and determination of various internal and external effects on core reactivity.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 208  Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 207
-reference:
 
Level RO S RO  Tier #   3 Group #   1 K/A # G1 2.1.43 Importance Rating 4.3 Conduct of Operations: Ability to use procedures to determine the effects on reactivity of plant changes, such as RCS temperature, secondary plant, fuel depletion, etc.
Examination Outline Cross-reference:         Level                     RO               SRO Tier #                                     3 Group #                                     1 K/A #                     G1         2.1.43 Importance Rating                           4.3 Conduct of Operations: Ability to use procedures to determine the effects on reactivity of plant changes, such as RCS temperature, secondary plant, fuel depletion, etc.
Proposed Question: SRO Question # 99 Following a reduction in feedwater temperature, reactor power has been lowered using recirculation flow. The OATC has determined that load line will exceed 100.64%.
Proposed Question:         SRO Question # 99 Following a reduction in feedwater temperature, reactor power has been lowered using recirculation flow. The OATC has determined that load line will exceed 100.64%.
Which ONE of the following is required?
Which ONE of the following is required?
The CRS will direct A.      recirculation flow be lowered as necessary to stay below the load line limit. A reactivity plan is required.
B.      recirculation flow be lowered as necessary to stay below the load line limit. A reactivity plan is NOT required.
C.      control rods be inserted as necessary to preclude an inadvertent violation of the load line limit. A reactivity plan is required.
D.      control rods be inserted as necessary to preclude an inadvertent violation of the load line limit. A reactivity plan is NOT required.
Proposed Answer:          D Explanation (Optional):
A.      Incorrect -Lowering recirculation flow will result in violating the load line limit. A reactivity plan is not required. Plausible because recirculation flow is used for fine adjustments of power and Reactivity plans are required for most power changes B.      Incorrect -Lowering recirculation flow will result in violating the load line limit. Plausible because recirculation flow is used for fine adjustments of power.
C.      Incorrect -No reactivity plan is required. This action is necessary to preclude an inadvertent violation of the 100.4% admin limit due to limitations in monitoring load line during transients. Plausible because reactivity plans are required for most power changes.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                          Page 208


The CRS will direct-  A. recirculation flow be lowered as necessary to stay below the load line limit. A reactivity plan is required.
D.     Correct - If load line will exceed the load line limit (100.64%), then take immediate action to reduce power to the allowable region of the power to flow map with rods. No reactivity plan is required. This action is necessary to preclude an inadvertent violation of the 100.4% admin limit due to limitations in monitoring load line during transients.
B. recirculation flow be lowered as necessary to stay below the load line limit. A reactivity plan is NOT required.
IAW IPOI 3, Reactivity plans are required for all planned core reactivity changes that will result in a change in power greater than or equal to 10 percent. Also During transient Xenon conditions action should be taken at an indicated load line of 100.0% to insert control rods. No reactivity plan is required. This action is necessary to preclude an inadvertent violation of the 100.4% admin limit due to limitations in monitoring load line during transients.
C. control rods be inserted as necessary to preclude an inadvertent violation of the load line limit. A reactivity plan is required.
AOP 646, pg 3 Technical Reference(s):                                           (Attach if not previously provided)
D. control rods be inserted as necessary to preclude an inadvertent violation of the load line limit. A reactivity plan is NOT required. Proposed Answer:
IPOI 3, P & L 10 & 35 Proposed References to be provided to applicants during examination:             None Learning Objective:                                                   (As available)
D  Explanation (Optional):
Question Source:       Bank #
A. Incorrect
Modified Bank #                             (Note changes or attach parent)
-Lowering recirculation flow will result in violating the load line limit. A reactivity plan is not required. Plausible because recirculation flow is used for fine adjustments of power and Reactivity plans are required for most power changes B. Incorrect
New               X Question History:                           Last NRC Exam:                 N/A Question Cognitive Level:       Memory or Fundamental Knowledge Comprehension or Analysis                   X 10 CFR Part 55 Content:         55.41 55.43     6 Procedures and limitations involved in initial core loading, alterations in core configuration, control rod programming, and determination of various internal and external effects on core reactivity.
-Lowering recirculation flow will result in violating the load line limit. Plausible because recirculation flow is used for fine adjustments of power.
C. Incorrect
-No reactivity plan is required. This action is necessary to preclude an inadvertent violation of the 100.4% admin limit due to limitations in monitoring load line during transients. Plausible because reactivity plans are required for most power changes.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC  Page 209 D. Correct - If load line will exceed the load line limit (100.64%), then take immediate action to reduce power to the allowable region of the power to flow map with rods.
No reactivity plan is required. This action is necessary to preclude an inadvertent violation of the 100.4% admin limit due to limitations in monitoring load line during transients. IAW IPOI 3, Reactivity plans are required for all planned core reactivity changes that will result in a change in power greater than or equal to 10 percent. Also During transient Xenon conditions action should be taken at an indicated load line of 100.0% to insert control rods. No reactivity plan is required. This action is necessary to preclude an inadvertent violation of the 100.4% admin limit due to limitations in monitoring load line during transients.
Technical Reference(s):
AOP 646, pg 3 IPOI 3, P & L 10 & 35 (Attach if not previously provided)
Proposed References to be provided to applicants during examination:
None Learning Objective:
(As available)
Question Source:
Bank #   Modified Bank #
(Note changes or attach parent)
New X Question History:
Last NRC Exam:
N/A Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41   55.43 6 Procedures and limitations involved in initial core loading, alterations in core configuration, control rod programming, and determination of various internal and external effects on core reactivity.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 210 Examination Outline Cross
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                         Page 209
-reference:
 
Level RO SRO Tier #   3 Group #   3 K/A # G3 2.3.5 Importance Rating 2.9 Radiation Control: Ability to use radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
Examination Outline Cross-reference:       Level                   RO               SRO Tier #                                   3 Group #                                   3 K/A #                   G3         2.3.5 Importance Rating                         2.9 Radiation Control: Ability to use radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
SRO Question # 100 An accident has occurred which has caused entry into the RPV Flood EOP. All control rods are fully inserted.
SRO Question # 100 An accident has occurred which has caused entry into the RPV Flood EOP. All control rods are fully inserted.
Reactor water level is unknown RHR and Condensate are injecting into the reactor Reactor pressure is 400 psig and lowering quickly Torus water level is 10.4 feet and rising slowly Torus water temperature is 105&deg;F and rising slowly All open SRV tailpipe temperatures are ~300&deg;F and steady Drywell area Rad monitors are now reading 450 and 500 R/Hr and slowly rising Torus area Rad monitors are now reading 45 and 50 R/hr and slowly rising The TSC is NOT manned at this time Using the Table below which ONE of the following actions is required at this time?
* Reactor water level is unknown
A. Continue to perform RPV/F actions. SAG entry is not required until multiple Core damage indications are seen.
* RHR and Condensate are injecting into the reactor
B. Continue to perform RPV/F actions, since core flooding indication s exist , enter the SAG s and then exit the EOPs.
* Reactor pressure is 400 psig and lowering quickly
DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 211 C. Continue to perform RPV/F actions until RPV reactor water level indications are observed. Once the TSC is operational
* Torus water level is 10.4 feet and rising slowly
, exit the EOPs and enter the SAGs. D. Enter the SAGs and transition from RPV/F to SAG 1 , Primary Containment Flooding. Continue to monitor the plant for degrading conditions and report them to the TSC once manned and operational.
* Torus water temperature is 105&deg;F and rising slowly
Proposed Answer:
* All open SRV tailpipe temperatures are ~300&deg;F and steady
C Explanation (Optional):
* Drywell area Rad monitors are now reading 450 and 500 R/Hr and slowly rising
A. Incorrect  
* Torus area Rad monitors are now reading 45 and 50 R/hr and slowly rising
- RPV/F actions must continue however there is a SAG entry condition on primary containment radiation
* The TSC is NOT manned at this time Using the Table below which ONE of the following actions is required at this time?
. Plausible because RPV/F action must continue and the candidate may misinterpret Table 5.
A.     Continue to perform RPV/F actions. SAG entry is not required until multiple Core damage indications are seen.
B. Incorrect  
B.     Continue to perform RPV/F actions, since core flooding indications exist, enter the SAGs and then exit the EOPs.
- EOPs should not be exited until there is evidence of core flooding and the TSC is operational.
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 210
With reactor pressure still lowering and SRV tailpipe temperatures stable there is NO evidence of core flooding, with the core NOT flooded and the TSC NOT operational the EOPs should NOT be exited at this time. Plausible because there is an SAG entry condition on primary containment radiation.
 
C. Continue to perform RPV/F actions until RPV reactor water level indications are observed. Once the TSC is operational, exit the EOPs and enter the SAGs.
D. Enter the SAGs and transition from RPV/F to SAG 1, Primary Containment Flooding.
Continue to monitor the plant for degrading conditions and report them to the TSC once manned and operational.
Proposed Answer:         C Explanation (Optional):
A. Incorrect - RPV/F actions must continue however there is a SAG entry condition on primary containment radiation. Plausible because RPV/F action must continue and the candidate may misinterpret Table 5.
B. Incorrect - EOPs should not be exited until there is evidence of core flooding and the TSC is operational. With reactor pressure still lowering and SRV tailpipe temperatures stable there is NO evidence of core flooding, with the core NOT flooded and the TSC NOT operational the EOPs should NOT be exited at this time. Plausible because there is an SAG entry condition on primary containment radiation.
C. Correct - Based upon the containment Rad levels during RPV flooding fuel damage is occurring. This requires entry to SAGs. The transition to SAGs is performed by continuing the EOP actions until there is evidence that the core is flooded or reactor water level indication is available and the TSC is operational. Once the TSC is operational, The SAGs are entered at the appropriate point and directed by the TSC and then the EOPs are exited and EOP actions terminated.
C. Correct - Based upon the containment Rad levels during RPV flooding fuel damage is occurring. This requires entry to SAGs. The transition to SAGs is performed by continuing the EOP actions until there is evidence that the core is flooded or reactor water level indication is available and the TSC is operational. Once the TSC is operational, The SAGs are entered at the appropriate point and directed by the TSC and then the EOPs are exited and EOP actions terminated.
D. Incorrect  
D. Incorrect - EOPs should NOT be exited until the TSC is operational. The transition to SAGs is performed by continuing the EOP actions until there is evidence that the core is flooded.
- EOPs should NOT be exited until the TSC is operational. The transition to SAGs is performed by continuing the EOP actions until there is evidence that the core is flooded. Technical Reference(s):
RPV/F, Table 5 Technical Reference(s):                                        (Attach if not previously provided)
RPV/F, Table 5 RPV/F Bases pg 8 (Attach if not previously provided)
RPV/F Bases pg 8 Proposed References to be provided to applicants during examination:         None Learning Objective:                                               (As available)
Proposed References to be provided to applicants during examination:
DAEC Bank # QQ Question Source:     Bank #
None Learning Objective:
20347 Modified Bank #                           (Note changes or attach parent)
(As available)
New Question History:                         Last NRC Exam:               Not Used DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                     Page 211
Question Source:
 
Bank # DAEC Bank # QQ 20347   Modified Bank #
Question Cognitive Level:   Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:     55.41 55.43     5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
(Note changes or attach parent)
New     Question History:
Last NRC Exam:
Not Used DAEC NRC WRITTEN EXAM, ALL 100, REV 03 13-SLV.DOC   Page 212  Question Cognitive Level:
Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content:
55.41   55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.
Comments:
Comments:
DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC                                Page 212
PDA 13-1 NRC Exam Applicant References
PDA 13-1 NRC Exam Applicant References
: 1. OI 698 Attachment 1
: 1. OI 698 Attachment 1
: 2. AOP 149 Appendix 1&2
: 2. AOP 149 Appendix 1&2
: 3. EOP Caution 1
: 3. EOP Caution 1
: 4. EOP Graph 1
: 4. EOP Graph 1
: 5. EOP Graph 5
: 5. EOP Graph 5
: 6. EOP Graph 8
: 6. EOP Graph 8
: 7. EOP Table 6
: 7. EOP Table 6
: 8. EAL-01 (Fission Product Barrier portion only)
: 8. EAL-01 (Fission Product Barrier portion only)
: 9. L3.1.7 10. Figure 3.1.7
: 9. L3.1.7
-1 11. Figure 3.1.7
: 10. Figure 3.1.7-1
-2 12. L 3.3.5.1 13. T3.3.5.1-1 (P1 thru 3, remove all allowable values)
: 11. Figure 3.1.7-2
: 14. L3.3.6.1 15. T3.3.6.1 16. L3.4.7 17. L3.4.8 18. L3.5.1 19. L3.6.4.1 OI 698 Page 45 of 46 Rev. 83 Page 1 of 1 APPENDIX 1 ESTIMATED CAPABILITY CURVES
: 12. L 3.3.5.1
: 13. T3.3.5.1-1 (P1 thru 3, remove all allowable values)
: 14. L3.3.6.1
: 15. T3.3.6.1
: 16. L3.4.7
: 17. L3.4.8
: 18. L3.5.1
: 19. L3.6.4.1
 
Page 1 of 1 APPENDIX 1 ESTIMATED CAPABILITY CURVES OI 698     Page 45 of 46           Rev. 83


AOP 149 LOSS OF DECAY HEAT REMOVAL AOP 149 Page 12 of 15 Rev. 40 APPENDIX 1 HEATUP RATE CURVE - RPV FLOODED NOTE The RPV Flooded condition is defined as the RPV head removed, Spent Fuel Pool Gates removed, and the RPV and refuel cavity flooded up so that cavity level equals Spent Fuel Pool level. Spent Fuel Pool level is within the normal band.
AOP 149                                         LOSS OF DECAY HEAT REMOVAL APPENDIX 1 HEATUP RATE CURVE - RPV FLOODED NOTE The RPV Flooded condition is defined as the RPV head removed, Spent Fuel Pool Gates removed, and the RPV and refuel cavity flooded up so that cavity level equals Spent Fuel Pool level. Spent Fuel Pool level is within the normal band.
_________ RFO-23 Vessel Water Heatup Rate (Floodup Condition)0.01.02.03.0 4.05.06.0 7.08.09.00102030405060708090100Time Since Shutdown (Days)Heatup Rate (Deg F/hr)
RFO-23 Vessel Water Heatup Rate (Floodup Condition) 9.0 8.0 Heatup Rate (Deg F/hr) 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0.0 0  10    20    30        40    50    60      70  80  90  100 Time Since Shutdown (Days)
CAUTION The initial heatup rate in the vessel may be higher than the calculated value when RHR or Fuel Pool Cooling is removed from service. The calculation used to generate the heatup rate curves assumes instantaneous mixing and heat transport from the fuel area to the remainder of the system volume. In addition, the calculated heatup rates reflect bulk temperatures not local temperatures. Under natural circulation conditions and the resulting time delay in heat transport, considerable differences in temperature may exist between the vessel and upper levels of the cavity or in the spent fuel pool. In some cases local boiling may occur but bulk boiling will not occur as long as cooling is restored within the calculated  
CAUTION The initial heatup rate in the vessel may be higher than the calculated value when RHR or Fuel Pool Cooling is removed from service. The calculation used to generate the heatup rate curves assumes instantaneous mixing and heat transport from the fuel area to the remainder of the system volume. In addition, the calculated heatup rates reflect bulk temperatures not local temperatures. Under natural circulation conditions and the resulting time delay in heat transport, considerable differences in temperature may exist between the vessel and upper levels of the cavity or in the spent fuel pool. In some cases local boiling may occur but bulk boiling will not occur as long as cooling is restored within the calculated time-to-boil period.
AOP 149                                                      Page 12 of 15                        Rev. 40


time-to-boil period.
AOP 149                                           LOSS OF DECAY HEAT REMOVAL APPENDIX 2 HEATUP RATE CURVE - RPV LEVEL AT 200" RFO-23 Vessel Water Heatup Rate (Water Level = 200'' )
_________
50.0 45.0 40.0 Heatup Rate (Deg F/hr) 35.0 30.0 25.0 20.0 15.0 10.0 5.0 0.0 0  10      20    30        40     50    60      70  80  90  100 Time Since Shutdown (Days)
AOP 149 LOSS OF DECAY HEAT REMOVAL AOP 149 Page 13 of 15 Rev. 40 APPENDIX 2 HEATUP RATE CURVE - RPV LEVEL AT 200" RFO-23 Vessel Water Heatup Rate (Water Level = 200'' )0.05.010.015.0 20.025.030.035.0 40.045.050.00102030405060708090100Time Since Shutdown (Days)Heatup Rate (Deg F/hr)
CAUTION The initial heatup rate in the vessel may be higher than the calculated value when cooling is removed from service. The calculation used to generate the heatup rate curves assumes instantaneous mixing and heat transport from the fuel area to the remainder of the system volume. In addition, the calculated heatup rates reflect bulk temperatures not local temperatures. Under natural circulation conditions and the resulting time delay in heat transport, considerable differences in temperature may exist between the fuel area and upper levels of vessel. In some cases local boiling may occur but bulk boiling will not occur as long as cooling is restored within the calculated time-to-boil period.
CAUTION The initial heatup rate in the vessel may be higher than the calculated value when cooling is removed from service. The calculation used to generate the heatup rate curves assumes instantaneous mixing and heat transport from the fuel area to the remainder of the system volume. In addition, the calculated heatup rates reflect bulk temperatures not local temperatures. Under natural circulation conditions and the resulting time delay in heat transport, considerable differences in temperature may exist between the fuel area and upper levels of vessel. In some cases local boiling may occur but bulk boiling will not occur as long as cooling is restored within the calculated time-to-boil period.
_________
AOP 149                                                        Page 13 of 15                         Rev. 40
Wide Range Yarways (LI-4539 and LI-4540) may be unreliable due to reference leg boiling during rapid RPV depressurization below 500 psig.Operation of HPCI, RCIC, Core Spray, or RHR with suction from the torus and pump flow above the NPSH or vortex limit may damage equipment.Elevated torus pressure may trip the RCIC turbine on high exhaust pressure.The following restrictions apply to RPV water level instruments:1.If drywell air temperature is above the RPV Saturation Temperature (Graph 1), water in the instrument legs may boil. If boiling is suspected:
a.Subtract23 inches from Fuel Zone and Narrow Range GEMAC indications.b.Do not use Floodup and Wide Range Yarway instruments.2.Floodup and Wide Range instruments may not be used below the Minimum Indicated Level for the indicated drywell temperature.CAUTIONS 1 2 4 3Water may drain from isolated drywell cooling loops if well water is out of service when a PCIS Group 7 Isolation signal clears. This creates the potential for water hammer in drywell cooling piping when well water is restored.
8Level InstrumentTemperature InstrumentDrywellTemp (&deg;F)MIL(in.)Wide Range Yarway LI-4539 (+8 to +218 in.)TR-4383A Channel 1 (red)100-150 151-200 201-250 251-300 301-350 Upscale+8+12
+16
+20
+25
+48Wide Range Yarway LI-4540 (+8 to +218 in.)TR-4383B Channel 2 (green)Floodup Range LI-4541
(+158 to +458 in.)TR-4383A Channel 1 (red)100-150 151-200 201-250 251-300 301-350 Upscale+168
+174
+181
+189
+199
+257 GRAPH 1 RPV SATURATION TEMPERATURE GRAPH 1 Page 1 of 2 Rev. 5 Graph 1:RPV Saturation Temperature 0200RPV Pressure (psig)Average Drywell Air Temperature (&deg;F)255075100125150225250275300325350375120212Action is required GRAPH 5 PRESSURE SUPPRESSION PRESSURE GRAPH 5 Page 1 of 2 Rev. 7 Graph 5:  Pressure Suppression Pressure 6 0Torus Water Level (ft)Torus Pressure (psig)810121416 5101520253025.87.113.8Action is required GRAPH 8 RHR NPSH GRAPH 8 Page 1 of 2 Rev. 5 1501601701801902002102202302402500200040006000800010000120001400001000200030004000500060007000RHR PUMP FLOW*15 psi g*10 psi g*5 psi g*0 psi g* torus pressureOperation of RHR pumps above these curves ma y result in e qui pment (2 pum p s)(1 pump)
DAEC EOP BASES DOCUMENT Rev. 11 EOP 3 - SECONDARY CONTAINMENT CONTROL GUIDELINE Page 5 of 21 Table 6 Secondary Containment Limits Parameter and Areas Max Normal Operating LimitMax Safe Operating LimitValue/Trend Area/Location Indicator &deg;F &deg;F  A RHR-SE Corner Room Area RHR SE CORNER ROOM AMBIENT RHR SE CORNER ROOM DIFFERENTIAL TR/TDR 2000A Ch 1 TR/TDR 2000A Ch 2 13050140 N/AB RHR-NW Corner Room Area RHR NW CORNER ROOM AMBIENT RHR NW CORNER ROOM DIFFERENTIAL TR/TDR 2000B Ch 1 TR/TDR 2000B Ch 2 13050140 N/AHPCI Room Area HPCI EMER COOLER AMBIENT HPCI ROOM AMBIENT HPCI ROOM DIFFERENTIAL TR/TDR 2225A[B] Ch 1 TR/TDR 2225A Ch 2 TR/TDR 2225A[B] Ch 4[3] 175 17550310 310 N/ARCIC Room Area RCIC EMER COOLER AMBIENT RCIC ROOM AMBIENT RCIC ROOM DIFFERENTIAL TR/TDR 2425A[B] Ch 1 TR/TDR 2425A Ch 2 TR/TDR 2425A[B] Ch 4 175 17550300 300 N/ATorus Area TORUS CATWALK NORTH AMBIENT TORUS CATWALK WEST AMBIENT TORUS CATWALK SOUTH AMBIENT TORUS CATWALK EAST AMBIENT TORUS CATWALK EAST DIFF TORUS CATWALK WEST DIFF TORUS CATWALK SOUTHWEST DIFF TORUS CATWALK SOUTH DIFF TR/TDR 2425A Ch 3 TR/TDR 2425B Ch 2 TR/TDR 2225A Ch 3 TR/TDR 2225B Ch 2 TR/TDR 2425A Ch 5 TR/TDR 2425B Ch 5 TR/TDR 2225A Ch 5 TR/TDR 2225B Ch 4 150 150 150 15050 50 50 50165 165 165 165 N/A N/A N/A N/ARB 786' South Area RWCU PUMP ROOM AMBIENT RWCU HX ROOM AMBIENT TR/TDR 2700A[B] Ch 1 TR/TDR 2700A[B] Ch 2,3 130 130212 212RB 757' South Area RWCU ABOVE TIP ROOM AMBIENT TR/TDR 2700A[B] Ch 4,5 111.5 150Temperature Steam Tunnel Area STEAM TUNNEL AMBIENT STEAM TUNNEL DIFFERENTIAL TR/TDR 2425B Ch 3 TR/TDR 2225B Ch 5 16070300 N/AArea/Location Indicator mR/hr mR/hr  RB 757' South Area RB RAILROAD ACCESS AREA SOUTH CRD MODULE AREA TIP ROOM RI 9167 RI 9169 RI 9176 10 10 60100 100 600RB 757' North Area NORTH CRD MODULE CRD REPAIR ROOM RI 9168 RI 9170 10 15100 150RB 786' North Area RWCU SPENT RESIN ROOM RWCU PHASE SEP TANK RI 9173 RI 9177 1002010 3200RB 786' South Area RWCU PUMP ROOM RWCU HX ROOM RI 9156 RI 9157 10 310 310 410 4RB 812' North Area MAIN PLANT EXHAUST FAN ROOM JUNGLE ROOM RI 9171 RI 9155 60 60600 600RadiationRefuel Floor Area NEW FUEL VAULT AREA NORTH REFUEL FLOOR SOUTH REFUEL FLOOR SPENT FUEL POOL AREA RI 9153 RI 9163 RI 9164 RI 9178 10 10 10100100 100 10010 3Area/Location Indicator inches inches  HPCI ROOM LI 3768 2 6  RCIC ROOM LI 3769 3 6  "A" RHR & CS SECR LI 3770 2 10  "B" RHR & CS NWCR LI 3771 2 10  Water Level TORUS AREA LI 3772 2 12 
~!  "&'%,.%!%'($"$)*+%&'%!%&'"$)*+%%*%7),)-'&&127&&127'7!+&#xb5;%&7),0- ((1277!&#xb5;%(&&(&7!/'
7&'&&7!.8,)&&&8&.#),)&(&&),)-'&&127&&127'7!&#xb5;%&.),)77!7
.),0/(&&&~-&&&127&&127'7!&#xb5;&-&(1277!&#xb5;%&),0- ((1277!&#xb5;%&),1-..'127'7!&#xb5;%&70,)A::-'('A::~&&
(:>-&./<7!
(~-&'%,&./<
0,)'>&&~&-!'>&&~''',&'',&':6'"!8;-77!&&~''',&'',&':!;-77!'"1,)-./77!*&&~%&'''<%&86.9,)),)'#B##~&%+*6#B:>&&~'#B&:#B 1<%&'(
B$#),)!7/ :
(&:>&$
B$#),)77!7#
/(&&&~-'&&127&&127'7!&#xb5;&- ((1277!&#xb5;%&#),079,)8&((9,)(:> #B'#B&:#B1<70,)$%&'((&'
&0,)&&'
(
71,)7==(&( '7 7/ :"78,)78!.*<!71E'6
#
&&
&&B$(
$
B$%&'8,)8.0,)%&'%&
~.01E'6
#&
&&&


&(
CAUTIONS The following restrictions apply to RPV water level instruments:
7/ :&
1 1. If drywell air temperature is above the RPV Saturation Temperature (Graph 1), water in the instrument legs may boil.
&(
If boiling is suspected:
&=,)=!.1,)1E'6
: a. Subtract 23 inches from Fuel Zone and Narrow Range GEMAC indications.
#&
: b. Do not use Floodup and Wide Range Yarway instruments.
(&$
: 2. Floodup and Wide Range instruments may not be used below the Minimum Indicated Level for the indicated drywell temperature.
!7/ :
Temperature    Drywell      MIL Level Instrument Instrument    Temp (&deg;F)      (in.)
Wide Range Yarway        TR-4383A        100-150        +8 LI-4539 (+8 to +218 in.) Channel 1        151-200      +12 (red)          201-250      +16 Wide Range Yarway        TR-4383B        251-300      +20 LI-4540 (+8 to +218 in.) Channel 2        301-350      +25 (green)         Upscale      +48 100-150    +168 Floodup Range LI-4541 TR-4383A            151-200    +174
(+158 to +458 in.)        Channel 1       201-250    +181 (red)          251-300    +189 301-350    +199 Upscale    +257 Wide Range Yarways (LI-4539 and LI-4540) may be unreliable 2 due to reference leg boiling during rapid RPV depressurization below 500 psig.
Operation of HPCI, RCIC, Core Spray, or RHR with suction from 3 the torus and pump flow above the NPSH or vortex limit may damage equipment.
Elevated torus pressure may trip the RCIC turbine on high 4 exhaust pressure.
Water may drain from isolated drywell cooling loops if well water 8 is out of service when a PCIS Group 7 Isolation signal clears.
This creates the potential for water hammer in drywell cooling piping when well water is restored.


(($
GRAPH 1 RPV SATURATION TEMPERATURE Graph 1: RPV Saturation Temperature 375 350          Action is required Average Drywell Air Temperature (&deg;F) 325 300 275 250 225 212 200 120 0       25          50            75    100    125        150 RPV Pressure (psig)
&
GRAPH 1                                                               Page 1 of 2                  Rev. 5
&
&
.1!!.*
#0,)1E'6
#&
/::7&
&(&!
7/ :&
&(<
#0!!.*<
71,0'(&(
7974">%9.9!.#)%79,0"%A'/7>/!7/ :
! "7/ ?:' :7'
! "7/' 7%7'
: 7)  7 7%7'~: "#$&&'
(! &&'
(&&(&7"(
:>&7$8&$8')  &.),07!&#:><
<%
<'
<
</$
<%7!%&'("%),17$8&$< G%7(<
<%<'
<%7!%&'("%),9&>&&
$!%&'("%),8-/"/0.("#$&70*!"
0 %%.%71"&"),='),B'7)%%#""
**<
)%#""
**<
70&07),1-..'127'7!&#xb5;%&A::-7'7!II:&&~<(&-?'%,&./<7!1%%7),9-1'/"<7'%&7),8-%&7),=-%&7),B%&B&&7'7!
&
),9-1'/"<7'7!+*6%&),8-9'7'7!5)6%&),=-7'7!*6%&),B%&B&&7'7!
&&.)! *4"%""
#)! *4"%""
.),177!
&
77!
&
#),170,00,0:>7~&7&:>7~7)>:>&'&'%"7>:>&7.79.79,)('<<!'
.79,0'%7'7!&#xb5;.78..78,)A(~&&7'7!.78,0(~&&7'7!.7D4.7D,)
::">&..),).7).7),)&(&.8%%
..)%%&..1,)..1.0,)&&&~$&~'/6
&: :&&~$&~'/6..0,).0"3
..0"!".70,)"(7
.71.%
.71,)A::&>&&~&.9,)A::&>&&~&/7!'&&~7':7%&.9.%<"0<>&&~(&
&7':7%&
..=,)..=%4"".7.7=,)..&&~(&&7&".7=,0..&&~(((8(((&&6%&&&=&:(:"6.#)&
$&&&~'&&
9'7'7!!!%.6%$
.#0,).#0~%
.704%".79,1(((9,0((&#),0!7/ :&$"%/::7(
((<&
1


&
GRAPH 5 PRESSURE SUPPRESSION PRESSURE Graph 5: Pressure Suppression Pressure 30 25.8 25              Action is required Torus Pressure (psig) 20 15 10 5
&""4@/'
0 7.1                                          13.8 6              8                10      12          14            16 Torus Water Level (ft)
GRAPH 5                                                  Page 1 of 2                    Rev. 7


7 1
GRAPH 8 RHR NPSH 250 240
&!~
                                                                *15 psig 230 220
<
                                                                *10 psig 210 200                                                    *5 psig 190 180
7'7!
                                                                *0 psig Operation of RHR pumps above these 170  curves may result in equipment
7$'
* torus pressure 160 150 (1 pump) 0    1000    2000      3000      4000  5000      6000      7000 (2 pumps) 0    2000    4000      6000      8000 10000    12000    14000 RHR PUMP FLOW GRAPH 8                          Page 1 of 2                            Rev. 5
<
7'7!
#!&77!&#xb5;KA/-.:7
/<'%"7'7!
~&
&~&
'
=:
7 1


&
DAEC EOP BASES DOCUMENT                                                                                          Rev. 11 EOP 3 - SECONDARY CONTAINMENT CONTROL                                                                            Page 5 of 21 GUIDELINE Table 6                                      Secondary Containment Limits Max Normal  Max Safe Parameter and Areas                              Operating  Operating  Value/Trend Limit      Limit Area/Location                            Indicator          &deg;F          &deg;F A RHR-SE Corner Room Area RHR SE CORNER ROOM AMBIENT              TR/TDR 2000A Ch 1            130          140 RHR SE CORNER ROOM DIFFERENTIAL          TR/TDR 2000A Ch 2            50          N/A B RHR-NW Corner Room Area RHR NW CORNER ROOM AMBIENT              TR/TDR 2000B Ch 1            130          140 RHR NW CORNER ROOM DIFFERENTIAL          TR/TDR 2000B Ch 2            50          N/A HPCI Room Area HPCI EMER COOLER AMBIENT                TR/TDR 2225A[B] Ch 1        175          310 HPCI ROOM AMBIENT                      TR/TDR 2225A Ch 2            175          310 HPCI ROOM DIFFERENTIAL                  TR/TDR 2225A[B] Ch 4[3]      50          N/A RCIC Room Area Temperature RCIC EMER COOLER AMBIENT                TR/TDR 2425A[B] Ch 1        175          300 RCIC ROOM AMBIENT                        TR/TDR 2425A Ch 2            175          300 RCIC ROOM DIFFERENTIAL                  TR/TDR 2425A[B] Ch 4          50          N/A Torus Area TORUS CATWALK NORTH AMBIENT            TR/TDR 2425A Ch 3            150          165 TORUS CATWALK WEST AMBIENT              TR/TDR 2425B Ch 2            150          165 TORUS CATWALK SOUTH AMBIENT            TR/TDR 2225A Ch 3            150          165 TORUS CATWALK EAST AMBIENT              TR/TDR 2225B Ch 2            150          165 TORUS CATWALK EAST DIFF                TR/TDR 2425A Ch 5            50          N/A TORUS CATWALK WEST DIFF                TR/TDR 2425B Ch 5            50          N/A TORUS CATWALK SOUTHWEST DIFF            TR/TDR 2225A Ch 5            50          N/A TORUS CATWALK SOUTH DIFF                TR/TDR 2225B Ch 4            50          N/A RB 786 South Area RWCU PUMP ROOM AMBIENT                  TR/TDR 2700A[B] Ch 1        130          212 RWCU HX ROOM AMBIENT                    TR/TDR 2700A[B] Ch 2,3      130          212 RB 757 South Area RWCU ABOVE TIP ROOM AMBIENT              TR/TDR 2700A[B] Ch 4,5      111.5        150 Steam Tunnel Area STEAM TUNNEL AMBIENT                    TR/TDR 2425B Ch 3            160          300 STEAM TUNNEL DIFFERENTIAL                TR/TDR 2225B Ch 5            70          N/A Area/Location                            Indicator        mR/hr      mR/hr RB 757 South Area RB RAILROAD ACCESS AREA                  RI 9167                      10          100 SOUTH CRD MODULE AREA                    RI 9169                      10          100 TIP ROOM                                RI 9176                      60          600 RB 757 North Area NORTH CRD MODULE                        RI 9168                      10          100 CRD REPAIR ROOM                          RI 9170                      15          150 Radiation RB 786 North Area 3
&
RWCU SPENT RESIN ROOM                    RI 9173                      100          10 RWCU PHASE SEP TANK                      RI 9177                      20          200 RB 786 South Area 3            4 RWCU PUMP ROOM                          RI 9156                      10          10 3          4 RWCU HX ROOM                            RI 9157                      10          10 RB 812 North Area MAIN PLANT EXHAUST FAN ROOM              RI 9171                      60          600 JUNGLE ROOM                              RI 9155                      60          600 Refuel Floor Area NEW FUEL VAULT AREA                    RI 9153                      10          100 NORTH REFUEL FLOOR                      RI 9163                      10          100 SOUTH REFUEL FLOOR                      RI 9164                      10          100 3
&$&:
SPENT FUEL POOL AREA                    RI 9178                      100          10 Area/Location                            Indicator        inches      inches Water Level HPCI ROOM                                    LI 3768                      2            6 RCIC ROOM                                    LI 3769                      3            6 A RHR & CS SECR                            LI 3770                      2          10 B RHR & CS NWCR                            LI 3771                      2          10 TORUS AREA                                  LI 3772                      2          12


!&~&
FG1        1      2      3                                  FS1          1      2      3                                    FA1          1      2      3                                          FU1            1        2      3 Loss of ANY Two Barriers AND Loss or Potential Loss of          Loss or Potential Loss of ANY Two Barriers (Table F-1)          ANY Loss or ANY Potential Loss of EITHER Fuel Clad OR                  ANY Loss or ANY Potential Loss of Primary Containment the Third Barrier (Table F-1)                                                                                                    RCS Barrier (Table F-1)                                                Barrier (Table F-1)
Table F-1 FISSION PRODUCT BARRIER MATRIX Fuel Clad Barrier                                                            RCS Barrier                                              Primary Containment Barrier ONE BARRIER AFFECTED Loss                      Potential Loss                                Loss                        Potential Loss                              Loss                        Potential Loss L  P    L  P  L  P RADIATION/CORE DAMAGE                                                RADIATION/CORE DAMAGE                                                                                            RADIATION/CORE Fuel damage assessment                                              Drywell Area Hi Range Rad                                                                                        DAMAGE                                      CLAD    RCS  CNTMT (PASAP 7.2) indicates at                                            Monitor RIM-9184A or B reading                                                                                  Drywell Area Hi Range Rad GREATER THAN 5 Rem/hr after                                                                                                                                                                  FU1 least 5% fuel clad damage                                                                                                                                                            Monitor, RIM-9184A or B                                                  UNUSUAL OR                                                                reactor shutdown                                                                                                reading GREATER THAN                                        1/1          EVENT Drywell Area Hi Range Rad                                                                                                                        LEAKAGE                              3000 Rem/hr LEAKAGE                              LEAKAGE                                                                                                                    1/2 Monitor, RIM-9184A or B                                                                                                                          Failure of both isolation valves      OR UNISOLABLE Main Steamline,            RCS Leakage GREATER THAN reading GREATER THAN                                                                                                                            in any one line to close AND a      Torus Area Hi Range Rad                                                    FA1 HPCI, Feedwater, RWCU or              50 GPM inside the drywell 700 Rem/hr                                                                                                                                      direct downstream pathway to        Monitor, RIM-9185A or B                                                    ALERT RCIC break as indicated by the          OR OR                                                                                                                                            the environment exists after        reading GREATER THAN failure of both isolation valves in  UNISOLABLE primary system Torus Area Hi Range Rad                                                                                                                          primary containment isolation        100 Rem/hr                              TWO BARRIERS AFFECTED any one line to close AND            leakage outside the drywell as Monitor, RIM-9185A or B                                                                                                                          signal.                                OR EITHER:                              indicated by area temps or ARMs reading GREATER THAN 30                                                                                                                              OR                              Fuel damage assessment High MSL flow or high          exceeding the Max Normal Limits                                                                                        L  P    L  P  L  P Rem/hr                                                                                                                                            UNISOLABLE primary system          (PASAP 7.2) indicates at steam tunnel temperature        per EOP 3, Table 6.
OR                                                                                                                                            leakage outside the drywell as      least 20% fuel clad annunciators                                                                                                                                          CLAD    RCS  CNTMT Coolant activity GREATER                                                                                                                        indicated by area temps or          damage Direct report of steam THAN 300 Ci/gm DOSE                                                      release                                                              ARMs exceeding the Max Safe          RPV LEVEL EQUIVALENT                                                            OR                                                                        Limits per EOP 3, Table 6,          Primary containment I-131                                                                Emergency RPV                                                              when Containment Isolation is        flooding required                                    2/3 Depressurization is required                                                required.                                                                                                        FS1 Fission Product                                                                                                                                                                                          PRIMARY CONTAINMENT OR                                                                                                        SITE AREA Barriers                                                                                                                                                        Intentional Primary                ATMOSPHERE                                                              EMERGENCY RPV LEVEL                        RPV LEVEL                          RPV LEVEL                                                                  Containment venting per EOPs        Torus pressure reaches 53 psig and rising                      THREE BARRIERS AFFECTED RPV Level cannot be              RPV Level cannot be                RPV Level cannot be restored and maintained          restored and                        restored and maintained                                                                                            OR above -25 Inches                maintained above +15                above +15 inches or                                                                                              Drywell or Torus H2                        L  P    L  P  L  P inches or cannot be                cannot be determined                                                        PRIMARY CONTAINMENT                  cannot be determined to determined                                                                                                      ATMOSPHERE                          be LESS THAN 6% and                        CLAD    RCS  CNTMT PRIMARY CONTAINMENT                                                        Drywell pressure rise followed      Drywell or Torus O2 ATMOSPHERE                                                                  by a rapid unexplained drop in drywell pressure                    cannot be determined to Drywell pressure GREATER be LESS THAN 5%
THAN 2 psig due to RCS                                                        OR                                                                                      3/3 Drywell pressure response              OR                                                                      NO Leakage (not caused by a loss NOT consistent with LOCA            RPV pressure and Torus                                        LOSS OF AT of DW Cooling)                                                                                                                                                                  LEAST 2 conditions                          water temperature cannot                                      BARRIERS?
be maintained below the Heat Capacity Limit (EOP                                    YES Graph 4)                                                                    FG1 GENERAL EMERGENCY DIRECTOR              EMERGENCY DIRECTOR                  EMERGENCY DIRECTOR                    EMERGENCY DIRECTOR                  EMERGENCY DIRECTOR                    EMERGENCY DIRECTOR                                                      EMERGENCY JUDGMENT                        JUDGMENT                            JUDGMENT                              JUDGMENT                            JUDGMENT                              JUDGMENT Any condition in the opinion of Any condition in the opinion of      Any condition in the opinion of the  Any condition in the opinion of the  Any condition in the opinion          Any condition in the opinion the Emergency Director (OSM,    the Emergency Director (OSM,        Emergency Director (OSM, EC, or      Emergency Director (OSM, EC, or      of the Emergency Director            of the Emergency Director EC, or ER&RD) that indicates    EC, or ER&RD) that indicates        ER&RD) that indicates Loss or        ER&RD) that indicates Loss or        (OSM, EC, or ER&RD) that              (OSM, EC, or ER&RD) that Loss or Potential Loss of the  Loss or Potential Loss of the        Potential Loss of the RCS Barrier    Potential Loss of the RCS Barrier    indicates Loss or Potential          indicates Loss or Potential Fuel Clad Barrier              Fuel Clad Barrier                                                                                              Loss of the Containment              Loss of the Containment Barrier                              Barrier Duane Arnold Energy Center EAL-01 Emergency Action Level Matrix, Rev. 9 Modes:                            1 Power Operation 2
Startup 3                    4                    5 Refueling DEF Defueled Modes 1, 2, 3 Hot Shutdown        Cold Shutdown                                                                                              Approved:    Mike Davis                                                09/26/2012 Manager Emergency Preparedness                      Date


=
SLC System 3.1.7 3.1 REACTIVITY CONTROL SYSTEMS 3.1.7 Standby Liquid Control (SLC) System LCO 3.1.7           Two SLC subsystems shall be OPERABLE.
7
APPLICABILITY:      MODES 1 and 2.
~B$!%7~&'
ACTIONS CONDITION                  REQUIRED ACTION        COMPLETION TIME A. One SLC subsystem        A.1    Restore SLC        7 days inoperable.                    subsystem to OPERABLE status.
<
B. Two SLC subsystems      B.1    Restore one SLC    8 hours inoperable.                  subsystem to OPERABLE status.
7'7!
C. Required Action and    C.1   Be in MODE 3.      12 hours associated Completion Time not met.
!7$'
DAEC                                3.1-20                Amendment 223
<
7'7!
!
1
&
7~&'
'/<
77!


?
SLC System 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE                            FREQUENCY SR 3.1.7.1  Verify available volume of sodium pentaborate    In accordance with the solution is within the limits of Figure 3.1.7-1. Surveillance Frequency Control Program SR 3.1.7.2  Verify temperature of sodium pentaborate        In accordance with the solution is within the limits of                Surveillance Figure 3.1.7-2.                                  Frequency Control Program SR 3.1.7.3  Verify temperature of pump suction piping is    In accordance with the within the limits of Figure 3.1.7-2.            Surveillance Frequency Control Program SR 3.1.7.4  Verify continuity of explosive charge.          In accordance with the Surveillance Frequency Control Program SR 3.1.7.5  Verify the concentration of boron in            In accordance with the solution is within the limits of Figure          Surveillance 3.1.7-1.                                        Frequency Control Program AND Once within 24 hours after water or boron is added to solution AND Once within 24 hours after solution temperature is restored within the limits of Figure 3.1.7-2 (continued)
'%/%
DAEC                                3.1-21                      Amendment 280
(&$&
:
/7!!".(&#


&'
SLC System 3.1.7 SURVEILLANCE REQUIREMENTS (continued)
H>% :7:77~7 7!
SURVEILLANCE                        FREQUENCY SR 3.1.7.6  Verify each pump develops a flow rate        In accordance 26.2 gpm at a discharge pressure  1150    with the psig.                                        Inservice Testing Program SR 3.1.7.7 Verify flow through one SLC subsystem from    In accordance pump into reactor pressure vessel.            with the Surveillance Frequency Control Program SR 3.1.7.8  Verify all heat traced piping between storage In accordance tank and pump suction is unblocked.          with the Surveillance Frequency Control Program AND Once within 24 hours after solution temperature is restored within the limits of Figure 3.1.7-2 DAEC                              3.1-22                    Amendment 280


?%6>% :7:77 "!'~(~
                                                              \t { \vqTom 3.1.7 110 ll            llii 100 tl    ttl Am lptable tl    ttl 90 l-L gr trJ tf PBo tT.
8
ul CL t!
~&!~&
F 60 J*      lr l--,'.,
: 7
r, Fl-I I
'
50 11                12            13        14 CONCENTRATION (Weight Percent Pentaborate in Solution)
Fr gure 3.1 .7 -2 (page 1 of i )
Sodium Pentaborate Solution Temperature Versus Concentration Requi rements DAIC                                3.r-?4                    Revi si on A


'
SLC Syste.
3.1.-
      =
    .9 2
o a
E h6 t-  'o 6J dp tF.
L6 1l r ) '^
z6 nq o
6
    -c
    .T c) 1L 1 500 2000                  2500              3000              3500 AVAILABLE VOLUME OF SOLTJIION hI TANIK (gaJJors)
Frgure 3 1  7-l  (page  I of 1)
Sodr um Pentabor-ate Sol urr  on Vo.lume Vensus Concenlralr on Requr rements DAtC                  3.1 23                      Amendmenr 236


'E'6
ECCS Instrumentation 3.3.5.1 3.3 INSTRUMENTATION 3.3.5.1 Emergency Core Cooling System (ECCS) Instrumentation LCO 3.3.5.1              The ECCS instrumentation for each Function in Table 3.3.5.1-1 shall be OPERABLE.
&%"
APPLICABILITY:            According to Table 3.3.5.1-1.
ACTIONS
-----------------------------------------------------------NOTE------------------------------------------------
Separate Condition entry is allowed for each channel.
CONDITION                          REQUIRED ACTION                        COMPLETION TIME A.      One or more channels                A.1      Enter the Condition          Immediately inoperable.                                    referenced in Table 3.3.5.1-1 for the channel.
(continued)
DAEC                                              3.3-32                              Amendment 223


'E'6
ECCS Instrumentation 3.3.5.1 ACTIONS (continued)
&%"
CONDITION              REQUIRED ACTION                          COMPLETION TIME B. As required by      B.1  --------------NOTES-----------
>% :7:77 "!'7$
Required Action A.1        1. Only applicable in and referenced in                MODES 1, 2, and Table 3.3.5.1-1                  3.
!~&77!
: 2. Only applicable for Functions 1.a, 1.b, 2.a, and 2.b.
~&77!'7$
Declare supported                  1 hour from discovery of feature(s) inoperable              loss of initiation when redundant                      capability for feature(s) feature(s) ECCS                    in two or more low initiation capability is            pressure ECCS inoperable.                        subsystems AND B.2  --------------NOTE------------
~
Only applicable for Functions 3.a and 3.b.
Declare High Pressure              1 hour from discovery of Coolant Injection (HPCI)            loss of HPCI initiation System inoperable.                  capability AND B.3    Place channel in trip.              24 hours (continued)
DAEC                            3.3-33                                  Amendment 223


!
ECCS Instrumentation 3.3.5.1 ACTIONS (continued)
CONDITION              REQUIRED ACTION                      COMPLETION TIME C. As required by      C.1 ------------NOTES----------
Required Action A.1      1. Only applicable in and referenced in              MODES 1, 2, and Table 3.3.5.1-1.              3.
: 2. Only applicable for Functions 1.c, 1.e, 2.c and 2.e.
Declare supported                1 hour from feature(s) inoperable.            discovery of loss of initiation capability for two or more low pressure ECCS subsystems AND C.2  -------------NOTES--------
: 1. Only applicable in Modes 1, 2, and 3.
: 2. Only applicable for Functions 2.g, 2.h, 2.i, and 2.j.
Declare Low Pressure              1 hour from Coolant Injection                discovery of loss of (LPCI) subsystem                  Loop Selection inoperable.                      capability AND C.3  Restore channel to                24 hours OPERABLE status.
(continued)
DAEC                          3.3-34                                  Amendment 223


&
ECCS Instrumentation 3.3.5.1 ACTIONS (continued)
CONDITION              REQUIRED ACTION                    COMPLETION TIME D. As required by      D.1    ----------NOTE-----------
Required Action A.1        Only applicable if and referenced in          HPCI pump suction is Table 3.3.5.1-1.          not aligned to the suppression pool.
Declare HPCI System          1 hour from discovery inoperable.                  of loss of HPCI suction transfer capability AND D.2.1 Place channel in trip.        24 hours OR D.2.2 Align the HPCI pump            24 hours suction to the suppression pool.
(continued)
DAEC                            3.3-35                              Amendment 223


0
ECCS Instrumentation 3.3.5.1 ACTIONS (continued)
CONDITION                REQUIRED ACTION                      COMPLETION TIME E. As required by      E.1  ----------NOTES----------
Required Action A.1      1. Only applicable in and referenced in              MODES 1, 2, and Table 3.3.5.1-1.              3.
: 2. Only applicable for Functions 1.d and 2.f.
Declare supported                1 hour from discovery of feature(s) inoperable.          loss of initiation capability for two or more minimum flow valves in the low pressure ECCS subsystems AND E.2  Restore channel to              7 days OPERABLE status.
F. As required by      F.1  Restore channel to                1 hour Required Action A.1      OPERABLE status.
and referenced in Table 3.3.5.1-1.
(continued)
DAEC                          3.3-36                              Amendment 223


&
ECCS Instrumentation 3.3.5.1 ACTIONS (continued)
CONDITION                REQUIRED ACTION            COMPLETION TIME G. As required by      G.1  Declare Automatic      1 hour from discovery Required Action A.1      Depressurization        of loss of ADS initiation and referenced in        System (ADS) valves    capability in both trip Table 3.3.5.1-1.          inoperable.            logics AND G.2  Place channel in trip. 96 hours from discovery of inoperable channel concurrent with HPCI or Reactor Core Isolation Cooling (RCIC) inoperable AND 8 days (continued)
DAEC                            3.3-37                      Amendment 223


0
ECCS Instrumentation 3.3.5.1 ACTIONS (continued)
%.'%"%:77%.'%"%:7%.'%"%:7-:7)7"/7'9:%>'9:%>>": .........(&C%7A::-7'7!I70,1.),9(77!(77!#),9:&<&:1E'6&
CONDITION                    REQUIRED ACTION            COMPLETION TIME H. As required by Required H.1    Declare ADS valves      1 hour from discovery Action A.1 and                inoperable.             of loss of ADS initiation referenced in Table                                    capability in both trip 3.3.5.1-1.                                             logics AND H.2    Restore channel to      96 hours from OEPRABLE status.       discovery of inoperable channel concurrent with HPCI or RCIC inoperable AND 8 days I. Required Action and    I.1    Declare associated      Immediately associated Completion          supported feature(s)
Time of Condition B,          inoperable.
C, D, E, F, G, or H not met.
DAEC                            3.3-38                      Amendment 223


&(
ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS
:1E'6&
------------------------------------------------------NOTES----------------------------------------------------
: 1. Refer to Table 3.3.5.1-1 to determine which SRs apply for each ECCS Function.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours for Functions 1.d, 2.f, 3.c, 3.d, 3.e, and 3.f; and (b) for up to 6 hours for Functions other than 1.d, 2.f, 3.c, 3.d, 3.e, and 3.f provided the associated Function (or the redundant Function for Functions 4 and 5) maintains ECCS initiation or loop selection capability.
SURVEILLANCE                                            FREQUENCY SR 3.3.5.1.1                Perform CHANNEL CHECK.                                    24 hours SR 3.3.5.1.2                Perform CHANNEL FUNCTIONAL                                31 days TEST.
SR 3.3.5.1.3                Perform CHANNEL FUNCTIONAL                                92 days TEST.
SR 3.3.5.1.4                Perform CHANNEL CALIBRATION.                              92 days SR 3.3.5.1.5                Perform CHANNEL FUNCTIONAL                                12 months TEST.
SR 3.3.5.1.6               Perform CHANNEL CALIBRATION.                              12 months (continued)
DAEC                                              3.3-39                                    Amendment 223


&(
ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS (continued)
:1E'6&
SURVEILLANCE                        FREQUENCY SR 3.3.5.1.7  Perform CHANNEL CALIBRATION.      18 months SR 3.3.5.1.8   Perform CHANNEL CALIBRATION.      24 months SR 3.3.5.1.9  Perform LOGIC SYSTEM FUNCTIONAL    24 months TEST.
&
DAEC                        3.3-40                  Amendment 223
&
:1E'6&
&
&
:1E'6&
:1E'6&
:1E'6&
:1E'6&
:1E'6&
:1E'6&
:1E'6&
8)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)019)01)01)01)018)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)019)01)01)01)01)0)0)0)01)01)01)01)01)01)01)01)01)011)018)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0198)0197),87),=8)0198)0197),)8)0197),08)0197),18)0197),98)01970,08)0198)0198)0198)019.%<'<%~&7$
<-
<!
<'!'"?
<9
< ((%~
</%
<~
<'"#$~8&


%
Primary Containment Isolation Instrumentation 3.3.6.1 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1               The primary containment isolation instrumentation for each Function in Table 3.3.6.1-1 shall be OPERABLE.
 
APPLICABILITY:           According to Table 3.3.6.1-1.
"
ACTIONS
 
-------------------------------------------------------NOTE-----------------------------------------------------
797
Separate Condition entry is allowed for each channel.
&"~#
CONDITION                           REQUIRED ACTION                        COMPLETION TIME A.       One or more required                 A.1     Place channel in trip.           12 hours for channels inoperable.                                                           Functions 2.a, 2.b, 6.b, and 6.c AND 24 hours for Functions other than Functions 2.a, 2.b, and 6.b, and 6.c AND A.2         ----------NOTE---------
"
Only applicable for Function 7.a.
7$
Inhibit containment           24 hours spray system.
 
(continued)
~7$
DAEC                                             3.3-50                                    Amendment 223
 
#
$#
%&&
'
SLC System 3.1.7 3.1  REACTIVITY CONTROL SYSTEMS 3.1.7  Standby Liquid Control (SLC) System LCO  3.1.7 Two SLC sub systems shall be OPERABLE.
APPLICABILITY: MODES 1 and 2.
ACTIONS CONDITION REQUIRED ACT ION COMPLETION TIME A. One SLC subsystem inoperable.
A.1 Restore SLC subsystem to OPERABLE status.
7 days  B. Two SLC subsystems inoperable.
B.1 Restore one SLC subsystem to
 
OPERABLE status.
8 hours  C. Required Action and associated Completion Time not
 
met. C.1 Be in MODE 3.
12 hours      DAEC 3.1-20 Amendment 223 SLC System 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR  3.1.7.1 Verify available volume of sodium pentaborate solution is within the limits of Figure 3.1.7-1.
In accordance with the Surveillance
 
Frequency Control
 
Program  SR  3.1.7.2 Verify temperature of sodium pentaborate solution is within the limits of  Figure 3.1.7-2.
In accordance with the
 
Surveillance Frequency Control Program  SR  3.1.7.3 Verify temperature of pump suction piping is within the limits of Figure 3.1.7-2.
In accordance with the
 
Surveillance
 
Frequency Control
 
Program  SR  3.1.7.4 Verify continuity of explosive charge.
In accordance with the Surveillance Frequency Control
 
Program  SR  3.1.7.5 Verify the concentration of boron in solution is within the limits of Figure
 
3.1.7-1. In accordance with the
 
Surveillance
 
Frequency Control Program  AND  Once within 24 hours after water or boron is added to solution AND Once within 24 hours after solution temperature is
 
restored within the limits of Figure 3.1.7-2 (continued)
DAEC 3.1-21 Amendment 280 SLC System 3.1.7 SURVEILLANCE REQUIREMENTS  (continued) SURVEILLANCE FREQUENCY SR  3.1.7.6 Verify each pump develops a flow rate  26.2 gpm at a discharge pressure  1150 psig. In accordance with the Inservice
 
Testing Program SR  3.1.7.7 Verify flow through one SLC subsystem from pump into reactor pressure vessel.
In accordance
 
with the Surveillance
 
Frequency
 
Control Program SR  3.1.7.8 Verify all h eat traced pipi ng between storage tank and pump suction is unblocked.
In accordance
 
with the Surveillance
 
Frequency
 
Control Program AND Once within
 
24 hours after solution
 
temperature is
 
restored within the limits of
 
Figure 3.1.7-2 DAEC 3.1-22 Amendment 280 
\t { \vqTom 3.1.7 110 ll llii tl Am tl ttl lptable ttl l--,'., r, J*lr Fl-I I 11 12 13 14 CONCENTRATION (Weight Percent Pentaborate in Solution)Requi rements 3.r-?4 l-L gr trJ tf PBo tT.ul CL t!F 100 90 60 50 Fr gure 3.1 .7 -2 (page 1 of i )Sodium Pentaborate Solution Temperature Versus Concentration DAIC Revi si on A SLC Syste.3.1.-=.9 2 o a E h6 t- 'o 6J dp tF.L6 1l r ) '^z6 nq o 6-c.T c)1L 1 500 2000 2500 3000 AVAILABLE VOLUME OF SOLTJIION hI TANIK (gaJJors)Frgure 3 1 7-l (page I of 1)Sodr um Pentabor-ate Sol urr on Vo.lume Vensus Concenlralr on Requr rements 3500 DAtC 3.1 23 Amendmenr 236 ECCS Instrumentation 3.3.5.1  DAEC 3.3-32 Amendment 223 3.3  INSTRUMENTATION 3.3.5.1  Emergency Core Cooling System (ECCS) Instrumentation LCO 3.3.5.1 The ECCS instrumentation for each Function in Table 3.3.5.1-1 shall be OPERABLE.
APPLICABILITY: According to Table 3.3.5.1-1.
ACTIONS ---------------------------------------------------
--------NOTE-------
---------------
-------------
-------------
Separate Condition entry is allowed for each channel. ------------------------------------
-------------------------------------------------------------------------------
CONDITION REQUIRED ACT ION COMPLETION TIME A. One or more channels inoperable.
A.1 Enter the Condition referenced in Table 3.3.5.1-1 for the
 
channel. Immediately (continued)
 
ECCS Instrumentation 3.3.5.1  DAEC 3.3-33 Amendment 223 ACTIONS  (continued)
CONDITION REQUIRED ACT ION COMPLETION TIME B. As required by Required Action A.1 and referenced in
 
Table 3.3.5.1-1 B.1 ------------
--NOTES----------- 1. Only applicable in MODES 1, 2, and
: 3. 2. Only applicable for Functions 1.a, 1.b, 2.a, and 2.b. ---------------------------------
Declare supported
 
feature(s) inoperable
 
when redundant
 
feature(s) ECCS
 
initiation capability is inoperable.
AND B.2 ------------
--NOTE------------ Only applicable for
 
Functions 3.a and 3.b.
------------------
----------------
Declare High Pressure
 
Coolant Injection (HPCI)
 
System inoperable.
AND  B.3 Place channel in trip.
1 hour from discovery of
 
loss of initiation
 
capability for feature(s)
 
in two or more low
 
pressure ECCS
 
subsystems 1 hour from discovery of loss of HPCI initiation
 
capability 24 hours (continued)
ECCS Instrumentation 3.3.5.1  DAEC 3.3-34 Amendment 223 ACTIONS  (continued)
CONDITION REQUIRED ACT ION COMPLETION TIME C. As required by Required Action A.1 and referenced in
 
Table 3.3.5.1-1.
C.1 ------------NOTES---------- 1. Only applicable in MODES 1, 2, and
: 3. 2. Only applicable for Functions 1.c, 1.e, 2.c and 2.e. --------------------------------
Declare supported
 
feature(s) inoperable.
AND C.2 -------------NOTES-------- 1. Only applicable in Modes 1, 2, and 3.
: 2. Only applicable for Functions 2.g, 2.h, 2.i, and 2.j.
------------------
-------------
Declare Low Pressure
 
Coolant Injection (LPCI) subsystem inoperable.
AND C.3 Restore channel to OPERABLE status.
1 hour from
 
discovery of loss of initiation capability
 
for two or more low
 
pressure ECCS
 
subsystems 1 hour from
 
discovery of loss of Loop Selection
 
capability 24 hours (continued)
ECCS Instrumentation 3.3.5.1  DAEC 3.3-35 Amendment 223 ACTIONS  (continued)
CONDITION REQUIRED ACT ION COMPLETION TIME D. As required by Required Action A.1 and referenced in
 
Table 3.3.5.1-1.
D.1 ----------NOTE----------- Only applicable if
 
HPCI pump suction is
 
not aligned to the
 
suppression pool.
---------------
--------------
Declare HPCI System inoperable.
AND D.2.1 Place channel in trip.
OR D.2.2 Align the HPCI pump suction to the
 
suppression pool.
1 hour from discovery of loss of HPCI suction
 
transfer capability 24 hours    24 hours (continued)
ECCS Instrumentation 3.3.5.1  DAEC 3.3-36 Amendment 223 ACTIONS  (continued)
CONDITION REQUIRED ACT ION COMPLETION TIME E. As required by Required Action A.1 and referenced in
 
Table 3.3.5.1-1.
E.1 ----------NOTES---------- 1. Only applicable in MODES 1, 2, and
: 3. 2. Only applicable for Functions 1.d and
 
2.f. ------------------
-------------
Declare supported
 
feature(s) inoperable.
AND E.2 Restore channel to OPERABLE status.
1 hour from discovery of
 
loss of initiation
 
capability for two or
 
more minimum flow
 
valves in the low
 
pressure ECCS
 
subsystems 7 days  F. As required by Required Action A.1 
 
and referenced in
 
Table 3.3.5.1-1.
F.1 Restore channel to OPERABLE status.
1 hour (continued)
ECCS Instrumentation 3.3.5.1  DAEC 3.3-37 Amendment 223 ACTIONS  (continued)
CONDITION REQUIRED ACT ION COMPLETION TIME G. As required by Required Action A.1 and referenced in
 
Table 3.3.5.1-1.
G.1 Declare Automatic Depressurization System (ADS) valves inoperable.
AND G.2 Place channel in trip.
1 hour from discovery of loss of ADS initiation
 
capability in both trip
 
logics    96 hours from discovery
 
of inoperable channel concurrent with HPCI or
 
Reactor Core Isolation
 
Cooling (RCIC)
 
inoperable AND 8 days  (continued)
ECCS Instrumentation 3.3.5.1  DAEC 3.3-38 Amendment 223 ACTIONS  (continued)
CONDITION REQUIRED ACT ION COMPLETION TIME H. As required by Required Action A.1 and referenced in Table
 
3.3.5.1-1.
H.1 Declare ADS valves inoperable.
AND H.2 Restore channel to OEPRABLE status.
1 hour from discovery of loss of ADS initiation
 
capability in both trip
 
logics    96 hours from
 
discovery of inoperable
 
channel concurrent
 
with HPCI or RCIC
 
inoperable AND 8 days  I. Required Action and associated Completion
 
Time of Condition B,  C, D, E, F, G, or H not
 
met. I.1 Declare associated supported feature(s) inoperable.
Immediately ECCS Instrumentation 3.3.5.1  DAEC 3.3-39 Amendment 223 SURVEILLANCE REQUIREMENTS
---------------------------------------------------
---NOTES-----------
---------------
-------------
------------- 1. Refer to Table 3.3.5.1-1 to determi ne which SRs apply for each ECCS Function.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into asso ciated Conditions and Required Actions may be delayed as follows:  (a) for up to 6 hours for Functions 1.d, 2.f, 3.c, 3.d, 3.e, and 3.f; and (b) for up to 6 hours for Functi ons other than 1.d, 2.f, 3.c, 3.d, 3.e, and 3.f provided the associated Function (or the redundant Function for Functions 4 and 5) maintains ECCS initiati on or loop selection capability. ------------------------------------
-----------------------------------------------------------------
-------------
SURVEILLANCE FREQUENCY SR 3.3.5.1.1 Perform CHANNEL CHECK.
24 hours  SR 3.3.5.1.2 Perform CHANNEL FUNCTIONAL TEST. 31 days  SR 3.3.5.1.3 Perform CHANNEL FUNCTIONAL TEST. 92 days  SR 3.3.5.1.4 Perform CHANNEL CALIBRATION.
92 days  SR 3.3.5.1.5 Perform CHANNEL FUNCTIONAL TEST. 12 months SR 3.3.5.1.6 Perform CHANNEL CALIBRATION.
12 months (continued)
ECCS Instrumentation 3.3.5.1  DAEC 3.3-40 Amendment 223 SURVEILLANCE REQUIREMENTS  (continued) SURVEILLANCE FREQUENCY SR 3.3.5.1.7 Perform CHANNEL CALIBRATION.
18 months SR 3.3.5.1.8 Perform CHANNEL CALIBRATION.
24 months SR 3.3.5.1.9 Perform LOGIC SYSTEM FUNCTIONAL TEST. 24 months
 
Primary Containment Isolation Instrumentation 3.3.6.1  DAEC 3.3-50 Amendment 223 3.3  INSTRUMENTATION 3.3.6.1  Primary Containment Isolation Instrumentation LCO  3.3.6.1 The primary containment isolation instrumentat ion for each Function in Table 3.3.6.1-1 shall be OPERABLE.
APPLICABILITY: According to Table 3.3.6.1-1.
ACTIONS  -------------------------------------------------------NOTE-----------------------------------------
------------
Separate Condition entry is allowed for each channel. ------------------------------------
-----------------
------------------
----------------------------------------------
CONDITION REQUIRED ACT ION COMPLETION TIME A. One or more required channels inoperable.
A.1 Place channel in trip.
AND A.2 ----------N OTE--------- Only applicable for Function 7.a.  
---------------
------------
Inhibit containment spray system.
12 hours for
 
Functions 2.a, 2.b, 6.b, and 6.c AND 24 hours for
 
Functions other than
 
Functions 2.a, 2.b, and 6.b, and 6.c 24 hours (continued)
Primary Containment Isolation Instrumentation 3.3.6.1  DAEC 3.3-51 Amendment 223 ACTIONS  (continued)
CONDITION REQUIRED ACT ION COMPLETION TIME B. One or more automatic Functions with isolation capability not
 
maintained.
B.1 Restore isolation capability.
1 hour  C. Required Action  and associated Completion Time of Condition A or
 
B not met.
C.1 Enter the Condition referenced in Table 3.3.6.1-1 for
 
the channel.
Immediately D. As required by Required Action C.1 and
 
referenced in Table


Primary Containment Isolation Instrumentation 3.3.6.1 ACTIONS (continued)
CONDITION                REQUIRED ACTION          COMPLETION TIME B. One or more automatic    B.1    Restore isolation    1 hour Functions with isolation        capability.
capability not maintained.
C. Required Action and      C.1    Enter the Condition  Immediately associated Completion          referenced in Time of Condition A or          Table 3.3.6.1-1 for B not met.                      the channel.
D. As required by Required  D.1    Isolate associated    12 hours Action C.1 and                  main steam line referenced in Table            (MSL).
3.3.6.1-1.
3.3.6.1-1.
D.1 Isolate associated main steam line (MSL). OR D.2.1 Be in MODE 3.
OR D.2.1 Be in MODE 3.         12 hours AND D.2.2 Be in MODE 4.         36 hours E. As required by Required E.1    Be in MODE 2.        8 hours Action C.1 and referenced in Table 3.3.6.1-1.
AND D.2.2 Be in MODE 4.
(continued)
12 hours      12 hours    36 hours E. As required by Required Action C.1 and  
DAEC                             3.3-51                      Amendment 223
 
referenced in Table  
 
3.3.6.1-1.
E.1 Be in MODE 2.
8 hours (continued)
Primary Containment Isolation Instrumentation 3.3.6.1  DAEC 3.3-52 Amendment No. 231 ACTIONS  (continued)
CONDITION REQUIRED ACT ION COMPLETION TIME F. As required by Required Action C.1 and referenced in Table


Primary Containment Isolation Instrumentation 3.3.6.1 ACTIONS (continued)
CONDITION                  REQUIRED ACTION            COMPLETION TIME F. As required by Required    F.1 Isolate the affected      1 hour Action C.1 and                  penetration flow referenced in Table              path(s).
3.3.6.1-1.
3.3.6.1-1.
F.1 Isolate the affected penetration flow
G. [Deleted]
 
H. As required by Required   H.1    Be in MODE 3.            12 hours Action C.1 and referenced in Table      AND 3.3.6.1-1.
path(s). 1 hour  G. [Deleted]
H.2    Be in MODE 4.            36 hours OR Required Action and associated Completion Time for Condition F not met.
H. As required by Required Action C.1 and  
I. As required by Required  I.1    Declare Standby Liquid 1 hour Action C.1 and                  Control (SLC) System referenced in Table             inoperable.
 
referenced in Table  
 
3.3.6.1-1.
3.3.6.1-1.
OR Required Action and associated Completion Time for Condition F not
OR I.2    Isolate the Reactor      1 hour Water Cleanup System.
 
(continued)
met. H.1 Be in MODE 3.
DAEC                              3.3-52                  Amendment No. 231
AND  H.2 Be in MODE 4.
12 hours    36 hours  I. As required by Required Action C.1 and
 
referenced in Table


Primary Containment Isolation Instrumentation 3.3.6.1 ACTIONS (continued)
CONDITION                REQUIRED ACTION                    COMPLETION TIME J. As required by Required J.1  Initiate action to restore      Immediately Action C.1 and                channel to OPERABLE referenced in Table          status.
3.3.6.1-1.
3.3.6.1-1.
I.1 Declare Standby Liquid Control (SLC) System inoperable.
OR J.2  Initiate action to isolate     Immediately the Residual Heat Removal (RHR)
OR I.2 Isolate the Reactor Water Cleanup
Shutdown Cooling System.
 
K. As required by         K.1   -----------NOTE------------
System. 1 hour      1 hour (continued)
Required Action C.1            Only applicable if and referenced in              inoperable channel is Table 3.3.6.1-1.              not in trip.
 
Declare associated             Immediately Suppression Pool Cooling/Spray subsystem(s) inoperable.
Primary Containment Isolation Instrumentation 3.3.6.1   DAEC 3.3-53 Amendment 223 ACTIONS  (continued)
OR K.2   ----------NOTE------------
CONDITION REQUIRED ACT ION  COMPLETION TIME J. As required by Required Action C.1 and referenced in Table
Only applicable if inoperable channel is in trip.
 
Declare Primary               Immediately Containment inoperable.
3.3.6.1-1.
(continued)
J.1 Initiate action to restore channel to OPERABLE
DAEC                             3.3-53                              Amendment 223
 
status. OR J.2 Initiate action to isolate the Residual Heat  
 
Removal (RHR)  
 
Shutdown Cooling  
 
System. Immediately Immediately K. As required by Required Action C.1
 
and referenced in
 
Table 3.3.6.1-1.
K.1 -----------N OTE------------ Only applicable if  
 
inoperable channel is  
 
not in trip.  
------------------
------------
Declare associated  
 
Suppression Pool  
 
Cooling/Spray  
 
subsystem(s) inoperable.
OR K.2 ----------NOTE------------ Only applicable if  
 
inoperable channel is  
 
in trip. ------------------
------------
Declare Primary  
 
Containment inoperable.
Immediately Immediately (continued)
Primary Containment Isolation Instrumentation 3.3.6.1  DAEC 3.3-54 Amendment 223 ACTIONS  (continued)
CONDITION REQUIRED ACT ION COMPLETION TIME L. As required by Required Action C.1 and referenced in
 
Table 3.3.6.1-1.
L.1 Isolate the primary containment vent and
 
purge penetration flow
 
paths. OR L.2 Establish administrative control
 
of the primary
 
containment vent and purge valves using
 
continuous monitoring
 
of alternate
 
instrumentation.
1 hour      1 hour Primary Containment Isolation Instrumentation 3.3.6.1  DAEC 3.3-55 Amendment 280 SURVEILLANCE REQUIREMENTS
----------------------------------------------------NOTES-------------
---------------
-------------
------------- 1. Refer to Table 3.3.6.1-1 to det ermine which SRs apply for each Primary Containment Isolation Function.
: 2. When a channel is placed in an inoper able status solely for performance of required Surveillances, entry into asso ciated Conditions and Required Actions may be delayed as follows:  (a) for up to 6 hours for Function 5.a; and (b) for up to 6 hours for Functions other than 5.a provided the associated Function maintains isolation capability. ------------------------------------
-----------------
------------------
----------------------------------------------
SURVEILLANCE FREQUENCY SR 3.3.6.1.1 Perform CHANNEL CHECK.
In accordance with
 
the Surveillance
 
Frequency Control
 
Program  SR 3.3.6.1.2 Perform CHANNEL CHECK.
In accordance with
 
the Surveillance
 
Frequency Control
 
Program  SR 3.3.6.1.3 Perform CHANNEL FUNCTIONAL TEST.
In accordance with
 
the Surveillance
 
Frequency Control
 
Program  SR 3.3.6.1.4 Perform CHANNEL FUNCTIONAL TEST.
In accordance with
 
the Surveillance
 
Frequency Control
 
Program  SR 3.3.6.1.5 Perform CHANNEL CALIBRATION.
In accordance with
 
the Surveillance
 
Frequency Control
 
Program  (continued)
 
Primary Containment Isolation Instrumentation 3.3.6.1  DAEC 3.3-56 Amendment 280 SURVEILLANCE REQUIREMENTS  (continued) SURVEILLANCE FREQUENCY SR 3.3.6.1.6 Perform CHANNEL CALIBRATION.
In accordance with the Surveillance
 
Frequency Control
 
Program  SR 3.3.6.1.7 Perform CHANNEL CALIBRATION.
In accordance with
 
the Surveillance Frequency Control Program  SR 3.3.6.1.8 Perform CHANNEL CALIBRATION.
In accordance with
 
the Surveillance
 
Frequency Control
 
Program  SR 3.3.6.1.9 Perform LOGIC SYSTEM FUNCTIONAL TEST. In accordance with
 
the Surveillance
 
Frequency Control


Program Primary Containment Isolation Instrumentation 3.3.6.1   DAEC 3.3-57 Amendment No. 261 Table 3.3.6.1-1 (page 1 of 5) Primary Containment Isolation Instrumentation
Primary Containment Isolation Instrumentation 3.3.6.1 ACTIONS (continued)
CONDITION              REQUIRED ACTION            COMPLETION TIME L. As required by      L.1  Isolate the primary    1 hour Required Action C.1      containment vent and and referenced in        purge penetration flow Table 3.3.6.1-1.        paths.
OR L.2  Establish              1 hour administrative control of the primary containment vent and purge valves using continuous monitoring of alternate instrumentation.
DAEC                        3.3-54                        Amendment 223


FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM CONDITIONS REFERENCED FROM REQUIRED ACTION C.1  
Primary Containment Isolation Instrumentation 3.3.6.1 SURVEILLANCE REQUIREMENTS
----------------------------------------------------NOTES------------------------------------------------------
: 1. Refer to Table 3.3.6.1-1 to determine which SRs apply for each Primary Containment Isolation Function.
: 2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours for Function 5.a; and (b) for up to 6 hours for Functions other than 5.a provided the associated Function maintains isolation capability.
SURVEILLANCE                                            FREQUENCY SR 3.3.6.1.1                Perform CHANNEL CHECK.                                      In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.2                Perform CHANNEL CHECK.                                      In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.3                Perform CHANNEL FUNCTIONAL TEST.                            In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.4                Perform CHANNEL FUNCTIONAL TEST.                            In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.5                Perform CHANNEL CALIBRATION.                                In accordance with the Surveillance Frequency Control Program (continued)
DAEC                                              3.3-55                                    Amendment 280


SURVEILLANCE REQUIREMENTS  
Primary Containment Isolation Instrumentation 3.3.6.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                          FREQUENCY SR 3.3.6.1.6  Perform CHANNEL CALIBRATION.              In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.7  Perform CHANNEL CALIBRATION.              In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.8    Perform CHANNEL CALIBRATION.            In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.9    Perform LOGIC SYSTEM FUNCTIONAL          In accordance with TEST.                                    the Surveillance Frequency Control Program DAEC                        3.3-56                        Amendment 280


ALLOWABLE VALUE
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 1 of 5)
Primary Containment Isolation Instrumentation APPLICABLE                      CONDITIONS MODES OR        REQUIRED        REFERENCED OTHER        CHANNELS            FROM SPECIFIED      PER TRIP        REQUIRED            SURVEILLANCE      ALLOWABLE FUNCTION                CONDITIONS        SYSTEM          ACTION C.1          REQUIREMENTS      VALUE
: 1. Main Steam Line Isolation
: 1. Main Steam Line Isolation
: a. Reactor Vessel Water Level - Low Low Low 1,2,3 2 D SR 3.3.6.1.1 SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
: a. Reactor Vessel Water             1,2,3             2                 D             SR   3.3.6.1.1     > 38.3 inches Level - Low Low Low                                                                SR   3.3.6.1.4 SR   3.3.6.1.8 SR   3.3.6.1.9
 
: b. Main Steam Line                   1               2                 E             SR 3.3.6.1.4       > 821 psig Pressure - Low                                                                    SR 3.3.6.1.5 SR 3.3.6.1.9
> 38.3 inches b. Main Steam Line Pressure - Low 1 2 E SR 3.3.6.1.4 SR 3.3.6.1.5 SR 3.3.6.1.9  
: c. Main Steam Line                 1,2,3           2 per               D             SR   3.3.6.1.1     < 138% rated Flow - High                                    MSL                                SR   3.3.6.1.4     steam flow SR   3.3.6.1.5 SR   3.3.6.1.9
 
: d. Condenser                           (a)           2                 D             SR 3.3.6.1.4       > 7.2 inches 1, 2  ,
> 821 psig c. Main Steam Line Flow - High 1,2,3 2 per MSL D SR 3.3.6.1.1 SR 3.3.6.1.4 SR 3.3.6.1.5 SR 3.3.6.1.9  
Backpressure - High              (a)                                              SR 3.3.6.1.8       Hg vacuum 3                                                SR 3.3.6.1.9
< 138% rated steam flow d. Condenser Backpressure - High 1, 2(a), 3(a) 2 D SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
: e. Main Steam Line Tunnel           1,2,3             4                 D             SR   3.3.6.1.2     < 205.1&deg;F Temperature - High                                                                SR   3.3.6.1.4 SR   3.3.6.1.7 SR   3.3.6.1.9 f.. Turbine Building               1,2,3             4                 D             SR   3.3.6.1.2     < 205.1&deg;F Temperature - High                                                                SR   3.3.6.1.4 SR   3.3.6.1.7 SR   3.3.6.1.9 (continued)
 
(a) When any turbine stop valve is greater than 90% open or when the key-locked bypass switch is in the NORM Position.
> 7.2 inches Hg vacuum e. Main Steam Line Tunnel Temperature - High 1,2,3 4 D SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.7 SR 3.3.6.1.9  
DAEC                                                         3.3-57                                              Amendment No. 261
< 205.1 F        f.. Turbine Building Temperature - High 1,2,3 4 D SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.7 SR 3.3.6.1.9  
 
< 205.1 F    (continued)  
 
(a) When any turbine stop valve is greater than 90% open or when the key-locked bypass switch is in the NORM Position.
Primary Containment Isolation Instrumentation 3.3.6.1  DAEC 3.3-58 Amendment 223 Table 3.3.6.1-1 (page 2 of 5) Primary Containment Isolation Instrumentation
 
FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM CONDITIONS REFERENCED FROM REQUIRED ACTION C.1
 
SURVEILLANCE REQUIREMENTS


ALLOWABLE VALUE
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 2 of 5)
Primary Containment Isolation Instrumentation APPLICABLE                        CONDITIONS MODES OR        REQUIRED        REFERENCED OTHER        CHANNELS              FROM SPECIFIED        PER TRIP        REQUIRED          SURVEILLANCE          ALLOWABLE FUNCTION                CONDITIONS        SYSTEM          ACTION C.1        REQUIREMENTS              VALUE
: 2. Primary Containment Isolation
: 2. Primary Containment Isolation
: a. Reactor Vessel Water Level - Low 1,2,3 2 H SR 3.3.6.1.1 SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
: a. Reactor Vessel Water             1,2,3             2                 H           SR   3.3.6.1.1 > 165.6 inches Level - Low                                                                        SR   3.3.6.1.4 SR   3.3.6.1.8 SR   3.3.6.1.9
 
: b. Drywell Pressure - High           1,2,3             2                 H           SR 3.3.6.1.4   < 2.2 psig SR 3.3.6.1.8 SR 3.3.6.1.9 (c)
> 165.6 inches b. Drywell Pressure - High 1,2,3 2 H SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
: c. Offgas Vent Stack -             1   , 2(c),         1                 L           SR   3.3.6.1.2 (b)
 
High Radiation                      (c)                                            SR   3.3.6.1.4 3                                                SR   3.3.6.1.8 SR   3.3.6.1.9
< 2.2 psig c. Offgas Vent Stack -
: d. Reactor Building                 1,2,3             1                 H           SR   3.3.6.1.2 < 12.8 mR/hr Exhaust Shaft -                                                                    SR   3.3.6.1.4 High Radiation                                                                    SR   3.3.6.1.8 SR   3.3.6.1.9
High Radiation 1 (c), 2 (c), 3 (c) 1 L SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
: e. Refueling Floor                   1,2,3             1                 H           SR   3.3.6.1.2 < 10.6 mR/hr Exhaust Duct -                                                                    SR   3.3.6.1.4 High Radiation                                                                    SR   3.3.6.1.8 SR   3.3.6.1.9
 
: 3. High Pressure Coolant Injection (HPCI) System Isolation
(b) d. Reactor Building Exhaust Shaft -
: a. HPCI Steam Line Flow -           1,2,3             1                 F           SR 3.3.6.1.4   < 409 inches High                                                                              SR 3.3.6.1.8   (inboard)
High Radiation 1,2,3   1 H SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
SR 3.3.6.1.9   < 110 inches (outboard)
 
(continued)
< 12.8 mR/hr e. Refueling Floor Exhaust Duct -
(b) Allowable value is determined in accordance with the ODAM.
 
(c) During venting or purging of primary containment.
High Radiation 1,2,3 1 H SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
DAEC                                                         3.3-58                                                Amendment 223
< 10.6 mR/hr 3. High Pressure Coolant Injection (HPCI) System Isolation
: a. HPCI Steam Line Flow -
High 1,2,3 1 F SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
 
< 409 inches (inboard)
 
< 110 inches (outboard) (continued) (b) Allowable value is determined in accordance with the ODAM. (c) During venting or purging of primary containment.
Primary Containment Isolation Instrumentation 3.3.6.1  DAEC 3.3-59 Amendment No. 231  Table 3.3.6.1-1 (page 3 of 5) Primary Containment Isolation Instrumentation


FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM CONDITIONS REFERENCED FROM REQUIRED ACTION C.1  
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 3 of 5)
 
Primary Containment Isolation Instrumentation APPLICABLE                 CONDITIONS MODES OR REQUIRED        REFERENCED OTHER   CHANNELS            FROM SPECIFIED PER TRIP         REQUIRED            SURVEILLANCE    ALLOWABLE FUNCTION          CONDITIONS  SYSTEM           ACTION C.1           REQUIREMENTS     VALUE
SURVEILLANCE REQUIREMENTS  
 
ALLOWABLE
 
VALUE
: 3. HPCI System Isolation (continued)
: 3. HPCI System Isolation (continued)
: b. HPCI Steam Supply Line Pressure - Low 1,2,3 2 F SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
: b. HPCI Steam Supply Line   1,2,3       2                 F             SR 3.3.6.1.4     > 50 psig and Pressure - Low                                                          SR 3.3.6.1.8     < 147.1 psig SR 3.3.6.1.9
 
: c. HPCI Turbine             1,2,3       2                 F             SR 3.3.6.1.4     > 2.5 psig Exhaust Diaphragm                                                      SR 3.3.6.1.8 Pressure - High                                                        SR 3.3.6.1.9
> 50 psig and
: d. Drywell Pressure -       1,2,3       1                 F             SR 3.3.6.1.4     < 2.2 psig High                                                                    SR 3.3.6.1.8 SR 3.3.6.1.9
< 147.1 psig c. HPCI Turbine Exhaust Diaphragm Pressure - High 1,2,3 2 F SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
: e. Suppression Pool         1,2,3       1                 F             SR   3.3.6.1.2   < 153.3&deg;F Area Ambient                                                            SR   3.3.6.1.4 Temperature - High                                                      SR   3.3.6.1.8 SR   3.3.6.1.9
> 2.5 psig d. Drywell Pressure -
: f. HPCI Leak Detection       1,2,3       1                 F             SR 3.3.6.1.4     N/A Time Delay                                                              SR 3.3.6.1.8 SR 3.3.6.1.9
High 1,2,3 1 F SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
: g. Suppression Pool         1,2,3        1                  F              SR  3.3.6.1.2  < 51.5&deg;F Area Ventilation                                                       SR  3.3.6.1.4 Differential                                                           SR  3.3.6.1.8 Temperature - High                                                     SR  3.3.6.1.9
 
: h. HPCI Equipment Room      1,2,3       1                 F             SR   3.3.6.1.2   < 178.3&deg;F Temperature - High                                                      SR   3.3.6.1.4 SR   3.3.6.1.8 SR   3.3.6.1.9
< 2.2 psig e. Suppression Pool Area Ambient Temperature - High 1,2,3   1 F SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
: i. HPCI Room Ventilation    1,2,3       1                 F             SR   3.3.6.1.2   < 51.5&deg;F Differential                                                            SR   3.3.6.1.4 Temperature - High                                                      SR   3.3.6.1.8 SR   3.3.6.1.9 (continued)
 
DAEC                                              3.3-59                                    Amendment No. 231
< 153.3 F f. HPCI Leak Detection Time Delay 1,2,3 1 F SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9 N/A g. Suppression Pool Area Ventilation Differential Temperature - High 1,2,3 1 F SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
 
< 51.5 F h. HPCI Equipment Room Temperature - High 1,2,3 1 F SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  


< 178.3 F  i. HPCI Room Ventilation Differential Temperature - High 1,2,3 1 F SR  3.3.6.1.2 SR  3.3.6.1.4 SR  3.3.6.1.8 SR  3.3.6.1.9
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 4 of 5)
 
Primary Containment Isolation Instrumentation APPLICABLE                 CONDITIONS MODES OR REQUIRED        REFERENCED OTHER   CHANNELS            FROM SPECIFIED PER TRIP         REQUIRED            SURVEILLANCE  ALLOWABLE FUNCTION        CONDITIONS  SYSTEM           ACTION C.1         REQUIREMENTS   VALUE
< 51.5 F 
 
(continued)
Primary Containment Isolation Instrumentation 3.3.6.1   DAEC 3.3-60 Amendment No. 231 Table 3.3.6.1-1 (page 4 of 5) Primary Containment Isolation Instrumentation  
 
FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM CONDITIONS REFERENCED FROM REQUIRED ACTION C.1  
 
SURVEILLANCE REQUIREMENTS  
 
ALLOWABLE
 
VALUE
: 4. Reactor Core Isolation Cooling (RCIC) System Isolation
: 4. Reactor Core Isolation Cooling (RCIC) System Isolation
: a. RCIC Steam Line Flow - High 1,2,3 1 F SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
: a. RCIC Steam Line           1,2,3       1                 F             SR 3.3.6.1.4   < 164 inches Flow - High                                                            SR 3.3.6.1.8   (inboard)
 
SR 3.3.6.1.9   < 159 inches (outboard)
< 164 inches (inboard)
: b. RCIC Steam Supply         1,2,3       2                 F             SR 3.3.6.1.4   > 50.3 psig Line Pressure - Low                                                    SR 3.3.6.1.8 SR 3.3.6.1.9
 
: c. RCIC Turbine             1,2,3       2                 F             SR 3.3.6.1.4   > 3.3 psig Exhaust Diaphragm                                                      SR 3.3.6.1.6 Pressure - High                                                        SR 3.3.6.1.9
< 159 inches (outboard)
: d. Drywell Pressure -       1,2,3       1                 F             SR 3.3.6.1.4   < 2.2 psig High                                                                    SR 3.3.6.1.8 SR 3.3.6.1.9
: b. RCIC Steam Supply Line Pressure - Low 1,2,3 2 F SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
: e. RCIC Suppression         1,2,3       1                 F             SR   3.3.6.1.2 < 153.3&deg;F Pool Area Ambient                                                      SR   3.3.6.1.4 Temperature - High                                                      SR   3.3.6.1.8 SR   3.3.6.1.9
 
: f. RCIC Leak Detection       1,2,3       1                 F             SR 3.3.6.1.4   N/A Time Delay                                                              SR 3.3.6.1.8 SR 3.3.6.1.9
> 50.3 psig c. RCIC Turbine Exhaust Diaphragm Pressure - High 1,2,3 2 F SR 3.3.6.1.4 SR 3.3.6.1.6 SR 3.3.6.1.9  
: g. RCIC Suppression         1,2,3       1                 F             SR   3.3.6.1.2 < 51.5&deg;F Pool Area Ventilation                                                  SR   3.3.6.1.4 Differential                                                            SR   3.3.6.1.8 Temperature - High                                                      SR   3.3.6.1.9
> 3.3 psig d. Drywell Pressure -
: h. RCIC Equipment Room       1,2,3       1                 F             SR   3.3.6.1.2 < 178.3&deg;F Temperature - High                                                      SR   3.3.6.1.4 SR   3.3.6.1.8 SR   3.3.6.1.9
High 1,2,3 1 F SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
: i. RCIC Room                 1,2,3       1                 F             SR   3.3.6.1.2 < 51.5&deg;F Ventilation                                                            SR   3.3.6.1.4 Differential                                                            SR   3.3.6.1.8 Temperature - High                                                      SR   3.3.6.1.9 (continued)
 
DAEC                                               3.3-60                                          Amendment No. 231
< 2.2 psig e. RCIC Suppression Pool Area Ambient Temperature - High
 
1,2,3 1 F SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
 
< 153.3 F f. RCIC Leak Detection Time Delay 1,2,3 1 F SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9 N/A g. RCIC Suppression Pool Area Ventilation Differential Temperature - High 1,2,3 1 F SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
 
< 51.5 F  h. RCIC Equipment Room Temperature - High 1,2,3 1 F SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
 
< 178.3 F i. RCIC Room Ventilation Differential Temperature - High 1,2,3 1 F SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
< 51.5 F           
 
(continued)  
 
Primary Containment Isolation Instrumentation 3.3.6.1  DAEC 3.3-61 Amendment 223 Table 3.3.6.1-1 (page 5 of 5) Primary Containment Isolation Instrumentation
 
FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER TRIP SYSTEM CONDITIONS REFERENCED FROM REQUIRED ACTION C.1
 
SURVEILLANCE REQUIREMENTS


ALLOWABLE  VALUE
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 5 of 5)
Primary Containment Isolation Instrumentation APPLICABLE                            CONDITIONS MODES OR            REQUIRED          REFERENCED OTHER            CHANNELS              FROM SPECIFIED            PER TRIP          REQUIRED  SURVEILLANCE  ALLOWABLE FUNCTION                          CONDITIONS            SYSTEM          ACTION C.1 REQUIREMENTS   VALUE
: 5. Reactor Water Cleanup (RWCU) System Isolation
: 5. Reactor Water Cleanup (RWCU) System Isolation
: a. Differential Flow -
: a. Differential Flow -                           1,2,3                1                F    SR 3.3.6.1.2 < 59 gpm High                                                                                        SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9
High 1,2,3 1 F SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
: b. Area Temperature - High                       1,2,3                 (d)              F    SR 3.3.6.1.2 1                                     < 133.3&deg;F SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9
< 59 gpm b. Area Temperature - High 1,2,3 1(d) F SR 3.3.6.1.2 SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9  
: c. Area Ventilation                              1,2,3                (d)              F    SR 3.3.6.1.2 1
Differential                                                                                SR 3.3.6.1.4 Temperature - High                                                                          SR 3.3.6.1.8 SR 3.3.6.1.9 RWCU Pump Room                                                                                          < 22.5&deg;F RWCU Pump A Room                                                                                        < 23.5&deg;F RWCU Pump B Room                                                                                        < 34.5&deg;F RWCU Heat Exch. Room                                                                                    < 51.5&deg;F
: d. SLC System Initiation                          1,2                  (e)              I    SR 3.3.6.1.9 NA 1
: e. Reactor Vessel Water                          1,2,3                2                F    SR 3.3.6.1.1 > 112.65 Level - Low Low                                                                            SR 3.3.6.1.4 inches SR 3.3.6.1.7 SR 3.3.6.1.9
: f. Area Near TIP Room                            1,2,3                1                F    SR 3.3.6.1.2 < 115.7&deg;F Ambient Temperature -                                                                       SR 3.3.6.1.4 High                                                                                       SR 3.3.6.1.8 SR 3.3.6.1.9
: 6. Shutdown Cooling System Isolation
: a. Reactor Steam Dome                            1,2,3                 1                F    SR 3.3.6.1.4 < 152.7 psig Pressure - High                                                                            SR 3.3.6.1.5 SR 3.3.6.1.9
: b. Reactor Vessel Water                          3,4,5                  (f)             J    SR 3.3.6.1.1 > 165.6 inches 2
Level - Low                                                                                SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9
: c. Drywell Pressure -                            1,2,3                2                F     SR 3.3.6.1.4 < 2.2 psig High                                                                                        SR 3.3.6.1.8 SR 3.3.6.1.9
: 7. Containment Cooling System Isolation
: a. Containment Pressure -                        1,2,3                4                 K    SR 3.3.6.1.3 > 1.25 psig High                                                                                        SR 3.3.6.1.8 SR 3.3.6.1.9 (d) Each Trip System must have either an OPERABLE Function 5.b or an OPERABLE Function 5.c channel in both the RWCU pump area and in the RWCU heat exchanger area.
(e) SLC System Initiation only inputs into one of the two trip systems.
(f) Only one trip system required in MODES 4 and 5 when RHR Shutdown Cooling System integrity maintained.
DAEC                                                              3.3-61                                          Amendment 223


  < 133.3 F c. Area Ventilation Differential Temperature - High RWCU Pump Room RWCU Pump A Room RWCU Pump B Room RWCU Heat Exch. Room 1,2,3 1(d) F SR 3.3.6.1.2 SR  3.3.6.1.4 SR  3.3.6.1.8 SR  3.3.6.1.9
RHR Shutdown Cooling System Hot Shutdown 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 Residual Heat Removal (RHR) Shutdown Cooling System Hot Shutdown LCO 3.4.7                Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.
                          -----------------------------------NOTES-------------------------------------------
: 1. Both required RHR shutdown cooling subsystems and recirculation pumps may not be in operation for up to 2 hours per 8 hour period.
: 2. One required RHR shutdown cooling subsystem may be inoperable for up to 2 hours for the performance of Surveillances.
APPLICABILITY:            MODE 3, with reactor steam dome pressure < the RCIC Steam Supply Line Pressure - Low isolation pressure.
ACTIONS
--------------------------------------------------------NOTE------------------------------------------------
Separate Condition entry is allowed for each RHR shutdown cooling subsystem.
CONDITION                            REQUIRED ACTION                      COMPLETION TIME A.       One or two required                A.1       Initiate action to              Immediately RHR shutdown cooling                        restore required RHR subsystems                                  shutdown cooling inoperable.                                 subsystem(s) to OPERABLE status.
AND (continued)
DAEC                                              3.4-15                                            AMD 255


  < 22.5 F < 23.5 F < 34.5 F < 51.5 F d. SLC System Initiation 1,2 1(e) I SR  3.3.6.1.9 NA e. Reactor Vessel Water Level - Low Low 1,2,3 2 F SR  3.3.6.1.1 SR  3.3.6.1.4 SR  3.3.6.1.7 SR  3.3.6.1.9
RHR Shutdown Cooling System Hot Shutdown 3.4.7 ACTIONS CONDITION              REQUIRED ACTION              COMPLETION TIME A.  (continued)             A.2    Verify by              1 hour administrative means an alternate method of decay heat removal is available for each required inoperable RHR shutdown cooling subsystem.
AND A.3   Be in MODE 4.         24 hours B. No RHR shutdown          B.1   Initiate action to    Immediately cooling subsystem in            restore one RHR operation.                     shutdown cooling subsystem or one AND                            recirculation pump to operation.
No recirculation pump in operation.               AND B.2    Verify reactor coolant 1 hour from circulation by an      discovery of no alternate method.     reactor coolant circulation AND Once per 12 hours thereafter AND B.3   Monitor reactor        Once per hour coolant temperature and pressure.
DAEC                            3.4-16                        Amendment 223


  > 112.65 inches f. Area Near TIP Room Ambient Temperature -
RHR Shutdown Cooling System Hot Shutdown 3.4.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                        FREQUENCY SR 3.4.7.1  ---------------------------NOTE---------------------------
Not required to be met until 2 hours after reactor steam dome pressure is < the RCIC Steam Supply Line Pressure - Low isolation pressure.
Verify one required RHR shutdown cooling                      12 hours subsystem or recirculation pump is operating.
DAEC                                  3.4-17                              Amendment 223


High 1,2,3 1 F SR  3.3.6.1.2 SR  3.3.6.1.4 SR  3.3.6.1.8 SR  3.3.6.1.9
RHR Shutdown Cooling System  Cold Shutdown 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 Residual Heat Removal (RHR) Shutdown Cooling System Cold Shutdown LCO 3.4.8                 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.
< 115.7 F 6. Shutdown Cooling System Isolation
                          ----------------------------------------NOTES--------------------------------------
: a. Reactor Steam Dome Pressure - High 1,2,3 1 F SR  3.3.6.1.4 SR  3.3.6.1.5 SR  3.3.6.1.9
: 1. Both required RHR shutdown cooling subsystems and recirculation pumps may not be in operation for up to 2 hours per 8 hour period.
 
: 2. One required RHR shutdown cooling subsystem may be inoperable for up to 2 hours for the performance of Surveillances.
< 152.7 psig b. Reactor Vessel Water Level - Low 3,4,5 2(f) J SR  3.3.6.1.1 SR  3.3.6.1.4 SR  3.3.6.1.8 SR  3.3.6.1.9
APPLICABILITY:           MODE 4.
> 165.6 inches c. Drywell Pressure -
ACTIONS
High 1,2,3 2 F SR  3.3.6.1.4 SR  3.3.6.1.8 SR  3.3.6.1.9
----------------------------------------------------NOTE-------------------------------------------------------
 
Separate Condition entry is allowed for each shutdown cooling subsystem.
< 2.2 psig 7. Containment Cooling System Isolation
CONDITION                             REQUIRED ACTION                          COMPLETION TIME A.         One or two required             A.1       Verify by                       1 hour RHR shutdown                                administrative cooling subsystems                          means an alternate             AND inoperable.                                method of decay heat removal is                 Once per 24 hours available for each             thereafter inoperable required RHR shutdown cooling subsystem.
: a. Containment Pressure -
(continued)
High 1,2,3 4 K SR  3.3.6.1.3 SR  3.3.6.1.8 SR  3.3.6.1.9
DAEC                                             3.4-18                                Amendment No. 234
 
> 1.25 psig (d)  Each Trip System must have either an OPERABLE Function 5.b or an OPERABLE Function 5.c channel in both the RWCU pump area and in the RWCU heat exchanger area.
 
(e)  SLC System Initiation only inputs into one of the two trip systems.
 
(f)  Only one trip system required in MODES 4 and 5 when RHR Shutdown Cooling System integrity maintained.
RHR Shutdown Cooling System - Hot Shutdown 3.4.7  DAEC 3.4-15 AMD 255 3.4  REACTOR COOLANT SYSTEM (RCS) 3.4.7 Residual Heat Removal (RHR) Shutdown Cooling System - Hot Shutdown LCO  3.4.7 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.
-----------------------------------N OTES------------------------------------------- 1. Both required RHR shutdown cooling subsystems and recirculation pumps may not be in operation for up to 2 hours per 8 hour period.
: 2. One required RHR shutdown cooling subsystem may be inoperable for up to 2 hour s for the performance of Surveillances. ---------------------------------------------------------------------------
--------------
APPLICABILITY: MODE 3, with reactor steam dome pressure  the RCIC Steam Supply Line Pressure - Low isolation pressure.
ACTIONS  --------------------------------------------------------NOTE---------
---------------
-------------
----------- Separate Condition entry is allowed for each RHR shutdown cooling subsystem. ------------------------------------
-----------------------------------------------------------------------------
CONDITION REQUIRED ACT ION COMPLETION TIME A. One or two required RHR shutdown cooling
 
subsystems inoperable.
A.1 Initiate action to restore required RHR shutdown cooling
 
subsystem(s) to
 
OPERABLE status.
AND  Immediately (continued)
RHR Shutdown Cooling System - Hot Shutdown 3.4.7  DAEC 3.4-16 Amendment 223 ACTIONS CONDITION REQUIRED ACT ION COMPLETION TIME A. (continued)
A.2 Verify by administrative means an alternate method
 
of decay heat
 
removal is available
 
for each required inoperable RHR shutdown cooling
 
subsystem.
AND A.3 Be in MODE 4.
1 hour            24 hours  B. No RHR shutdown cooling subsystem in
 
operation.
AND No recirculation pump in
 
operation.
B.1 Initiate action to restore one RHR shutdown cooling
 
subsystem or one
 
recirculation pump to
 
operation.
AND B.2 Verify reactor coolant circulation by an
 
alternate method.
AND B.3 Monitor reactor coolant temperature
 
and pressure.
Immediately 1 hour from
 
discovery of no reactor coolant
 
circulation AND Once per 12 hours thereafter Once per hour RHR Shutdown Cooling System - Hot Shutdown 3.4.7  DAEC 3.4-17 Amendment 223 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.7.1 -----------
----------------N OTE------------
---------------
Not required to be met until 2 hours after reactor steam dome pressure is  the RCIC Steam Supply Line Pressure - Low isolation pressure. --------------------------------------------------------------
Verify one required RHR shutdown cooling
 
subsystem or recirculat ion pump is operating.
12 hours RHR Shutdown Cooling System - Cold Shutdown 3.4.8   DAEC 3.4-18 Amendment No. 234 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 Residual Heat Removal (RHR) Shutdown Cooling System - Cold Shutdown LCO 3.4.8 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.  
------------------------------------
----NOTES---------
---------------
-------------- 1. Both required RHR shutdown cooling subsystems and recirculation pumps may not be in operation for up to 2 hours per 8 hour period.
: 2. One required RHR shutdown cooling subsystem may be inoperable for up to 2 hour s for the performance of Surveillances. ---------------------------------------------------------------------------
--------------
APPLICABILITY: MODE 4.
ACTIONS ----------------------------------------------------NOTE---------------
----------------------------------------
Separate Condition entry is allowed for each shutdown cooling subsystem. ------------------------------------
--------------------------------------------------------------------------------
CONDITION REQUIRED ACT ION COMPLETION TIME A. One or two required RHR shutdown
 
cooling subsystems inoperable.
A.1 Verify by administrative  
 
means an alternate  
 
method of decay  
 
heat removal is  
 
available for each  
 
inoperable required RHR shutdown cooling subsystem.
1 hour  AND Once per 24 hours thereafter (continued)  
 
RHR Shutdown Cooling System - Cold Shutdown 3.4.8  DAEC 3.4-19 Amendment 223 ACTIONS  (continued)
CONDITION REQUIRED ACT ION COMPLETION TIME B. No RHR shutdown cooling subsystem in operation.
AND No recirculation pump
 
in operation.
B.1 Verify reactor coolant circulation by an
 
alternate method.
AND B.2 Monitor reactor coolant temperature.
1 hour from
 
discovery of no reactor coolant
 
circulation AND Once per 12
 
hours thereafter Once per hour SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.8.1 Verify one requi red RHR shutdown cooling subsystem or one recirculation pump is
 
operating.
12 hours ECCS- Operating 3.5.1  DAEC 3.5-1 AMD 255 3.5  EMERGENCY CORE COOLING SYS TEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1  ECCS - Operating LCO  3.5.1 Each ECCS injection/
spray subsystem and the Automatic Depressurization System (ADS) function of four safety/relief valves shall be OPERABLE.
APPLICABILITY: MODE 1, MODES 2 and 3, except High Pressu re Coolant Injection (HPCI) is not required to be OPER ABLE with reactor steam dome pressure  150 psig and ADS valves are not required to be OPERABLE with reactor steam dome pressure  100 psig.
ACTIONS --------------------------------------------------------NOTE---------------------------------------
-------------
LCO 3.0.4.b is not applicable to HPCI. ------------------------------------
-----------------
------------------
----------------------------------------------
CONDITION REQUIRED ACT ION COMPLETION TIME A. One Residual Heat Removal (RHR) pump inoperable.
A.1 Restore RHR pump to OPERABLE status.
30 Days  B. One low pressure ECCS subsystem inoperable for


reasons other than
RHR Shutdown Cooling System  Cold Shutdown 3.4.8 ACTIONS (continued)
CONDITION                REQUIRED ACTION              COMPLETION TIME B. No RHR shutdown          B.1    Verify reactor coolant 1 hour from cooling subsystem in              circulation by an      discovery of no operation.                        alternate method.      reactor coolant circulation AND AND No recirculation pump in operation.                                            Once per 12 hours thereafter AND B.2    Monitor reactor        Once per hour coolant temperature.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                            FREQUENCY SR 3.4.8.1      Verify one required RHR shutdown cooling      12 hours subsystem or one recirculation pump is operating.
DAEC                                3.4-19                        Amendment 223


ECCS Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS  Operating LCO 3.5.1                Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of four safety/relief valves shall be OPERABLE.
APPLICABILITY:            MODE 1, MODES 2 and 3, except High Pressure Coolant Injection (HPCI) is not required to be OPERABLE with reactor steam dome pressure  150 psig and ADS valves are not required to be OPERABLE with reactor steam dome pressure  100 psig.
ACTIONS
--------------------------------------------------------NOTE----------------------------------------------------
LCO 3.0.4.b is not applicable to HPCI.
CONDITION                            REQUIRED ACTION                        COMPLETION TIME A.      One Residual Heat                  A.1      Restore RHR pump to              30 Days Removal (RHR) pump                          OPERABLE status.
inoperable.
B.      One low pressure ECCS B.1                    Restore low pressure              7 days subsystem inoperable for                    ECCS subsystem to reasons other than                          OPERABLE status.
Condition A.
Condition A.
B.1 Restore low  pressure ECCS subsystem to  
C.      One Core Spray                      C.1     Restore Core Spray                72 hours subsystem inoperable.                        subsystem to AND                                          OPERABLE status.
One or two RHR                      OR pump(s) inoperable.                                                            72 hours C.2      Restore RHR pump(s) to OPERABLE status.
D.      Both Core Spray                      D.1      Restore one Core                  72 hours subsystems inoperable.                        Spray subsystem to OPERABLE status.
(continued)
DAEC                                              3.5-1                                            AMD 255


OPERABLE status.
ECCS Operating 3.5.1 ACTIONS (continued)
7 days C. One Core Spray subsystem inoperable.
CONDITION                REQUIRED ACTION          COMPLETION TIME E. Required Action and    E.1    Be in MODE 3.        12 hours associated Completion Time of Condition A, B, AND C, or D not met.
AND One or two RHR
E.2    Be in MODE 4.        36 hours F. HPCI System            F.1    Verify by            Immediately inoperable.                    administrative means RCIC System is OPERABLE.
AND F.2    Restore HPCI        14 days System to OPERABLE status.
G. HPCI System            G.1    Restore HPCI        7 days inoperable.                    System to OPERABLE status.
AND OR One RHR pump inoperable.            G.2    Restore RHR pump to OPERABLE          7 days status.
H. HPCI System            H.1    Restore HPCI        72 hours inoperable.                    System to OPERABLE status.
AND OR One low pressure ECCS subsystem is      H.2    Restore low pressure 72 hours inoperable for reasons        ECCS subsystem to other than Condition A.        OPERABLE status.
I. HPCI System            I.1    Restore HPCI        72 hours inoperable.                    System to OPERABLE status.
AND OR One ADS valve inoperable.            I.2    Restore ADS valve to 72 hours OPERABLE status.
(continued)
DAEC                            3.5-2                        Amendment 223


pump(s) inoperable. C.1 Restore Core Spray subsystem to  
ECCS Operating 3.5.1 ACTIONS (continued)
CONDITION                  REQUIRED ACTION        COMPLETION TIME J. Required Action and      J.1  Be in MODE 3.        12 hours associated Completion Time of Condition F, G,  AND H, or I not met.        J.2  Reduce reactor steam 36 hours dome pressure to 150 psig.
K. One ADS valve            K.1  Restore ADS valve to 30 days inoperable.                   OPERABLE status.
L. One ADS valve            L.1   Restore ADS valve to 72 hours inoperable.                    OPERABLE status.
AND                      OR One low pressure        L.2  Restore low pressure 72 hours ECCS subsystem                 ECCS subsystem to inoperable for reasons        OPERABLE status.
other than Condition A.
M. Two or more ADS          M.1  Be in MODE 3.        12 hours valves inoperable.
AND OR M.2  Reduce reactor steam 36 hours Required Action and dome pressure to associated Completion 100 psig.
Time of Condition K or L not met.
(continued)
DAEC                              3.5-3                      Amendment 223


OPERABLE status.
ECCS Operating 3.5.1 ACTIONS (continued)
ORC.2 Restore RHR pump(s) to OPERABLE status.
CONDITION                     REQUIRED ACTION      COMPLETION TIME N. Two or more low              N.1     Enter LCO 3.0.3. Immediately pressure ECCS subsystems inoperable for reasons other than Condition C or D.
72 hours  72 hours D. Both Core Spray subsystems inoperable. D.1 Restore one Core Spray subsystem to
OR HPCI System and two or more ADS valves inoperable.
 
OPERABLE status.
72 hours (continued)
ECCS- Operating 3.5.1 DAEC 3.5-2 Amendment 223 ACTIONS (continued)
CONDITION REQUIRED ACT ION COMPLETION TIME E. Required Action and associated Completion Time of Condition A, B, C, or D not met. E.1 Be in MODE 3.
ANDE.2 Be in MODE 4.
12 hours  36 hours  F. HPCI System inoperable.
F.1 Verify  by administrative means
 
RCIC System is OPERABLE.
AND F.2 Restore HPCI System to
 
OPERABLE status.
Immediately 14 days G. HPCI System inoperable.
AND  One RHR pump inoperable. G.1 Restore HPCI System to
 
OPERABLE status.
OR  G.2 Restore RHR pump to OPERABLE
 
status. 7 days    7 days  H. HPCI System inoperable.
AND One low pressure
 
ECCS subsystem is
 
inoperable for reasons
 
other than C ondition A.
H.1 Restore HPCI System to
 
OPERABLE status.
OR H.2 Restore low pressure ECCS subsystem to
 
OPERABLE status.
72 hours    72 hours I. HPCI System inoperable.
AND One ADS valve inoperable. I.1 Restore HPCI System to
 
OPERABLE status.
ORI.2 Restore ADS valve to OPERABLE status.
72 hours    72 hours (continued)
ECCS- Operating 3.5.1  DAEC 3.5-3 Amendment 223 ACTIONS  (continued)
CONDITION REQUIRED ACT ION COMPLETION TIME J. Required Action and associated Completion Time of Condition F, G, H, or I not met. J.1 Be in MODE 3.
ANDJ.2 Reduce reactor steam dome pressure to  150 psig.
12 hours  36 hours  K. One ADS valve inoperable.
K.1 Restore ADS valve to OPERABLE status.
30 days  L. One ADS valve inoperable.
AND  One low pressure ECCS subsystem
 
inoperable for reasons
 
other than C ondition A.
L.1 Restore ADS valve to OPERABLE status.
OR  L.2 Restore low pressure ECCS subsystem to
 
OPERABLE status.
72 hours  72 hours  M. Two or more ADS valves inoperable.
OR Required Action and
 
associated Completion Time of Condition K or L
 
not met. M.1 Be in MODE 3.
AND M.2 Reduce reactor steam dome pressure to  100 psig.
12 hours  36 hours (continued)
ECCS- Operating 3.5.1  DAEC 3.5-4 Amendment 280 ACTIONS  (continued)
CONDITION REQUIRED ACT ION COMPLETION TIME N. Two or more low pressure ECCS subsystems inoperable  
 
for reasons other than  
 
Condition C or D.
OR HPCI System and two or  
 
more ADS valves inoperable.
OR HPCI System and two or more low pressure ECCS subsystems inoperable.
OR HPCI System and two or more low pressure ECCS subsystems inoperable.
OR One ADS valve and two or more low pressure  
OR One ADS valve and two or more low pressure ECCS subsystems inoperable.
OR One ADS valve and HPCI System and one low pressure ECCS subsystem inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                          FREQUENCY SR 3.5.1.1        Verify, for each ECCS injection/spray      In accordance with the subsystem, the piping is filled with water  Surveillance from the pump discharge valve to the        Frequency Control injection valve.                            Program (continued)
DAEC                                  3.5-4                    Amendment 280


ECCS subsystems inoperable.
ECCS Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)
OR One ADS valve and
SURVEILLANCE                                                      FREQUENCY SR 3.5.1.2  -------------------------------NOTE-------------------------------------
The low pressure coolant injection (LPCI) system may be considered OPERABLE during alignment and operation for decay heat removal in MODE 3, if capable of being manually realigned and not otherwise inoperable.
Verify each ECCS injection/spray subsystem power                            In accordance operated and automatic valve in the flow path, that is not                  with the locked, sealed, or otherwise secured in position, is in the                  Surveillance correct position.                                                            Frequency Control Program SR 3.5.1.3  Verify a 100 day supply of nitrogen exists for each ADS                     In accordance accumulator.                                                                with the Surveillance Frequency Control Program SR 3.5.1.4    Verify the following ECCS pumps develop the specified                        In accordance flow rate against a system head corresponding to the                        with the specified reactor pressure.                                                  Inservice Testing Program SYSTEM HEAD NO.        CORRESPONDING OF          TO A REACTOR SYSTEM FLOW RATE PUMPS PRESSURE OF Core Spray          2718 gpm            1          113 psig LPCI            4320 gpm            1          20 psig (continued)
DAEC                                      3.5-5                                Amendment 280


HPCI System and one low pressure ECCS subsystem inoperable.
ECCS Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)
N.1 Enter LCO 3.0.3.
SURVEILLANCE                                            FREQUENCY SR 3.5.1.5  ----------------------------NOTE----------------------------
Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.1 Verify, for each ECCS injection/spray subsystem, the piping is filled with water
Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test.
Verify, with reactor pressure  1025 and  940                    In accordance psig, the HPCI pump can develop a flow rate                      with the 2700 gpm against a system head                                  Inservice Testing corresponding to reactor pressure.                                Program SR 3.5.1.6  -----------------------------NOTE---------------------------
Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test.
Verify, with reactor pressure  160 psig, the                    In accordance HPCI pump can develop a flow rate  2700                          with the gpm against a system head corresponding to                        Surveillance reactor pressure.                                                Frequency Control Program SR 3.5.1.7  ----------------------------NOTES--------------------------
: 1. Vessel injection /spray may be excluded.
: 2. For the LPCI System, the Surveillance may be met by any series of sequential and/or overlapping steps, such that the LPCI Loop Select function is tested.
Verify each ECCS injection/spray subsystem                       In accordance actuates on an actual or simulated automatic                      with the initiation signal.                                                Surveillance Frequency Control Program (continued)
DAEC                                    3.5-6                                Amendment 280


from the pump disc harge valve to the injection valve.
ECCS Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)
In accordance with the Surveillance
SURVEILLANCE                                            FREQUENCY SR 3.5.1.8  -------------------------NOTE-------------------------------
Valve actuation may be excluded.
Verify the ADS actuates on an actual or                          In accordance simulated automatic initiation signal.                            with the Surveillance Frequency Control Program SR 3.5.1.9  Verify each ADS valve actuator strokes when                      In accordance manually actuated.                                                with the Inservice Testing Program DAEC                                    3.5-7                                Amendment 282


Frequency Control
Secondary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1         The secondary containment shall be OPERABLE.
 
APPLICABILITY:     MODES 1, 2, and 3, During Operations with a Potential for Draining the Reactor Vessel (OPDRVs).
Program (continued)
ACTIONS CONDITION                   REQUIRED ACTION                    COMPLETION TIME A. Secondary containment     A.1    Restore secondary              4 hours inoperable in MODE 1,             containment to 2, or 3.                         OPERABLE status.
ECCS- Operating 3.5.1  DAEC 3.5-5 Amendment 280 SURVEILLANCE REQUIREMENTS  (continued) SURVEILLANCE FREQUENCY SR 3.5.1.2 ---------------
B. Required Action and       B.1    Be in MODE 3.                  12 hours associated Completion Time of Condition A not   AND met.
----------------NOTE---------
B.2     Be in MODE 4.                 36 hours C. Secondary containment     C.1   -----------NOTE----------
---------------
inoperable during                LCO 3.0.3 is not OPDRVs.                          applicable.
------------- The low pressure coolant injection (LPCI) system may be considered OPERABLE during alignment and
Initiate action to             Immediately suspend OPDRVs.
 
(continued)
operation for decay heat removal in MODE 3, if capable
DAEC                                 3.6-35                              Amendment 237
 
of being manually real igned and not otherwise inoperable. ---------------------------------------------------------------
------------
Verify each ECCS injection/spray subsystem power
 
operated and automatic valve in t he flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.
In accordance with the Surveillance Frequency Control Program SR 3.5.1.3 Verify a 100 day supply of nitrogen exists for each ADS accumulator.
In accordance
 
with the Surveillance
 
Frequency
 
Control Program SR 3.5.1.4 Verify the following ECCS pumps develop the specified flow rate against a system head corresponding to the
 
specified reactor pressure.
SYSTEM HEAD NO.        CORRESPONDING OF TO A REACTOR SYSTEM  FLOW RATE  PUMPS  PRESSURE OF Core Spray          2718  gpm      1 113 psig LPCI            4320  gpm 1            20 psig In accordance
 
with the Inservice Testing
 
Program (continued)
ECCS- Operating 3.5.1  DAEC 3.5-6 Amendment 280 SURVEILLANCE REQUIREMENTS  (continued) SURVEILLANCE FREQUENCY SR 3.5.1.5 -----------
-----------------N OTE---------------
-------------
Not required to be performed until 12 hours after reactor steam pr essure and flow are adequate to perform the test. ---------------------------------------------------
-------------
Verify, with reactor pressure  1025 and  940 psig, the HPCI pump can develop a flow rate  2700 gpm against a system head corresponding to reactor pressure.
In accordance
 
with the Inservice Testing
 
Program  SR 3.5.1.6 -----------
------------------NOTE
---------------
------------
Not required to be performed until 12 hours
 
after reactor steam pr essure and flow are adequate to perform the test. ---------------------------------------------------
-------------
Verify, with reactor pressure  160 psig, the HPCI pump can develop a flow rate  2700 gpm against a system head corresponding to
 
reactor pressure.
In accordance
 
with the Surveillance
 
Frequency
 
Control Program SR 3.5.1.7 -----------
-----------------N OTES-------------
------------- 1. Vessel injection /spray may be excluded.
: 2. For the LPCI System, the Surveillance may be met by any series of sequential
 
and/or overlapping steps, such that the
 
LPCI Loop Select function is tested. ---------------------------------------------------
-------------
Verify each ECCS injection/spray subsystem
 
actuates on an actual or simulated automatic
 
initiation signal.
In accordance
 
with the Surveillance
 
Frequency
 
Control Program (continued)
ECCS- Operating 3.5.1  DAEC 3.5-7 Amendment 282 SURVEILLANCE REQUIREMENTS  (continued) SURVEILLANCE FREQUENCY SR 3.5.1.8 -----------
--------------NOTE------------------------------- Valve actuation may be excluded. ---------------------------------------------------
-------------
Verify the ADS actuates on an actual or simulated automatic initiation signal.
In accordance
 
with the Surveillance
 
Frequency
 
Control Program SR  3.5.1.9 Verify each ADS valve actuator strokes when manually actuated.
In accordance
 
with the Inservice Testing
 
Program Secondary Containment 3.6.4.1   DAEC 3.6-35 Amendment 237 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondar y Containment LCO 3.6.4.1 The secondary c ontainment shall be OPERABLE.
APPLICABILITY: MOD ES 1, 2, and 3, During Operations with a Potential for Draining the Reactor Vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACT ION COMPLETION TIME A. Secondary containment inoperable in MODE 1, 2, or 3. A.1 Restore secondary containment to
 
OPERABLE status.
4 hours  B. Required Action and associated Completion  
 
Time of Condition A not  
 
met. B.1 Be in MODE 3.
AND B.2 Be in MODE 4.
12 hours    36 hours C. Secondary containment inoperable during
 
OPDRVs. C.1 -----------N OTE----------
LCO 3.0.3 is not  
 
applicable.  
---------------
--------------
Initiate action to  
 
suspend OPDRVs.
Immediately (continued)
Secondary Containment 3.6.4.1  DAEC 3.6-36 Amendment 237 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1.1 Verify all secondary containment equipment hatches are closed.
31 days  SR 3.6.4.1.2 -----------------------NOTE----------------
------------
Doors in high radiation areas may be verified by administrative means. ---------------------------------------------
--------------
Verify that either t he outer door(s) or the inner door(s) in each secondary containment
 
access opening are closed.
31 days  SR 3.6.4.1.3 Verify each SBGT subsystem can maintain  0.25 inch of vacuum water gauge in the secondary containment at a flow rate  4000 cfm. 24 months on a
 
STAGGERED


TEST BASIS}}
Secondary Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                        FREQUENCY SR 3.6.4.1.1  Verify all secondary containment equipment                  31 days hatches are closed.
SR 3.6.4.1.2  -----------------------NOTE----------------------------
Doors in high radiation areas may be verified by administrative means.
Verify that either the outer door(s) or the                31 days inner door(s) in each secondary containment access opening are closed.
SR 3.6.4.1.3 Verify each SBGT subsystem can maintain                      24 months on a 0.25 inch of vacuum water gauge in the                    STAGGERED secondary containment at a flow rate  4000                  TEST BASIS cfm.
DAEC                                  3.6-36                                Amendment 237}}

Latest revision as of 01:35, 6 February 2020

2013 DAEC Initial License Examination Administered Written Exam with Answers and References
ML13308A839
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/16/2013
From:
NRC/RGN-III
To:
Duane Arnold
Randal Baker
Shared Package
ML11354A336 List:
References
Download: ML13308A839 (265)


Text

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 217000 K1.03 Importance Rating 3.6 Knowledge of the physical connections and/or cause-effect relationships between REACTOR CORE ISOLATION COOLING SYSTEM (RCIC) and the following: Suppression pool Proposed Question: RO Question # 1 Which ONE of the following correctly describes the RCIC suction transfer interlock?

The RCIC inboard and outboard Torus suction valves MO-2516 and MO-2517 open automatically on A. low CST level at 1' 1/4"; and, when both valves begin to open, MO-2500 CST Suction automatically closes.

B. low CST level at 1' 1/4"; and, when both valves are fully open, MO-2500 CST Suction automatically closes.

C. high Suppression Pool water level; when both valves begin to open, MO-2500 CST Suction automatically closes.

D. high Suppression Pool water level; and, when both valves are fully open, MO-2500 CST Suction automatically closes.

Proposed Answer: B Explanation (Optional):

A. Incorrect - Torus suction valves must be full open before the MO-2500 CST Suction automatically closes. The first part of the distracter is correct, however the second part is not correct, but plausible, if the candidate assumes that both valves cycle at the same time to prevent having both valves fully open at the same time and cross connecting the CST and torus.

B. Correct - The suction path will automatically shift from the Condensate Storage Tanks to the Suppression Pool on a low level in the Condensate Storage Tanks of 1' 1/4".

The RCIC inboard and outboard torus suction valves MO-2516 and MO-2517 open automatically on low CST level, and when both valves are fully open, MO-2500 CST Suction automatically closes.

C. Incorrect - RCIC suction valves will NOT swap on a high Suppression Pool level.

Plausible because HPCI suction valves will swap on a high Suppression Pool level and if the candidate assumes that both valves cycle at the same time to prevent having both valves fully open at the same time and cross connecting the CST and torus.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 1

D. Incorrect - RCIC suction valves will NOT swap on a high Suppression Pool level, plausible because HPCI suction valves will swap on a high Suppression Pool level.

SD 150, pgs 10, 19 & 20 Technical Reference(s): (Attach if not previously provided)

OI 150, pgs 30 & 31 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 2

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 205000 K1.01 Importance Rating 3.6 Knowledge of the physical connections and/or cause- effect relationships between SHUTDOWN COOLING SYSTEM (RHR SHUTDOWN COOLING MODE) and the following:

Reactor pressure Proposed Question: RO Question # 2 Following a reactor scram, the following conditions exist:

  • Reactor level +190 inches
  • Reactor pressure 139 psig
  • Drywell pressure 1.72 psig Based upon the given conditions, which ONE of the following Residual Heat Removal valves is closed and prevented from opening?

A. MO-2006, RHR LOOP A TORUS SPRAY HEADER ISOLATION B. MO-1908, RHR SHUTDOWN COOLING ISOLATION VALVE C. MO-2007, RHR LOOP A TORUS COOLING AND TEST RETURN HDR ISOLATION D. MO-1940, RHR HX 1E-201B BYPASS VALVE Proposed Answer: B Explanation (Optional):

A. Incorrect - For the given conditions MO-2006 is able to be opened, the valve is isolated when containment pressure is > 2 psig. Plausible because the candidate may assume that a high Drywell pressure is needed to place Torus sprays in service.

B. Correct - Of the signals listed, only the reactor pressure signal causes an RHR isolation/interlock. This high-pressure interlock prevents the SDC section of piping from being over pressurized. A reactor pressure of approximately 135 psig (per ARP 1C03B B-4 this pressure is approximately 100 psig) initiates an isolation of SDC suction valves MO-1908 and 1909. The LPCI piping is also protected from over pressurization, but the setpoint is 450 psig.

C. Incorrect - For the given conditions MO-2007 is able to be opened, the valve is isolated when containment pressure is > 2 psig. Plausible because the candidate may assume that a high Drywell pressure is needed to place Torus sprays in service.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 3

D. Incorrect - MO-1940 has an automatic open function on a LPCI initiation signal. It does NOT have an auto close function.

ARP 1C05B, D-8 Technical Reference(s): (Attach if not previously provided)

SD-149 pgs. 31-34 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 4

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 300000 K2.01 Importance Rating 2.8 Knowledge of electrical power supplies to the following: Instrument air compressor Proposed Question: RO Question # 3 Backup Instrument Air Compressor 1K1 is in STANDBY operating mode with power being supplied from the preferred source.

An electrical disturbance occurs resulting in:

  • LLRPSF transformers XR1 and XR2 are de-energized
  • A Bus 1A3 lockout Which ONE of the following is the response of the Air Compressor 1K1?

Air Compressor 1K1 will A. start when header pressure reaches 90 psig and will cycle to maintain 90 - 100 psig.

B. start when header pressure reaches 100 psig and will cycle to maintain 100 - 110 psig.

C. NOT start until its power supply is manually transferred from the normal source to the alternate source.

D. NOT start until HSS-3002, BACKUP COMPRESSOR 1K-1 PRESSURE SELECT SWITCH is placed to the PRIMARY position.

Proposed Answer: C Explanation (Optional):

A. Incorrect - The electrical power supply to the backup compressor is lost due to the 1A3 lockout. Air Compressor 1K1 power source will NOT start and must be shifted to its alternate power source.

B. Incorrect - The electrical power supply to the backup compressor is lost due to the 1A3 lockout. Air Compressor 1K1 power source will NOT start and must be shifted to its alternate power source.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 5

C. Correct - The electrical power supply to the backup compressor is from essential bus, 1B33 or 1B45. Bus 1B33, the normal source, is powered from Essential Bus 1A3, a lockout will prevent the 1G31 Diesel from supplying the bus therefore Air Compressor 1K1 power source must be shifted to its alternate power source. The power source is selected from either 1B33 or 1B45, the alternate source, via a manually selectable power transfer switch 1N3312.

D. Incorrect - Pressure select switch HSS-3002 is a two position switch used to determine the operating mode of the backup compressor. The backup compressor is normally maintained in the STANDBY status. It will NOT have an effect until the power supply is transferred to the alternate source.

OI-518.1, Precaution and Technical Reference(s): Limitation 19 and Note in Sect 4.7, (Attach if not previously provided)

SD-518 pg. 18 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

DAEC Bank Question Source: Bank #

(19111)22681 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: 2011 DAEC (#4)

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 4 55.43 Secondary coolant and auxiliary systems that affect the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 6

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 263000 K2.01 Importance Rating 3.1 Knowledge of electrical power supplies to the following: Major D.C. loads Proposed Question: RO Question # 4 The plant is at rated conditions with the electric plant in its normal full power lineup when a fault results in a loss of 125 VDC bus 1D20.

While in this condition, a loss of coolant accident occurs and the reactor scrams.

Following the scram, the Main Turbine is manually tripped.

Which one of the following is correct regarding high pressure systems or components that are available to control RPV level from the control room?

A. HPCI and both Reactor Feed Pumps B. RCIC and both Reactor Feed Pumps C. HPCI and A Reactor Feed Pump ONLY D. RCIC and A Reactor Feed Pump ONLY Proposed Answer: D Explanation (Optional):

A. Incorrect: HPCI will not function without 125 VDC Div II power (bus 1D20). Plausible if the candidate confuses the power supplies of HPCI and RCIC (Div 1 versus Div 2).

Additionally only the A RFP will be available because bus 1A2 will de-energize when the turbine is tripped due to the loss of control power. Plausible if the candidate does not understand the response of the electric plant to a loss of DC following a turbine trip.

B. Incorrect: Only the A RFP will be available because bus 1A2 will de-energize when the turbine is tripped due to the loss of control power.

C. Incorrect: HPCI will not function without 125 VDC Div II power (bus 1D20). Plausible if the candidate confuses the power supplies of HPCI and RCIC (Div 1 versus Div 2).

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 7

D. Correct: RCIC will still be available with a loss of 125 VDC. Although RCIC suction will transfer to the torus and one channel of isolation logic is disabled, it is still available for level control. Additionally when the turbine trips, bus 1A2 will de-energize due to the loss of control power supplied by Div II 125 VDC. However, 1A1 still has control power and will transfer to the off-site power source which will supply power to the A RFP.

AOP 302.1, page 10 Technical Reference(s): (Attach if not previously provided)

ARP 1C04C, B-9 for effects on a loss of B logic (Div 2)

ARP 1C03C, C-9 for effects on a loss of B logic (Div 2)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 8

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 209001 K3 01 Importance Rating 3.8 Knowledge of the effect that a loss or malfunction of the LOW PRESSURE CORE SPRAY SYSTEM will have on following: Reactor water level Proposed Question: RO Question # 5 The plant is operating at 100% power when a small A recirc loop leak results in drywell pressure rising to 3 psig. The following conditions exist:

  • The reactor is scrammed and all rods are fully inserted
  • RPV level is stabilized at 190 inches range using high pressure injection systems
  • Drywell pressure remains at 3 psig
  • RPV pressure is 900 psig and slowly lowering
  • The BOP operator:

o Momentarily places both Core Spray pump control switches to the STOP position and then releases the switch.

o The Core Spray pump amber OVERRIDE INITIATED lights above both pump control switches illuminate.

Then, the A recirc loop ruptures, resulting in the following:

  • RPV level and pressure lower rapidly
  • Drywell pressure rises and stabilizes at ~ 22 psig.

Which one of the following is correct regarding the ability of Core Spray to assist in water level recovery?

The Core Spray pumps will _______________ when RPV pressure lowers to less than 450 psig.

A. NOT automatically restart, but can be manually re-started and then will inject B. automatically re-start when RPV level lowers to less than +64 inches and inject C. automatically re-start IF the CORE SPRAY INITIATION SEALED-IN reset pushbuttons are first depressed and will inject regardless of RPV level D. NOT automatically restart, but can be manually restarted IF the CORE SPRAY INITIATION SEALED-IN reset pushbuttons are first depressed and then will inject DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 9

Proposed Answer: A Explanation (Optional):

A. Correct: Placing the core spray pump control switch to STOP with an auto start signal present seals out the auto start signal and lights an amber light located above the pump control switch indicating that the auto start signal has been overridden. The core spray pump may be restarted using the START position of the control switch.

B. Incorrect: The Core Spray pumps will not automatically restart. Plausible if the candidate believes that the redundant pump auto start signal of RPV level < 64 in conjunction with RPV pressure < 450 psig will restart the pump.

C. Incorrect: The Core Spray pumps will not automatically restart. Plausible if the candidate believes that the pumps will restart if the initiation reset pushbuttons are depressed. With drywell pressure above 2 psig, the initiation logic will not reset if the reset pushbuttons are depressed, therefore the core spray pumps will not restart.

Although, the injection valves will open when RPV pressure lowers below 450 psig.

D. Incorrect: The core spray pump may be restarted using the START position of the control switch. Depressing the seal-in pushbutton is not required. Plausible in that this pushbutton would reset the initiation and the pump override, but ONLY IF the initiation signals are clear. With the high drywell pressure condition the initiation cannot be reset.

SD 151, pg 9 Technical Reference(s): (Attach if not previously provided)

OI 518.1, P & L 19 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 10

Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 11

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 215004 K3.02 Importance Rating 3.4 Knowledge of the effect that a loss or malfunction of the SOURCE RANGE MONITOR (SRM)

SYSTEM will have on following: Reactor manual control: Plant-Specific Proposed Question: RO Question # 6 During a reactor startup the following conditions exist:

  • The reactor is critical
  • IRM C is on range 2
  • All other IRMs are on range 3
  • All SRM detectors are partially withdrawn
  • SRM readings are all approaching 105 cps Which ONE of the following is the effect of stuck withdraw button causing SRM A to withdraw from the core and its count rate to lower to 90 cps?

A. ONLY the retract permitted light on SRM/IRM drive controls will go out.

B. ONLY the detector retracted when NOT permitted annunciator will alarm.

C. ONLY the detector retracted when NOT permitted annunciator will alarm, and a rod block will prevent further rod motion.

D. ONLY a detector retracted when NOT Permitted annunciator will alarm, a rod block will prevent further rod motion, and a half scram will occur.

Proposed Answer: C Explanation (Optional):

A. Incorrect - withdrawing the SRM out past 90 will cause a rod withdrawal block if the SRM detectors are NOT fully inserted and SRM flux level is lower than 100 cps when the IRMs are on range 1 or 2.

B. Incorrect - withdrawing the SRM out past 90 will cause a rod withdrawal block if the SRM detectors are NOT fully inserted and SRM flux level is lower than 100 cps when the IRMs are on range 1 or 2.

C. Correct - A rod withdrawal block will occur if the SRM detectors are NOT fully inserted and SRM flux level is lower than 100 cps when the IRMs are on range 1 or 2.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 12

D. Incorrect - withdrawing the SRM out past 90 will cause a rod withdrawal block if the SRM detectors are NOT fully inserted and SRM flux level is lower than 100 cps when the IRMs are on range 1 or 2. There are NO half scrams on the SRMs for normal operating conditions and even if the shorting links were installed the low reading on the SRM would NOT cause a scram.

Technical Reference(s): ARP 1C05A, E-5 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 13

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 262001 K4.06 Importance Rating 3.6 Knowledge of A.C. ELECTRICAL DISTRIBUTION design feature(s) and/or interlocks which provide for the following: Redundant power sources to vital buses Proposed Question: RO Question # 7 The plant is operating at 100% power. Essential Buses 1A3 and 1A4 are being supplied from the Standby Transformer.

The Startup transformer has just been re-energized and is available.

Which ONE of the following describes the actions that will occur if the Standby Transformer Lockout Relay energizes to trip the "Standby Transformer Feeder Breaker, CB8490 (M Breaker)"?

Essential Buses1A3 and 1A4 A. de-energize and transfer to the Startup Transformer.

B. remain energized due to fast transfer to the Startup Transformer.

C. de-energize and are repowered by the Standby Diesel Generators.

D. are de-energized with the Standby Diesel Generators running but NOT connected.

Proposed Answer: C Explanation (Optional):

A. Incorrect - There NO is transfer to the Startup Transformer during this event. Plausible because the Startup Transformer also supplies the Essential Buses. Candidate may assume that the Startup Transformer will pick up the load.

B. Incorrect - The conditions are not met for a fast transfer. The DGs will re-energize the load centers. Plausible because the Startup Transformer also supplies the Essential Buses. Candidate may assume that the Startup Transformer will pick up the load.

C. Correct - The Standby Transformer Feeder Breaker CB8490 breaker is the supply to the standby transformer. The loss of the Standby Transformer results in a loss of power to both vital buses. The EDGs will pick up the load centers on the bus undervoltage start signal.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 14

D. Incorrect - Standby Transformer Lockout Relay will Lock Out the Standby Transformer the Essential Load Centers 1A3 and 1A4 are not locked out and will be re-energized by the SBDGs. Plausible because the Essential Buses Supply Breakers 1A301 and 1A401 trip open deenergizing Buses 1A3 and 1A4 the candidate may assume the lockout extends to the Essential Buses or that the SBDGs will NOT automatically close in on the dead buses.

SD 304 pgs. 24-29 Technical Reference(s): (Attach if not previously provided)

ARP 1C08B (A11)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 5 55.43 Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 15

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 261000 K4.02 Importance Rating 2.6 Knowledge of STANDBY GAS TREATMENT SYSTEM design feature(s) and/or interlocks which provide for the following: Charcoal bed decay heat removal Proposed Question: RO Question # 8 Both SBGT Trains have been in operation following a LOCA in the Drywell. After some time the lineup was changed as follows:

  • "B" SBGT Train remains in service
  • "A" SBGT Train has been placed in STANDBY

A. Dispatch the fire brigade to manually start the fire deluge sprays.

B. Initiate a manual cooldown using the Cooldown /Outside Air Valve.

C. Dispatch the fire brigade to verify the automatic initiation of the fire deluge sprays.

D. Place the A SBGT Train back in service and verify Carbon Bed Temperatures lower.

Proposed Answer: B Explanation (Optional):

A. Incorrect - The operator has the option of manually starting the fire deluge sprays when Carbon Bed Temperatures reach 255°F. The temperature given in the stem 220°F is well below this.

B. Incorrect - The deluge system automatically initiates when charcoal temperatures reach 310°F.

C. Correct - Per OI 170, Section 9.1. Manual Cooldown of SBGT System Train, Open COOLDOWN/OUTSIDE AIR VLV AV-5801A and Place HS-5825A INTAKE VALVE to CLOSE. Then monitor the CARBON BED TEMP Indicator TI-5838A on Panel 1C24A occasionally over the next 30 minutes to verify the carbon bed temperature remains within reasonable limits (between 150°F and 255°F).

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 16

D. Incorrect - The A SBGT Train should NOT be returned to service the train must be shutdown, cooled and monitored over the next 30 minutes to verify the carbon bed temperature remains within reasonable limits (between 150°F and 255°F).

Technical Reference(s): OI 170 Section 9.1, pgs. 22-23 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 17

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 206000 K5.06 Importance Rating 2.6 Knowledge of the operational implications of the following concepts as they apply to HIGH PRESSURE COOLANT INJECTION SYSTEM: Turbine speed measurement: BWR-2,3,4 Proposed Question: RO Question # 9 The plant is at power and operators are performing post maintenance testing on the HPCI turbine in order to exit the HPCI LCO.

HPCI has been manually started in the CST-CST mode using the manual control and adjusting the pulsar knob on the front of the flow controller. The system is stable at 3500 rpm and 2000 gpm.

At this point, the operator throttles open CV-2315, TEST BYPASS, to achieve 3000 GPM.

Which ONE of the following correctly describes the response of HPCI Discharge Pressure and turbine speed?

PI-2306 (HPCI) PUMP DISCHARGE PRESSURE indication on 1C03 _____(1)_____.

SI-2284, HPCI TURBINE SPEED indication on 1C03 ______(2)______.

A. (1) Rises (2) Rises B. (1) Lowers (2) Lowers C. (1) Rises (2) Remains the same D. (1) Lowers (2) Remains the same Proposed Answer: D Explanation (Optional):

A. Incorrect - Pump laws dictate that a pump at constant speed will have a lower discharge pressure at higher flow. HPCI speed does not change because the control signal remains the same until the manual control knob is adjusted.

B. Incorrect - HPCI speed does not change because the control signal remains the same until the manual control knob is adjusted.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 18

C. Incorrect - Discharge pressure will not rise but will lower with a constant speed and higher flow.

D. Correct - Pump laws dictate that a pump at constant speed will have a lower discharge pressure at higher flow. HPCI speed does not change because the control signal remains the same until the manual control knob is adjusted.

Technical Reference(s): SD 152, page 11 & 12 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 19

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 218000 K5.01 Importance Rating 3.8 Knowledge of the operational implications of the following concepts as they apply to AUTOMATIC DEPRESSURIZATION SYSTEM: ADS logic operation Proposed Question: RO Question # 10 The plant was operating at 100% when the following events occurred:

  • A large unisolable RWCU leak OUTSIDE the Drywell has occurred
  • HPCI is unavailable due to planned maintenance Assuming no operator action, which ONE of the following correctly states ALL the necessary conditions for the ADS Valves to open?

The ADS logic will open the ADS Valves when any low pressure ECCS Pump A. breaker is closed and RPV water level reaches Low-Low-Low.

B. reaches normal discharge pressure and RPV water level reaches Low-Low-Low.

C. breaker is closed, and RPV water level reaches Low-Low-Low, and two minutes have elapsed.

D. reaches normal discharge pressure, and RPV water level reaches Low-Low-Low, and two minutes have elapsed.

Proposed Answer: D Explanation (Optional):

A. Incorrect - This would be true if Pump breakers were used by logic and two minute timer didn't delay actuation B. Incorrect - This would be true if two minute timer didn't delay actuation C. Incorrect - This would be true if Pump breakers were used by logic D. Correct - ECCS Pump Discharge Pressure signal is used for ADS Logic, when RPV water level reaches Low-Low-Low and two minutes elapse, ADS Valves will OPEN.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 20

OI-183.1, pg 7 Technical Reference(s): (Attach if not previously provided)

SD-183-1 pg 9 & 14 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank # WTSI 11320 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: 2007 Duane Arnold Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 21

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 215003 K6.02 Importance Rating 3.6 Knowledge of the effect that a loss or malfunction of the following will have on the INTERMEDIATE RANGE MONITOR (IRM) SYSTEM: 24/48 volt D.C. power: Plant-Specific Proposed Question: RO Question # 11 The plant is starting up with the following:

  • Mode Switch is in STARTUP
  • IRMs are on Range 6 24 VDC power to IRM E is then lost.

Which ONE of the following describes the effect of the power loss?

A. NO effect.

B. ONLY a rod block will occur.

C. ONLY a half scram will occur.

D. A rod block and half scram will occur.

Proposed Answer: D Explanation (Optional):

A. Incorrect - With a loss of 24 VDC, the indication fails downscale and the IRM becomes inoperative, causing a rod block and half scram.

B. Incorrect - With a loss of 24 VDC, the IRM becomes inoperative, causing a rod block and half scram.

C. Incorrect - With a loss of 24 VDC the indication fails downscale.

D. Correct - With a loss of 24 VDC, the indication fails downscale and the IRM becomes inoperative, causing a rod block and half scram.

AOP-375, pgs 3 & 6 Technical Reference(s): OI-878.2, pg 3 (Attach if not previously provided)

SD-878.2, pg 17 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 22

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 23

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 239002 K6.04 Importance Rating 3.0 Knowledge of the effect that a loss or malfunction of the following will have on the RELIEF/SAFETY VALVES: D.C. power: Plant-Specific Proposed Question: RO Question # 12 The plant is operating at 100% power when the following events occur:

  • 1D13 Circuit 14 "AUTO BLOWDOWN RELAY PANEL 1C45" trips
  • Annunciator 1C03A (C-6) ADS/LLS 125 VDC CONTROL POWER FAILURE alarms Regarding ADS operation, which ONE of the following describes the effect of the breaker trip?

A. "A" ADS logic shifts to its alternate power supply so there is temporary loss of power to the ADS logic.

B. "A" ADS logic has lost power; however, all 4 ADS SRVs have control power, and there is NO effect on the operation of ADS.

C. "A" ADS logic has lost power; however, ONLY PSV 4401 and PSV 4407 have alternate control power and will open during ADS initiation.

D. "A" ADS logic shifts to its alternate power supply; however, control power is lost to PSV-4402 and PSV-4405, therefore, these valves will NOT open during ADS initiation.

Proposed Answer: B Explanation (Optional):

A. Incorrect - The "A" logic does NOT have control power, there is no alternate power to the A logic.

B. Correct - Because either logic system is capable of producing ADS initiations in each of the four ADS valves the loss of DC power to logic "A has no affect on ADS operation.

C. Incorrect - All the ADS SRVs have an alternate source of control power. The loss of DC power to logic "A has no affect on ADS operation and all four ADS SRVs open.

D. Incorrect - The "A" logic does NOT have control power, there is no alternate power to the A logic. The loss of DC power to logic "A has no affect on ADS operation and all four ADS SRVs open.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 24

SD 183.1, pg 22 Technical Reference(s): (Attach if not previously provided) 1C03A, C-6 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank # DAEC Bank 20458 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 25

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 212000 A1.11 Importance Rating 3.4 Ability to predict and/or monitor changes in parameters associated with operating the REACTOR PROTECTION SYSTEM controls including: System status lights and alarms Proposed Question: RO Question # 13 Following a reactor scram the Scram Discharge Volume High Water Level Bypass Switch was placed in BYPASS to reset the scram and was left in that position.

After the scram was reset, the following alarms cleared:

Which ONE of the following describes the position of the Scram Discharge Volume Vent and Drain Valves (1) after resetting the scram and (2) after the mode switch is placed in Startup?

A. (1) Open (2) Open B. (1) Open (2) Closed C. (1) Closed (2) Open D. (1) Closed (2) Closed Proposed Answer: A Explanation (Optional):

A. Correct. The scram discharge volume high water level bypass switch only bypasses the SDV high level scram it does nothing regarding the position of the SDV vent and drain valves. Therefore when the scram is reset the SDV vent and drain valves open and will remain open even after the scram bypass switch is taken out of bypass.

B. Incorrect - Once the mode switch is in startup the scram bypass is removed and the valves remain open.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 26

C. Incorrect - the SDV vent and drain valves will be open before and open after the mode switch is placed in Startup D. Incorrect - the SDV vent and drain valves will be open before the mode switch is placed in Startup.

Technical Reference(s): ARP 1C05B (E-1) (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank # DAEC Bank 48127 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 27

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 215005 A1.07 Importance Rating 3.0 Ability to predict and/or monitor changes in parameters associated with operating the AVERAGE POWER RANGE MONITOR/LOCAL POWER RANGE MONITOR SYSTEM controls including: APRM (gain adjustment factor)

Proposed Question: RO Question # 14 The plant is operating at 100% power. The Process Computer indicates the following information:

1 2 3 4 5 6 APRM READING 101.5 99.4 99.2 101.4 101.0 99.8 APRM GAF 0.967 1.002 1.009 0.987 0.986 1.001 Which ONE of the following provides the correct response?

The indication from APRMs ___(1)___ are conservative because thermal power is ___(2)___

indicated power.

A. (1) 1, 4, 5 (2) less than B. (1) 2, 3, 6 (2) greater than C. (1) 2, 3, 6 (2) less than D. (1) 1, 4, 5 (2) greater than Proposed Answer: A Explanation (Optional):

A. Correct - The APRMs at all times should read no lower than actual core power. If the AGAF is greater than 1.0 then the APRM needs adjustment. Thus any AGAF >1.0 would be non-conservative with respect to power operations because actual thermal power would be greater than indicated power.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 28

B. Incorrect - APRMs 2, 3, 6 are NOT conservative and for the GAF to be conservative the actual power must be less than the indicated power.

C. Incorrect - Incorrect - APRMs 2, 3, 6 are NOT conservative.

D. Incorrect - For the GAF to be conservative the actual power must be less than the indicated power.

Technical Reference(s): SD-878.3, pgs 38 & 39 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank # WTSI 10732 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: 2005 Monticello Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 29

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 211000 A2.03 Importance Rating 3.2 Ability to (a) predict the impacts of the following on the STANDBY LIQUID CONTROL SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: A.C. power failures Proposed Question: RO Question # 15 An ATWS has occurred resulting in the need to inject boron using Standby Liquid Control (SBLC).

  • A loss of Instrument AC 1Y11 occurs
  • The operator places the STANDBY LIQUID CONTROL Switch HS-2613 in the PUMPS A and B RUN position (1) How will the SBLC system and indications respond?

(2) What actions are required?

A. (1) Both pumps indicate they are running and squib valve continuity lights extinguish.

SBLC tank level, pump discharge pressure and flow will indicate zero.

(2) Inject boron into the RPV with RWCU (SEP 304).

B. (1) Both pumps indicate they are running and squib valve continuity lights extinguish.

SBLC tank level, pump discharge pressure and flow will indicate zero.

(2) Send an operator to the SBLC system to monitor parameters.

C. (1) Both pumps indicate they are shutdown and the squib valve continuity lights are illuminated. Pump discharge pressure and flow will indicate zero. SBLC tank level will indicate normally.

(2) Inject boron into the RPV with RWCU (SEP 304).

D. (1) Both pumps indicate they are shutdown and the squib valve continuity lights are illuminated. Pump discharge pressure and flow will indicate zero. SBLC tank level will indicate normally.

(2) Send an operator to the SBLC system to monitor parameters Proposed Answer: B Explanation (Optional):

A. Incorrect - Both pumps and squib valves operate normally (powered from 1B34 and 1B44) there is no need for alternate boron injection DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 30

B. Correct - Per AOP 317, The loss of Instrument AC will result in a loss of power to: SBLC Storage Tank Level (LI-2600A), SBLC Pump Discharge Pressure (PI-2605), SBLC System Flow (FI-2620), Injection Valve Position (V26-0032). Therefore, flow and tank level indication will fail to zero. The pumps & squib valves have NOT lost power (powered from 1B34 and 1B44). There is NO need for alternate boron injection and IAW the ARP for the low SBLC tank level the control room should send an operator to the SBLC system to monitor the system parameters.

C. Incorrect - Both pumps and squib valves operate normally (powered from 1B34 and 1B44), the loss of 1Y11 will cause SBLC tank level, flow and pressure to indicate zero.

There is NO need for alternate boron injection and IAW the ARP for the low SBLC tank level the control room should send an operator to the SBLC system to monitor the system parameters.

D. Incorrect - Both pumps and squib valves operate normally (powered from 1B34 and 1B44), the loss of 1Y11 will cause flow and pressure to indicate zero AOP 317, pg 10 Technical Reference(s): (Attach if not previously provided)

ARP 1C05A (E-3)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

DAEC Bank #

Question Source: Bank #

46971(1410)

Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 31

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 400000 A2.03 Importance Rating 2.9 Ability to (a) predict the impacts of the following on the CCWS and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal operation: High/low CCW temperature Proposed Question: RO Question # 16 DAEC has just completed refueling and is back on line. The following additional conditions exist:

  • The Fuel Pool Cooling (FPC) system is in its normal configuration IAW OI 435, Fuel Pool Cooling System
  • The FPC Heat Exchanger (HX) outlet temperature is slowly rising due to the recently discharged fuel Based on the above, which ONE of the following is correct regarding:

(1) the impact of the FPC HX outlet temperature reaching 130°F AND (2) the action taken in order to mitigate the rising temperature?

A. (1) Temperature limit on the Filter/Demin resin will be exceeded.

(2) Throttle close the FPC HX bypass valve as required to increase flow through the heat exchanger.

B. (1) Temperature limit on the Filter/Demin resin will be exceeded.

(2) Throttle open the FPC HX RBCCW outlet isolation valve as required to increase cooling to the heat exchanger.

C. (1) Temperature limit on the Spent Fuel Pool will be exceeded.

(2) Throttle close the FPC HX bypass valve as required to increase flow through the heat exchanger.

D. (1) Temperature limit on the Spent Fuel Pool will be exceeded.

(2) Throttle open the FPC HX RBCCW outlet isolation valve as required to increase cooling to the heat exchanger.

Proposed Answer: B Explanation (Optional):

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 32

A. Incorrect: The Heat Exchanger bypass valve is a normally closed valve. Temperature is controlled by throttling the RBCCW flow to the heat exchanger. Plausible if the candidate believes that the HX bypass valve is normally in mid position to control system temperature.

B. Correct: The temperature limit to preclude resin damage is 130 degrees. Temperature control is via throttling the RBCCW cooling flow through the heat exchanger.

C. Incorrect: The temperature limit on the Spent Fuel Pool will not be exceeded till 150 degrees. Additionally, the temperature is controlled by throttling the RBCCW flow to the heat exchanger.

D. Incorrect: The temperature limit on the Spent Fuel Pool will not be exceeded till 150 degrees.

Technical Reference(s): SD 435, page 9 (Attach if not previously provided)

OI 435, section 4.0, Normal Operation of the FPC System, page 12.

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Secondary coolant and auxiliary systems that affect the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 33

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 203000 A3.02 Importance Rating 4.0 Ability to monitor automatic operations of the RHR/LPCI: INJECTION MODE (PLANT SPECIFIC) including: Pump start Proposed Question: RO Question # 17 The plant is operating at 100% power when a Reactor SCRAM on High DRYWELL PRESSURE occurs simultaneously with a STARTUP and STANDBY TRANSFORMER Lockout. Both Standby Diesel Generators START as designed and come up to rated speed and voltage.

  • Reactor Water Level: 100 inches and rising slowly
  • Reactor Pressure: 800 psig and lowering slowly Which of the following describe the ECCS response to these conditions?

After the SBDG Output Breakers CLOSE, ...

A. "A" and "B" RHR Pumps START after 5 seconds "C" and "D" RHR Pumps START after 10 seconds "A" and "B" Core Spray Pumps START after 15 seconds B. "A" and "C" RHR Pumps START after 5 seconds "B" and "D" RHR Pumps START after 10 seconds "A" and "B" Core Spray Pumps START after 15 seconds C. "A" and "B" Core Spray Pumps START after 5 seconds "A" and "B" RHR Pumps START after 10 seconds "C" and "D" RHR Pumps START after 15 seconds D. "A" and "B" Core Spray Pumps START after 5 seconds "A" and "C" RHR Pumps START after 10 seconds "B" and "D" RHR Pumps START after 15 seconds Proposed Answer: C Explanation (Optional):

A. Incorrect - The CS pumps in both subsystems are automatically started approximately 5 seconds after AC power is available. The RHR C and D pumps approximately 15 seconds after AC power is available. The RHR A and B pumps approximately 10 seconds after AC power is available DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 34

B. Incorrect - The CS pumps in both subsystems are automatically started approximately 5 seconds after AC power is available. The RHR C and D pumps approximately 15 seconds after AC power is available. The RHR A and B pumps approximately 10 seconds after AC power is available C. Correct - Upon receipt of an initiation signal, the CS pumps in both subsystems are automatically started approximately 5 seconds after AC power is available.

Upon receipt of an initiation signal, all four LPCI pumps are automatically started (A and B pumps approximately 10 seconds after AC power is available, and C and D pumps approximately 15 seconds after AC power is available).

D. Incorrect - The CS pumps in both subsystems are automatically started approximately 5 seconds after AC power is available. The RHR C and D pumps approximately 15 seconds after AC power is available. The RHR A and B pumps approximately 10 seconds after AC power is available SD 149, pg 20 SD 151, pg 18 Technical Reference(s): (Attach if not previously provided)

OI 149, pg 11 OI 151, pg 6 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank # DAEC Bank 46127 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 35

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 223002 A3.03 Importance Rating 2.5 Ability to monitor automatic operations of the PRIMARY CONTAINMENT ISOLATION SYSTEM/NUCLEAR STEAM SUPPLY SHUT-OFF including: SPDS/ERIS/CRIDS/GDS: Plant-Specific Proposed Question: RO Question # 18 A plant startup and heatup is in progress at 600 psig RPV pressure. The Main Turbine is in Chest Warming. IDT computer terminals are set up as follows:

  • The terminal next to 1C14 is being used to monitor KAMAN parameters.
  • The Chemist is collecting data from the MIDAS terminal.
  • The terminal to the left of the ANSOE desk is being used as the alarm monitor as usual.

For the remaining terminals, which set of Plant Process Computer displays meets the requirement for this plant condition?

A. TURBINE (Key turbine parameters)

Group Display 15 (APRM and other data)

STATUS (Plant status overview display)

B. HEATUP (9 Reactor Temperature parameters)

Group Display 32 (Startup parameters)

POWER (Turbine parameter display)

C. SPDS Containment Conditions DR (Rod position display)

Group Display 3 (Turbine vibration data)

D. SCR (Strip Chart Request output points)

PPC Menu (Top Level Menu)

Group Display 33 (Turbine Startup parameters)

Proposed Answer: C Explanation (Optional):

A. Incorrect - All options are groups of normal displays used in the control room. Plausible because they all contain displays that may be used at times during reactor startup /

turbine warm-up, but incorrect because they do not contain SPDS displays.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 36

B. Incorrect - All options are groups of normal displays used in the control room. Plausible because they all contain displays that may be used at times during reactor startup /

turbine warm-up, but incorrect because they do not contain SPDS displays.

C. Correct - "SPDS should be continuously displayed in the Control Room. Any of the SPDS displays (top level, 2nd level, 3rd level or graphs) are acceptable. Containment Conditions is an SPDS display that displays containment isolation valve status.

D. Incorrect - All options are groups of normal displays used in the control room. Plausible because they all contain displays that may be used at times during reactor startup /

turbine warm-up, but incorrect because they do not contain SPDS displays.

Technical Reference(s): OI-831.4, P&L #5 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank # DAEC Bank Modified Bank # 48747 (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 37

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 262002 A4.01 Importance Rating 2.8 Ability to manually operate and/or monitor in the control room: Transfer from alternative source to preferred source Proposed Question: RO Question # 19 The plant is at 100% power when the following sequence occurs:

  • UPS Inverter 1D45 output voltage lowers to 80% of nominal output voltage
  • Ten seconds later, UPS Inverter 1D45 output voltage recovers to its nominal output voltage Which ONE of the following is correct regarding:

(1) The response of the UPS AND (2) Any associated control room indications?

UPS distribution panel 1Y23 is currently being supplied by A. (1) Regulating Transformer 1Y4 (2) Both feedwater regulating valves are locked up due to the break before make transfer B. (1) Regulating Transformer 1Y4 (2) There are no adverse indications in the control room due to the make before break transfer C. (1) Static Inverter 1D45 (2) Both feedwater regulating valves are locked up due to the break before make transfer D. (1) Static Inverter 1D45 (2) There are no adverse indications in the control room due to the make before break transfer Proposed Answer: D Explanation (Optional):

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 38

A. Incorrect: When Inverter output voltage lowered, the Static Transfer switch transferred the power supply to the Regulating Transformer 1Y4. When Inverter output voltage recovered, it transferred back to the Inverter. These transfers are make before break and would have no adverse impact on plant systems. Plausible if the candidate believes that a manual transfer back to the inverter is required. Additionally if the candidate believes it is a break before make transfer, both feed reg valves would lock up (see AOP 357, Loss of 120 VAC UPS)

B. Incorrect: When Inverter output voltage lowered, the Static Transfer switch transferred the power supply to the Regulating Transformer 1Y4. When Inverter output voltage recovered, it transferred back to the Inverter. Plausible if the candidate believes that a manual transfer back to the inverter is required.

C. Incorrect: The transfers are make before break and would have no adverse impact on plant systems. Plausible if the candidate believes the transfer is similar to that of transfer switch 1Y22 which is a break before make transfer.

D. Correct: When Inverter output voltage lowered, the Static Transfer switch transferred the power supply to Regulating Transformer 1Y4. When Inverter output voltage recovered, it transferred back to the Inverter. The transfers are make before break resulting in continuous power to 1Y23 distribution panel.

Technical Reference(s): SD 357, pages 10 and 11 (Attach if not previously provided)

AOP 357, page 2 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 39

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 264000 A4.02 Importance Rating 3.4 Ability to manually operate and/or monitor in the control room: Synchroscope Proposed Question: RO Question # 20 OI 324, Standby Diesel Generators, Section 6.5, PARALLELING THE A SBDG SYSTEM TO ESSENTIAL BUS 1A3, is being performed.

Which ONE of the following describes what the operator must ensure during this evolution?

Adjust the INCOMING VOLTS SYNCHRONIZE to slightly ____(1)____ than RUNNING VOLTS SYNCHRONIZE.

Using the A DIESEL GENERATOR 1G-31 SPEED ADJUST, adjust diesel generator speed to a slow, ____(2)____ synchroscope rotation.

A. (1) lower (2) clockwise B. (1) higher (2) clockwise C. (1) lower (2) counter clockwise D. (1) higher (2) counter clockwise Proposed Answer: B Explanation (Optional):

A. Incorrect - Incoming voltages must be raised to slightly more than running volts.

B. Correct - Incoming voltages must be raised to slightly more than running volts and the diesel speed adjusted to where the Synchroscope is rotating slowly in the clockwise direction.

C. Incorrect - Incoming voltages must be raised to slightly more than running volts and the diesel speed adjusted to where the Synchroscope is rotating slowly in the clockwise direction.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 40

D. Incorrect - the diesel speed adjusted to where the Synchroscope is rotating slowly in the clockwise direction.

Technical Reference(s): OI-324, Sect 6.5, pg 33 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank # WTSI 1738 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: 2007 Susquehanna Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 41

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 259002 2.4.50 Importance Rating 4.2 Emergency Procedures / Plan: Ability to verify system alarm setpoints and operate controls identified in the alarm response manual.

Proposed Question: RO Question # 21 The plant is operating at 100% power when the following indications occur:

  • 1C05A (D-1), REACTOR VESSEL HI/LO LEVEL RECORDER ALARM actuates.
  • "B" GEMAC RPV Water Level Indicator LI-4560 indicates 198 inches, RISING.
  • "A" and "C" GEMAC RPV Water Level Indicators LI-4559 and 4561 indicates 186 inches, LOWERING.
  • Reactor Vessel Level Control is in 3 ELEMENT with B Level selected.
  • Total Steam Flow is 7.0 Mlbm/hr.

Which ONE of the following is correct regarding the ACTUAL RPV Water Level trend and the action that will stabilize RPV Water Level?

ACTUAL RPV Water Level is:

A. RISING; place the 1-ELEMENT 3-ELEMENT Control Switch in the 1-ELEMENT position.

B. LOWERING; place the 1-ELEMENT 3-ELEMENT Control Switch in the 1-ELEMENT position.

C. RISING; select A-LEVEL on REACTOR WATER LEVEL CONTROL INPUT SELECT HSS-4560.

D. LOWERING; select A-LEVEL on REACTOR WATER LEVEL CONTROL INPUT SELECT HSS-4560.

Proposed Answer: D Explanation (Optional):

A. Incorrect - Level is lowering, this response is plausible and would be a correct trend and action for a Feedwater Flow input failed LOW.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 42

B. Incorrect - Level is lowering, this response with level rising is plausible and would be a correct trend and action for a Steam Flow input failed HIGH.

C. Incorrect - This is plausible; would be true for mismatched Steam Flow and Feed Flow with no disparity between level channels.

D. Correct - With LI-4559 rising and redundant channels LI-4560 and LI-4561 lowering, level channel failure is indicated. Additionally with steam flow greater than feedwater flow the lowering level is substantiated. This will be corrected by swapping level channels as directed in the ARP.

Technical Reference(s): ARP 1C05A D-1 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank # WTSI 4078 Modified Bank (Note changes or attach parent)

New Question History: Last NRC Exam: 2007 Duane Arnold Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 43

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 262002 2.4.3 Importance Rating 3.7 Emergency Procedures / Plan: Ability to identify post-accident instrumentation. (Uninterruptable Power Supply)

Proposed Question: RO Question # 22 Which ONE of the following is a post-accident instrument that will lose power during a loss of 120 VAC Instrument Control Power Panel 1Y11?

A. NMR-9253, SRM COUNTS B. LI-4565C, FUEL ZONE RX LEVEL C. PI-1816A, CRD CHARGING WATER PRESS D. PI-4563, A PRESSURE (REACTOR PRESSURE)

Proposed Answer: B Explanation (Optional):

A. Incorrect - SRM COUNTS NMR-9253 is NOT a post accident instrument and this instrument is powered from 120 VAC UNINTERRUPTIBLE POWER B. Correct - During a loss of instrument AC Panel 1Y11 FUEL ZONE RX LEVEL LI-4565C fails downscale activating 2/3 core coverage interlock.

C. Incorrect - Although PI-1816A, CRD CHARGING WATER PRESS is powered from Instrument AC it is not a post accident instrument D. Incorrect - (REACTOR PRESSURE) A PRESSURE PI-4563 is powered from 120 VAC UNINTERRUPTIBLE POWER AOP-317, pg 4 & 11 Technical Reference(s): (Attach if not previously provided)

T.S. Table 3.3.3.1-1 Proposed References to be provided to applicants during examination: None DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 44

Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 45

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 262001 2.1.7 Importance Rating 4.4 Conduct of Operations: Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation. (AC Electrical Distribution)

Proposed Question: RO Question # 23 During the watch turnover it is noted that the Standby Transformer is energized and Standby Transformer Breaker (M), OCB-8490, is closed. Later, during a panel walkdown, it is noted that the Standby Transformer Breaker (M), OCB-8490, RED and GREEN indicating lights are NOT lit. BOTH light bulbs are GOOD.

All other 1C08 panel indications are normal for this plant configuration, and no annunciators were received from this event.

Which ONE of the following describes the impact of this indication?

A. Essential bus power will not transfer to the Standby Transformer when required.

B. OCB-8490 has lost control power and will ONLY respond to breaker protective breaker trips.

C. OCB-8490 has lost control power and will NOT OPEN when the control switch is taken to the TRIP position D. Essential Bus Power will ONLY slow transfer to the Standby Transformer when required.

Proposed Answer: C Explanation (Optional):

A. Incorrect - This is plausible however, this condition would not inhibit the ability of the essential busses to transfer to the Standby Transformer. The failure is in the Standby Transformer Feeder Breaker not the essential bus logic.

B. Incorrect - This is plausible because 125 VDC supplies control power to the breaker.

However a loss of power to the tripping circuit would block all remote and protective trips.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 46

C. Correct - The breaker indicating lights are powered from breaker control power, lost continuity in the control circuit de-energizes indicating lights. A loss of power to the tripping circuit would block all remote and protective trips.

D. Incorrect - This is plausible however, this condition would not have any effect on the ability of the essential busses to transfer to the Standby Transformer. The failure is in the Standby Transformer Feeder Breaker not the essential bus logic.

OI-304.2, Sect 2 (2), pg 4 Technical Reference(s): SD-304 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank # WTSI 11277 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 47

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 264000 K5.06 Importance Rating 3.4 Knowledge of the operational implications of the following concepts as they apply to EMERGENCY GENERATORS (DIESEL/JET): Load sequencing Proposed Question: RO Question # 24 Which ONE of the following describes the load sequencing of the Standby Diesel Generators (SBDGs) following a complete instantaneous loss of offsite power?

(Assume normal full power operation and SBDGs in standby readiness as initial conditions.)

SBDG picks up the 1A3 and 1A4 buses _____(1)_____ after the loss of power.

Emergency Service Water Pump 1P-99A(B) starts _____(2)_____ after the SBDG picks up the 1A3 and 1A4 buses.

Diesel Generator Room Ventilation Supply Fan 1V-SF-20 (1V-SF-21) starts and ventilation dampers align to control room temperature and pressure _____(3)_____ after the SBDG picks up the 1A3 and 1A4 buses..

A. (1) 10 seconds (2) immediately (3) immediately B. (1) 10 seconds (2) immediately (3) 5 seconds C. (1) 18.5 seconds (2) 5 seconds (3) immediately D. (1) 18.5 seconds (2) 5 seconds (3) 5 seconds Proposed Answer: A Explanation (Optional):

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 48

A. Correct - The time frame assumed in the UFSAR and the Technical Specifications for the SBDGs to start and reenergize the essential busses is 10 seconds). The ESW pump and SBDG room ventilation start immediately when power is restored to the bus.

The 18.5 seconds used as a distracter is based on the 8 to 8.5 second delay to start the SBDG during a degraded voltage situation. In this question the stem specifies a complete instantaneous loss of offsite power, therefore the time delay does NOT apply.

B. Incorrect - The ESW pump and SBDG room ventilation start immediately when power is restored to the bus.

C. Incorrect - The ESW pump and SBDG room ventilation start immediately when power is restored to the bus. The 18.5 seconds used as a distracter is based on the 8 to 8.5 second delay to start the SBDG during a degraded voltage situation. In this question the stem specifies a complete instantaneous loss of offsite power, therefore the time delay does NOT apply.

D. Incorrect - The ESW pump and SBDG room ventilation start immediately when power is restored to the bus. The 18.5 seconds used as a distracter is based on the 8 to 8.5 second delay to start the SBDG during a degraded voltage situation. In this question the stem specifies a complete instantaneous loss of offsite power, therefore the time delay does NOT apply.

SD 324, pg 36, 38 Technical Reference(s): (Attach if not previously provided)

OI 324, pg 6 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

DAEC Bank #

Question Source: Bank #

46985 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 49

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 223002 A4.04 Importance Rating 3.5 Ability to manually operate and/or monitor in the control room: System indicating lights and alarms. (Primary Containment Isolation System /Nuclear Steam Supply Shut-Off)

Proposed Question: RO Question # 25 The plant is operating at 12% power. A plant transient occurred; and several seconds later, the CIMS panel indicates the following:

Which ONE of the following correctly describes a condition which would cause the above indications?

A. Drywell pressure rising above 2.5 psig, and there has been a failure of CV4412 "A" MAIN STEAM LINE INBOARD ISOLATION to isolate.

B. A reactor high water level tripped the main turbine, and there has been a failure of CV4419 "C" MAIN STEAM LINE OUTBOARD ISOLATION to isolate.

C. Steam tunnel temperatures rising above 200°F for several seconds, and there has been a failure of CV4420 "D" MAIN STEAM LINE INBOARD ISOLATION to isolate.

D. Turbine building main steam line area temperatures rising above 200°F for several seconds, and there has been a failure of CV4416 "B" MAIN STEAM LINE OUTBOARD ISOLATION to isolate.

Proposed Answer: C DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 50

Explanation (Optional):

A. Incorrect - DW press > 2# will NOT provide a Group 1 isolation signal; Plausible: failure of an INBOARD MSIV to close will provide an incomplete "A" Logic indication for the MSIVs. Also, 2.5 psig in DW would result in Group 2 & 3 isolation signals.

B. Incorrect - There is NOT a Group 1 isolation signal from a reactor high water level.

Failure of an OUTBOARD MSIV to close will NOT provide an incomplete "A" Logic indication for the MSIVs.

C. Correct - Steam Tunnel temps > 200°F provide a Group 1 isolation signal; Failure of an INBOARD MSIV to close will provide an incomplete "A" Logic indication for the MSIVs.

D. Incorrect - Plausible - Turbine building main steam line area temps > 200°F provide a Group 1 isolation signal; however, failure of an OUTBOARD MSIV to close will NOT provide an incomplete "A" Logic indication for the MSIVs.

50007_57-05_lp, pages 24-27 and 40-42 SD 959.1, Technical Reference(s): (Attach if not previously provided)

All conditions verified using DAEC Simulator 4/10/12 Print this question in COLOR Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

DAEC Bank #

Question Source: Bank #

48708 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 51

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 211000 K1.03 Importance Rating 2.5 Knowledge of the physical connections and/or cause- effect relationships between STANDBY LIQUID CONTROL SYSTEM and the following: Plant air systems: Plant-Specific Proposed Question: RO Question # 26 The plant is operating at 100% power.

A loss of Instrument Air occurred to the Standby Liquid Control (SBLC) tank bubbler dip tube.

Which ONE of the following correctly describes the effect on indicated SBLC tank level and SBLC heater operation?

The control room Indicated SLC tank level will fail ___ (1) ___.

The SBLC Tank Heater will ____ (2) ____.

A. (1) low (2) trip B. (1) high (2) trip C. (1) low (2) NOT trip D. (1) high (2) NOT trip Proposed Answer: C Explanation (Optional):

A. Incorrect - A low level in the SLC Tank will NOT automatically trip the heaters.

B. Incorrect - SLC Tank level indication will fail low. A low level in the SLC Tank will NOT automatically trip the heaters.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 52

C. Correct - Instrument Air provides compressed air for storage tank level bubbler instrumentation via PCV- 2600 and FIC-2600. In the event of a Loss of Instrument Air, air-flow to the SBLC Storage Tank bubbler (level indication) will be lost. As a result, indicated storage tank level will decrease (or fail low). A low level in the SLC Tank will NOT automatically trip the heaters.

D. Incorrect - Incorrect - SLC Tank level indication will fail low.

OI 153, pg 7 Technical Reference(s): AOP 518, pg 8 (Attach if not previously provided)

SD 153, pgs 8 & 27 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

DAEC Bank #

Question Source: Bank #

48408 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 4 55.43 Secondary coolant and auxiliary systems that affect the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 53

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 290002 K1.01 Importance Rating 3.2 Knowledge of the physical connections and/or cause- effect relationships between REACTOR VESSEL INTERNALS and the following: Main steam system Proposed Question: RO Question # 27 Which ONE of the following prevents the Reactor Pressure Vessel Steam Dryer from lifting as steam flow rises?

A. Hold-down ties which attach the steam separator and dryer to the core shroud.

B. Its weight, and analysis that high dryer Ps are limited by the length of the dryer skirt.

C. Hold-down brackets fitted to the underside of the vessel head contact the top of the dryer.

D. Its weight, and that steam flow is directed perpendicular both up and down within the dryer.

Proposed Answer: C Explanation (Optional):

A. Incorrect - Only the steam separator is attached to the core shroud.

B. Incorrect - The dryer is restricted from lifting by hold-down brackets fitted to the underside of the vessel head.

C. Correct - The dryer rests on support brackets attached to the reactor vessel wall and is restricted from lifting by hold-down brackets fitted to the underside of the vessel head.

D. Incorrect - Regardless of the steam flows the P would try to lift the dryer.

SD-262, pgs 27-28 Technical Reference(s): (Attach if not previously provided)

LP-50007-262, pg 15 Proposed References to be provided to applicants during examination: None DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 54

Learning Objective: (As available)

DAEC Bank #

Question Source: Bank #

22356 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 2 55.43 General design features of the core, including core structure, fuel elements, control rods, core instrumentation, and coolant flow.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 55

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 202001 K2.03 Importance Rating 2.7 Knowledge of electrical power supplies to the following: Recirculation system valves Proposed Question: RO Question # 28 The plant is at 100% power with the electric plant aligned for normal full power operation.

Then the following occurs:

  • A load reject scram and complete loss of offsite power occurs.
  • A Diesel Generator fails to start.
  • B Diesel Generator starts and re-energizes bus 1A4.

What is the status of the power supply to the Recirc Loop Suction, Discharge and Discharge Bypass valves?

Suction Valve Discharge Valve Discharge Bypass Valve A. Loop A De-energized Energized Energized Loop B De-energized Energized Energized B. Loop A De-Energized De-Energized De-Energized Loop B Energized Energized Energized C. Loop A Energized Energized Energized Loop B Energized Energized Energized D. Loop A De-Energized De-Energized De-Energized Loop B De-energized Energized Energized Proposed Answer: C Explanation (Optional):

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 56

A. Incorrect: The Recirc pump suction valves will also have power. Plausible in that LPCI swing bus 1B34A/1B44A supplies power to all LPCI and RHR valves that may have to reposition during a LPCI Loop selection. However the Recirc loop suction valves which do not reposition are also powered from 1B34A/1B44A. This would be correct if this answer if this were not the case.

B. Incorrect: LPCI swing bus 1B34A/1B44A supplies power to all Recirc Loop valves.

The bus is normally aligned to 1A3 via 1B34. When 1A3 failed to re-energize following the loss of off-site power, a power seeking ABT circuit transfers the LPCI swing bus to 1A4 via 1B44. Plausible if the candidate is believes that the Recirc and LPCI loop select valves are divisional in configuration.

C. Correct: LPCI swing bus 1B34A/1B44A supplies power to all Recirc Loop valves. The bus is normally aligned to 1A3 via 1B34. When 1A3 failed to re-energize following the loss of off-site power, a power seeking ABT circuit transfers the LPCI swing bus to 1A4 via 1B44.

D. Incorrect: Incorrect: LPCI swing bus 1B34A/1B44A supplies power to all Recirc Loop valves. The bus is normally aligned to 1A3 via 1B34. When 1A3 failed to re-energize following the loss of off-site power, a power seeking ABT circuit transfers the LPCI swing bus to 1A4 via 1B44. Plausible if the candidate believes that the Recirc and LPCI loop select valves are divisional in configuration and that the recirc suction valves are not powered from this bus.

Technical Reference(s): SD 304, page 34 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 57

Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 58

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 219000 K3.01 Importance Rating 3.9 Knowledge of the effect that a loss or malfunction of the RHR/LPCI: TORUS/SUPPRESSION POOL COOLING MODE will have on following: Suppression pool temperature control Proposed Question: RO Question # 29 The plant is operating at 90% power.

  • HPCI is running to support a pump operability surveillance
  • Torus Cooling is in service IAW OI 149, RHR System Which ONE of the following describes:

(1) How Torus water temperature is controlled, IAW OI 149, during this evolution?

AND (2) How Torus water temperature would be affected if an inadvertent LPCI initiation signal occurred during the HPCI surveillance test?

A. (1) Throttle MO-2031 [1941] HEAT EXCH OUTLET (2) Torus water temperature would rise B. (1) Close, Open or Throttle MO-2030 [1940] A[B] HEAT EXCH BYPASS (2) Torus water temperature would rise C. (1) Throttle MO-2031 [1941] HEAT EXCH OUTLET (2) Torus water temperature would remain the same or lower D. (1) Close, Open or Throttle MO-2030 [1940] A[B] HEAT EXCH BYPASS (2) Torus water temperature would remain the same or lower Proposed Answer: B Explanation (Optional):

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 59

A. Incorrect - The RHR heat exchanger outlet valves (MO-2031 [1941]) are isolation valves and NOT used for throttling flow, torus cooling is controlled by closing or opening MO-2030 [1940] A[B] HEAT EXCH BYPASS. Plausible because the RHR Heat Exchanger INLET valve is used for controlling the cooldown rate in shutdown cooling mode as stated in OI 149, Control the cooldown rate by adjusting MO-2030 [MO-1940]

A[B] HEAT EXCH BYPASS valve and MO-2029 [MO-1939] A[B] HX INLET THROTTLE valve on 1C03.

B. Correct - (1) Per OI 149, Section 5.4, Open or Close MO 2030 [1940] A[B] HEAT EXCH BYPASS valve as required.

(2) Per SD 149 - The LPCI initiation signal overrides all modes of the RHR System (except shutdown cooling). The intent is to direct maximum system effort toward restoring and maintaining the reactor vessel water level, i.e., all pumps are started, all non LPCI modes secured. This would secure torus cooling and the resulting HPCI surveillance test would cause torus temperature to rise.

C. Incorrect - The RHR heat exchanger outlet valves (MO-2031 [1941]) are isolation valves and NOT used for throttling flow. Plausible because the RHR Heat Exchanger INLET valve is used for controlling the cooldown rate in shutdown cooling mode as stated in OI 149, Control the cooldown rate by adjusting MO-2030 [MO-1940] A[B] HEAT EXCH BYPASS valve and MO-2029 [MO-1939] A[B] HX INLET THROTTLE valve on 1C03.

Torus cooling is controlled by closing or opening MO-2030 [1940] A[B] HEAT EXCH BYPASS. A LPCI signal would shut the Torus Cooling valves and Torus temperature would rise.

D. Incorrect - A LPCI signal would shut the Torus Cooling valves and Torus temperature would rise.

OI 149, Sect 5.4 Technical Reference(s): (Attach if not previously provided)

SD 149, pg 21 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 60

10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 61

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 201002 K4.07 Importance Rating 2.5 Knowledge of REACTOR MANUAL CONTROL SYSTEM design feature(s) and/or interlocks which provide for the following: Timing of rod insert and withdrawal cycles (rod movement sequence timer)

Proposed Question: RO Question # 30 During a control rod single notch withdrawal, a Reactor Manual Control System timer malfunction occurs resulting in the withdraw bus remaining energized.

Which ONE of the following RMCS protective features prevents a continuous withdrawal event AND how is this accomplished?

A. When a withdrawal signal lasts greater than 2 seconds, the current rod is de-selected and a select block is generated.

B. When the Rod Movement control switch is held in "withdraw" for greater than 2 seconds, a rod out block is generated.

C. When the Rod Movement control switch is momentarily placed in "withdraw," any stopping of the rod sequence timer generates a select block.

D. When a single notch withdrawal signal is generated, the rod position indication system initiates a rod block if the control rod moves beyond one notch.

Proposed Answer: A Explanation (Optional):

A. Correct - The operation of the RMCS solid state timer is monitored in the rod withdrawal mode to protect against unrequested continuous rod withdrawal should the timer fail, holding in the withdraw time interval. If the drive out time interval during notch withdrawal is actuated for a period of approximately 2 seconds (normal interval is 1.5 seconds) the timer malfunction circuit de-energizes the rod select relays (enforces a select block). Actuation of the timer malfunction circuit energizes the amber SELECT BLOCK indicator light.

B. Incorrect - The Rod Movement control switch may be held in "withdraw" indefinably only the time the timer is energized is monitored.

C. Incorrect - Rod withdrawal accidents are prevented by monitoring the amount of time the rod sequence timer energizes the withdraw bus.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 62

D. Incorrect - Rod withdrawal accidents are prevented by monitoring the amount of time the rod sequence timer energizes the withdraw bus, the RPIS does not cause this block or prevent this event.

Technical Reference(s): SD 856.1, pg 11 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

DAEC Bank #

Question Source: Bank #

19307 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 63

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 202002 K5.01 Importance Rating 2.8 Knowledge of the operational implications of the following concepts as they apply to RECIRCULATION FLOW CONTROL SYSTEM: Fluid coupling: BWR-3,4 Proposed Question: RO Question # 31 Regarding the operation of a Recirc MG Set scoop tube:

With the Scoop Tube fully withdrawn,

___(1)___ (more / less) oil is present in the fluid coupler, resulting in

___ (2) ___ (raising / lowering) Recirc pump speed.

A. (1) less (2) raising B. (1) more (2) lowering C. (1) less (2) lowering D. (1) more (2) raising Proposed Answer: C Explanation (Optional):

A. Incorrect: When there is less oil in the coupler, recirc speed lowers.

B. Incorrect: Withdrawing the scoop tube reduces the amount of oil.

C. Correct: When the scoop tube moves away from the shaft, the amount of oil being removed increases. This decreases the amount of oil in the working circuit. The lower amount of oil decreases the hydraulic coupling and decreases the generator speed.

D. Incorrect: Withdrawing the scoop tube reduces the amount of oil. This in turn will cause speed to lower.

Technical Reference(s): SD 264, pages 24 & 25, Figure 8 (Attach if not previously provided)

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 64

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

DAEC Bank #

Question Source: Bank #

48329 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not used Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 65

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 216000 K6.03 Importance Rating 2.8 Knowledge of the effect that a loss or malfunction of the following will have on the NUCLEAR BOILER INSTRUMENTATION: Temperature Compensation KA Justification: Pressure Compensation compensates for changes in the density of the coolant in the RPV across the spectrum of operating pressures. Since the vessel is saturated temperature and pressure compensation are equivalent.

Proposed Question: RO Question # 32 The RPV pressure instruments used to pressure compensate the Nuclear Boiler Instrumentation are not available.

Which range of RPV Level indicators will be affected?

A. Fuel Zone B. Wide Range Yarway C. Narrow Range Yarway D. Narrow Range GEMAC Proposed Answer: A Explanation (Optional):

A. Correct: A modification was installed to pressure-compensate the fuel zone detectors to correct the inaccuracies caused by the difference in variable leg density from the calibrated cold condition to normal operating and accident pressures. Two amber lights on 1C-03, located next to the fuel zone level indicators, will illuminate if sensed RPV pressure is not within 0-1500#.

B. Incorrect: The Wide Range Yarways are not pressure compensated by sensing RPV pressure. Plausible in that they do have heated reference legs to reduce the error imparted by changes in coolant density between shutdown and operating conditions.

C. Incorrect: The Narrow Range Yarways are not pressure compensated by sensing RPV pressure. Plausible in that the Wide Range Yarways (but not the Narrow Range) do have heated reference legs to reduce the error imparted by changes in coolant density between shutdown and operating conditions.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 66

D. Incorrect: The GEMACs are not pressure compensated.

Technical Reference(s): SD 880, page 17 (Attach if not previously provided)

P&ID M115 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 67

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 201003 A1.02 Importance Rating 2.8 Ability to predict and/or monitor changes in parameters associated with operating the CONTROL ROD AND DRIVE MECHANISM controls including: CRD drive pressure Proposed Question: RO Question # 33 The plant is operating at rated conditions.

Which ONE of the following identifies the component manipulations that will raise CRD drive water header differential pressure indication at Panel 1C05?

A. Adjust CRD SYSTEM FLOW CONTROL FC-1814 to open the flow control valve or throttle open DRIVE WATER P CONTROL MO-1830 B. Adjust CRD SYSTEM FLOW CONTROL FC-1814 to open the flow control valve or throttle closed DRIVE WATER P CONTROL MO-1830 C. Adjust CRD SYSTEM FLOW CONTROL FC-1814 to close the flow control valve or throttle open DRIVE WATER P CONTROL MO-1830 D. Adjust CRD SYSTEM FLOW CONTROL FC-1814 to close the flow control valve or throttle closed DRIVE WATER P CONTROL MO-1830 Proposed Answer: B Explanation (Optional):

A. Incorrect. Throttling open MO-1830 will lower CRD drive pressure differential.

B. Correct - To raise drive water pressure close MO-1830 or open FC-1814.

C. Incorrect. Throttling closed FC-1814 will lower CRD drive pressure differential.

D. Incorrect. Throttling closed FC-1814 will lower CRD drive pressure differential.

OI 255, pg 9 Technical Reference(s): (Attach if not previously provided)

SD 255, pg 6 & 32 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 68

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank # WTSI 4396 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: 2008 Brunswick Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 5 55.43 Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 69

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 271000 A2.11 Importance Rating 2.8 Ability to (a) predict the impacts of the following on the OFFGAS SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Offgas system low flow Proposed Question: RO Question # 34 With the plant operating at 100% power the following conditions occur:

  • SJAE flow on FR-1374 has lowered
  • Off Gas flow rates on FR-4132 have become erratic
  • Annunciator 1C34, C-1, RECOMBINER HI/LO TEMP is in alarm
  • Reactor power has been lowered to 25%

Which ONE of the following is (1) the cause of these conditions and besides monitoring critical parameters (2) what other action is required?

A. (1) An Offgas premature recombination event has occurred.

(2) Shutdown the hydrogen water chemistry system.

B. (1) An Offgas premature recombination event has occurred.

(2) Start the mechanical vacuum pump and shutdown the steam jet air ejectors.

C. (1) Steam supply pressure to the Offgas Jet Compressor has lowered to 290 psig.

(2) Start the mechanical vacuum pump to stabilize condenser vacuum.

D. (1) Steam supply pressure to the Offgas Jet Compressor has lowered to 290 psig.

(2) Place the second set of SJAE in service in parallel with the operating SJAE.

Proposed Answer: A Explanation (Optional):

A. Correct - In the event of Offgas premature recombination, off gas flow and recombiner temperature would lower. Action must be taken to stop the premature recombination to prevent damage to other off gas equipment and piping. To limit H2 the hydrogen water chemistry system must be secured.

B. Incorrect - This is plausible, because with a Offgas premature recombination with power <10% the procedure directs start the mechanical vacuum pump to stabilize condenser vacuum, however in this case power level is 25%.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 70

C. Incorrect - The low SJAE flow and erratic offgas flow indicate a H2 event NOT an offgas isolation. This distracter is plausible, because with a Offgas isolation with power

<10% the procedure directs starting the mechanical vacuum pump to stabilize condenser vacuum, however in this case power level is 25%.

D. Incorrect - The low SJAE flow and erratic offgas flow indicate a H2 event NOT an offgas isolation. This distracter is plausible, because with the low off-gas flow another set of air ejectors would provide additional flow.

Technical Reference(s): AOP-672.3 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 71

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 214000 A3.02 Importance Rating 3.2 Ability to monitor automatic operations of the ROD POSITION INFORMATION SYSTEM including: Alarm and indicating lights Proposed Question: RO Question # 35 A control rod is being withdrawn from position 24 to position 26.

Which of the following conditions will result in a Control Rod Drift alarm? Consider all conditions separately.

Condition 1: The reed switch for position 25 fails to close.

Condition 2: The reed switch for position 25 fails to open.

Condition 3: The reed switch for position 26 fails to close.

A. Condition 2 ONLY B. Condition 3 ONLY C. Conditions 1 and 2 ONLY D. Conditions 2 and 3 ONLY Proposed Answer: D Explanation (Optional):

A. Incorrect: Condition 3 will also cause a rod drift alarm. Once the timer times out a rod drift alarm will occur for that rod if an even numbered reed switch is not closed.

B. Incorrect: Condition 2 will also cause a rod drift alarm. A rod drift alarm will occur if after the timer times out an odd numbered reed switch is closed, as this may be indicative of a rod drifting.

C. Incorrect: Condition 1 will not cause a rod drift alarm. Odd numbered reed switches are normally open.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 72

D. Correct: If an even numbered (latched position) reed switch is not closed and the rod is not being driven, a drift alarm will be generated. A drift alarm will be also be generated if an odd numbered (between latched positions) reed switch closes without the rod being driven. As soon as the timer times out, i.e., not being selected and driving, a drift alarm will occur from either condition 2 or 3.

Technical Reference(s): SD 856.1, page 28 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 73

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 241000 A4.13 Importance Rating 2.9 Ability to manually operate and/or monitor in the control room: Turbine inlet pressure Proposed Question: RO Question # 36 The plant is operating at 98% power with the "A" EHC Pressure Regulator in service.

A steam leak occurs on the sensing line for the "A" Pressure Regulator such that "Steam Throttle Pressure A" is slowly failing DOWNSCALE.

Assuming NO operator action is taken, which ONE of the following correctly describes the expected response of turbine throttle pressure?

Turbine throttle pressure will A. slowly rise until the reactor scrams on either high flux or high pressure.

B. stabilize a few psig lower controlled by the "B" EHC Pressure Regulator.

C. slowly lower resulting in a reactor scram on an automatic MSIV closure.

D. stabilize a few psig higher controlled by the "B" EHC Pressure Regulator.

Proposed Answer: D Explanation (Optional):

A. Incorrect - As the A side pressure error signal goes down, the B pressure error signal will go up. This will eventually cause the B regulator to take over and control pressure.

No scram will occur.

B. Incorrect - The B regulator will take over at a slightly elevated reactor and throttle pressure.

C. Incorrect - As the A side pressure error signal goes down, the B pressure error signal will go up. This will eventually cause the B regulator to take over and control pressure.

No scram will occur.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 74

D. Correct - As the A steam throttle pressure falls, the A side pressure error signal will go down. This will cause the CVs to begin to close. As the CVs close, reactor pressure (and hence throttle pressure) will begin to rise. This rise will be seen by the B regulator. So as the A side pressure error signal goes down, the B pressure error signal will go up. This will eventually cause the B regulator to take over at a slightly elevated reactor and throttle pressure.

Technical Reference(s): AOP 262, pg 3 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

DAEC Bank #

Question Source: Bank #

19235 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 75

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 256000 2.4.31 Importance Rating 4.2 Emergency Procedures / Plan: Knowledge of annunciator alarms, indications, or response procedures.

Proposed Question: RO Question # 37 Following a failure to scram, the RO is performing RIP 103.2, Increase CRD Cooling Flow and Pressure. The RO has placed both CRD pumps in service when the following annunciators alarm and remain in alarm:

  • 1C06A (A-12) A CONDENSATE PUMP 1P-8A TRIP OR MOTOR OVERLOAD
  • 1C06A (A-13) B CONDENSATE PUMP 1P-8A TRIP OR MOTOR OVERLOAD Which ONE of the following describes the effects of these annunciators on RIP 103.2?

A. The CRD pumps will trip on a loss of suction pressure; the RIP must be exited.

B. Continue in the RIP securing one CRD pump to prevent both pumps tripping on a loss of suction.

C. Continue in the RIP; the CRD pump suction source will automatically shift to the condensate storage tanks.

D. Exit the RIP, manually shift the CRD pump suction to the condensate storage tanks, and re-enter the RIP.

Proposed Answer: C Explanation (Optional):

A. Incorrect - The CRD pumps will NOT trip on a loss of suction. The CST suction is always lined up to the CRD pump suction. If CV-1497 closes the CRD pump suction will automatically shift to the CSTs. Plausible because the normal suction source is isolated on a trip of both condensate pumps.

B. Incorrect - There is no reason to secure a CRD pump. Plausible because the normal suction source is isolated on a trip of both condensate pumps and the normal source has a higher pressure than the alternate source from the CSTs.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 76

C. Correct - The CRD pumps will NOT trip on a loss of suction. These annunciators indicate the condensate pump has tripped or is about to trip. The condensate pump breaker closed position provides an interlock to CV-1497 through which condensate flows from the reject line to the Control Rod Drive Hydraulic System. However the CST suction is always lined up to the CRD pump suction. If CV-1497 closes the CRD pump suction will automatically shift to the CSTs.

D. Incorrect - There is no reason to exit the RIP both CRD pumps will remain running with the CSTs as their suction. Plausible because the normal suction source is isolated on a trip of both condensate pumps.

1C06A, C-12 & C-13 RIP 103.2 Technical Reference(s): (Attach if not previously provided)

SD 639, pg 9 SD 255, pg 6 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 77

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 201006 K5.10 Importance Rating 3.2 Knowledge of ROD WORTH MINIMIZER SYSTEM (RWM) (PLANT SPECIFIC) design feature(s) and/or interlocks which provide for the following: Withdraw error: P-Spec(Not-BWR6)

Proposed Question: RO Question # 38 Given the following:

  • A reactor startup is in progress with reactor power in the source range
  • The RWM is in OPERATE enforcing the Rod Sequence
  • Step 27 control rods o Insert Limit: 8 o Withdraw Limit: 12 When control rod 26-15 is withdrawn, the rod "double-notches" and settles at position 14.

Which ONE of the following is correct regarding further control rod movement?

The RWM will automatically block A. ANY control rods from being withdrawn. ALL control rods can be inserted until three insert errors are created.

B. ANY control rods from being inserted or withdrawn. Control rod 26-15 can ONLY be repositioned after bypassing the RWM.

C. control rod 26-15 from further withdrawal, but it can be inserted back to position 12 to clear the rod block. NO other control rod movement is possible unless the RWM is bypassed.

D. control rod 26-15 from further withdrawal. The remaining rods in step 27 can be withdrawn within the limits of the step. Control rod 26-15 must be inserted before leaving Step 27.

Proposed Answer: C DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 78

Explanation (Optional):

A. Incorrect: All rod movement is inhibited unless the withdraw error is corrected.

Plausible in that normally, operation can continue if an insert error is made provided that there are no more than three insert errors.

B. Incorrect: The error rod can be inserted to correct the withdrawal error.

C. Correct: A withdrawal error was generated when rod 26-15 was withdrawn past it's withdraw limit. Until the error is corrected, all other control rod motion is inhibited.

D. Incorrect: A withdrawal error was generated when rod 26-15 was withdrawn past it's withdraw limit. Until the error is corrected, all other rod motion is inhibited. Plausible in that the RWM does not enforce how the rods are withdrawn or inserted within the step provided the insert and withdrawal limits are not violated.

Technical Reference(s): SD 878.8, pg 16 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank # WTSI 12965 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: 2011 Pilgrim Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 79

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295025 EK1.02 Importance Rating 4.1 Knowledge of the operational implications of the following concepts as they apply to HIGH REACTOR PRESSURE: Reactor vessel integrity Proposed Question: RO Question # 39 Which ONE of the following is the highest steam dome pressure that will ensure that the reactor coolant system will remain intact at its most limiting location?

A. 1250 psig B. 1335 psig C. 1380 psig D. 1590 psig Proposed Answer: B Explanation (Optional):

A. Incorrect: Plausible in that this is the design pressure of the RPV.

B. Correct: The Tech Spec Safety Limit on reactor steam dome pressure protects the reactor coolant system against over-pressurization. The most limiting transient location is the recirc suction piping which has a design pressure of 1150 psig. USAS, Nuclear Power Piping Code, Section B31.1, 1967 Edition (Ref. 6) permits a maximum pressure transient of 120% of design pressure or 1380 psig (120% x 1150 psig = 1380 psig). This value is adjusted to account for the added pressure due to elevation sensed at the lowest points in the reactor pressure vessel and reactor coolant system piping in order to determine the most limiting steam dome pressure. This results in a safety limit of 1335 psig steam dome pressure.

C. Incorrect: Plausible in that 1380 psig is the maximum allowed transient pressure allowed for in the recirc loop suction piping. However it does not take into account the weight of the water above the lowest section of the reactor coolant system piping in order to determine the required steam dome pressure.

D. Incorrect: Plausible in that 1590 is the maximum allowed transient pressure rating of the recirc discharge piping. However it is not the most limiting pressure within the reactor coolant system.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 80

Safety Limit 2.1.2 and associated Technical Reference(s): (Attach if not previously provided) bases.

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

WTS Bank #

Question Source: Bank # Adjusted for DAEC 295025 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: 2010 NMP2 Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 3 55.43 Mechanical components and design features of reactor primary system.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 81

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295026 EK1.01 Importance Rating 3.0 Knowledge of the operational implications of the following concepts as they apply to SUPPRESSION POOL HIGH WATER TEMPERATURE: Pump NPSH Proposed Question: RO Question # 40 Following a loss of coolant accident the following conditions exist:

  • A RHR Pump is in Torus cooling at 3300 gpm
  • B RHR Pump is in Torus cooling at 4700 gpm
  • Torus pressure is 5 psig
  • Torus water temperature is 215 °F NPSH limits are currently being exceeded for A. Both RHR Pumps B. Neither RHR Pump C. A RHR pump ONLY D. B RHR pump ONLY Proposed Answer: D Explanation (Optional):

A. Incorrect: The limit for A RHR pump is ~ 217 degrees. Plausible if the candidate sums the 2 flows and uses the 2 pumps values for the bottom axis of the curve. If so, the limit for 8000 gpm at 5 psig torus pressure would be 215 degrees. This would be incorrect in that the two pumps are in different loops.

B. Incorrect: The B pump is exceeding its limit. At 4700 gpm and with a torus pressure of 5 psig, the limit is ~ 214 degrees. Plausible if the candidate again uses the 2 pump values on the horizontal axis but considers the flow rates individually. In this case the limits for both pumps would be around 220 degrees.

C. Incorrect: The A RHR pump limit is ~ 217 degrees. Plausible if the candidate misinterprets the graph for the two flow rates.

D. Correct: The B pump is exceeding its limit. At 4700 gpm and with a torus pressure of 5 psig, the limit is ~ 214 degrees. The A RHR pump is < its limit of ~ 217 degrees.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 82

Technical Reference(s): EOP Graph 8 (Attach if not previously provided)

Bases EOP Curves and Limits Pgs. 60-61 EOP Graph # 8, Proposed References to be provided to applicants during examination:

RHR NPSH Learning Objective: LP 95.01, LO 95.00.00.17 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 8 55.43 Components, capacity, and functions of emergency systems.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 83

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295021 AK1.02 Importance Rating 3.3 Knowledge of the operational implications of the following concepts as they apply to LOSS OF SHUTDOWN COOLING: Thermal stratification Proposed Question: RO Question # 41 The plant is in MODE 4 with A loop of RHR in Shutdown Cooling (SDC).

  • Both Recirc pumps are secured and unavailable
  • The B Loop of RHR is tagged out for maintenance Then (1) A leak on the discharge of A Loop of RHR occurs (2) RPV level lowers and SDC isolates IAW with AOP 149, Loss of Decay Heat Removal, which ONE of the following is required to ensure adequate mixing of the coolant in the core?

Raise and control reactor water level between A. 170 and 211 inches.

B. 186 and 195 inches.

C. 230 and 240 inches.

D. 258 and 270 inches.

Proposed Answer: C Explanation (Optional):

A. Incorrect: AOP-149 requires level to be raised and controlled between 230 and 240 inches. Plausible in that an EOP 1 entry condition has occurred and this is the initial control band.

B. Incorrect: AOP-149 requires level to be raised and controlled between 230 and 240 inches. Plausible in that this range is between the low and high level alarm setpoints.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 84

C. Correct: Insufficient RHR flow while in SDC can result in RPV thermal stratification. To prevent thermal stratification a natural circulation flow path must be established that allows the hotter water in the reactor core to flow upwards out the steam separators into the annulus region. AOP 149, Follow-up Action # 4 requires level to be raised and controlled between 230 and 240 inches. Insufficient RHR flow while in SDC can result in RPV stratification. AOP 264, pg 8 states If RWCU System is not available OR Recirc Pumps are not available, raise RPV level to greater than (>) 214" (preferably between 230" and 240") to improve natural circulation. T.S. Bases 3.4.8 RHR Shutdown Cooling System also states Alternate methods of reactor coolant circulation that can be used include (but are not limited to) raising reactor water level above the minimum natural circulation level (i.e., lowest turnaround point for water in the steam separator).

D. Incorrect: AOP-149 requires level to be raised and controlled between 230 and 240 inches. Plausible in that the higher the level the more the natural circulation. However this would flood the main steam lines.

AOP 149, Follow-up Action # 4 RHR lesson plan pg 29 Technical Reference(s): (Attach if not previously provided)

AOP 264, Pg 8 T.S. Bases 3.4.8 Proposed References to be provided to applicants during examination: None Learning Objective: STG AOP 149, 94.01.01.03 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 85

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295031 EK2.13 Importance Rating 4.1 Knowledge of the interrelations between REACTOR LOW WATER LEVEL and the following:

ARI/RPT/ATWS: Plant-Specific Proposed Question: RO Question # 42 Which ONE of the following is the effect of tripping the Alternate Rod Insertion (ARI) system reactor water level A and C detectors?

A. One ARI system valve will open, and both recirculation pumps trip immediately.

B. Both ARI system valves will open, and one recirculation pump trips immediately.

C. One ARI system valve will open, and both recirculation pumps trip after a 9 second time delay.

D. Both ARI system valves will open, and one recirculation pump trips after a 9 second time delay.

Proposed Answer: C Explanation (Optional):

A. Incorrect: The recirculation pumps trip after a 9 second time delay.

B. Incorrect: Only one ARI valve will open and the recirculation pumps trip after a 9 second time delay.

C. Correct: The two ATWS-RPT/ARI logics are arranged such that a trip of either logic trips both recirculation pumps (one RPT breaker per pump) and energizes one ARI solenoid valve.

D. Incorrect: Only one ARI valve will open. Additionally both recirc pumps will trip.

Technical Reference(s): SD-358, pg 23 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 86

LP 358 - Reactor Protection, Learning Objective: (As available) 22.00.00.05 Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 87

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295019 AK2.08 Importance Rating 2.8 Knowledge of the interrelations between PARTIAL OR COMPLETE LOSS OF INSTRUMENT AIR and the following: Plant ventilation Proposed Question: RO Question # 43 Which ONE of the following describes an effect of a loss of instrument air to the Standby Gas Treatment (SBGT) system?

As a result of the loss of instrument air, SBGT...

A. will automatically start and establish rated flow.

B. will NOT automatically start; however, it can be manually started.

C. will NOT automatically start and can NOT be started manually.

D. will automatically start; however, the suction and discharge dampers will NOT open.

Proposed Answer: B Explanation (Optional):

A. Incorrect: SBGT will NOT auto start. SBGT will only auto start on the following signals:

Reactor Building ventilation exhaust high radiation of 8 mR/hr (inc) or downscale.

Refueling Pool exhaust high radiation of 8 mR/hr (inc), or INOP.

Primary containment (Drywell) high pressure of 2 psig.

Reactor vessel low water level of 170 inches.

Offgas Vent Pipe (Stack) HI-HI radiation.

Plausible in that the candidate may feel that SBGT will automatically start to maintain RX building D/P when RX building ventilation dampers fail closed as a result of the loss of air.

B. Correct: SBGT will NOT automatically start as a result of the loss of air. SBGT can be manually started and is normally manually started on a loss of IA (see AOP 518).

C. Incorrect: SBGT can be manually started and is normally manually started on a loss of IA (see AOP 518). Plausible in that the candidate may feel that SBGT will automatically start to maintain RX building D/P when RX building ventilation dampers fail closed as a result of the loss of air.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 88

D. Incorrect: SBGT will NOT automatically start as a result of the loss of air. Plausible in that a loss of IOA to the RBHVAC system will cause a loss of reactor building D/P.

However SBGT is designed to operate in this condition to maintain building D/P. Flow will be established because the suction and discharge dampers fail open and the cool down air damper fails closed.

SD 170, SBGT, page 18 Technical Reference(s): (Attach if not previously provided)

AOP 518, pg 3 Proposed References to be provided to applicants during examination: None Learning Objective: LP 730, LO 67.01.01.10, e (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 4 55.43 Secondary coolant and auxiliary systems that affect the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 89

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295004 AK2.01 Importance Rating 3.1 Knowledge of the interrelations between PARTIAL OR COMPLETE LOSS OF D.C. POWER and the following: Battery charger Proposed Question: RO Question # 44 DAEC was operating at 100% power when an event occurred, resulting in the following:

  • Breaker 1D10 ckt 4, supply to 125VDC Distribution Panel 1D13 tripped.
  • 10 seconds later, a complete loss of Offsite power occurred.

Which of the following correctly describes the SOURCE of power to the remaining station 125 VDC loads one minute later?

A. A battery is supplying Division 1 DC loads A battery is supplying Division 2 DC loads B. A battery is supplying Division 1 DC loads A charger is supplying Division 2 DC loads C. A charger is supplying Division 1 DC loads A battery is supplying Division 2 DC loads D. A charger is supplying Division 1 DC loads A charger is supplying Division 2 DC loads Proposed Answer: B Explanation (Optional):

A. Incorrect: 1A4 will be re-energized by 1G21 B SBDG, and therefore 1D22, Div 2 125VDC Charger will supply the Div 2 125VDC loads.

B. Correct: The complete loss of offsite power results in loss of both essential busses and start signals to both SBDGs. The loss of 1D13 results in loss of control power to the 1A3 Bus supply breakers including 1G31 A SBDG Output Breaker. This results in 1A3 failing to re-energize, therefore 1B32, which supplies 1D12, Div 1 125VDC Charger, is also de-energized, resulting in Div 1 loads being supplied by the battery. 1A4 will be re-energized by 1G21 B SBDG, and therefore 1D22, Div 2 125VDC Charger will supply the Div 2 125VDC loads.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 90

C. Incorrect: Div 1 125VDC Charger is de-energized, resulting in Div 1 loads being supplied by the battery. 1A4 will be re-energized by 1G21 B SBDG, and therefore 1D22, Div 2 125VDC Charger will supply the Div 2 125VDC loads.

D. Incorrect: Div 1 125VDC Charger is de-energized, resulting in Div 1 loads being supplied by the battery.

Technical Reference(s): AOP 302.1, rev 52, p 12 (Attach if not previously provided)

AOP 301, rev 59, p 28 SD-375, rev 8, p 16 Proposed References to be provided to applicants during examination: None Learning Objective: 13.00.00.05 & 94.06.01.06 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 91

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295006 AK3.01 Importance Rating 3.8 Knowledge of the reasons for the following responses as they apply to SCRAM: Reactor water level response Proposed Question: RO Question # 45 The plant has been operating at 100% power with the reference leg backfill system out of service. These conditions have existed for the last 30 days.

Then the following sequence occurs:

  • A SRV fails partially open and cannot be closed
  • Reactor pressure is 900 psig and lowering slowly
  • As required by IPOI 5, Reactor Scram, Enhanced Reactor Vessel Level Monitoring is initiated IAW OI 880, Non-Nuclear Instrumentation System.
  • As RPV pressure continues to lower, RPV level perturbations are noted on various level indicators.

Based on the above:

Water is being displaced in the reference leg by gases coming out of solution, causing indicated level to ____ (1) ____. The condensing chamber then refills the reference leg resulting in a return to actual level.

Under these conditions the _________ (2) _______ should be used to determine actual vessel level.

A. (1) INCREASE (2) Narrow Range Gemacs B. (1) DECREASE (2) Narrow Range Gemacs C. (1) INCREASE (2) Wide Range Yarways D. (1) DECREASE (2) Wide Range Yarways Proposed Answer: C DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 92

Explanation (Optional):

A. Incorrect: The Wide Range Yarways are to be used. Plausible in that non-condensable gas build up occurs in the GEMAC reference leg. However the Narrow Range Gemacs also use this reference leg.

B. Incorrect: Water displacement in the reference leg causes an increase in indicated level. Additionally, the Wide Range Yarways are to be used.

C. Correct: With the Reference Leg Back Fill System out of service, gases will accumulate in the reference legs. As gases come out of solution in the reference leg as the vessel depressurizes, water is displaced. This results in a lowering differential pressure between the reference leg and the variable leg. The lowering differential pressure results in an indicated level rise. The condensing pot then restores the level of the reference leg resulting in a return to actual level.

IAW Section 6.1 of OI 880 (J-1), page 17, the Wide Range Yarways are to be used to determine actual level.

D. Incorrect: Water displacement in the reference leg causes an increase in indicated level.

Technical Reference(s): SD 880, page 20 (Attach if not previously provided)

Section 6.1 of OI 880 (J-1), page 17 Proposed References to be provided to applicants during examination: None Learning Objective: 88.00.00.05 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 5 55.43 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 93

Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 94

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295001 AK3.05 Importance Rating 3.2 Knowledge of the reasons for the following responses as they apply to PARTIAL OR COMPLETE LOSS OF FORCED CORE FLOW CIRCULATION: Reduced loop operating requirements: Plant-Specific Proposed Question: RO Question # 46 The plant is operating in single loop. The running Recirc Pump speed is 45%.

(1) Which one of the following instruments is used to determine core flow?

AND (2) Why is this instrument used?

A. (1) 1C05 Total Core Flow recorder FR-4635.

(2) Because there is reverse flow in the idle jet pumps at this pump speed.

B. (1) 1C05 Core Plate Differential Pressure recorder PDR/FR-4528.

(2) Because there is forward flow in the idle jet pumps at this pump speed.

C. (1) 1C38 Jet Pump Total Head indication PDI-4567.

(2) Because there is forward flow in the idle jet pumps at this pump speed.

D. (1) 1C05 Core Plate Differential Pressure recorder PDR/FR-4528.

(2) Because there is reverse flow in the idle jet pumps at this pump speed.

Proposed Answer: B Explanation (Optional):

A. Incorrect: At recirc pump speeds < 50% flow shifts in the idle jet pumps from reverse to forward and the Total Core Flow indication becomes inaccurate because the loop flow summers subtract the idle loop flow from the operating loop when in single loop.

Plausible if the candidate believes this happens at a lower pump speed because then there would still be reverse flow in the idle loop.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 95

B. Correct: The Total core flow indication becomes inaccurate at running pump speeds <

50% because the loop flow summers subtract the idle loop flow from the operating loop when in single loop. However at low running pump speeds the flow in the idle loop jet pumps shifts from reverse to forward flow. At speed less than 50% procedures direct that core plate delta P indications be used to determine core flow.

C. Incorrect: Core plate dp indication is used at speeds < 50%. Plausible because this indication could be converted into a core flow determination if the correlation was provided to the operator.

D. Incorrect: At this pump speed there is forward flow in the idle jet pumps. Plausible if the candidate recalls that a different indication must be used at this pump speed but does not recall why.

Technical Reference(s): AOP 255.2, Note on page 4 (Attach if not previously provided)

OI 264, section 6.1, 1st two notes.

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 5 55.43 Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 96

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295024 EK3.07 Importance Rating 3.5 Knowledge of the reasons for the following responses as they apply to HIGH DRYWELL PRESSURE: Drywell venting Proposed Question: RO Question # 47 Primary containment pressure is rising following a large RCS break inside the primary containment. Primary containment parameters are as follows:

  • Drywell Pressure indication is 49 psig and slowly rising
  • Torus pressure indication is 48 psig and slowly rising
  • Narrow Range Torus level indication is pegged high at 16 feet IAW EOP 2, Primary Containment Control, which ONE of the following is correct regarding the vent path that should be used and why?

A. Torus vent through CV-4301, OUTBD TORUS VENT ISOL, CV-4309 INBD TORUS VENT BYPASS ISOL and CV-4300 INBD TORUS VENT ISOL as required.

The filtering of the SBGT system will reduce the offsite release rate.

B. Drywell vent through CV-4303, OUTBD DRYWELL VENT ISOL, CV-4310, INBD DW VENT BYPASS ISOL and CV-4302, INBD DRYWELL VENT ISOL as required.

This is the ONLY vent path available due to the level in the Torus.

C. The hardened vent path via CV-4300, INBD TORUS VENT ISOL and CV-4357, HARD PIPE VENT.

This path eliminates the potential for duct work or SBGT failure during venting which would significantly increase radioactivity levels in the reactor building.

D. Drywell vent through CV-4303, OUTBD DRYWELL VENT ISOL, CV-4310, INBD DW VENT BYPASS ISOL and CV-4302, INBD DRYWELL VENT ISOL as required.

Drywell venting is always preferred while in the EOPs because it has the most immediate and direct effect on Drywell pressure.

Proposed Answer: B DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 97

Explanation (Optional):

A. Incorrect: Torus vent paths are not allowed when torus water level is above 16 feet.

Plausible in that torus venting is normally preferred due to the scrubbing provided by the torus and this path also utilizes SBGT.

B. Correct: With torus level above 16 feet the drywell must be vented because the torus vent paths are now flooded or at least must be assumed to be flooded.

C. Incorrect: This vent path is also via the torus and Torus vent paths are not allowed when Narrow Range torus water level is above 16 feet.

D. Incorrect: If available, torus venting is preferred. The reason why the drywell vent is used in this case is because the level in the torus precludes the use of torus vent paths.

Plausible in that venting the drywell will have more of an immediate effect on drywell pressure than venting the torus but is still normally less preferred than the torus venting because of the scrubbing by the Torus.

Technical Reference(s): EOP-2 step PC/P-10 (Attach if not previously provided)

LP 95.59, Primary Containment Control, page 15.

Proposed References to be provided to applicants during examination: None LP 95.59, Objective 95.64.16.01 Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 9 55.43 Shielding, isolation, and containment design features, including access limitations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 98

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295028 EA1.03 Importance Rating 3.9 Ability to operate and/or monitor the following as they apply to HIGH DRYWELL TEMPERATURE: Drywell cooling system Proposed Question: RO Question # 48 The plant was operating at 100% power with the Drywell Cooling system in its normal full power configuration when a small steam leak in the Drywell occurred. The sequence of events that occurred is as follows:

  • T= 0 minutes : EOP 2 is entered when Drywell temperature exceeds 150°F
  • T= 5 minutes: Drywell pressure exceeds 2 psig and the reactor scrams
  • T= 15 minutes: Drywell spray was initiated to maintain Drywell temperature < 280°F Note: RPV level lowered to 150 inches on the SCRAM and is now being maintained 170-211 with Condensate and Feed.

Assuming no other operator action has been taken, which ONE of the following is correct regarding the automatic response of the drywell cooling fans to the above sequence?

All running fans A. tripped when Drywell pressure exceeded 2 psig.

No other automatic action occurred.

B. shifted to slow speed when Drywell pressure exceeded 2 psig.

No other automatic action occurred.

C. shifted to slow speed when Drywell pressure exceeded 2 psig.

All fans tripped when Drywell spray was initiated.

D. remained at their original speed when Drywell pressure exceeded 2 psig.

All fans tripped when Drywell spray was initiated.

Proposed Answer: C Explanation (Optional):

A. Incorrect: Fans shift to slow speed when drywell pressure exceeds 2 psig. Additionally the fans tripped when drywell spray was initiated.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 99

B. Incorrect: Drywell fans all tripped once drywell spray was initiated.

C. Correct: All fans shift to slow speed when drywell pressure exceeds 2 psig. All fans trip when drywell sprays are initiated.

D. Incorrect: All drywell fans are normally running in fast speed. Fans shift to slow speed when drywell pressure exceeds 2 psig. Additionally all drywell fans trip when drywell sprays are initiated.

Technical Reference(s): SD 760, page 7 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None LP 573 - Primary Containment, Learning Objective: Control, and Monitoring, objective (As available) 42.01.01.02 Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 100

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295005 AA1.01 Importance Rating 3.1 Ability to operate and/or monitor the following as they apply to MAIN TURBINE GENERATOR TRIP: Recirculation system: Plant-Specific Proposed Question: RO Question # 49 The plant is operating at 100% power when a turbine trip occurs. Additional information is as follows:

  • A RPS trip system actuates as designed
  • B RPS trip system fails to automatically actuate
  • Division 1 EOC-RPT actuates as designed
  • Division 2 EOC-RPT fails to actuate Two minutes later, B RPS is manually tripped.

Based on the above, what is the response of the Recirculation System?

A. Both Recirc Pumps trip.

B. A Recirc Pump trips.

B Recirc Pump runs back to minimum speed following control rod insertion.

C. Neither Recirc Pump trips.

Both Recirc Pumps run back to minimum speed following control rod insertion via the trip of B RPS.

D. Neither Recirc Pump trips.

Both Recirc Pumps run back to minimum speed following control rod insertion due to lowering feedwater flow.

Proposed Answer: A Explanation (Optional):

A. Correct: Each division can perform the ATWS function. Each division controls one RPT for each Recirc Pump.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 101

B. Incorrect: Both pumps trip. Plausible if the candidate thinks that Division 1 will only trip the A recirc pump but understands that only one ARI valve is required to insert the control rods. If so, the candidate would conclude that B Recirc pump would run back to minimum speed when feed flow lowers.

C. Incorrect: Both Recirc pumps trip. Plausible if the candidate believes that both divisions are required to trip the recirc pumps and open the ARI valves. If so, the candidate would conclude that the recirc pumps would run back to minimum speed when feed flow lowers following the RPS trip.

D. Incorrect: Both Recirc pumps trip. Plausible if the candidate believes that both divisions are required to trip the recirc pumps but only one division is required to open an ARI valve. If so, the candidate would conclude that both Recirc pumps would run back to minimum speed when feed flow lowers.

Technical Reference(s): SD 358, pages 24 - 26 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: LP 264, 12.00.00.02.C (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 102

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 600000 AA1.06 Importance Rating 3.0 Ability to operate and / or monitor the following as they apply to PLANT FIRE ON SITE: Fire alarm Proposed Question: RO Question # 50 The plant is operating at 100% power when annunciator 1C40A (F-3) MAIN GEN EXCITER SMOKE DETECTOR OR EXCITER CARDOX SYS INITIATED alarms in the control room.

Which ONE of the following describes the Cardox System response and action(s) required for this alarm condition? Assume that a fire exists in the Main Generator Exciter.

The Cardox System ___ (1) ___.

Following closure of the exciter vent exhaust dampers, the Main Turbine must be tripped

___ (2) ___.

A. (1) will automatically initiate (2) immediately B. (1) will automatically initiate (2) within 2 minutes C. (1) must be manually initiated (2) immediately D. (1) must be manually initiated (2) within 2 minutes Proposed Answer: D Explanation (Optional):

A. Incorrect: The Cardox requires manual initiation. Additionally IAW OI 513 the main turbine shall be tripped within 2 minutes of the closure of the exciter vent exhaust dampers.

B. Incorrect: The Cardox requires manual initiation.

C. Incorrect: IAW OI 513 the main turbine shall be tripped within 2 minutes of the closure of the exciter vent exhaust dampers.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 103

D. Correct: IAW the ARP the system must be manually initiated. Additionally the turbine must be tripped within two minutes of damper closure.

ARP 1C40A (F-3)

Technical Reference(s): (Attach if not previously provided)

OI 513, P7L #15 and 17 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 4 55.43 Secondary coolant and auxiliary systems that affect the facility Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 104

Examination Outline Cross-reference: Level RO SRO Tier # 1 1 Group #

K/A # 295037 EA2.06 Importance Rating 4.0 Ability to determine and/or interpret the following as they apply to SCRAM CONDITION PRESENT AND REACTOR POWER ABOVE APRM DOWNSCALE OR UNKNOWN: Reactor pressure Proposed Question: RO Question # 51 An ATWS is in progress following an inadvertent Group 1 isolation.

  • RPV pressure is currently cycling between 1080 and 1135 psig
  • Reactor power is cycling between 30% and 40%
  • Standby Liquid is injecting Based on the above and IAW ATWS - RPV Control, what action is now required for RPV pressure control?

A. Open additional SRVs as required and stabilize pressure below 880 psig.

B. Open additional SRVs as required and stabilize pressure below 1055 psig.

C. Open additional SRVs manually and commence a plant cooldown not to exceed 100°F per hour.

D. Operate SRVs manually while maintaining pressure between 1080 and 1135 psig.

Alternate SRVs to help prevent localized Torus heatup.

Proposed Answer: B Explanation (Optional):

A. Incorrect: The required action is to stabilize below 1055 psig. Plausible in that if the bypass valves were available EHC pressure set would be lowered to this pressure.

B. Correct: IAW EOP steps P2 through P-4, if SRVs are cycling the required action is to terminate the cycling by manually opening SRVs and stabilizing pressure below 1055 psig.

C. Incorrect: A plant cooldown is not authorized until the cold shutdown boron weight has been injected.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 105

D. Incorrect: The required action is to terminate the SRV cycling by opening additional SRVs. Plausible in that ATWS-RPV control in general does not allow a pressure reduction/cooldown unless the reactor is shutdown. It also directs that if SRVs are being manually operated to alternate the SRVs being used to prevent localized heatup.

However terminating the cycling of the SRVs takes priority.

ATWS - RPV Control, steps P-2 Technical Reference(s): (Attach if not previously provided) and P-4.

Proposed References to be provided to applicants during examination: None Learning Objective: LP 50007-95, LO 95.56.08.04 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 106

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295018 AA2.04 Importance Rating 2.9 Ability to determine and/or interpret the following as they apply to PARTIAL OR COMPLETE LOSS OF COMPONENT COOLING WATER: System flow Proposed Question: RO Question # 52 RHR Loop A is aligned for Torus Cooling during accident conditions. RHRSW conditions are as follows:

  • RHRSW pumps A and C are in service
  • A RHRSW TO RHR P indicator PDI-2046 is indicating 25 psid
  • A RHRSW INLET FLOW indicator FI-2050 is indicating 5000 gpm Then, RHRSW pump A trips and parameters change as follows:
  • A RHRSW TO RHR P indicator PDI-2046 lowers to 18 psid
  • A RHRSW INLET FLOW indicator FI-2050 lowers to 2800 gpm Based on the above, which ONE of the following is correct?

C RHRSW pump is A. exceeding runout limits.

B. exceeding cavitation limits.

C. within all flow limits, but the P across the heat exchanger is too low.

D. within all flow limits, and the P across the heat exchanger is also within limits.

Proposed Answer: A Explanation (Optional):

A. Correct: Per precaution 15 of OI 416, RHRSW pump flow must be limited to < 2600 gpm to prevent runout.

B. Incorrect: Per precaution 15 of OI 416, RHRSW pump flow must be above 1200 gpm to prevent cavitation.

C. Incorrect: The RHRSW pump is exceeding runout limitations.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 107

D. Incorrect: The RHRSW pump is exceeding runout limitations. Additionally the P across the heat exchanger must be above 20 psid (precaution #3).

OI 416 RHR SERVICE WATER Technical Reference(s): SYSTEM, pages 3 and 4 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: LP 416, objective 30.01.01.01 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 8 55.43 Components, capacity, and functions of emergency systems.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 108

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295023 AA2.01 Importance Rating 3.6 Ability to determine and/or interpret the following as they apply to REFUELING ACCIDENTS:

Area radiation levels Proposed Question: RO Question # 53 The plant is operating at 100% power with spent fuel being moved in the spent fuel pool when the control room is notified that the spent fuel pool water level is lowering.

Additional conditions are as follows:

  • SPENT FUEL STORAGE AREA ARM HI RAD annunciator has alarmed. RI-9178 is indicating 500 mR/hr and rising slowly.
  • REFUELING FLOOR NORTH END HI RADIATION annunciator has alarmed. RI-9163 is pegged high at > 100 mR/hr.
  • REFUELING FLOOR SOUTH END HI RADIATION annunciator has alarmed. RI-9164 is pegged high at > 100 mR/hr.
  • CONTROL BLDG INTAKE AIR RAD MON RIM-6101A and B HI/TROUBLE annunciators have both alarmed. RIM-6101A and B are both reading 5 mR/hr and rising slowly.
  • A and B Control Building Standby Filter Units are in standby readiness.

Based on the above:

IAW EOP 3, entry into EOP 1 RPV Control and its associated manual scram is ___ (1) ____.

Manual starting of the Control Building Standby Filter Unit is ___ (2) ____.

A. (1) required (2) required B. (1) required (2) NOT yet required C. (1) NOT yet required (2) required D. (1) NOT yet required (2) NOT yet required Proposed Answer: C DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 109

Explanation (Optional):

A. Incorrect: Entry into EOP 1 is Not required. EOP 3 directs that EOP 1 be entered if a pressure reduction will reduce the leak rate (steps SC 4 and 5). Given that the conditions describe a spent fuel pool leak, this is not the case. Plausible in that EOP 3 also asks whether a parameter has exceeded its Max Safe Value, and if the leaking system is a primary system then EOP 1 entry is required. Two ARMs have exceeded their Max Safe Values in that they are pegged high.

B. Incorrect: Entry into EOP 1 is Not required. Also a manual start of the Control Building Standby Filter Unit (SFU) is required. The Control Building SFUs are designed to auto start when RIM-6101A and B exceed 3.5 mR/hr. Since they failed to auto start, they are required to be manually started.

C. Correct: Entry into EOP 1 is Not required as described above. Also manual starting of the SFU is required.

D. Incorrect: Manual starting of the SFU is required.

Technical Reference(s): EOP 3 (Attach if not previously provided)

ARP 1C26A[B], C-2 Proposed References to be provided to applicants during examination: None Learning Objective: LP 95.68, objective 95.70.07.02 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 110

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295001 2.1.1 Importance Rating 3.8 Conduct of Operations: Knowledge of conduct of operations requirements (Partial or Complete Loss of Forced Core Flow Circulation)

Proposed Question: RO Question # 54 The plant was operating at 15% power when an inadvertent closing of the A Recirc Pump discharge valve occurs. The CRS has directed the ATC operator to attempt to open the discharge valve. The BOP operator has gone to the EHC controls to adjust the EHC setpoint.

Which ONE of the following applies to these conditions?

A. The simultaneous performance of these activities is permitted because the A Recirc Pump has tripped.

B. The simultaneous performance of these activities is permitted because reactor pressure will NOT be affected.

C. The simultaneous performance of these activities is NOT permitted because of the potential for a reactor scram.

D. The simultaneous performance of these activities is NOT permitted because of the possible addition of positive reactivity.

Proposed Answer: D Explanation (Optional):

A. Incorrect: Performance of these activities is NOT permitted because of the possible addition of positive reactivity from two sources. Plausible because the candidate may assume closing the discharge valve in this condition would trip the pump. However at this power the recirc pumps will be on minimum speed and no pump trips will occur.

B. Incorrect: Performance of these activities is NOT permitted because of the possible addition of positive reactivity from two sources. Plausible because the candidate may believe that the actions taken will NOT increase reactor power, however any closure of the bypass valves will cause a positive reactivity addition.

C. Incorrect: Because the reactor mode switch is in RUN at this power level actions performed will NOT cause a reactor scram.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 111

D. Correct - Opening the recirc pump discharge valve will raise recirculation flow, while operating the EHC controls may affect bypass valve position affecting reactor pressure and also adding positive reactivity. IAW OP-AA-103-1000 Reactivity Control, positive reactivity additions shall not be made via simultaneous use of control rods and dilution on lowering Tavg for PWRs or via simultaneous use of control rods, recirc flow, or EHC Pressure for BWRs.

Technical Reference(s): OP-AA-103-1000 pg.13 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 112

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295003 2.1.20 Importance Rating 2.7 Ability to interpret and execute procedure steps: Partial or Complete Loss of AC Proposed Question: RO Question # 55 The plant is operating at 100% power with the electric plant configured for normal full power operation.

Then, the following alarms and indications are received:

  • 1C08A (A-6), S/U XFMR TO 1A3 BREAKER 1A302 TRIP
  • 1C08A (A-5), BUS 1A3 LOCKOUT TRIP
  • 1C08A (C-6), BUS 1A3 LOSS OF VOLTAGE
  • Breaker 1A301, STANDBY TRANSFORMER TO BUS 1A3, indicates open
  • Breaker 1A302, STARTUP TRANSFORMER TO BUS 1A3, indicates open
  • Breaker 1A311, A DIESEL GENERATOR 1G-31, indicates open
  • A SBDG 1G-31 is running at rated voltage and frequency Given the above information, which ONE of the following immediate actions is required by AOP 301 and why?

A. Manually close A SBDG output breaker, 1A311. The breaker should have closed.

B. Manually close the Standby Transformer to bus 1A3, 1A301. A fast transfer should have occurred.

C. Manually close the Standby Transformer to bus 1A3, 1A301. A slow transfer should have occurred.

D. Manually trip the A SBDG by placing its control switch in pull-to-lock. The diesel is running without cooling water.

Proposed Answer: D Explanation (Optional):

A. Incorrect: The BUS 1A3 LOCKOUT TRIP alarm indicates that the bus lockout relay tripped LOR 186-3 due to a bus fault. This relay prevents A SBDG output breaker, 1A311 from auto closing.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 113

B. Incorrect: The BUS 1A3 LOCKOUT TRIP alarm indicates that the bus lockout relay tripped LOR 186-3 due to a bus fault. This relay prevents Standby Transformer to bus 1A3, 1A301 from auto closing.

C. Incorrect: The BUS 1A3 LOCKOUT TRIP alarm indicates that the bus lockout relay tripped LOR 186-3 due to a bus fault. This relay prevents Standby Transformer to bus 1A3, 1A301 from auto closing.

D. Correct: The BUS 1A3 LOCKOUT TRIP alarm indicates that the bus lockout relay tripped LOR 186-3 due to a bus fault. The automatic actions associated with this relay tripping are:

Breakers 1A301 and 1A302 trip open and are interlocked from manually or automatically closing Bus 1A3 load sheds.

"A" SBDG 1G-31 auto starts on Bus 1A3 undervoltage, then runs up to speed and frequency.

Breaker 1A311 does NOT auto close and cannot be manually closed.

With the diesel running with a bus lockout, there is no ESW to the diesel. AOP 301 directs that the diesel be shutdown by placing the HS3231A in pull-to-lock.

Technical Reference(s): ARP 1C08A A-5 (Attach if not previously provided)

ARP 1C08A A-6 AOP 301, Immediate Action Proposed References to be provided to applicants during examination: None Learning Objective: LP 304.1, 15.00.00.03 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 114

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295038 2.4.45 Importance Rating 4.1 Emergency Procedures / Plan: Ability to prioritize and interpret the significance of each annunciator or alarm: High Off-site Release Rate Proposed Question: RO Question # 56 The plant is operating at 100% power with plant ventilation systems in a normal full power configuration.

Then the plant scrams following a plant transient. Both SBGT trains start and a complete Group 3 isolation occurs. The following indications are then noted:

  • Alarm REACTOR BUILDING KAMAN 3, 4, 5, 6, 7 & 8 RAD TROUBLE (IC35A C-3) annunciates.
  • The alarm is determined to be due to rising radiation levels on the KAMAN monitors.

IAW with ARP IC35A C-3 and OI 170, STANDBY GAS TREATMENT SYSTEM, which ONE of the following identifies the earliest point where operator action is required?

When the KAMAN monitors reach the A. High-High (red) setpoint, ALL running Main Plant Exhaust Fans must be secured.

B. High level (yellow) setpoint, ALL running Main Plant Exhaust Fans must be secured.

C. High-High (red) setpoint, the number of running Main Plant Exhaust Fans must be reduced down to ONE fan.

D. High level (yellow) setpoint, the number of running Main Plant Exhaust Fans must be reduced down to ONE fan.

Proposed Answer: A Explanation (Optional):

A. Correct: IAW ARP IC35A C-3 and OI 170 precaution #10, Main Plant Exhaust Fans 1V-EF-1, 1V-EF-2, and 1V-EF-3 have to be shutdown if SBGT A[B] is running due to a Group III isolation signal and Reactor Building KAMAN red alarm condition exists. The red alarm corresponds to the High-High setpoint. This is done to prevent bypass of the SGTS filter units by air from the reactor building via the main plant ventilation stack and precludes or limits an untreated release to the environs.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 115

B. Incorrect: This action is required at the High-High setpoint.

C. Incorrect: All fans must be secured. Plausible if the operator believes that reducing the number of running fans would reduce the total amount of radioactivity released.

D. Incorrect: Action is not required to the High-High setpoint is reached. Additionally, the required action is to secure all fans.

ARP IC35A C-3 and OI 170 Technical Reference(s): (Attach if not previously provided) precaution #10 Proposed References to be provided to applicants during examination: None Learning Objective: LP 879.3, objective 87.01.01.01 (As available)

Question Source: Bank # DAEC # 47017 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 11 55.43 Purpose and operation of radiation monitoring systems, including alarms and survey equipment.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 116

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 700000 AA2.02 Importance Rating 3.5 Ability to determine and/or interpret the following as they apply to GENERATOR VOLTAGE AND ELECTRIC GRID DISTURBANCES: Voltage outside the generator capability curve.

K/A Justification: The DAEC generator capability curve is a function of Megavar loading and Megawatt electric loading. Main Generator voltage is not plotted on this curve. However there is a direct correlation between grid voltage and the amount of Megavar loading on the DAEC generator and therefore on generator capability curve limits.

Proposed Question: RO Question # 57 The plant is operating at 100% power with the Main Generator in its normal full power configuration, when ITC MIDWEST notifies DAEC of potential grid instabilities over the next few hours.

Current Main Generator conditions are as follows:

  • 640 MWe Gross
  • 150 MVARS, lagging (out)
  • 45 psig Hydrogen pressure One hour later grid voltage is observed to be slowly lowering.

If uncorrected, the lowering grid voltage will result in the Main Generator exceeding the Main Generator Estimated Capability Curve when A. MVAR loading exceeds -240 MVAR leading.

B. MVAR loading exceeds 260 MVAR lagging.

C. MVAR loading reaches 210 MVAR lagging based on exceeding the rated PF.

D. MVAR loading reaches -100 MVAR leading based on exceeding the URAL limit.

Proposed Answer: B Explanation (Optional):

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 117

A. Incorrect: DAEC MVAR loading increases in the Lagging direction as grid voltage lowers relative to main generator terminal voltage. Plausible if the candidate is unsure of how MVAR loading varies with changes in grid voltage. (For 640 MWe and 45 psig H2, the curve is exceeded in the leading direction at -240 MVARs)

B. Correct: As grid voltage lowers, the DAEC generator will tend to pickup additional reactive loading. Using the Estimated Capability Curve, the curve will be exceeded when MVAR loading increase to 260 MVAR, Lagging.

C. Incorrect: The curve will not be exceeded until MVAR loading increase to 260 MVAR, Lagging. 210 MVAR is when the .95 PF (power factor) line is exceeded for a real loading of 640 MWe. Plausible if the candidate believes the .95 PF (power factor) is a limit. This is plausible in that the generator ratings are based on a .95 PF - see the ratings at the top of the curve. However the individual power factors are not limits but merely define the relationship between MWe and MVAR loading.

D. Incorrect: DAEC MVAR loading increases in the Lagging direction as grid voltage lowers relative to main generator terminal voltage. The URAL limit is only applicable when MVAR loading is in the Lead direction. Plausible if the candidate is unsure of how MVAR loading varies with changes in grid voltage.

Technical Reference(s): OI 698, Appendix 1 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: OI 698, Appendix 1 Learning Objective: LP 698, 57.00.00.04 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 118

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295016 AK3.03 Importance Rating 3.5 Knowledge of the reasons for the following responses as they apply to CONTROL ROOM ABANDONMENT: Disabling control room controls Proposed Question: RO Question # 58 The control room has been evacuated due to a fire in the main control room.

Regarding RHR operation via the Remote Shutdown System:

What is the reason for placing the RHR related Remote Shutdown System transfer switches in the EMER position following a control room evacuation?

These switches A. install separate auto isolation circuits to ensure that fire damage will NOT prevent an automatic isolation on low vessel level.

B. install separate auto initiation circuits to ensure that fire damage will NOT prevent an automatic LPCI injection on Low-Low-Low vessel level.

C. ensure that fire induced circuit faults associated with normal control circuits are isolated and will NOT prevent RHR operation from the Remote Shutdown panels.

D. ensure that fire induced faults in control power circuits will NOT prevent RHR operation by transferring RHR pump and valve power supplies to alternate power supplies.

Proposed Answer: C Explanation (Optional):

A. Incorrect: The low level isolation for SDC is bypassed when the transfer switches are in EMER.

B. Incorrect: LPCI initiation signals and LPCI valve logics are bypassed when the transfer switches are in EMER.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 119

C. Correct: The design basis scenario for the adequacy of the Remote Shutdown Panel System assumes that normal control circuits may either short circuit or open circuit due to the fire. Therefore, to take credit for having equipment available, fire damaged circuits must be isolated and replaced by non-damaged control circuits. This is the function of the transfer switches.

D. Incorrect: Power to the pumps and valves is not transferred. Plausible in that the yellow transfer switches will transfer components to the emergency fuses in case a normal control circuit has blown due to fire damage. However the power supply remains the same.

Technical Reference(s): SD 925, page 24 (Attach if not previously provided)

SD 925, Functional description of transfer switch operation on REMOTE SHUTDOWN PANEL 1C-388 (page 10)

Proposed References to be provided to applicants during examination: None Learning Objective: STG AOP 915, 94.28.06.02 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 120

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295009 AK1.05 Importance Rating 3.3 Knowledge of the operational implications of the following concepts as they apply to LOW REACTOR WATER LEVEL: Natural circulation Proposed Question: RO Question # 59 During ATWS conditions Boron was injected and RPV level intentionally lowered to reduce reactor power.

RPV level is now being controlled between -25 inches and +15 inches.

Based on the above:

(1) When can RPV level FIRST be raised to the normal control band of +170 inches to +211 inches AND (2) Why is water level raised at this time?

A. (1) When the Hot Shutdown Boron Weight is injected (2) So that a controlled plant cooldown can be commenced without challenging adequate core cooling.

B. (1) When the Cold Shutdown Boron Weight is injected (2) So that a controlled plant cooldown can be commenced without challenging adequate core cooling.

C. (1) When the Hot Shutdown Boron Weight is injected (2) To mix the Boron that has accumulated below the core plate with the water in the core by increasing natural circulation flow.

D. (1) When the Cold Shutdown Boron Weight is injected (2) To mix the Boron that has accumulated below the core plate with the water in the core by increasing natural circulation flow.

Proposed Answer: C Explanation (Optional):

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 121

A. Incorrect: Level is raised to mix the boron that may have accumulated in the lower plenum. Plausible in that a plant cooldown is contingent upon how much boron has been injected.

B. Incorrect: Level is raised to mix the boron that may have accumulated in the lower plenum. Additionally level is raised as soon as the hot shutdown boron weight is injected.

C. Correct: IAW with the ATWS EOP, steps L-7 and L-8, level is raised when the Hot Shutdown Boron Weight is injected. When level was lowered to below TAF, little if any natural circulation was occurring. The boron that was being injecting was accumulating in the lower plenum due to the low flow conditions. Once the Hot Shutdown Boron Weight has been injected it is necessary to raise level and re-establish natural circulation in order to mix the boron.

D. Incorrect: IAW with the ATWS EOP, steps L-7 and L-8, level is raised when the Hot Shutdown Boron Weight is injected. Plausible in that other EOP actions are contingent on the Cold Shutdown Boron Weight Being injected.

Technical Reference(s): ATWS EOP, steps L-7 and L-8 (Attach if not previously provided)

ATWS Bases document Proposed References to be provided to applicants during examination: None Learning Objective: LP 95-50, EO 95.51.01.01 (As available)

Question Source: Bank #

Modified Bank #

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 122

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295014 AK2.01 Importance Rating 3.9 Knowledge of the interrelations between INADVERTENT REACTIVITY ADDITION and the following: RPS Proposed Question: RO Question # 60 With the plant operating at 100% power, CV-4416, B OUTBOARD MSIV and CV-4419, C OUTBOARD MSIV fail SHUT.

Which ONE of the following will be the impact of this failure?

This condition will result in A. NO automatic actions.

B. a half scram initiated by the "B" and "C" MSIV position.

C. a full scram initiated by reactor pressure.

D. a full scram initiated by the "B" and "C" MSIV position.

Proposed Answer: C Explanation (Optional):

A. Incorrect: Plausible; would be true for an initial low power condition. With Mode Switch in STARTUP, no automatic actions occur. 75% is the normal power limitation with 3 Main Steam Lines.

B. Incorrect: Plausible; would be true for A and B, C and D, A and C, or B and D with a lower initial power. B and C MSIV do NOT cause a Half Scram based on valve positions.

C. Correct: Closure of one MSIV at full power raises reactor pressure to the alarm point, and power >120%. (Steam flow in the remaining lines also rises to near the MSL Hi Flow Group 1 isolation setpoint.). The sudden closure described causes transient power and pressure above the scram setpoints. This transient results in a full scram. It is required to enter IPOI-5 and place the Reactor Mode Switch in SHUTDOWN.

D. Incorrect: Plausible because closure of the two valves does cause a scram and MSIV position does cause a scram, however B and C MSIV do NOT cause a Full Scram based on valve positions, they would cause a half scram.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 123

SD 358, pg 20 50000_683-0_lp page 26, 27, 34 Technical Reference(s): (Attach if not previously provided)

Validated in DAEC Simulator 1/9/12 Proposed References to be provided to applicants during examination: None Learning Objective: LP 358, 22.02.01.03 (As available)

DAEC Bank #

Question Source: Bank #

47907 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 6 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 124

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295015 AK3.01 Importance Rating 3.4 Knowledge of the reasons for the following responses as they apply to INCOMPLETE SCRAM:

Bypassing rod insertion blocks Proposed Question: RO Question # 61 Following a reactor scram, 6 control rods failed to fully insert.

The CRS has authorized the use of RIP 103.3, MANUALLY DRIVE CONTROL RODS, to complete the control rod insertion.

Which ONE of the following actions is directed by RIP 103.3 in order to prevent control rod blocks from interfering with manually inserting the rods?

A. Bypass the RWM to prevent any RWM insert blocks from interfering with rod insertion.

B. Bypass the RWM to prevent any RPIS Inoperative select blocks from interfering with rod insertion.

C. Bypass the SRM closest to the control rods being inserted to prevent SRM associated rod blocks.

D. Insert rods using ONLY the EMER ROD IN/NOTCH OVERRIDE switch because this will bypass all insert blocks.

Proposed Answer: A Explanation (Optional):

A. Correct: RIP 103.3, step 3, directs that the RWM be bypassed. This is to prevent any RWM insert blocks from preventing rod insertion. Following a scram multiple insert errors would be indicated when one of the problem rods was selected for insertion resulting in a RWM insert block.

B. Incorrect: The RWM is bypassed in order to prevent insert blocks. An RPIS Inop condition would still result in a select block preventing rod insertion regardless of the position of the RWM bypass switch.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 125

C. Incorrect: Bypassing an SRM will not prevent a RWM insert block. Plausible in that SRM reading near the control rods will change, however with the SRMs inserted lowering counts will NOT cause a rod block.

D. Incorrect: The EMER ROD IN/NOTCH OVERRIDE switch will not prevent a RWM insert block. Plausible in that use of this switch is directed in RIP 103.3 and it also acts directly on the directional control valves of the HCUs, bypassing the timer circuits.

Technical Reference(s): LP 95-03, page 17 (Attach if not previously provided)

RIP 103.3 Proposed References to be provided to applicants during examination: None Learning Objective: LP 95-03, EO 95.09.01.04 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Design, components, and function of reactivity control mechanisms and instrumentation.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 126

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295008 AA1.02 Importance Rating 3.3 Ability to operate and/or monitor the following as they apply to HIGH REACTOR WATER LEVEL: Reactor water cleanup (ability to drain): Plant-Specific Proposed Question: RO Question # 62 Following a reactor scram, Reactor Water Cleanup (RWCU) is being used to assist in RPV level control. Additional information is as follows:

  • RPV level is 205 inches and slowly rising
  • MO 2731, CLEANUP DRAIN TO MN COND is open
  • Current drain flow to the Main Condenser is 40 gpm Based on the above and IAW OI 261, which of the following actions is authorized in order to raise the drain flow rate and stabilize RPV level?

Action 1: Open CV-2729, Cleanup System Drain Header Control Valve further, using HC-2729 DRAIN FLOW REGULATOR Action 2: Open MO-2727, DRAIN FLOW ORIFICE BYP Action 3: Open MO-2732, CLEANUP DRAIN TO RW A. Action 1 ONLY B. Action 1 or 2 ONLY C. Action 1 or 3 ONLY D. Action 1, 2 or 3 Proposed Answer: A Explanation (Optional):

A. Correct: Given the current conditions only action 1 is authorized DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 127

B. Incorrect: Per the caution in OI 261, section 7.1, when reactor pressure is above 600 psig, MO-2727 DRAIN FLOW ORIFICE BYP valve should be closed (protects low pressure piping downstream).

C. Incorrect: Per precaution 7 of OI 261, MO-2731 CLEANUP DRAIN TO MN COND valve and MO-2732 CLEANUP DRAIN TO RW valve should not be opened at the same time when there is a vacuum on the condenser. This can provide a path through Radwaste with a resultant loss of condenser vacuum. Since the bypass valve is open, there is a vacuum in the main condenser.

D. Incorrect: Opening MO-2727 or MO-2732 is not authorized.

Technical Reference(s): OI 261, section 7.1 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: LP 261 RO objective 11.01.01.06 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 128

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295035 EA2.02 Importance Rating 2.8 Ability to determine and/or interpret the following as they apply to SECONDARY CONTAINMENT HIGH DIFFERENTIAL PRESSURE: Off-site release rate: Plant-Specific Proposed Question: RO Question # 63 The plant is operating at 100% power when the following occur:

  • A steam line break in the steam tunnel which could NOT be isolated has caused a reactor scram
  • Fuel failures have occurred
  • RPV pressure is 420 psig and lowering
  • The steam tunnel blowout panels have released
  • Steam tunnel temperatures have exceed their max safe values
  • An ALERT has just been declared based on Offsite Rad levels (1) Which ONE of the following is the most significant release pathway?

AND (2) When is emergency depressurization required?

A. (1) Steam tunnel Turbine building Turbine building exhaust fans environment.

(2) Emergency depressurization is currently required B. (1) Steam tunnel Turbine building Turbine building exhaust fans environment.

(2) Before offsite release rates exceed that level requiring a General Emergency C. (1) Steam tunnel Reactor Building Vent Shaft Standby Gas Treatment Offgas stack environment.

(2) Emergency depressurization is currently required D. (1) Steam tunnel Reactor Building Vent Shaft Standby Gas Treatment Offgas stack environment.

(2) Before offsite release rates exceed that level requiring a General Emergency Proposed Answer: B Explanation (Optional):

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 129

A. Incorrect: An entry condition to EOP 4 was exceeded when offsite release rates exceeded that requiring an Alert. EOP 4 requires an emergency depressurization be performed before release rates exceed that requiring a General Emergency. Although EOP 3 entry conditions have also been exceeded there are no conditions currently requiring an ED since the max safe temperature is limited to one area.

B. Correct: A blowout panel in the steam tunnel will vent the steam tunnel to the turbine building when pressure in the steam tunnel exceeds 7 inches of water. An entry condition to EOP 4 was exceeded when offsite release rates exceeded that requiring an Alert. EOP 4 requires an emergency depressurization be performed before release rates exceed that requiring a General Emergency.

C. Incorrect: A blowout panel in the steam tunnel will vent the steam tunnel to the turbine building when pressure in the steam tunnel exceeds 7 inches of water. Plausible if the candidate does not recognize that the blowout panel will vent the steam tunnel as this would then be the correct flow path. Also there are no conditions currently requiring an ED.

D. Incorrect: A blowout panel in the steam tunnel will vent the steam tunnel to the turbine building when pressure in the steam tunnel exceeds 7 inches of water.

Technical Reference(s): SD 170-1, page 7 (Attach if not previously provided)

EOP 4, step RR-4 Proposed References to be provided to applicants during examination: None Learning Objective: LP 95.71, objective 95.71.01.04 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 13 55.43 Procedures and equipment available for handling and disposal of radioactive materials and effluents.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 130

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295034 2.4.2 Importance Rating 4.5 Emergency Procedures / Plan: Knowledge of system set points, interlocks and automatic actions associated with EOP entry conditions: Secondary Containment Ventilation High Radiation Proposed Question: RO Question # 64 The plant is shut down and cooling down for a forced outage. A Drywell air purge has been established using A SBGT train.

Then, both RB Vent Shaft Rad Monitors, RIM 7606A and B, rise to the EOP 3, Secondary Containment Control entry condition.

Which ONE of the following is correct regarding the impact on SBGT and the drywell air purge lineup?

B SBGT will .

A. not automatically start but should be started manually.

The drywell air purge valves will NOT isolate.

B. not automatically start but should be started manually.

The drywell air purge Valves will isolate.

C. automatically start.

The drywell air purge valves will NOT isolate.

D. automatically start.

The drywell air purge valves will isolate.

Proposed Answer: D Explanation (Optional):

A. Incorrect: The EOP 3 entry condition on RB Vent Shaft Rad high radiation is also the setpoint for the Group 3 isolation. Both radiation monitors reaching this setpoint will result in a Channel A and Channel B trips within the Group 3 logic. This will result in the B train of SBGT starting and drywell air purge lineup isolating. Plausible if the candidate is not aware of the correlation between the entry condition and the Group 3 setpoints.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 131

B. Incorrect: Both radiation monitors reaching this setpoint will result in a Channel A and Channel B trips within the Group 3 logic. This will result in the B train of SBGT starting and drywell air purge lineup isolating.

C. Incorrect: Both radiation monitors reaching this setpoint will result in a Channel A and Channel B trips within the Group 3 logic. This will result in SBGT starting and drywell air purge lineup isolating.

D. Correct: The EOP 3 entry condition on RB Vent Shaft Rad high radiation is also the setpoint for the Group 3 isolation. Both radiation monitors reaching this setpoint will result in a Channel A and Channel B trips within the Group 3 logic. This will result in the B train of SBGT starting and drywell air purge lineup isolating.

Technical Reference(s): ARP 1C05B, C-8 (Attach if not previously provided)

EOP 3 entry conditions Proposed References to be provided to applicants during examination: None Learning Objective: LP 95.68, objective 95.00.00.22 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 132

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295020 AK2.12 Importance Rating 3.1 Knowledge of the interrelations between INADVERTENT CONTAINMENT ISOLATION and the following: Instrument air/nitrogen Proposed Question: RO Question # 65 The plant is operating at 100% power with the Drywell pneumatic system aligned for normal full power operation.

Then, an inadvertent Group 3 isolation occurs.

Which ONE of the following is correct regarding the impact of the isolation on the Drywell pneumatics and Drywell components?

A. The Drywell pneumatic supply line will isolate. Local accumulators inside the Drywell will provide for 5 actuations of the inboard MSIVs.

B. The Drywell pneumatic supply line will isolate. Local accumulators inside the Drywell will provide for 5 actuations of the ADS valves until the isolation can be corrected.

C. The Drywell N2 compressor will trip when Compressor Suction Isolation Valves, CV-4378A & CV-4378B close. Emergency N2 Backup Supply Valve CV-4377 will open to maintain the pneumatic supply to the Drywell.

D. The Drywell N2 compressor will trip when Compressor Suction Isolation Valves, CV-4378A & CV-4378B close. Nitrogen Accumulator 1T128 will maintain the pneumatic supply to the Drywell until the isolation can be corrected.

Proposed Answer: B Explanation (Optional):

A. Incorrect: The MSIVs are not assured of remaining open for this period of time.

Plausible in that there are accumulators associated with the MSIVs. However the accumulator volume is adequate to provide full stroking of the valve, (NOT five) for only one half cycle (open to close) when supply gas to the accumulator has failed.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 133

B. Correct: In addition to the compressor suction valves, compressor isolation valve, CV-4371A also closes, isolating the pneumatic supply line. The accumulator on each ADS valve provides pneumatic pressure for valve actuation. The design pneumatic supply pressure requirements for the accumulator are such that following a failure of the pneumatic supply to the accumulator; each ADS valve can be actuated at least 5 times up to 100 days following a LOCA.

C. Incorrect: In addition to the compressor suction valves, compressor isolation valve, CV-4371A also closes, isolating the pneumatic supply line. Although Emergency N2 Backup Supply Valve CV-4377 will open as accumulator pressure lowers, the drywell will remain isolated.

D. Incorrect: In addition to the compressor suction valves, compressor isolation valve, CV-4371A also closes, isolating the pneumatic supply line. Accumulator 1T128 is upstream of these isolation valves and will have no bearing on maintaining drywell pneumatics.

Technical Reference(s): SD 183-1, pages 7 -12 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 7 55.43 Design, components, and function of control and safety systems, including instrumentation, signals, interlocks, failure modes, and automatic and manual features.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 134

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 1 K/A # G1 2.1.17 Importance Rating 3.9 Conduct of Operations: Ability to make accurate, clear and concise verbal reports.

Proposed Question: RO Question # 66 Which ONE of the following statements describes the annunciator reporting requirements after the CRS has announced entry into abnormal or emergency operating procedures?

A. Do NOT announce any alarms unless directed by the CRS.

B. ALL alarms shall be announced unless given specific instructions from the CRS.

C. Announce ONLY alarms which represent Emergency Operating Procedure entry conditions.

D. Announce ONLY those significant alarms needed to implement Emergency Operating Procedures and Abnormal Operating Procedures.

Proposed Answer: D Explanation (Optional):

A. Incorrect -Because during EOP operations there are too many alarms and alarm prioritization can be difficult, it is plausible the CRS could direct which alarms they wish to monitor.

B. Incorrect - This is plausible because the normal alarm response requires announcing ALL unexpected alarms.

C. Incorrect - This is plausible because these alarms are announced, however all annunciators significant to implementing EOPs and AOPs must be announced.

D. Correct - Under transient conditions, the CRS will announce entry into abnormal or emergency operating procedures. The operators are then allowed to announce only those significant alarms needed to implement those procedures.

OP-AA-100-1000, Att. 1, step 9, Technical Reference(s): (Attach if not previously provided) pg 13-14 Proposed References to be provided to applicants during examination: None DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 135

Learning Objective: (As available)

DAEC Bank #

Question Source: Bank #

47329(1412)

Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 136

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 1 K/A # G1 2.1.20 Importance Rating 4.6 Conduct of Operations: Ability to interpret and execute procedure steps.

Proposed Question: RO Question # 67 A control room operator is running a Standby Diesel Generator Surveillance Test Procedure (STP). After the Operator completes each step of the surveillance, the Operator places their initials beside the step.

While conducting the test, an unexpected alarm is received in the Control Room. The Operator acknowledges and announces the alarm, ensures that the Diesel Generator is in a stable condition, flags the current step in the STP, lays the STP to the side, and pulls out the Annunciator Response Procedure (ARP) for the alarm.

The operator reviews the steps in the ARP, sets it down, and without any further reference to the ARP, begins taking the stated actions.

The Operator then gets permission from shift supervision and returns to the STP flagged step, performs a Job Site Review, and continues on with the STP performance.

Which ONE of the following is correct regarding the operators compliance with the requirements for procedural adherence?

A. NO, the operator has NOT complied. STPs cannot be suspended in order to take other actions.

B. YES, the operator has complied. STPs are continuous use procedures, and ARPs are reference use procedures.

C. NO, the operator has NOT complied. The ARP is a reference use procedure and must be either place kept, or periodically reviewed and reviewed upon completion.

D. YES, the operator has complied. Operators are allowed to take any actions deemed necessary to respond to the alarm even if it conflicts with an approved procedure (STP).

Proposed Answer: C Explanation (Optional):

A. Incorrect - The procedure may be exited procedure if it will be resumed in a timely manner. Plausible if the candidate believes exiting the procedure requires exiting the procedure.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 137

B. Incorrect - Reference use procedures require place keeping and reviewing the actions taken. Plausible because the candidate may not realize the actions required for a reference use procedure and literally treat the procedure as a reference.

C. Correct - The ARP is a Reference Use procedure, requiring the CRO to complete each step in the sequence specified unless the procedure specifically allows otherwise.

Then mark off steps when completed and review the procedure upon completion to verify required actions were completed.

D. Incorrect - Reference use procedures require place keeping and reviewing the actions taken. Plausible because the candidate may not realize the actions required for a reference use procedure and literally treat the procedure as a reference.

AD-AA-100-1006, Sect 4.2, pgs Technical Reference(s): (Attach if not previously provided) 13-15 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

DAEC Bank #

Question Source: Bank #

19661(1412)

Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 138

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 2 K/A # G2 2.2.39 Importance Rating 3.9 Equipment Control: Knowledge of less than or equal to one hour technical specification action statements for systems.

Proposed Question: RO Question # 68 The plant is operating at 100% power when the CRS determines the A Standby Diesel Generator (SBDG) is inoperable.

Which ONE of the following is required by Technical Specifications?

Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> A. determine that the Offsite Circuits are operable.

B. determine that the B SBDG is not inoperable due to common cause failure.

C. demonstrate that the B SBDG is operable by running its operability surveillance test.

D. declare the required feature(s) supported by the A SBDG inoperable when redundant required feature(s) are inoperable.

Proposed Answer: A Explanation (Optional):

A. Correct. - With one DG inoperable T.S. 3.8.1.B.1 requires performing SR 3.8.1.1 for OPERABLE offsite circuit(s). This STP verifies correct breaker alignment and indicated power availability for each offsite circuit capable of supplying the onsite Class 1E AC Electrical Distribution System.

B. Incorrect. - T.S. 3.8.1.B.3, requires determining the OPERABLE DG is not inoperable due to common cause failure.

C. Incorrect. - T.S. 3.8.1.B.3, requires performing SR 3.8.1.2 for the operable DG once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

D. Incorrect. - T.S. 3.8.1.B.2, requires declaring the required features(s) supported by inoperable DG inoperable when redundant required feature(s) are inoperable within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of the discovery of the SBDG being inoperable.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 139

TS 3.8.1 Technical Reference(s): (Attach if not previously provided)

STP 3.8.1-01, pg 2 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 140

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 2 K/A # G2 2.2.22 Importance Rating 4.0 Equipment Control: Knowledge of limiting conditions for operations and safety limits.

Proposed Question: RO Question # 69 Which ONE of the following constitutes a Technical Specifications safety limit violation?

A. Reactor Water level is currently 25 inches above TAF.

B. Core flow is 20% of rated and thermal power is 21.7% RTP.

C. Reactor steam dome pressure reaches the safety valves lift setpoint.

D. Reactor steam dome pressure 800 psig, 25% rated core flow, and MCPR is 1.10 during single loop operation.

Proposed Answer: D Explanation (Optional):

A. Incorrect - the RPV water level safety limit is reactor vessel water level shall be greater than 15 inches above the top of active irradiated fuel.

B. Incorrect - Fuel Cladding Integrity - With the core flow < 10% rated core flow:

THERMAL POWER shall be 21.7% RTP.

C. Incorrect - Fuel Cladding Integrity - The safety valves lift at 1240 psig vs. the safety limit of 1335 psig.

D. Correct - The MCPR safety limit is that with the reactor steam dome pressure 785 psig and core flow 10% rated core flow: MCPR shall be 1.10 for two recirculation loop operation or 1.12 for single recirculation loop operation.

Technical Reference(s): Tech Spec Sect. 2.1.1 and 2.1.2 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 141

Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 5 55.43 Facility operating characteristics during steady state and transient conditions, including coolant chemistry, causes and effects of temperature, pressure and reactivity changes, effects of load changes, and operating limitations and reasons for these operating characteristics.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 142

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 3 K/A # G3 2.3.11 Importance Rating 3.8 Radiation Control: Ability to control radiation releases.

Proposed Question: RO Question # 70 The plant is operating at 100% power with the following conditions:

  • MODE SELECT Handswitch HS-4103 is verified to be in the AUTO Position Based on these conditions, which of the following is the expected position of the Offgas Treatment valves?
1. CV4134A, OG PREFILTERS 1F-213A/B OUTLET ISOLATION
2. CV4134B, OFFGAS CHARCOAL ADSORBER TRAIN BYPASS A. 1. Open
2. Open B. 1. Open
2. Closed C. 1. Closed
2. Open D. 1. Closed
2. Closed Proposed Answer: B Explanation (Optional):

A. Incorrect - CV-4134B closes to the place the charcoal adsorbers in the treatment mode B. Correct - When the gamma radiation level in the treated offgas reaches this value, (if the auto mode of the offgas system is used), the system provides for automatic switching from the bypass mode (CV-4134B closes) to the treatment mode (CV-4134A opens).

C. Incorrect - CV-4134A opens and CV-4134B closes to the place the charcoal adsorbers in the treatment mode.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 143

D. Incorrect - CV-4134A opens and CV-4134B closes to the place the charcoal adsorbers in the treatment mode.

1C03A, C-2 Technical Reference(s): (Attach if not previously provided)

SD 879-1, pg 22 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

DAEC Bank #

Question Source: Bank #

19383 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 11 55.43 Purpose and operation of radiation monitoring systems, including alarms and survey equipment.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 144

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 3 K/A # G3 2.3.12 Importance Rating 3.2 Radiation Control: Knowledge of Radiological Safety Principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.

Proposed Question: RO Question # 71 Actions of IPOI 2, Plant Startup, are being performed. The Plant Manager has directed that all requirements of IPOI 7, Special Operations, are to be adhered to.

You have been directed to vent 1P-201A, A Recirc Pump while the Drywell is accessible, per OI 264, Section 10.2.

Which ONE of the following is the MAXIMUM power level permitted for this Drywell entry?

Reactor power must be A. below range 1 on the IRMs B. below the point of adding heat, approximately 2% power C. stable and below approximately 7% power D. stable and below 30% power Proposed Answer: C Explanation (Optional):

A. Incorrect - Reactor power must be below Approximately 7% power. This is plausible if the candidate assumes that the reactor must be almost subcritical to enter the drywell.

B. Incorrect - Reactor power must be below Approximately 7% power. This is plausible if The candidate assumes the limit is based on drywell temperature conditions as well as reactor power and radiation levels.

C. Correct - To protect against the radiological hazards of an operating reactor a drywell entry can be made with reactor power stable and <30 on IRM Range 10, (~7%).

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 145

D. Incorrect - Reactor power must be below Approximately 7% power unless permission is granted to exceed 7% by the Plant Manager. In this question the stem states The Plant Manager has directed that all requirements of IPOI 7, Special Operations, are to be adhered to. Therefore, the 7% limit applies. Plausible be because the actual limit is

<30 on range 10 of the IRMs (~ 7% power) and that IPOI 2 raises power level up to 35%.

IPOI 7, Att 1, pg 4 Technical Reference(s): (Attach if not previously provided)

HPP 3104, pgs 5 & 6 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank # 20492(1410)

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 12 55.43 Radiological safety principles and procedures.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 146

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 4 K/A # G4 2.4.34 Importance Rating 4.2 Emergency Procedures / Plan: Knowledge of RO tasks performed outside the main control room during an emergency and the resultant operational effects.

Proposed Question: RO Question # 72 Following a fire in the Control Room the crew entered AOP 915, Shutdown Outside the Control Room, and immediately evacuated the Control Room without inserting a Manual Reactor SCRAM.

In accordance with AOP 915, which ONE of the following methods is used to:

(1) shutdown the reactor?

(2) determine if the SCRAM was successful?

A. (1) Turn OFF the RPS breakers supplying Power Range Neutron Monitoring-Buses A and B.

(2) At any available computer terminal, check the control rod position printout by depressing the OD3 keys.

B. (1) Turn OFF the EPA-A1, EPA-A2, EPA-B1 and EPA-B2 circuit breakers.

(2) Locally verifying all the scram valves are open using the CRD HCU Location

/Scram Valve Checklist.

C. (1) Turn OFF the RPS breakers supplying Power Range Neutron Monitoring-Buses A and B.

(2) Locally verifying all the scram valves are open using the CRD HCU Location

/Scram Valve Checklist.

D. (1) Turn OFF the EPA-A1, EPA-A2, EPA-B1 and EPA-B2 circuit breakers.

(2) At any available computer terminal, check the control rod position printout by depressing the OD3 keys.

Proposed Answer: C Explanation (Optional):

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 147

A. Incorrect - Demanding an OD3 would determine control rod position after a Scram and before the Scram reset, some control rods will go to an overtravel condition. This is a position beyond the full-in "00" indication. A control rod printout will display these overtravel positions as "-99". This display cannot be distinguished from a control rod in any other mid-stroke position where the position reed switch is not picked up. Plausible because this is an accepted way to determine control rod position.

B. Incorrect - Tripping the EPA breakers will remove power from the RPS buses and cause unnecessary isolations and is NOT used in AOP 915. Plausible because this is a quick way to scram the reactor from outside the control room.

C. Correct - IAW AOP 915; Open the door of Panel 1Y30 with a screwdriver and turn off the circuit breakers on for Power Range Neutron Monitoring System A and B. Then locally verify all scram valves open. Use Attachment 4 (CRD HCU Location /Scram Valve Checklist) for check off.

D. Incorrect - Tripping the EPA breakers will remove power from the RPS buses and cause unnecessary isolations and is NOT used in AOP 915. Plausible because this is a quick way to scram the reactor from outside the control room.

Demanding an OD3 would determine control rod position after a Scram and before the Scram reset, some control rods will go to an overtravel condition. This is a position beyond the full-in "00" indication. A control rod printout will display these overtravel positions as "-99". This display cannot be distinguished from a control rod in any other mid-stroke position where the position reed switch is not picked up. Plausible because this is an accepted way to determine control rod position.

Technical Reference(s): AOP 915, pg 23 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 148

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 4 K/A # G4 2.4.13 Importance Rating 4.0 Emergency Procedures / Plan: Knowledge of crew roles and responsibilities during EOP usage.

Proposed Question: RO Question # 73 The plant is operating at 100% when the following occurs:

  • Drywell pressure reaches 1.25 psig and slowly rising
  • Reactor water level is +165" and slowly lowering

A. Notify the CRS of the condition, request direction and await direction.

B. Notify the CRS of the condition, recommend a manual scram, and await direction.

C. Perform a fast power reduction using Recirc and/or control rods and announce the action to the CRS.

D. Time permitting, obtain a peer check, then initiate a manual scram and announce the action to the CRS.

Proposed Answer: D Explanation (Optional):

A. Incorrect - The CRO has the responsibility for obtaining a peer check and initiating a reactor scram. Plausible because there is no immediate challenge to core cooling.

B. Incorrect - Because there is no immediate challenge to core cooling the CRO has the time to obtain a peer check. Plausible because in an emergency a peer check is NOT required.

C. Incorrect - The CRO has the responsibility for obtaining a peer check and initiating a reactor scram. Plausible because there is no immediate challenge to core cooling.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 149

D. Correct - IAW OP-AA-103-1000, Each licensed operator shall be responsible for reducing power or initiating a manual reactor scram if a key reactor safety parameter deviates from an expected condition or if it is believed necessary to assure nuclear safety. Due to time considerations, peer checking is desired but not required in these conditions.

Technical Reference(s): OP-AA-103-1000, pg 14 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 150

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 3 K/A # G3 2.3.14 Importance Rating 3.4 Radiation Control: Knowledge of radiation or contamination hazards that may arise during normal, abnormal, or emergency conditions or activities.

Proposed Question: RO Question # 74 Which ONE of the following actions requires the Control Room to notify Health Physics that areas in both Reactor Building and Radwaste may require upgrading their radiation area postings?

A. Placing a RWCU Filter Demineralizer in service B. Operation of the Traversing In-Core Probe system C. Swapping Fuel Pool Cooling Filter Demineralizer A to B D. Flushing the Residual Heat Removal System for Shutdown Cooling startup Proposed Answer: D Explanation (Optional):

A. Incorrect - Its plausible that backwashing a Reactor Water Cleanup filter demineralizer may affect radiation levels, however there are no precautions about changes in radiation levels during this procedure.

B. Incorrect - Plausible because operation of the Traversing In-Core Probe system may affect radiation levels in the Reactor Building. However they will NOT affect radiation levels in Radwaste C. Incorrect - Plausible because backwashing a Fuel Pool Cooling Filter/Demineralizer requires the operator to notify HP prior and after backwashing. However there are no requirements for reposting of Rad areas when conducting this evolution.

D. Correct - The Control Room must notify Health Physics that the A[B] Loop of RHR will be warmed by flushing Reactor Water to Radwaste, followed by the startup of the A[B]

Loop of RHR in the Shutdown Cooling Mode. The affected areas may require upgrading their radiation area postings.

Technical Reference(s): OI 149, pg 40 (Attach if not previously provided)

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 151

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 12 55.43 Radiological safety principles and procedures.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 152

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 2 K/A # G2 2.2.6 Importance Rating 3.0 Equipment Control: Knowledge of the process for making changes to procedures.

Proposed Question: RO Question # 75 A plant startup is in progress following a refueling outage. A Control Room Operator is performing the initial startup of the Reactor Building Closed Cooling Water (RBCCW) system using OI 414, Reactor Building Closed Cooling Water. The operator notices the step to start the A RBCCW pump is incorrect as shown below:

Description Handswitch A TBCCW PUMP 1P-81A HS-4829 B RBCCW PUMP 1P-81B HS-4833 C RBCCW PUMP 1P-81C HS-4837 Which ONE of the following statements is correct regarding the error in the procedure?

A. The RO must exit the procedure, place all equipment in a safe condition, and then discuss the error with the OSM/CRS. Until the procedure is revised, the A RBCCW pump may NOT be started.

B. The RO may make a field change to the procedure and start the A RBCCW pump.

When the procedure is completed, the RO must notify the OSM/CRS of the field change for further corrective action.

C. The startup of the RBCCW system must be stopped and the error brought to the attention of the OSM/CRS. The OSM/CRS authorizes an editorial change to the procedure to permit starting the A RBCCW pump.

D. The startup of the RBCCW system may continue the RO must obtain concurrence from another licensed operator prior to completing the step. The editorial change must be discussed with the OSM/CRS before the end of the shift.

Proposed Answer: C Explanation (Optional):

A. Incorrect - Typical editorial correction(s) are processed administratively and typically in the field. As such, they do not require formal reviews (i.e. no PCR or Temp Change and none of the typical forms or screenings required of a permanent change. Therefore there is NO need to wait to start the pump. Plausible because most procedure changes do require submitting a procedure change request or CR which would could stop completing the procedure as written.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 153

B. Incorrect - The work must be stopped (in this case starting the A RBCCW pump) and the error brought to the attention of the OSM/CRS. The OSM/CRS must authorize starting the A RBCCW pump. Plausible because the RO would proceed with the procedure AFTER making a field change authorized by the CRS/OSM.

C. Correct - The work must be stopped (in this case starting the A RBCCW pump). IAW AD-AA-100-1006, For obvious minor typographical errors, minor discrepancies in nomenclature or discrepancies involving equivalence (i.e. handswitch in STOP versus OFF, START versus HAND or MAN, etc), the OSM/CRS may, after review, allow the procedure to continue. Since the pump identification number (1P-81A ) and switch identification number (HS-4829) are correct this is a typographical error. Based on this the procedure can be performed as written. Typical editorial correction(s) are processed administratively and typically in the field. As such, they do not require formal reviews (i.e. no PCR or Temp Change and none of the typical forms or screenings required of a permanent change.

D. Incorrect - The work must be stopped (in this case starting the A RBCCW pump) and the error brought to the attention of the OSM/CRS. The OSM/CRS must authorize starting the A RBCCW pump, NOT another licensed operator which may be an RO.

Plausible because the RO would proceed with the procedure AFTER making a field change authorized by the CRS/OSM.

ACP 106.1, Att 5 Technical Reference(s): (Attach if not previously provided)

AD-AA-100-1006, pgs 29 & 30 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 10 55.43 Administrative, normal, abnormal, and emergency operating procedures for the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 154

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295021 AA2.01 Importance Rating 3.6 Ability to determine and/or interpret the following as they apply to LOSS OF SHUTDOWN COOLING: Reactor water heatup/cooldown rate Proposed Question: SRO Question # 76 The plant was shutdown ten (10) days ago following an extended high power run to replace a core spray pump. Plant conditions are as follows:

  • The Recirculation pumps are shutdown and unavailable
  • Reactor water level is 190 inches
  • The Drywell has NOT been entered
Then,
  • SDC was isolated following an RHR system leak and cannot be re-established

(1) When does the plant enter Mode 3?

AND (2) After entering Mode 3 what is the maximum amount of time before the plant is required to be in Mode 4?

A. (1) 2.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (2) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B. (1) 2.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (2) 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> C. (1) 11.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> (2) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> D. (1) 11.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> (2) 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 155

Proposed Answer: A Explanation (Optional):

A. Correct: using appendix 1 of AOP 149, the heatup rate is 25 degrees per hour. With this heatup rate, the coolant will reach 212 degrees in 2.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. At 212°F Mode 3 is entered. This results in a failure to meet LCO 3.4.7. Condition A required action A.3 Be in Mode 4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Condition B is also applicable but not information that is requested in the question.

B. Incorrect: 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> is not correct for placing the plant in Mode 4. This is plausible if the candidate incorrectly applies the Secondary Containment LCO to determine the Mode 4 time requirement.

C. Incorrect: Plausible if the candidate uses Appendix 1 of AOP 149 (vice Appendix 2) a heatup rate of 4.5 degrees per hour is obtained. In this case, Mode 3 is entered in 11.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

D. Incorrect: Plausible if the candidate uses Appendix 1 of AOP 149 (vice Appendix 2) a heatup rate of 4.5 degrees per hour is obtained. In this case, Mode 3 is entered in 11.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. In addition, 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> is not correct for placing the plant in Mode 4. This is plausible if the candidate incorrectly applies the Secondary Containment LCO to determine the Mode 4 time requirement.

T.S 3.4.7 Technical Reference(s): (Attach if not previously provided)

T.S 3.4.8 AOP 149, App 2 T.S 3.4.7 T.S 3.4.8 Proposed References to be provided to applicants during examination: T.S. 3.6.4.1 AOP 149, Appendix 1&2 Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 156

10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 157

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295028 EA2.02 Importance Rating 3.9 Ability to determine and/or interpret the following as they apply to HIGH DRYWELL TEMPERATURE: Reactor pressure Proposed Question: SRO Question # 77 An Emergency Depressurization is in progress following high drywell air temperature conditions. Current plant conditions are as follows:

  • Four SRVs were originally opened, but two have just failed closed
  • No other SRVs can be opened
  • Reactor pressure is 75 psig, lowering slowly
  • Torus pressure is 10 psig and lowering slowly
  • Drywell air temperature is 325°F, rising slowly
  • RHR injection is NOT available
  • RPV level indicator response during the depressurization was as follows:

o Floodup Range indication pegged low but has been rising steadily and is now +190 inches and steady o Wide Range Yarway indication lowered steadily to +15 inches but then began rising steadily and is now +22 inches and steady o Fuel Zone indication lowered steadily to -40 inches but then began oscillating o Fuel Zone indication is now +10 inches and continuing to rise slowly.

o Water level oscillations have stopped.

Using the information provided:

(1) What is RPV Water Level?

AND (2) What action is required for RPV pressure control?

A. (1) +10 inches (2) Continue depressurizing with the 2 SRVs ONLY until the plant is in cold shutdown B. (1) +22 inches (2) Alternate Depressurization Systems of Table 8 of ED - Emergency Depressurization must be aligned to complete the depressurization.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 158

C. (1) -13 inches (2) Continue depressurizing with the 2 SRVs ONLY until the plant is in cold shutdown D. (1) -13 inches (2) Alternate Depressurization Systems of Table 8 of ED - Emergency Depressurization must be aligned to complete the depressurization.

Proposed Answer: D Explanation (Optional):

A. Incorrect: RPV level is -13 inches. RPV parameters are above the Saturation Curve of graph 1. Additionally indication was received of boiling as the vessel depressurized.

Per Caution 1, if boiling is suspected, 23 inches is to be subtracted from the fuel zone indication. Plausible if the candidate discounts the fuel zone indication due to the oscillations and relies on the Wide Range indication or the candidate believes that the Fuel Zone level of +10 inches is accurate because the level oscillations have stopped.

If 2 of the 4 SRVs have gone closed prior to RPV pressure being within 50 psig of the torus pressure the crew must continue the depressurization with alternate depressurization systems. Plausible if the candidate assumes that the two SRVs will continue the emergency depressurization.

B. Incorrect: RPV level is -13 inches. Plausible if the candidate discounts the fuel zone indication due to the oscillations and relies on the Wide Range indication or the candidate believes that the Fuel Zone level of +10 inches is accurate because the level oscillations have stopped. However this instrument cannot be used because indication of boiling has occurred.

C. Incorrect: RPV parameters are above the Saturation Curve of graph 1 and indications of reference leg boiling has occurred. Per Caution 1, if boiling is suspected, 23 inches is to be subtracted from the fuel zone indication. This would result in a level of -13 inches.

However if 2 of the 4 SRVs have gone closed prior to RPV pressure being within 50 psig of the torus pressure the crew must continue the depressurization with alternate blowdown systems. Plausible if the candidate assumes that the two SRVs will continue the emergency depressurization.

D. Correct: RPV parameters are above the Saturation Curve of graph 1 and indications of reference leg boiling has occurred. Per Caution 1, if boiling is suspected, 23 inches is to be subtracted from the fuel zone indication. This would result in a level of -13 inches.

Because 2 of the 4 SRVs have gone closed, and no other SRVs will open; prior to RPV pressure being within 50 psig of the torus pressure, the crew must continue the depressurization with alternate depressurization systems.

EOP 1, Caution 1 Technical Reference(s): EOP ED, Continuous Recheck (Attach if not previously provided)

Statement above step ED-13.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 159

EOP Caution 1 and associated RPV Proposed References to be provided to applicants during examination: Saturation Temperature Curve EOP-ED LP 95.00 - EOP Introduction, objective Learning Objective: (As available) 95.00.00.14 Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 160

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295016 AA2.03 Importance Rating 4.4 Ability to determine and/or interpret the following as they apply to CONTROL ROOM ABANDONMENT: Reactor pressure Proposed Question: SRO Question # 78 AOP 915, Shutdown Outside the Control Room, has been entered. The Reactor was scrammed and the following conditions exist:

  • RPV water level has been stabilized at +190 inches using the Feed and Condensate system
  • RPV pressure is 900 psig and slowly rising
  • Personnel are at their assigned locations and communications established Given the above, as the Control Room Supervisor:
1) What actions should be directed to perform a plant cooldown?

AND

2) Which of the following is correct regarding plant cooldown rate?

A. (1) Manually operate SRVs and determine cooldown rate using AOP 915, Attachments 5 and 6.

(2) The cooldown rate should be maintained <80°F per hour.

B. (1) Manually operate SRVs and determine cooldown rate using AOP 915, Attachments 5 and 6.

(2) Maintaining a cooldown rate is NOT required.

C. (1) Establish RCIC in pressure control mode per OI 150; Section "10.0 RCIC Operation from Outside the Control Room and determine cooldown rate using AOP 915, Section 2, RPV Pressure/Level Control.

(2) The cooldown rate should be maintained <80°F per hour.

D. (1) Establish RCIC in pressure control mode per OI 150; Section "10.0 RCIC Operation from Outside the Control Room and determine cooldown rate using AOP 915, Section 2, RPV Pressure/Level Control.

(2) Maintaining a cooldown rate is NOT required.

Proposed Answer: A DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 161

Explanation (Optional):

A. Correct - IAW AOP 915, if reactor water level can be controlled above 119.5 inches reactor pressure is maintained and the cooldown rate controlled using SRVs. A NOTE that appears in AOP 015 states While it is desirable to limit cooldown rate to <80° F/Hr, cooldown rate cannot be controlled during Emergency Depressurization or HPCI/RCIC injection. The Technical Specification cooldown rate limit of 100° F in any 1 hr. period applies to normal plant cooldown only. Because there is NO reason stated for Emergency Depressurization or HPCI/RCIC injection the desirable cooldown rate is

<80° F/Hr.

B. Incorrect - A NOTE that appears in AOP 015 states While it is desirable to limit cooldown rate to <80° F/Hr, cooldown rate cannot be controlled during Emergency Depressurization or HPCI/RCIC injection. The Technical Specification cooldown rate limit of 100° F in any 1 hr. period applies to normal plant cooldown only. Because there is NO reason stated for Emergency Depressurization or HPCI/RCIC injection the desirable cooldown rate is <80° F/Hr.

C. Incorrect - Plausible because RCIC is cited in AOP 915, Shutdown Outside the Control Room. However, RCIC is only used for RPV water makeup and its specific operation is directed in AOP 915, NOT OI 150.

D. Incorrect - Plausible because RCIC is cited in AOP 915, Shutdown Outside the Control Room. However, RCIC is only used for RPV water makeup and its specific operation is directed in AOP 915, NOT OI 150.

Technical Reference(s): AOP 915, Section 2 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 162

55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 163

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295031 2.2.12 Importance Rating 4.1 Knowledge of surveillance procedures. Reactor Low Water Level Proposed Question: SRO Question # 79 The plant is operating at 100% power.

The B Core Spray pump was declared inoperable earlier in the shift.

Functional Testing of the HPCI LO-LO instrumentation is also scheduled for the shift as required by SR 3.3.5.1.3.

If the functional testing of the HPCI instrumentation commences as scheduled which ONE of the following is correct?

In addition to declaring the instrument channel being tested inoperable, A. within one hour RCIC must be verified to be operable.

B. HPCI must be declared inoperable and a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> LCO must be entered.

C. if the functional test of each channel is completed within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, no additional action is required.

D. HPCI must be declared inoperable within one hour and the channel tripped if the testing is not completed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Proposed Answer: C Explanation (Optional):

A. Incorrect: Plausible if the candidate believes that HPCI must be declared inoperable to perform the test.

B. Incorrect: Plausible if the candidate believes that HPCI must be declared inoperable to perform the test. If so then LCO 3.5.1, condition H would be entered.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 164

C. Correct: Per note 2 on page 3-3-39 (TS Section 3.3.5.1, Surveillance Requirements):

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 1.d, 2.f, 3.c, 3.d, 3.e, and 3.f; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions other than 1.d, 2.f, 3.c, 3.d, 3.e, and 3.f provided the associated Function (or the redundant Function for Functions 4 and 5) maintains ECCS initiation or loop selection capability.

D. Incorrect: Plausible if the candidate believes that HPCI must be declared inoperable to perform the test. As discussed above up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is allowed to test each channel.

Plausible if the candidate does not apply the note and applies the actions for each channel being inop and adds the total time allowed for the 4 instrument channels being tested (4 x 6 = 24).

TS section 3.3.5.1, pg.39 Technical Reference(s): TS section 3.5.1 (Attach if not previously provided)

STP 3.3.5.1-01, pg.3 Proposed References to be provided to applicants during Tech Spec Table 3.3.5.1-1 examination: pages 1 through 3 only (White out all of the Allowable Values)

TS section 3.3.5.1, NO BASES TS section 3.5.1, NO BASES Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 2 Facility operating limitations in the technical specifications and their bases.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 165

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295037 2.4.6 Importance Rating 4.7 Conduct of Operations: 2.4.6, Knowledge of EOP mitigation strategies. (SCRAM Condition Present and Reactor Power Above APRM Downscale or Unknown)

Proposed Question: SRO Question # 80 An ATWS is in progress. The following conditions exist:

  • Bypass valves failed to open and cannot be opened
  • Reactor pressure is being maintained 800-1000 psig and 2 SRVs are open
  • Torus water temperature is 120°F
  • Torus water level is 12.8 feet
  • SBLC failed to inject and cannot be started
  • No alternate Boron injection system is injecting When RPV level reaches -10 inches, direction is given to re-establish injection and maintain indicated level -25 to +15 inches.

With RPV water level at -15 inches, RPV injection is re-established. Twenty (20) seconds later RPV water level is +17 inches and reactor power is 6%.

Which ONE of the following is the correct action in response to this transient?

A. Terminate and prevent injection again.

B. Perform a RPV Blowdown per EOP-ED.

C. Direct a new level control band of -10 to +15 inches.

D. Reduce the injection rate until reactor power falls below 5%.

Proposed Answer: A Explanation (Optional):

A. Correct - Level rise outside the assigned level band (above +15) will cause reactor power to increase and exceed 5%. Override conditions are met ( Power above 5%,

Level above +15 inches, Torus water temp above 110°F, and an SRV is open) this requires returning to terminate and prevent injection until reactor power lowers below 5% or level is at +15 inches or the SRVs remain closed.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 166

B. Incorrect - There is initially a 28°F margin to HCTL (120°F is the lower line on the HCTL graph), and rise in suppression pool temperature will not require RPV Blowdown at this time. Torus water level is 1 foot below the level that would require RPV Blowdown.

C. Incorrect - Level rise has caused reactor power to increase and exceed 5%. This new level band could permit power to remain at 6%. Override conditions are met to terminate and prevent injection until reactor power lowers below 5% or level is at +15 inches or the SRVs remain closed.

D. Incorrect - Override conditions are met to terminate and prevent injection again EOP 2 Technical Reference(s): (Attach if not previously provided)

ATWS Proposed References to be provided to applicants during examination: None Learning Objective: (As available) 2009 Nine Mile Question Source: Bank #

Point Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: 2009 Nine Mile Point Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 167

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295003 2.4.4 Importance Rating 4.7 Emergency Procedures / Plan: Ability to recognize abnormal indications for system operating parameters that are entry-level conditions for emergency and abnormal operating procedures.

(Partial or Complete Loss of AC)

Proposed Question: SRO Question # 81 The plant is operating at 78% power with the Turbine Generator on line when DAEC switchyard voltage slowly lowers from 100% to 90% of normal voltages over a 5 minute time period.

Which of the following procedures are required to be entered as voltage lowers?

A. Enter AOP 304, Grid Instability; NO other procedures are required during this event.

B. Enter AOP 301, Loss of Essential Electrical Power; NO other procedures are required during this event.

C. Enter AOP 304, Grid Instability, AOP 301, Loss of Essential Electrical Power, IPOI 5 Reactor Scram, and EOP 1 - RPV Control.

D. Enter AOP 304, Grid Instability, AOP 301, Loss of Essential Electrical Power, and IPOI 5, Reactor Scram. There is NO need to enter EOPs at this time.

Proposed Answer: C Explanation (Optional):

A. Incorrect - Plausible because AOP 304 is entered for these conditions, however with voltage this low the vital buses will trip resulting in a reactor scram as the RPS buses are de-energized.

B. Incorrect - Entry conditions are met for AOP 304, which is only exited when the essential buses 1A3 and 1A4 trip when the voltages lowers to 91.3%. When the essential buses trip it is an entry condition for AOP 301. Plausible if the candidate fails to recognize the degraded grid conditions and focuses on the loss of essential Bus power.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 168

C. Correct - Entry conditions are met for AOP 304, which is only exited when the essential buses 1A3 and 1A 4 trip when the voltages lowers to 91.3%. When the essential buses trip it is an entry condition for AOP 301. A reactor scram will occur because of a loss of power to the RPS buses when the vital buses de-energize so the crew must enter IPOI

5. The resultant reactor SCRAM will cause RPV level to lower below the entry requirements for EOP-1 necessitating its entry.

D. Incorrect - AOP 304 is entered on the low voltage condition but is exited when the loss of the essential buses occurs and the crew must enter AOP 301. The reactor scrams because of a loss of power to the RPS buses when the vital buses de-energize so the crew must enter IPOI 5. The non-essential buses will remain energized and the essential buses are powered from the SBDGs so no loss of feedwater occurs and there is no need to enter an EOP at this time. Plausible if the candidate determines that reactor water level will be maintained through the use of Condensate and Feedwater since the non-essential busses remain energized throughout this event. The candidate may incorrectly determine that EOP-1 has no entry conditions on a loss of electrical power. However, the SCRAM from 78% power would result in exceeding the Low-Level trip setpoint requiring entry to EOP-1.

AOP 301 pg. 18-19, AOP 304, Technical Reference(s): (Attach if not previously provided) pg.4 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 169

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295006 2.4.35 Importance Rating 4.0 Emergency Procedures / Plan: Knowledge of local auxiliary operator tasks during emergency and the resultant operational effects. SCRAM SRO Level Justification: IPOI 5, Reactor Scram states that If all control rods are not fully inserted, EOP Support Rod Insertion Procedures may be used as authorized by the CRS. The SRO must know the operational effects of the local actions associated with each procedure in order to select the correct procedure.

Proposed Question: SRO Question # 82 The plant was at 10% power starting up, when a manual scram was inserted following an equipment failure. Conditions are as follows:

  • All scram signals have been cleared, but the scram CANNOT be reset
  • The RO reports that there is insufficient cooling water pressure to drift the rods after fully opening the CRD Flow Control Valve Which ONE of the following procedures should you direct be performed?

A. RIP 103.1, Individual Scram Test Switches.

B. RIP 103.3, Manually Drive Control Rods.

C. RIP 101.3, Vent Scram Air Header.

D. RIP 101.2, RPS Fuse Removal.

Proposed Answer: B Explanation (Optional):

A. Incorrect: The scram signal has already caused the scram inlets and outlets for the 8 rods to open as evidenced by the blue scram lights being illuminated. Plausible if the candidate does not understand what will cause the blue scram light to turn on.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 170

B. Correct: RIP 103.3 directs that if the scram cannot be reset and there are difficulties inserting the rods with CRD hydraulic pressure then an AO must be sent into the plant to close the CRD Charging Water Isolation Valve. This will shut off flow to the accumulators resulting in an increase in CRD drive pressure.

C. Incorrect: The air header is already vented. The scram inlets and outlets for the 8 rods have repositioned as evidenced by the blue scram lights being illuminated. Plausible if the candidate does not understand what will cause the blue scram light to turn on.

D. Incorrect: Pulling the fuses will de-energize the scram trip logic. This would be an appropriate action for an electrical ATWS. This action would prevent the RPS from resetting.

RIP 103.3, Manually Drive Control Technical Reference(s): (Attach if not previously provided)

Rods Proposed References to be provided to applicants during examination: None Learning Objective: LP SEG 6, objective, 6.07.01 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 171

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 295029 EA2.01 Importance Rating 3.9 Ability to determine and/or interpret the following as they apply to HIGH SUPPRESSION POOL WATER LEVEL: Suppression pool water level Proposed Question: SRO Question # 83 Following a loss of coolant accident the following conditions exist:

  • RPV level is +170 inches, rising slowly
  • Condensate is injecting and maintaining level
  • RPV pressure is 200 psig, lowering slowly
  • RHR A and B are aligned for both Torus and Drywell sprays
  • Drywell pressure is 16 psig, lowering slowly
  • Drywell temperature is 240°F lowering slowly
  • Torus pressure is 15 psig lowering slowly
  • Torus water temperature is 120°F, rising slowly
  • Torus water level is 13.5 feet rising slowly IAW EOP 2, Primary Containment Control, which of the following actions is required?

A. Secure Drywell sprays and emergency depressurize B. Emergency depressurize while continuing Drywell sprays C. Secure Drywell sprays and terminate injection from condensate and inject with low pressure ECCS D. Terminate injection from condensate and inject with low pressure ECCS while continuing Drywell sprays Proposed Answer: C Explanation (Optional):

A. Incorrect: Emergency Depressurization is not required at this time. Plausible in that Torus parameters are close to exceeding the PSP curve. The required action to secure injection from condensate and shift injection to the low pressure ECCS will terminate the torus level rise and prevent exceeding the PSP curve.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 172

B. Incorrect: Emergency Depressurization is not required at this time.

C. Correct: When Torus level cannot be maintained below 13.5 feet, step T/L-11 requires that the drywell sprays be secured. This action is required because the torus to drywell vacuum breakers are covered and continued spraying could result in exceeding the negative design pressure rating of the containment. Additionally, step T/L 12 requires that injection from sources external to the primary containment be terminated if not required for core cooling. Since RPV pressure is within the capacity of low pressure ECCS, RPV level control should be shifted to LP ECCS to stop the torus level rise.

D. Incorrect: Step T/L-11 requires that the drywell sprays be secured.

EOP 2 step T/L-11 and 12 Technical Reference(s): (Attach if not previously provided)

Print in COLOR Proposed References to be provided to applicants during examination: EOP Graph 5 Learning Objective: SEG 108, LO 95.59 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 173

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 295009 2.4.45 Importance Rating 4.3 Emergency Procedures / Plan: Ability to prioritize and interpret the significance of each annunciator or alarm: Low Reactor Water Level Proposed Question: SRO Question # 84 During a major loss of coolant accident the following conditions exist:

  • RPV level is steady at -30
  • RHR pumps A and B are aligned for Torus and Drywell sprays
  • Torus pressure is 31 psig and slowly lowering
  • ALL other injection sources are unavailable Then, alarm 1C03C (A-2) B CORE SPRAY PUMP 1P-211B TRIP OR MOTOR OVERLOAD, annunciates. Operators report that Core Spray Pump B amps pegged immediately prior to the pump trip.

Which ONE of the following is required by the EOPs?

A. SAG entry is required. Coordinate with the TSC to exit BOTH EOP 1 AND EOP 2 and enter SAGs.

B. SAG entry is required. Coordinate with the TSC to exit EOP 1 and enter SAGs Continue Torus and Drywell Sprays in accordance with EOP 2.

C. Secure all containment sprays and direct all RHR flow to the RPV to restore RPV level greater than -25 inches. Make preparations to vent the containment in accordance with EOP 2.

D. Continue Torus and Drywell Sprays in accordance with EOP 2. If RPV level lowers to

-39 inches, secure all containment sprays and direct all RHR flow to the RPV to restore RPV level greater than -39 inches. Make preparations to vent the containment in accordance with EOP 2.

Proposed Answer: C Explanation (Optional):

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 174

A. Incorrect: Once the Core Spray pump tripped, adequate core cooling via spray cooling was lost. EOP 1 step RC/L-12 directs that injection be maximized with all available injection systems in an attempt to restore level to above -25 inches. Only after this attempt has been proven unsuccessful is SAG entry required. Additionally, once SAG entry is required, all EOPs are exited.

B. Incorrect: Once the Core Spray pump tripped, adequate core cooling via spray cooling was lost. EOP 1 step RC/L-12 directs that injection be maximized with all available injection systems in an attempt to restore level to above -25 inches. Only after this attempt has proven unsuccessful is SAG entry required.

C. Correct: Once the Core Spray pump tripped, adequate core cooling via spray cooling was lost. EOP 1 step RC/L-12 directs that injection be maximized with all available injection systems in an attempt to restore level to above -25 inches. Additionally, EOP 2 directs that only those pumps not required for core cooling be utilized for containment sprays. Since torus pressure was 31 psig, it will begin to rise once sprays are secured.

The only available action then is to vent the containment to maintain pressure less than the limit of 53 psig.

D. Incorrect: Once the Core Spray pump tripped, adequate core cooling via spray cooling was lost. EOP 1 step RC/L-12 directs that injection be maximized with all available injection systems in an attempt to restore level to above -25 inches.

Technical Reference(s): EOP 1 step RC/L-12 (Attach if not previously provided)

EOP 2 steps PC/P-9 and 10 Proposed References to be provided to applicants during examination: None Learning Objective: LP SEG 98, objective 6.74.08 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 175

Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 295012 AA2.01 Importance Rating 3.9 Ability to determine and/or interpret the following as they apply to HIGH DRYWELL TEMPERATURE: Drywell temperature Proposed Question: SRO Question # 85 A LOCA is in progress with the following conditions:

  • RPV water level is being maintained at +180 inches with Condensate and Feedwater
  • Both recirc pumps are tripped
  • Drywell temperature reaches 280°F and continues to rise slowly.

Ten (10) minutes later Drywell temperature and pressure are now reported to be 290°F and 12 psig, both slowly rising and within the bounds of the Drywell Spray Initiation Limit.

Which ONE of the following describes the actions that are to be taken to control primary containment temperature if Drywell sprays become available per EOP 2?

A. Enter ED-Emergency Depressurization; after the reactor is depressurized Drywell sprays are NOT required.

B. Enter ED-Emergency Depressurization, spray the Drywell to lower Drywell temperature.

If Drywell temperature lowers below 280°F, exit ED-Emergency Depressurization and re-enter EOP-1 pressure control.

C. IAW EOP 2, Primary Containment Control, spray the Drywell to lower Drywell temperature and pressure. If Drywell temperature and pressure do NOT lower, exit EOP 1 Pressure Control and enter ED-Emergency Depressurization D. IAW EOP 2, Primary Containment Control, spray the Drywell to lower Drywell temperature and pressure. Exit EOP 1 Pressure Control and enter ED-Emergency Depressurization regardless of Drywell temperature response.

Proposed Answer: C Explanation (Optional):

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 176

A. Incorrect: An immediate Emergency Depressurization is not required. Plausible in that temperature is above the value associated with the Emergency Depressurization step.

Additionally the decision not to spray the drywell is also plausible if the candidate does not understand the meaning of a Before step. The direction to spray the drywell is Before the drywell temperature reaches 280°F.

B. Incorrect: An immediate Emergency Depressurization is not required. Plausible in that temperature is above the value associated with the RPV ED step.

C. Correct: Drywell and temperature and pressure are within the DSIL curve. Although drywell temperature is above the value requiring a blow down, the associated step directs that when temperature cannot be restored and maintained below 280°F, only then is a blow down performed. As discussed in the EOP bases, the step allows the operator to attempt to restore the drywell temperature below 280°F. Since not all the steps have been performed to prevent the blow down the action of initiating drywell sprays should first be attempted. If after attempting drywell sprays, drywell temperature cannot be restored below 280°F, then Emergency Depressurization is required.

D. Incorrect: Emergency Depressurization is not immediately required after spraying the drywell. Plausible in that temperature is above the value associated with the Emergency Depressurization step.

Technical Reference(s): EOP 2 step DWT-6 (Attach if not previously provided)

EOP 2 Bases page 39 Proposed References to be provided to applicants during examination: None Learning Objective: SEG 108, objective 6.63.08 (As available)

Question Source: Bank # WTS # 11851 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: 2010 NMP2 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 177

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 215005 A2.08 Importance Rating 3.2 Ability to (a) predict the impacts of the following on the AVERAGE POWER RANGE MONITOR/LOCAL POWER RANGE MONITOR SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions Faulty or erratic operation of detectors/systems Proposed Question: SRO Question # 86 The plant is at 100% power with the following initial conditions: APRM E Detectors LPRM (Status)

2D-08-33 OK 4D-24-17 OK A. (1) APRM E output will lower.

(2) Enter OI 878.3, LPRM System, bypass LPRM 5A-32-17, verify or adjust AGAFs as required and continue plant operation without any additional restrictions.

B. (1) APRM E output will remain the same.

(2) Enter OI 878.3, LPRM System, bypass LPRM 5A-32-17, verify or adjust AGAFs as required and continue plant operation without any additional restrictions.

C. (1) APRM E output will lower.

(2) Enter Tech Spec LCO 3.3.1.1, RPS Instrumentation. If APRM "A" or "E" is not restored within the required completion time, insert a trip on RPS A.

D. (1) APRM E output will remain the same.

(2) Enter Tech Spec LCO 3.3.1.1, RPS Instrumentation. If APRM "A" or "E" is not restored within the required completion time, insert a trip on RPS A.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 178

Proposed Answer: C Explanation (Optional):

A. Incorrect: APRM E is inoperable due to having only one operable LPRM at the A level. IAW OI 878.4 to be considered operable, APRM E must have at least 13 LPRM inputs. Each APRM must have at least 2 LPRM inputs per level. Plausible in that the APRM does satisfy the requirement for the overall number of LPRMs in that 13 of the 20 assigned LPRMs is operable. If the candidate believes that the APRM is operable then the required action would be to bypass the LPRM and adjust gains as required.

B. Incorrect: The APRM output would lower. Plausible in that, unlike the Rod Block Monitor, there are no input trip units that monitor the status of the LPRMs inputting into the APRM. Therefore the output of the downscale LPRM would be included into the overall average causing the APRM output to lower. Additionally the APRM would be inoperable as described in explanation A.

C. Correct: The output of the APRM would lower as described in explanation B. IAW OI 878.4 to be considered operable, APRM E must have at least 13 LPRM inputs. Each APRM must have at least 2 LPRM inputs per level. Therefore APRM E is inoperable.

With APRM A also inoperable only one APRM is operable for RPS A. TS LCO3.3.1.1, RPS Instrumentation and associated table requires a minimum of 2.

Therefore Condition A of the LCO is not satisfied and the required action is to place the channel or trip system in trip within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

D. Incorrect: The output of the APRM would lower as described in explanation B.

TS LCO 3.3.1.1 and associated Technical Reference(s): (Attach if not previously provided)

TS Table.

APRM System Description pages 17 through 19 OI 878.4, P&L # 6 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank # WTSI Bank 12910 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: 2011 Pilgrim Question Cognitive Level: Memory or Fundamental Knowledge DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 179

Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 180

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 223002 A2.03 Importance Rating 3.0 Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT ISOLATION SYSTEM/NUCLEAR STEAM SUPPLY SHUT-OFF; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: System Logic Failures K/A Justification: Although not an obvious two part question, part (a) of the K/A is tested in that the SRO must predict the impact of the trip settings on the PCIS and then determine what action is required per Tech Specs to mitigate the effects as required by part (b) of the K/A.

Proposed Question: SRO Question # 87 The plant is at 100% power. I & C then reports that the A1 Trip Channel for the Group 1 and Group 2 PCIS are currently set to trip at:

  • Group 2 A1 (Reactor Vessel Water Level Low) Trip Channel: 160 inches Assuming all other trip channels are set to trip at their nominal values, what is the maximum time allowed before the A1 Trip Channels must be tripped in order to restore operability?

A. Group 1: 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Group 2: 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> B. Group 1: 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Group 2: 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> C. Group 1: 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Group 2: 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> D. Group 1: 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Group 2: 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Proposed Answer: C Explanation (Optional):

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 181

A. Incorrect: Group 1 Channel A1 isolation logic initiates MSIV closure on Low-Low-Low level. Per TS Table 3.3.6.1-1, this function is identified as Function 1.a. and must be set to trip 38.3 inches. IAW LCO 3.3.61 if one or more required channels are inoperable, then that channel must be placed in trip within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> if it is associated with any function other than 2.a, 2.b, 6.b, and 6.c.

B. Incorrect: The completion time for tripping the Group 1 Channel A1 trip channel is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> as described above. Additionally, Group 2 Channel A1 isolation logic initiates a Primary Containment Isolation on Low level. Per TS Table 3.3.6.1-1, this function is identified as Function 2.a. and must be set to trip 165.6 inches. IAW LCO 3.3.61 if one or more required channels are inoperable, then that channel must be placed in trip within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> if it is associated with function 2.a.

C. Correct: The completion time for tripping the Group 1 Channel A1 trip channel is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> as described above. The completion time for tripping the Group 2 Channel A1 trip channel is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> as described above.

D. Incorrect: The completion time for tripping the Group 2 Channel A1 trip channel is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> as described above.

TS LCO 3.3.6.1 and Technical Reference(s): (Attach if not previously provided)

Table 3.3.6.1-1 TS LCO 3.3.6.1 and Proposed References to be provided to applicants during examination:

Table 3.3.6.1-1 Learning Objective: LP 94.18, objective 5.18.01.01 (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 2 Facility operating limitations in the technical specifications and their bases.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 182

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 239002 2.4.18 Importance Rating 4.0 Emergency Procedures / Plan: Knowledge of the specific bases for EOPs.

Proposed Question: SRO Question # 88 RPV Flooding is being executed following a complete loss of RPV level indication.

Plant conditions are as follows:

  • The switches for four (4) ADS valves have been placed in OPEN
  • Reactor pressure is 700 psig and lowering Given these conditions what action is required?

Wait until RPV pressure is below the Minimum Steam Cooling Pressure (MSCP), then A. slowly raise injection to maintain at least one SRV open and reactor pressure above, but as close to the MSCP as possible.

B. slowly raise injection to the RPV to maintain all four SRVs open and reactor pressure below, but as close to the MSCP as possible.

C. maximize injection to the RPV to maintain all four SRVs open with reactor pressure above, but as close to the MSCP as possible.

D. maximize injection to the RPV to maintain at least one SRV open with reactor pressure below, but as close to the MSCP as possible.

Proposed Answer: A Explanation (Optional):

A. Correct - When RPV pressure is below the Minimum Steam Cooling Pressure (MSCP) injection flow must be slowly raised. With 4 ADS valves opened, the Minimum Steam Cooling Pressure is 160 psig. With one SRV open the MSCP is 680 psig. As long as RPV pressure is maintained above the MSCP for the number of SRVs open the core will be cooled by submergence or steam cooling.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 183

B. Incorrect - When RPV pressure drops below the Minimum Steam Cooling Pressure, steam flow may no longer be sufficient to provide adequate core cooling. All four SRVs are NOT required to be open.

C. Incorrect - If injection is maximized RPV water level, reactor power, and RPV pressure will rise. Injection must be throttled to reduce pressure and the subsequent power increase. Injection must NOT be maximized and all injection must be from ATWS preferred flooding systems. All four SRVs are NOT required to be open.

D. Incorrect - If injection is increased, RPV water level, reactor power, and RPV pressure will rise. Injection must be throttled to reduce pressure and the subsequent power increase. Injection must NOT be maximized and all injection must be from ATWS preferred flooding systems. As long as RPV pressure is maintained above MSCP the core will be cooled by submergence or steam cooling.

RPV/F - RPV Flooding RPV/F-8 Technical Reference(s): (Attach if not previously provided)

RPV/F EOP Bases pgs 16, 17, 18 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 184

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 211000 2.2.25 Importance Rating 4.2 Equipment Control: Knowledge of bases in technical specifications for limiting conditions for operations and safety limits.

Proposed Question: SRO Question # 89 During operation at 100% power an operator reports the heat tracing on the suction side of the Standby Liquid Control (SBLC) pumps is damaged and inoperable. The following conditions exist:

  • SBLC Tank Concentration is 14%.
  • SBLC Tank Volume 3200 gallons.
  • Reactor Building Ambient Temperature at SBLC Pumps is 72°F.

Which ONE of the following describes the condition of the SBLC system per Technical Specifications?

A. OPERABLE as long as Reactor Building Temperature remains at its current value which is based on preventing Boron from precipitating out of solution inside system components.

B. INOPERABLE because the Boron Solution Concentration is below the minimum allowable. A 7 day LCO is required, which is based on injecting 780 ppm of Boron solution into the reactor core.

C. INOPERABLE because the Boron Solution Concentration is below the minimum allowable. An 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> LCO is required, which is based on injecting 780 ppm of Boron solution into the reactor core.

D. OPERABLE because Technical Specifications allows 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to restore the heat tracing to operability as long as Reactor Building Temperature is above the minimum.

Based on preventing Boron from precipitating out of solution and lowering the effective Boron concentration.

Proposed Answer: A Explanation (Optional):

A. Correct - SR 3.1.7.3 (verify solution and piping temps >70°F) WILL be met with RB Temperature at 72°F in the vicinity of SBLC components. Heat Trace functionality is not specified as a Surveillance Requirement.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 185

B. Incorrect - The SBLC is operable, plausible; with ONE subsystem INOPERABLE, a 7 day LCO would be applicable C. Incorrect - The SBLC is operable, plausible; with BOTH subsystems INOPERABLE, an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> LCO would be applicable D. Incorrect - There is no Technical Specifications requirement for the heat tracing to be operable. Plausible because surveillance testing for suction piping temperatures must be taken every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Additionally the tank heat is required to maintain SBLC tank temperature which prevents tank temperature from lowering and permitting boron to precipitate out of solution within the tank.

T.S. Bases 3.1.7 Technical Reference(s): (Attach if not previously provided)

T.S. 3.1.7 T.S. 3.1.7 Figures Proposed References to be provided to applicants during examination:

3.1.71 and 3.1.7. Learning Objective: (As available)

Question Source: Bank # WTSI Bank Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: 2008 Nine Mile Point 2 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 2 Facility operating limitations in the technical specifications and their bases.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 186

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 217000 A2.15 Importance Rating 3.8 Ability to (a) predict the impacts of the following on the REACTOR CORE ISOLATION COOLING SYSTEM (RCIC); and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Steam line break Proposed Question: SRO Question # 90 Given the following conditions:

  • A RCIC steam leak has occurred in the Reactor Building
  • Efforts to isolate the leak are unsuccessful
  • Water level in the RCIC Room (LI 3769) is 4 inches
  • RCIC Emergency Cooler outlet temp (TR/TDR 2425 Ch 1) is 301°F
  • RCIC Room ambient (TR/TDR 2425 Ch 2) is 325°F Which ONE of the following correctly completes the following statement?

Based on the conditions above, entry into Emergency Depressurization A. is currently required because the integrity of the secondary containment is threatened.

B. is currently required because the continued operability of safety related equipment is threatened.

C. will be required if Torus East Catwalk Ambient temperature exceeds 165°F because the continued operability of safety related equipment is threatened.

D. will be required if the water level in the "A" RHR & CS SECR rises above its Max safe limit because the integrity of the secondary containment is threatened.

Proposed Answer: C Explanation (Optional):

A. Incorrect: Emergency Depressurization is not currently required. Plausible in that both temperatures are above their Max Safe Operating Values but they are within the same area. Emergency Depressurization is performed if Max Safe values are exceeded in 2 different areas.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 187

B. Incorrect: Emergency Depressurization is not currently required. Plausible in that both temperatures are above their Max Safe Operating Values but they are within the same area. Emergency Depressurization is performed if Max Safe values are exceeded in 2 different areas.

C. Correct: When the Torus East Catwalk Ambient temperature exceeds 165°F, Max Safe limit are now exceeded in two different areas and Emergency Depressurization is required. Maximum Safe Limits are defined as the highest parameter value at which neither: (1) equipment necessary for the safe shutdown of the plant will fail nor (2) personnel access necessary for the safe shutdown of the plant will be precluded.

IAW NUREG 1021, Section 401 2.a. When selecting or writing questions for K/As that test coupled knowledge or abilities (e.g., the A.2 K/A statements in Tiers 1 and 2 and a number of generic K/A statements, such as 2.4.1, in Tier 3), try to test both aspects of the K/A statement. If that is not possible without expending an inordinate amount of resources, limit the scope of the question to that aspect of the K/A statement requiring the highest cognitive level (e.g., the (b) portion of the A.2 K/A statements) or substitute another randomly selected K/A. Predicting the impact of a steam line break on the RCIC system would be an RO knowledge. Rather than complicate the question Because we felt this was a valid K/A to test on we have only tested the second part of the K/A.

D. Incorrect: Emergency Depressurization is required when the same parameter exceeds the Max Safe Values in 2 or more areas. Plausible in that a Max Safe value has been exceeded in but a different parameter.

EOP-03 Technical Reference(s): (Attach if not previously provided)

EOP-03, Bases, pg 20 EOP 3, Table 6 Proposed References to be provided to applicants during examination:

(Table only)

Learning Objective: (As available)

Question Source: Bank # WTSI 12939 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: 2004 Nine Mile Point 1 Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 188

55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 189

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 223001 A2.11 Importance Rating 3.8 Ability to (a) predict the impacts of the following on the PRIMARY CONTAINMENT SYSTEM AND AUXILIARIES; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Abnormal suppression pool level Proposed Question: SRO Question # 91 The plant was operating normally at power when a loss of coolant accident occurred.

Conditions after the scram are as follows:

  • Drywell pressure is 5.5 psig and rising slowly
  • Drywell temperature is 250°F and rising slowly
  • RPV water level is 45 inches and slowly lowering
  • Torus water level is 7.1 feet and slowly lowering
  • RPV pressure 700 psig and slowly lowering
  • Torus water temperature is 120°F and rising slowly Per the EOPs, which ONE of the following is required AND why?

A. Secure Core Spray pumps to prevent cavitation damage of the pumps.

B. Place RHR in Drywell Spray to lower Drywell temperature and pressure.

C. Emergency depressurize due to compromise of pressure suppression capability.

D. Cycle SRV's to maintain RPV pressure below the heat capacity limit.

Proposed Answer: C Explanation (Optional):

A. Incorrect - Plausible because with the torus level so low high core spray flows would be limited by the vortex limits. However if the flow was affected by the vortex limits core spray flow should be lowered. With reactor water level lowering the core spray pumps should NOT be secured.

B. Incorrect - Drywell pressure is too low to allow drywell sprays in that drywell temperature and pressure are not within the bounds of the Drywell Spray Initiation Limit (DSIL). Plausible in that the EOP action to initiate drywell spray would be appropriate if within the bounds of the DSIL.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 190

C. Correct - Per EOP bases Torus water level must be maintained above the bottom of the downcomer vent openings (7.1 feet) to ensure that steam discharged from the drywell into the torus following a primary system break will be adequately condensed. If a primary system break were to occur with torus water level below the bottom of the downcomers, pressure suppression capability would be unavailable and torus pressure could exceed the Primary Containment Pressure Limit.

D. Incorrect - Plausible if the candidate does NOT realize that HCL is substantially higher for this reactor pressure. With RPV pressure between 700 and 800 psig, HCL limit is

~150°F even when including the low torus water level.

EOP-2 Technical Reference(s): EOP-2, Bases, pg 12 (Attach if not previously provided)

Print in COLOR Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 191

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 288000 2.2.40 Importance Rating 4.7 Equipment Control: Ability to apply technical specifications for a system. (Plant Ventilation)

Proposed Question: SRO Question # 92 With the plant operating at 100% power the fan belts on the B RHR/CS corner room cooler, 1V-AC-11 must be replaced. The Technical Requirements Manual states:

TLCO 3.5.2 The following ECCS and RCIC unit coolers shall be OPERABLE:

a. One RCIC room unit cooler;
b. One HPCI room unit cooler; and
c. Two CS/RHR room unit coolers.

APPLICABILITY: When the associated pumps are required to be OPERABLE.

ACTIONS


NOTES------------------------------------------------

1. Separate condition entry is allowed for each unit cooler.
2. TLCO 3.0.4.b is N/A for HPCI and RCIC Room Coolers.

CONDITION REQUIRED ACTION COMPLETION TIME Immediately A. Required unit room A.1 Declare the associated cooler inoperable. pump(s) inoperable.

Which ONE of the following actions is required by Technical Specifications?

A. No action is required because room cooler 1V-AC-12 remains operable.

B. 1V-AC-11 must be restored to service immediately because ONLY one RHR/CS Room Cooler remains operable.

C. 1V-AC-11 must be restored to service within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> because the B and D RHR and B Core Spray pumps must be declared inoperable D. Place the plant in Mode 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> because with one cooler inoperable the TRM requirement for two CS/RHR room unit coolers is NOT met and T.S. 3.5.1.E applies.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 192

Proposed Answer: C Explanation (Optional):

A. Incorrect - There are only two RHR/CS Room Coolers, one for each ECCS division.

With one cooler out of service TRM requires declaring the associated pump(s) inoperable, in this case the B and D RHR and B Core Spray pumps.

B. Incorrect - This would apply if both loops of RHR and Core Spray were affected by the loss of one cooler. It is plausible because the TRM states than two room coolers must be operable and with one inoperable only one remains operable.

C. Correct - With 1V-AC-11 inoperable the B and D RHR and B Core Spray pumps must be declared inoperable this requires entry into TS 3.5.1.C which requires restoring one of the two systems to operable within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Since both these systems must be considered inoperable until the cooler is returned to service the cooler must be returned to service within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

D. Incorrect - This would apply if the candidate literally reads the TRM requirement as both (Two) CS/RHR room unit coolers must be operable. This would imply that all the both RHR and CS systems are considered inoperable and therefore T.S. 3.5.1.E would apply. However as stated in the TRM Separate condition entry is allowed for each unit cooler, therefore only one of the coolers and associated RHR/CS systems are considered inoperable.

TRM 3.5.2 Technical Reference(s): (Attach if not previously provided)

TS 3.5.1 Proposed References to be provided to applicants during examination: T.S. 3.5.1 Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 2 Facility operating limitations in the technical specifications and their bases.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 193

Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 215001 2.4.41 Importance Rating 4.6 Emergency Procedures / Plan: Knowledge of the emergency action level thresholds and classifications. (Traversing In-core Probe)

Proposed Question: SRO Question # 93 The plant was operating at 100% power when the following events occurred:

Time Event 0100 Traversing Incore Probe (TIP) traces are in progress.

0108 Both seals on a Reactor Recirc Pump fail.

0110 The reactor scrams when Drywell pressure exceeds 2.0 psig.

RPV level lowers to +160 inches before recovering to the normal range.

0115 BOP Operator reports that the Recirc Pump cannot be isolated and that Drywell pressure is now 3.0 psig and rising slowly.

Reactor Operator reports the following indications for the TIP system:

  • Two TIPs have withdrawn to their shields and their ball valves have closed
  • The third detector has NOT withdrawn and its ball valve remains open 0120 Reactor Operator reports the detector will not move and the ball valve CANNOT be manually closed.

0125 Reactor Operator reports the shear valve failed to fire.

In accordance with the EAL for the Fission Product Barrier Matrix which ONE of the following contains ALL of the required Emergency Plan classifications?

A. An UNUSUAL EVENT must be declared by 0125.

B. An ALERT must be declared by 0125.

C. An UNUSUAL EVENT must be declared by 0125.

An ALERT must be declared by 0140.

D. An ALERT must be declared by 0125.

A SITE AREA EMERGENCY must be declared by 0140.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 194

Proposed Answer: D Explanation (Optional):

A. Incorrect: A SITE AREA EMERGENCY was exceeded at time 0125 when the shear valve failed to fire and needed to be declared by 0140 based on EAL FS1. Plausible if the candidate only recognizes that the RCS barrier was lost when drywell pressure exceeded 2.0 psig and determines that Unusual Event FU1 was exceeded. This would also be incorrect in that an Alert EAL was also exceeded when the RCS barrier was lost based on EAL FA1.

B. Incorrect: A SITE AREA EMERGENCY was exceeded at time 0125 when the shear valve failed to fire and needed to be declared by 0140 based on EAL FS1. Plausible if the candidate only recognizes that the RCS barrier was lost when drywell pressure exceeded 2.0 psig and determines that ALERT EAL FA1 was exceeded.

C. Incorrect: A SITE AREA EMERGENCY was exceeded at time 0125 when the shear valve failed to fire and needed to be declared by 0140 based on EAL FS1. Plausible if the candidate recognizes that the PC barrier was lost at time 0125 and thinking that the event should be upgraded to an ALERT by 0140 based on the second barrier failing.

D. Correct: The RCS barrier was lost when drywell pressure exceeded 2.0 psig. This resulted in ALERT EAL FA1 being exceeded at time 0110. The ALERT was required to be declared by 0125.

Then when the shear valve failed to fire, the PC Barrier was lost at time 0125. This resulted in a SITE AREA EMERGENCY EAL being exceeded based on EAL FS1 due to having lost two barriers. The SITE AREA EMERGENCY was required to be declared within the next 15 minutes or time 0140.

Technical Reference(s): EAL-01 (Attach if not previously provided)

EAL-01, only the Proposed References to be provided to applicants during examination: portion Fission Product Barriers Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 195

Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 196

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 1 K/A # G1 2.1.20 Importance Rating 4.6 Conduct of Operations: Ability to interpret and execute procedure steps.

Proposed Question: SRO Question # 94 The plant is operating in MODE 1 at 100% power with the following conditions:

  • A spurious Group I isolation occurred which cannot be reset.
  • As a result of the pressure spike, a break occurred in the Recirculation system piping.
  • While executing EOP-2, Primary Containment Control, it is determined that Torus pressure is approaching but has not yet reached the Pressure Suppression Pressure (PSP) Curve.

Under these conditions, Emergency Depressurization...

A. is required when you make the determination that the PSP limits will be exceeded.

B. should be anticipated by depressurizing the RPV using Alternate Pressure Control Systems.

C. is NOT allowed until the PSP curve limits are exceeded but then must be executed regardless of any anticipated trends.

D. is NOT required if the PSP limits are exceeded provided you believe you will be able to restore parameters based on anticipated trends.

Proposed Answer: A Explanation (Optional):

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 197

A. Correct - EOP-2, Step PC/P-7 is a Hold Point Figure regarding the PSP, this step precludes subsequent actions until the conditions listed in the Hold Point (Exceeding PSP) are met. When the conditions in the Hold Point are met, the operator continues to the next step in the flowchart and performs it. This hold point is further clarified by the Point of Emphasis, The logic phrase CAN/CANNOT BE MAINTAINED dictates that the required action should be initiated before or at the identified critical value. The value of the identified parameter(s) is/is not able to be kept above/below specified limits. This determination includes making an evaluation that considers both current and future system performance in relation to the current value and trend of the parameter(s). As specifically regards "cannot," this does not imply that the actual value of the parameter must first pass the specified limit. Proceeding actions in the EOP flow path should be directed prior to or at the stated condition.

B. Incorrect - Emergency Depressurization can only be anticipated using the turbine bypass valves. Plausible since the MSIVs are closed.

C. Incorrect - The logic phrase CAN/CANNOT BE MAINTAINED dictates that the required action should be initiated before or at the identified critical value.

D. Incorrect - There is no provision for restoring PSP, when it is believed PSP cannot be maintained. Emergency Depressurization must be executed.

EOP-02, Step PC/P-7 Bases Technical Reference(s): Bases Flowchart Use pg 30 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank # X Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 198

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 2 K/A # G2 2.2.5 Importance Rating 3.2 Equipment Control: Knowledge of the process for making design or operating changes to the facility.

Proposed Question: SRO Question # 95 When proposing a design change to DAEC, the 10CFR 50.59 process determines if...

A. the change may be accomplished without prior NRC approval.

B. an evaluation for compliance with NRC Reg Guides is required.

C. a Technical Specification revision is required after implementation.

D. a Technical Specification Bases change is required after implementation.

Proposed Answer: A Explanation (Optional):

A. Correct: 10 CFR 50.59 establishes the conditions under which licensees may make changes to the facility or procedures and conduct tests or experiments without prior NRC approval.

B. Incorrect - Plausible because a design change may be in response to a Reg Guide however the 50.59 review does NOT evaluate compliance with NRC Reg Guides.

C. Incorrect - Plausible because the evaluation may determine that a Technical Specifications is required. It does not, however, always require a TS revision, and it would NOT allow a TS change after the fact for a facility change. An UFSAR change is sometimes allowed to take up to 2 years to make, and this choice is additionally plausible if the candidate transferred this knowledge to TS.

D. Incorrect - Plausible because a design change may involve a Technical Specification Bases change, however 50.59 evaluates for license (TS) amendment requirements NOT Bases revisions. A Technical Specification Bases is not part of the determination.

ACP-103.2 rev 39, pg 3, Technical Reference(s): (Attach if not previously provided)

ACP 103.0, rev 23, page 9 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 199

Proposed References to be provided to applicants during examination: None Learning Objective: SRO 1.11.02.06 (As available)

Question Source: Bank # DAEC 50652 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: 2011 DAEC (# 95)

Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 3 Facility licensee procedures required to obtain authority for design and operating changes in the facility.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 200

Examination Outline Cross-reference: Level RO SRO Tier #

Group #

K/A # G3 2.3.13 Importance Rating 3.8 Radiation Control: Knowledge of Radiological Safety Procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high radiation areas, aligning filters, etc.

Proposed Question: SRO Question # 96 During movement of an irradiated fuel bundle from the reactor to the spent fuel pool, a reactor primary system piping break results in Fuel Pool level slowly lowering below 36 feet.

  • The refueling platform has entered the spent fuel pool area from the reactor cavity.
  • No radiation alarms have occurred at this time.

Which ONE of the following actions is required?

A. Return the bundle to its original position then suspend all movement of irradiated fuel.

B. Immediately stop fuel handling and evacuate via the safest exit to the reactor building 4th floor.

C. Immediately place the bundle in the spent fuel pool and suspend movement of irradiated fuel.

D. Immediately evacuate nonessential personnel; essential personnel place fuel into its original position and evacuate via the safest exit to the reactor building 4th floor.

Proposed Answer: C Explanation (Optional):

A. Incorrect - The fuel bundle must be taken to the spent fuel pool.

B. Incorrect - There is NO requirement to evacuate the refuel floor at this time, Plausible because AOP 981 Fuel Handling Event directs evacuating the floor, however the AOP anticipates high radiation on the refuel floor.

C. Correct -Whenever Spent Fuel Pool Level is less than 36 feet, immediately suspend movement of irradiated fuel and place any load suspended in the Spent Fuel Pool into a safe configuration.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 201

D. Incorrect - There is NO requirement to evacuate the refuel floor at this time. Plausible because AOP 981 Fuel Handling Event directs evacuating the floor, however the AOP anticipates high radiation on the refuel floor. Additionally the fuel bundle must be taken to the spent fuel pool.

Technical Reference(s): RFP 403, P & L 2.27, pg 6 (Attach if not previously provided)

Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 202

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 4 K/A # G4 2.4.8 Importance Rating 4.5 Emergency Procedures / Plan: Knowledge of how abnormal operating procedures are used in conjunction with EOP's.

Proposed Question: SRO Question # 97 With the plant at 100% power drywell temperature and pressure begin to rise due to a partial loss of Well Water. The following sequence occurs:

  • AOP 408 Well Water System Abnormal Operation is entered
  • Drywell pressure is reported as 1.55 and rising slowly
  • Drywell temperature is reported as 130 °F and rising slowly Then
  • Drywell pressure is reported as 1.70 and rising slowly
  • Drywell temperature is reported as 155 °F and rising slowly Which ONE of the following is correct regarding additional procedures to be used to mitigate the event?

A. EOP 2 Primary Containment Control must be entered. All AOPs must be exited.

Response to the event is as directed by the EOP.

B. EOP 2 Primary Containment Control must be entered. AOP 573, Primary Containment Control may also be entered as determined by the Shift Manager. If a conflict arises, the actions of the event specific AOPs take precedence.

C. EOP 2 Primary Containment Control must be entered. AOP 573, Primary Containment Control may also be entered as determined by the Shift Manager. AOP execution may continue provided that the actions do not conflict with EOP actions.

D. EOP 2 Primary Containment Control and AOP 573 Primary Containment Control must be entered. However initial response to the event is IAW AOP 408 and 573. Execution of EOP actions may be delayed until all applicable actions of the AOPs have been completed.

Proposed Answer: C Explanation (Optional):

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 203

A. Incorrect: The AOP execution can continue provided the actions do not conflict with the EOP actions and it is approved by the shift manager. Plausible in that the EOP is the higher tier document in the hierarchy of procedures.

B. Incorrect: If a conflict arises the EOP takes precedent. The Shift Manager is not authorized to deviate from an EOP action.

C. Correct: IAW ACP 1410.1, EOPs can be used in conjunction with other operating procedures (OIs, ARPs, AOPs, etc.). However, EOPs are higher tier documents and shall direct the primary response to operational transients that require their use. The decision to utilize other approved procedures during EOP execution rests with the Shift Supervisor/Manager. If other plant procedures are used while executing EOPs, actions specified in these procedures shall not contradict or subvert actions described in EOPs or degrade the operability of equipment critical to EOP strategies.

D. Incorrect: There is no allowance to defer EOP actions when in an AOP.

ACP 1410.1, pg 17 Technical Reference(s): EOP 2 (Attach if not previously provided)

AOP 573 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: NA Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 204

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 2 K/A # G2 2.2.1 Importance Rating 4.4 Equipment Control: Ability to perform pre-startup procedures for the facility, including operating those controls associated with plant equipment that could affect reactivity.

Proposed Question: SRO Question # 98 Today is January 8, 2013. The plant has been shutdown for 5 days following a forced outage.

The last plant startup was conducted on November 14, 2011.

In preparation for todays reactor startup STP 3.3.2.1-05 RWM Control Rod Sequence Verification is being performed. During the performance of the STP the RWM locks-up.

Based on the above:

(1) What method specified in OI 878.8, RWM can be used in an attempt to reset the RWM lock-up?

AND (2) If the RWM will not reset, will Tech Specs allow control rod withdrawal?

A. (1) Reset the RWM by de-energizing and then re-energizing its power supply.

(2) No, because using a 2nd licensed operator or other qualified individual is only allowed if 12 rods are withdrawn.

B. (1) Reset the RWM by de-energizing and then re-energizing its power supply.

(2) Yes, but only if rod movements are verified by a 2nd licensed operator or other qualified individual.

C. (1) Reset the RWM by placing the RWM keylock Mode Switch on panel 1C05 in TEST then back to the OPERATE position.

(2) Yes, but only if rod movements are verified by a 2nd licensed operator or other qualified individual.

D. (1) Reset the RWM by placing the RWM keylock Mode Switch on panel 1C05 in TEST then back to the OPERATE position.

(2) No, because using a 2nd licensed operator or other qualified individual is only allowed if 12 rods are withdrawn.

Proposed Answer: B DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 205

Explanation (Optional):

A. Incorrect: Tech Spec 3.3.2.1 required action C.2.2 allows the startup to commence.

Plausible in that Tech Spec 3.3.2.1 action C.2.1.1 would allow an already in progress startup to continue if 12 rods were withdrawn.

B. Correct: OI 878.8, RWM Precaution and Limitation # 7 states that if, at any point, the RWM is found locked up, then reset the RWM by de-energizing and reenergizing its power per Section 6.2 of the procedure. Tech Spec 3.3.2.1 required actions C2.1.2 and C.2.2 allows rod withdraw if a startup has not been conducted within the last calendar year with the RWM inoperable and a 2nd licensed operator or other qualified individual is verifying control rod movement. Since the last plant startup was conducted on November 14, 2011 this requirement has been met.

C. Incorrect: OI 878.8, RWM Precaution and Limitation # 7 states that if, at any point, the RWM is found locked up, then reset the RWM by de-energizing and reenergizing its power per Section 6.2 of the procedure. Plausible if the candidate is unaware of this procedure requirement and the impact of placing the RWM Mode Switch in TEST.

D. Incorrect: OI 878.8, RWM Precaution and Limitation # 7 states that if, at any point, the RWM is found locked up, then reset the RWM by de-energizing and reenergizing its power per Section 6.2 of the procedure. Additionally, Tech Spec 3.3.2.1 required action C.2.2 allows the startup to commence.

OI 878.8, RWM Precaution and Technical Reference(s): (Attach if not previously provided)

Limitation # 7 Tech Spec 3.3.2.1 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 6 DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 206

Procedures and limitations involved in initial core loading, alterations in core configuration, control rod programming, and determination of various internal and external effects on core reactivity.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 207

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 1 K/A # G1 2.1.43 Importance Rating 4.3 Conduct of Operations: Ability to use procedures to determine the effects on reactivity of plant changes, such as RCS temperature, secondary plant, fuel depletion, etc.

Proposed Question: SRO Question # 99 Following a reduction in feedwater temperature, reactor power has been lowered using recirculation flow. The OATC has determined that load line will exceed 100.64%.

Which ONE of the following is required?

The CRS will direct A. recirculation flow be lowered as necessary to stay below the load line limit. A reactivity plan is required.

B. recirculation flow be lowered as necessary to stay below the load line limit. A reactivity plan is NOT required.

C. control rods be inserted as necessary to preclude an inadvertent violation of the load line limit. A reactivity plan is required.

D. control rods be inserted as necessary to preclude an inadvertent violation of the load line limit. A reactivity plan is NOT required.

Proposed Answer: D Explanation (Optional):

A. Incorrect -Lowering recirculation flow will result in violating the load line limit. A reactivity plan is not required. Plausible because recirculation flow is used for fine adjustments of power and Reactivity plans are required for most power changes B. Incorrect -Lowering recirculation flow will result in violating the load line limit. Plausible because recirculation flow is used for fine adjustments of power.

C. Incorrect -No reactivity plan is required. This action is necessary to preclude an inadvertent violation of the 100.4% admin limit due to limitations in monitoring load line during transients. Plausible because reactivity plans are required for most power changes.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 208

D. Correct - If load line will exceed the load line limit (100.64%), then take immediate action to reduce power to the allowable region of the power to flow map with rods. No reactivity plan is required. This action is necessary to preclude an inadvertent violation of the 100.4% admin limit due to limitations in monitoring load line during transients.

IAW IPOI 3, Reactivity plans are required for all planned core reactivity changes that will result in a change in power greater than or equal to 10 percent. Also During transient Xenon conditions action should be taken at an indicated load line of 100.0% to insert control rods. No reactivity plan is required. This action is necessary to preclude an inadvertent violation of the 100.4% admin limit due to limitations in monitoring load line during transients.

AOP 646, pg 3 Technical Reference(s): (Attach if not previously provided)

IPOI 3, P & L 10 & 35 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

Question Source: Bank #

Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam: N/A Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 6 Procedures and limitations involved in initial core loading, alterations in core configuration, control rod programming, and determination of various internal and external effects on core reactivity.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 209

Examination Outline Cross-reference: Level RO SRO Tier # 3 Group # 3 K/A # G3 2.3.5 Importance Rating 2.9 Radiation Control: Ability to use radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.

SRO Question # 100 An accident has occurred which has caused entry into the RPV Flood EOP. All control rods are fully inserted.

  • Reactor water level is unknown
  • RHR and Condensate are injecting into the reactor
  • Reactor pressure is 400 psig and lowering quickly
  • Torus water level is 10.4 feet and rising slowly
  • Torus water temperature is 105°F and rising slowly
  • All open SRV tailpipe temperatures are ~300°F and steady
  • Drywell area Rad monitors are now reading 450 and 500 R/Hr and slowly rising
  • Torus area Rad monitors are now reading 45 and 50 R/hr and slowly rising
  • The TSC is NOT manned at this time Using the Table below which ONE of the following actions is required at this time?

A. Continue to perform RPV/F actions. SAG entry is not required until multiple Core damage indications are seen.

B. Continue to perform RPV/F actions, since core flooding indications exist, enter the SAGs and then exit the EOPs.

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 210

C. Continue to perform RPV/F actions until RPV reactor water level indications are observed. Once the TSC is operational, exit the EOPs and enter the SAGs.

D. Enter the SAGs and transition from RPV/F to SAG 1, Primary Containment Flooding.

Continue to monitor the plant for degrading conditions and report them to the TSC once manned and operational.

Proposed Answer: C Explanation (Optional):

A. Incorrect - RPV/F actions must continue however there is a SAG entry condition on primary containment radiation. Plausible because RPV/F action must continue and the candidate may misinterpret Table 5.

B. Incorrect - EOPs should not be exited until there is evidence of core flooding and the TSC is operational. With reactor pressure still lowering and SRV tailpipe temperatures stable there is NO evidence of core flooding, with the core NOT flooded and the TSC NOT operational the EOPs should NOT be exited at this time. Plausible because there is an SAG entry condition on primary containment radiation.

C. Correct - Based upon the containment Rad levels during RPV flooding fuel damage is occurring. This requires entry to SAGs. The transition to SAGs is performed by continuing the EOP actions until there is evidence that the core is flooded or reactor water level indication is available and the TSC is operational. Once the TSC is operational, The SAGs are entered at the appropriate point and directed by the TSC and then the EOPs are exited and EOP actions terminated.

D. Incorrect - EOPs should NOT be exited until the TSC is operational. The transition to SAGs is performed by continuing the EOP actions until there is evidence that the core is flooded.

RPV/F, Table 5 Technical Reference(s): (Attach if not previously provided)

RPV/F Bases pg 8 Proposed References to be provided to applicants during examination: None Learning Objective: (As available)

DAEC Bank # QQ Question Source: Bank #

20347 Modified Bank # (Note changes or attach parent)

New Question History: Last NRC Exam: Not Used DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 211

Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Assessment of facility conditions and selection of appropriate procedures during normal, abnormal, and emergency situations.

Comments:

DAEC NRC WRITTEN EXAM, ALL 100, REV 03-28-13-SLV.DOC Page 212

PDA 13-1 NRC Exam Applicant References

1. OI 698 Attachment 1
2. AOP 149 Appendix 1&2
3. EOP Caution 1
4. EOP Graph 1
5. EOP Graph 5
6. EOP Graph 8
7. EOP Table 6
8. EAL-01 (Fission Product Barrier portion only)
9. L3.1.7
10. Figure 3.1.7-1
11. Figure 3.1.7-2
12. L 3.3.5.1
13. T3.3.5.1-1 (P1 thru 3, remove all allowable values)
14. L3.3.6.1
15. T3.3.6.1
16. L3.4.7
17. L3.4.8
18. L3.5.1
19. L3.6.4.1

Page 1 of 1 APPENDIX 1 ESTIMATED CAPABILITY CURVES OI 698 Page 45 of 46 Rev. 83

AOP 149 LOSS OF DECAY HEAT REMOVAL APPENDIX 1 HEATUP RATE CURVE - RPV FLOODED NOTE The RPV Flooded condition is defined as the RPV head removed, Spent Fuel Pool Gates removed, and the RPV and refuel cavity flooded up so that cavity level equals Spent Fuel Pool level. Spent Fuel Pool level is within the normal band.

RFO-23 Vessel Water Heatup Rate (Floodup Condition) 9.0 8.0 Heatup Rate (Deg F/hr) 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0.0 0 10 20 30 40 50 60 70 80 90 100 Time Since Shutdown (Days)

CAUTION The initial heatup rate in the vessel may be higher than the calculated value when RHR or Fuel Pool Cooling is removed from service. The calculation used to generate the heatup rate curves assumes instantaneous mixing and heat transport from the fuel area to the remainder of the system volume. In addition, the calculated heatup rates reflect bulk temperatures not local temperatures. Under natural circulation conditions and the resulting time delay in heat transport, considerable differences in temperature may exist between the vessel and upper levels of the cavity or in the spent fuel pool. In some cases local boiling may occur but bulk boiling will not occur as long as cooling is restored within the calculated time-to-boil period.

AOP 149 Page 12 of 15 Rev. 40

AOP 149 LOSS OF DECAY HEAT REMOVAL APPENDIX 2 HEATUP RATE CURVE - RPV LEVEL AT 200" RFO-23 Vessel Water Heatup Rate (Water Level = 200 )

50.0 45.0 40.0 Heatup Rate (Deg F/hr) 35.0 30.0 25.0 20.0 15.0 10.0 5.0 0.0 0 10 20 30 40 50 60 70 80 90 100 Time Since Shutdown (Days)

CAUTION The initial heatup rate in the vessel may be higher than the calculated value when cooling is removed from service. The calculation used to generate the heatup rate curves assumes instantaneous mixing and heat transport from the fuel area to the remainder of the system volume. In addition, the calculated heatup rates reflect bulk temperatures not local temperatures. Under natural circulation conditions and the resulting time delay in heat transport, considerable differences in temperature may exist between the fuel area and upper levels of vessel. In some cases local boiling may occur but bulk boiling will not occur as long as cooling is restored within the calculated time-to-boil period.

AOP 149 Page 13 of 15 Rev. 40

CAUTIONS The following restrictions apply to RPV water level instruments:

1 1. If drywell air temperature is above the RPV Saturation Temperature (Graph 1), water in the instrument legs may boil.

If boiling is suspected:

a. Subtract 23 inches from Fuel Zone and Narrow Range GEMAC indications.
b. Do not use Floodup and Wide Range Yarway instruments.
2. Floodup and Wide Range instruments may not be used below the Minimum Indicated Level for the indicated drywell temperature.

Temperature Drywell MIL Level Instrument Instrument Temp (°F) (in.)

Wide Range Yarway TR-4383A 100-150 +8 LI-4539 (+8 to +218 in.) Channel 1 151-200 +12 (red) 201-250 +16 Wide Range Yarway TR-4383B 251-300 +20 LI-4540 (+8 to +218 in.) Channel 2 301-350 +25 (green) Upscale +48 100-150 +168 Floodup Range LI-4541 TR-4383A 151-200 +174

(+158 to +458 in.) Channel 1 201-250 +181 (red) 251-300 +189 301-350 +199 Upscale +257 Wide Range Yarways (LI-4539 and LI-4540) may be unreliable 2 due to reference leg boiling during rapid RPV depressurization below 500 psig.

Operation of HPCI, RCIC, Core Spray, or RHR with suction from 3 the torus and pump flow above the NPSH or vortex limit may damage equipment.

Elevated torus pressure may trip the RCIC turbine on high 4 exhaust pressure.

Water may drain from isolated drywell cooling loops if well water 8 is out of service when a PCIS Group 7 Isolation signal clears.

This creates the potential for water hammer in drywell cooling piping when well water is restored.

GRAPH 1 RPV SATURATION TEMPERATURE Graph 1: RPV Saturation Temperature 375 350 Action is required Average Drywell Air Temperature (°F) 325 300 275 250 225 212 200 120 0 25 50 75 100 125 150 RPV Pressure (psig)

GRAPH 1 Page 1 of 2 Rev. 5

GRAPH 5 PRESSURE SUPPRESSION PRESSURE Graph 5: Pressure Suppression Pressure 30 25.8 25 Action is required Torus Pressure (psig) 20 15 10 5

0 7.1 13.8 6 8 10 12 14 16 Torus Water Level (ft)

GRAPH 5 Page 1 of 2 Rev. 7

GRAPH 8 RHR NPSH 250 240

  • 15 psig 230 220
  • 10 psig 210 200 *5 psig 190 180
  • 0 psig Operation of RHR pumps above these 170 curves may result in equipment
  • torus pressure 160 150 (1 pump) 0 1000 2000 3000 4000 5000 6000 7000 (2 pumps) 0 2000 4000 6000 8000 10000 12000 14000 RHR PUMP FLOW GRAPH 8 Page 1 of 2 Rev. 5

DAEC EOP BASES DOCUMENT Rev. 11 EOP 3 - SECONDARY CONTAINMENT CONTROL Page 5 of 21 GUIDELINE Table 6 Secondary Containment Limits Max Normal Max Safe Parameter and Areas Operating Operating Value/Trend Limit Limit Area/Location Indicator °F °F A RHR-SE Corner Room Area RHR SE CORNER ROOM AMBIENT TR/TDR 2000A Ch 1 130 140 RHR SE CORNER ROOM DIFFERENTIAL TR/TDR 2000A Ch 2 50 N/A B RHR-NW Corner Room Area RHR NW CORNER ROOM AMBIENT TR/TDR 2000B Ch 1 130 140 RHR NW CORNER ROOM DIFFERENTIAL TR/TDR 2000B Ch 2 50 N/A HPCI Room Area HPCI EMER COOLER AMBIENT TR/TDR 2225A[B] Ch 1 175 310 HPCI ROOM AMBIENT TR/TDR 2225A Ch 2 175 310 HPCI ROOM DIFFERENTIAL TR/TDR 2225A[B] Ch 4[3] 50 N/A RCIC Room Area Temperature RCIC EMER COOLER AMBIENT TR/TDR 2425A[B] Ch 1 175 300 RCIC ROOM AMBIENT TR/TDR 2425A Ch 2 175 300 RCIC ROOM DIFFERENTIAL TR/TDR 2425A[B] Ch 4 50 N/A Torus Area TORUS CATWALK NORTH AMBIENT TR/TDR 2425A Ch 3 150 165 TORUS CATWALK WEST AMBIENT TR/TDR 2425B Ch 2 150 165 TORUS CATWALK SOUTH AMBIENT TR/TDR 2225A Ch 3 150 165 TORUS CATWALK EAST AMBIENT TR/TDR 2225B Ch 2 150 165 TORUS CATWALK EAST DIFF TR/TDR 2425A Ch 5 50 N/A TORUS CATWALK WEST DIFF TR/TDR 2425B Ch 5 50 N/A TORUS CATWALK SOUTHWEST DIFF TR/TDR 2225A Ch 5 50 N/A TORUS CATWALK SOUTH DIFF TR/TDR 2225B Ch 4 50 N/A RB 786 South Area RWCU PUMP ROOM AMBIENT TR/TDR 2700A[B] Ch 1 130 212 RWCU HX ROOM AMBIENT TR/TDR 2700A[B] Ch 2,3 130 212 RB 757 South Area RWCU ABOVE TIP ROOM AMBIENT TR/TDR 2700A[B] Ch 4,5 111.5 150 Steam Tunnel Area STEAM TUNNEL AMBIENT TR/TDR 2425B Ch 3 160 300 STEAM TUNNEL DIFFERENTIAL TR/TDR 2225B Ch 5 70 N/A Area/Location Indicator mR/hr mR/hr RB 757 South Area RB RAILROAD ACCESS AREA RI 9167 10 100 SOUTH CRD MODULE AREA RI 9169 10 100 TIP ROOM RI 9176 60 600 RB 757 North Area NORTH CRD MODULE RI 9168 10 100 CRD REPAIR ROOM RI 9170 15 150 Radiation RB 786 North Area 3

RWCU SPENT RESIN ROOM RI 9173 100 10 RWCU PHASE SEP TANK RI 9177 20 200 RB 786 South Area 3 4 RWCU PUMP ROOM RI 9156 10 10 3 4 RWCU HX ROOM RI 9157 10 10 RB 812 North Area MAIN PLANT EXHAUST FAN ROOM RI 9171 60 600 JUNGLE ROOM RI 9155 60 600 Refuel Floor Area NEW FUEL VAULT AREA RI 9153 10 100 NORTH REFUEL FLOOR RI 9163 10 100 SOUTH REFUEL FLOOR RI 9164 10 100 3

SPENT FUEL POOL AREA RI 9178 100 10 Area/Location Indicator inches inches Water Level HPCI ROOM LI 3768 2 6 RCIC ROOM LI 3769 3 6 A RHR & CS SECR LI 3770 2 10 B RHR & CS NWCR LI 3771 2 10 TORUS AREA LI 3772 2 12

FG1 1 2 3 FS1 1 2 3 FA1 1 2 3 FU1 1 2 3 Loss of ANY Two Barriers AND Loss or Potential Loss of Loss or Potential Loss of ANY Two Barriers (Table F-1) ANY Loss or ANY Potential Loss of EITHER Fuel Clad OR ANY Loss or ANY Potential Loss of Primary Containment the Third Barrier (Table F-1) RCS Barrier (Table F-1) Barrier (Table F-1)

Table F-1 FISSION PRODUCT BARRIER MATRIX Fuel Clad Barrier RCS Barrier Primary Containment Barrier ONE BARRIER AFFECTED Loss Potential Loss Loss Potential Loss Loss Potential Loss L P L P L P RADIATION/CORE DAMAGE RADIATION/CORE DAMAGE RADIATION/CORE Fuel damage assessment Drywell Area Hi Range Rad DAMAGE CLAD RCS CNTMT (PASAP 7.2) indicates at Monitor RIM-9184A or B reading Drywell Area Hi Range Rad GREATER THAN 5 Rem/hr after FU1 least 5% fuel clad damage Monitor, RIM-9184A or B UNUSUAL OR reactor shutdown reading GREATER THAN 1/1 EVENT Drywell Area Hi Range Rad LEAKAGE 3000 Rem/hr LEAKAGE LEAKAGE 1/2 Monitor, RIM-9184A or B Failure of both isolation valves OR UNISOLABLE Main Steamline, RCS Leakage GREATER THAN reading GREATER THAN in any one line to close AND a Torus Area Hi Range Rad FA1 HPCI, Feedwater, RWCU or 50 GPM inside the drywell 700 Rem/hr direct downstream pathway to Monitor, RIM-9185A or B ALERT RCIC break as indicated by the OR OR the environment exists after reading GREATER THAN failure of both isolation valves in UNISOLABLE primary system Torus Area Hi Range Rad primary containment isolation 100 Rem/hr TWO BARRIERS AFFECTED any one line to close AND leakage outside the drywell as Monitor, RIM-9185A or B signal. OR EITHER: indicated by area temps or ARMs reading GREATER THAN 30 OR Fuel damage assessment High MSL flow or high exceeding the Max Normal Limits L P L P L P Rem/hr UNISOLABLE primary system (PASAP 7.2) indicates at steam tunnel temperature per EOP 3, Table 6.

OR leakage outside the drywell as least 20% fuel clad annunciators CLAD RCS CNTMT Coolant activity GREATER indicated by area temps or damage Direct report of steam THAN 300 Ci/gm DOSE release ARMs exceeding the Max Safe RPV LEVEL EQUIVALENT OR Limits per EOP 3, Table 6, Primary containment I-131 Emergency RPV when Containment Isolation is flooding required 2/3 Depressurization is required required. FS1 Fission Product PRIMARY CONTAINMENT OR SITE AREA Barriers Intentional Primary ATMOSPHERE EMERGENCY RPV LEVEL RPV LEVEL RPV LEVEL Containment venting per EOPs Torus pressure reaches 53 psig and rising THREE BARRIERS AFFECTED RPV Level cannot be RPV Level cannot be RPV Level cannot be restored and maintained restored and restored and maintained OR above -25 Inches maintained above +15 above +15 inches or Drywell or Torus H2 L P L P L P inches or cannot be cannot be determined PRIMARY CONTAINMENT cannot be determined to determined ATMOSPHERE be LESS THAN 6% and CLAD RCS CNTMT PRIMARY CONTAINMENT Drywell pressure rise followed Drywell or Torus O2 ATMOSPHERE by a rapid unexplained drop in drywell pressure cannot be determined to Drywell pressure GREATER be LESS THAN 5%

THAN 2 psig due to RCS OR 3/3 Drywell pressure response OR NO Leakage (not caused by a loss NOT consistent with LOCA RPV pressure and Torus LOSS OF AT of DW Cooling) LEAST 2 conditions water temperature cannot BARRIERS?

be maintained below the Heat Capacity Limit (EOP YES Graph 4) FG1 GENERAL EMERGENCY DIRECTOR EMERGENCY DIRECTOR EMERGENCY DIRECTOR EMERGENCY DIRECTOR EMERGENCY DIRECTOR EMERGENCY DIRECTOR EMERGENCY JUDGMENT JUDGMENT JUDGMENT JUDGMENT JUDGMENT JUDGMENT Any condition in the opinion of Any condition in the opinion of Any condition in the opinion of the Any condition in the opinion of the Any condition in the opinion Any condition in the opinion the Emergency Director (OSM, the Emergency Director (OSM, Emergency Director (OSM, EC, or Emergency Director (OSM, EC, or of the Emergency Director of the Emergency Director EC, or ER&RD) that indicates EC, or ER&RD) that indicates ER&RD) that indicates Loss or ER&RD) that indicates Loss or (OSM, EC, or ER&RD) that (OSM, EC, or ER&RD) that Loss or Potential Loss of the Loss or Potential Loss of the Potential Loss of the RCS Barrier Potential Loss of the RCS Barrier indicates Loss or Potential indicates Loss or Potential Fuel Clad Barrier Fuel Clad Barrier Loss of the Containment Loss of the Containment Barrier Barrier Duane Arnold Energy Center EAL-01 Emergency Action Level Matrix, Rev. 9 Modes: 1 Power Operation 2

Startup 3 4 5 Refueling DEF Defueled Modes 1, 2, 3 Hot Shutdown Cold Shutdown Approved: Mike Davis 09/26/2012 Manager Emergency Preparedness Date

SLC System 3.1.7 3.1 REACTIVITY CONTROL SYSTEMS 3.1.7 Standby Liquid Control (SLC) System LCO 3.1.7 Two SLC subsystems shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One SLC subsystem A.1 Restore SLC 7 days inoperable. subsystem to OPERABLE status.

B. Two SLC subsystems B.1 Restore one SLC 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable. subsystem to OPERABLE status.

C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

DAEC 3.1-20 Amendment 223

SLC System 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.1 Verify available volume of sodium pentaborate In accordance with the solution is within the limits of Figure 3.1.7-1. Surveillance Frequency Control Program SR 3.1.7.2 Verify temperature of sodium pentaborate In accordance with the solution is within the limits of Surveillance Figure 3.1.7-2. Frequency Control Program SR 3.1.7.3 Verify temperature of pump suction piping is In accordance with the within the limits of Figure 3.1.7-2. Surveillance Frequency Control Program SR 3.1.7.4 Verify continuity of explosive charge. In accordance with the Surveillance Frequency Control Program SR 3.1.7.5 Verify the concentration of boron in In accordance with the solution is within the limits of Figure Surveillance 3.1.7-1. Frequency Control Program AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after water or boron is added to solution AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after solution temperature is restored within the limits of Figure 3.1.7-2 (continued)

DAEC 3.1-21 Amendment 280

SLC System 3.1.7 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.1.7.6 Verify each pump develops a flow rate In accordance 26.2 gpm at a discharge pressure 1150 with the psig. Inservice Testing Program SR 3.1.7.7 Verify flow through one SLC subsystem from In accordance pump into reactor pressure vessel. with the Surveillance Frequency Control Program SR 3.1.7.8 Verify all heat traced piping between storage In accordance tank and pump suction is unblocked. with the Surveillance Frequency Control Program AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after solution temperature is restored within the limits of Figure 3.1.7-2 DAEC 3.1-22 Amendment 280

\t { \vqTom 3.1.7 110 ll llii 100 tl ttl Am lptable tl ttl 90 l-L gr trJ tf PBo tT.

ul CL t!

F 60 J* lr l--,'.,

r, Fl-I I

50 11 12 13 14 CONCENTRATION (Weight Percent Pentaborate in Solution)

Fr gure 3.1 .7 -2 (page 1 of i )

Sodium Pentaborate Solution Temperature Versus Concentration Requi rements DAIC 3.r-?4 Revi si on A

SLC Syste.

3.1.-

=

.9 2

o a

E h6 t- 'o 6J dp tF.

L6 1l r ) '^

z6 nq o

6

-c

.T c) 1L 1 500 2000 2500 3000 3500 AVAILABLE VOLUME OF SOLTJIION hI TANIK (gaJJors)

Frgure 3 1 7-l (page I of 1)

Sodr um Pentabor-ate Sol urr on Vo.lume Vensus Concenlralr on Requr rements DAtC 3.1 23 Amendmenr 236

ECCS Instrumentation 3.3.5.1 3.3 INSTRUMENTATION 3.3.5.1 Emergency Core Cooling System (ECCS) Instrumentation LCO 3.3.5.1 The ECCS instrumentation for each Function in Table 3.3.5.1-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.3.5.1-1.

ACTIONS


NOTE------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Enter the Condition Immediately inoperable. referenced in Table 3.3.5.1-1 for the channel.

(continued)

DAEC 3.3-32 Amendment 223

ECCS Instrumentation 3.3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. As required by B.1 --------------NOTES-----------

Required Action A.1 1. Only applicable in and referenced in MODES 1, 2, and Table 3.3.5.1-1 3.

2. Only applicable for Functions 1.a, 1.b, 2.a, and 2.b.

Declare supported 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery of feature(s) inoperable loss of initiation when redundant capability for feature(s) feature(s) ECCS in two or more low initiation capability is pressure ECCS inoperable. subsystems AND B.2 --------------NOTE------------

Only applicable for Functions 3.a and 3.b.

Declare High Pressure 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery of Coolant Injection (HPCI) loss of HPCI initiation System inoperable. capability AND B.3 Place channel in trip. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (continued)

DAEC 3.3-33 Amendment 223

ECCS Instrumentation 3.3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. As required by C.1 ------------NOTES----------

Required Action A.1 1. Only applicable in and referenced in MODES 1, 2, and Table 3.3.5.1-1. 3.

2. Only applicable for Functions 1.c, 1.e, 2.c and 2.e.

Declare supported 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from feature(s) inoperable. discovery of loss of initiation capability for two or more low pressure ECCS subsystems AND C.2 -------------NOTES--------

1. Only applicable in Modes 1, 2, and 3.
2. Only applicable for Functions 2.g, 2.h, 2.i, and 2.j.

Declare Low Pressure 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from Coolant Injection discovery of loss of (LPCI) subsystem Loop Selection inoperable. capability AND C.3 Restore channel to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPERABLE status.

(continued)

DAEC 3.3-34 Amendment 223

ECCS Instrumentation 3.3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D. As required by D.1 ----------NOTE-----------

Required Action A.1 Only applicable if and referenced in HPCI pump suction is Table 3.3.5.1-1. not aligned to the suppression pool.

Declare HPCI System 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery inoperable. of loss of HPCI suction transfer capability AND D.2.1 Place channel in trip. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OR D.2.2 Align the HPCI pump 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> suction to the suppression pool.

(continued)

DAEC 3.3-35 Amendment 223

ECCS Instrumentation 3.3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. As required by E.1 ----------NOTES----------

Required Action A.1 1. Only applicable in and referenced in MODES 1, 2, and Table 3.3.5.1-1. 3.

2. Only applicable for Functions 1.d and 2.f.

Declare supported 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery of feature(s) inoperable. loss of initiation capability for two or more minimum flow valves in the low pressure ECCS subsystems AND E.2 Restore channel to 7 days OPERABLE status.

F. As required by F.1 Restore channel to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Required Action A.1 OPERABLE status.

and referenced in Table 3.3.5.1-1.

(continued)

DAEC 3.3-36 Amendment 223

ECCS Instrumentation 3.3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME G. As required by G.1 Declare Automatic 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery Required Action A.1 Depressurization of loss of ADS initiation and referenced in System (ADS) valves capability in both trip Table 3.3.5.1-1. inoperable. logics AND G.2 Place channel in trip. 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> from discovery of inoperable channel concurrent with HPCI or Reactor Core Isolation Cooling (RCIC) inoperable AND 8 days (continued)

DAEC 3.3-37 Amendment 223

ECCS Instrumentation 3.3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME H. As required by Required H.1 Declare ADS valves 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from discovery Action A.1 and inoperable. of loss of ADS initiation referenced in Table capability in both trip 3.3.5.1-1. logics AND H.2 Restore channel to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> from OEPRABLE status. discovery of inoperable channel concurrent with HPCI or RCIC inoperable AND 8 days I. Required Action and I.1 Declare associated Immediately associated Completion supported feature(s)

Time of Condition B, inoperable.

C, D, E, F, G, or H not met.

DAEC 3.3-38 Amendment 223

ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS


NOTES----------------------------------------------------

1. Refer to Table 3.3.5.1-1 to determine which SRs apply for each ECCS Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 1.d, 2.f, 3.c, 3.d, 3.e, and 3.f; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions other than 1.d, 2.f, 3.c, 3.d, 3.e, and 3.f provided the associated Function (or the redundant Function for Functions 4 and 5) maintains ECCS initiation or loop selection capability.

SURVEILLANCE FREQUENCY SR 3.3.5.1.1 Perform CHANNEL CHECK. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SR 3.3.5.1.2 Perform CHANNEL FUNCTIONAL 31 days TEST.

SR 3.3.5.1.3 Perform CHANNEL FUNCTIONAL 92 days TEST.

SR 3.3.5.1.4 Perform CHANNEL CALIBRATION. 92 days SR 3.3.5.1.5 Perform CHANNEL FUNCTIONAL 12 months TEST.

SR 3.3.5.1.6 Perform CHANNEL CALIBRATION. 12 months (continued)

DAEC 3.3-39 Amendment 223

ECCS Instrumentation 3.3.5.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.5.1.7 Perform CHANNEL CALIBRATION. 18 months SR 3.3.5.1.8 Perform CHANNEL CALIBRATION. 24 months SR 3.3.5.1.9 Perform LOGIC SYSTEM FUNCTIONAL 24 months TEST.

DAEC 3.3-40 Amendment 223

Primary Containment Isolation Instrumentation 3.3.6.1 3.3 INSTRUMENTATION 3.3.6.1 Primary Containment Isolation Instrumentation LCO 3.3.6.1 The primary containment isolation instrumentation for each Function in Table 3.3.6.1-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.3.6.1-1.

ACTIONS


NOTE-----------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A.1 Place channel in trip. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for channels inoperable. Functions 2.a, 2.b, 6.b, and 6.c AND 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for Functions other than Functions 2.a, 2.b, and 6.b, and 6.c AND A.2 ----------NOTE---------

Only applicable for Function 7.a.

Inhibit containment 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> spray system.

(continued)

DAEC 3.3-50 Amendment 223

Primary Containment Isolation Instrumentation 3.3.6.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One or more automatic B.1 Restore isolation 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Functions with isolation capability.

capability not maintained.

C. Required Action and C.1 Enter the Condition Immediately associated Completion referenced in Time of Condition A or Table 3.3.6.1-1 for B not met. the channel.

D. As required by Required D.1 Isolate associated 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Action C.1 and main steam line referenced in Table (MSL).

3.3.6.1-1.

OR D.2.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> AND D.2.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> E. As required by Required E.1 Be in MODE 2. 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Action C.1 and referenced in Table 3.3.6.1-1.

(continued)

DAEC 3.3-51 Amendment 223

Primary Containment Isolation Instrumentation 3.3.6.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME F. As required by Required F.1 Isolate the affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Action C.1 and penetration flow referenced in Table path(s).

3.3.6.1-1.

G. [Deleted]

H. As required by Required H.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Action C.1 and referenced in Table AND 3.3.6.1-1.

H.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> OR Required Action and associated Completion Time for Condition F not met.

I. As required by Required I.1 Declare Standby Liquid 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Action C.1 and Control (SLC) System referenced in Table inoperable.

3.3.6.1-1.

OR I.2 Isolate the Reactor 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Water Cleanup System.

(continued)

DAEC 3.3-52 Amendment No. 231

Primary Containment Isolation Instrumentation 3.3.6.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME J. As required by Required J.1 Initiate action to restore Immediately Action C.1 and channel to OPERABLE referenced in Table status.

3.3.6.1-1.

OR J.2 Initiate action to isolate Immediately the Residual Heat Removal (RHR)

Shutdown Cooling System.

K. As required by K.1 -----------NOTE------------

Required Action C.1 Only applicable if and referenced in inoperable channel is Table 3.3.6.1-1. not in trip.

Declare associated Immediately Suppression Pool Cooling/Spray subsystem(s) inoperable.

OR K.2 ----------NOTE------------

Only applicable if inoperable channel is in trip.

Declare Primary Immediately Containment inoperable.

(continued)

DAEC 3.3-53 Amendment 223

Primary Containment Isolation Instrumentation 3.3.6.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME L. As required by L.1 Isolate the primary 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Required Action C.1 containment vent and and referenced in purge penetration flow Table 3.3.6.1-1. paths.

OR L.2 Establish 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> administrative control of the primary containment vent and purge valves using continuous monitoring of alternate instrumentation.

DAEC 3.3-54 Amendment 223

Primary Containment Isolation Instrumentation 3.3.6.1 SURVEILLANCE REQUIREMENTS


NOTES------------------------------------------------------

1. Refer to Table 3.3.6.1-1 to determine which SRs apply for each Primary Containment Isolation Function.
2. When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed as follows: (a) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Function 5.a; and (b) for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions other than 5.a provided the associated Function maintains isolation capability.

SURVEILLANCE FREQUENCY SR 3.3.6.1.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.2 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.3 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.4 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.5 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program (continued)

DAEC 3.3-55 Amendment 280

Primary Containment Isolation Instrumentation 3.3.6.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.6.1.6 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.7 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.8 Perform CHANNEL CALIBRATION. In accordance with the Surveillance Frequency Control Program SR 3.3.6.1.9 Perform LOGIC SYSTEM FUNCTIONAL In accordance with TEST. the Surveillance Frequency Control Program DAEC 3.3-56 Amendment 280

Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 1 of 5)

Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE

1. Main Steam Line Isolation
a. Reactor Vessel Water 1,2,3 2 D SR 3.3.6.1.1 > 38.3 inches Level - Low Low Low SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9
b. Main Steam Line 1 2 E SR 3.3.6.1.4 > 821 psig Pressure - Low SR 3.3.6.1.5 SR 3.3.6.1.9
c. Main Steam Line 1,2,3 2 per D SR 3.3.6.1.1 < 138% rated Flow - High MSL SR 3.3.6.1.4 steam flow SR 3.3.6.1.5 SR 3.3.6.1.9
d. Condenser (a) 2 D SR 3.3.6.1.4 > 7.2 inches 1, 2 ,

Backpressure - High (a) SR 3.3.6.1.8 Hg vacuum 3 SR 3.3.6.1.9

e. Main Steam Line Tunnel 1,2,3 4 D SR 3.3.6.1.2 < 205.1°F Temperature - High SR 3.3.6.1.4 SR 3.3.6.1.7 SR 3.3.6.1.9 f.. Turbine Building 1,2,3 4 D SR 3.3.6.1.2 < 205.1°F Temperature - High SR 3.3.6.1.4 SR 3.3.6.1.7 SR 3.3.6.1.9 (continued)

(a) When any turbine stop valve is greater than 90% open or when the key-locked bypass switch is in the NORM Position.

DAEC 3.3-57 Amendment No. 261

Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 2 of 5)

Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE

2. Primary Containment Isolation
a. Reactor Vessel Water 1,2,3 2 H SR 3.3.6.1.1 > 165.6 inches Level - Low SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9
b. Drywell Pressure - High 1,2,3 2 H SR 3.3.6.1.4 < 2.2 psig SR 3.3.6.1.8 SR 3.3.6.1.9 (c)
c. Offgas Vent Stack - 1 , 2(c), 1 L SR 3.3.6.1.2 (b)

High Radiation (c) SR 3.3.6.1.4 3 SR 3.3.6.1.8 SR 3.3.6.1.9

d. Reactor Building 1,2,3 1 H SR 3.3.6.1.2 < 12.8 mR/hr Exhaust Shaft - SR 3.3.6.1.4 High Radiation SR 3.3.6.1.8 SR 3.3.6.1.9
e. Refueling Floor 1,2,3 1 H SR 3.3.6.1.2 < 10.6 mR/hr Exhaust Duct - SR 3.3.6.1.4 High Radiation SR 3.3.6.1.8 SR 3.3.6.1.9
3. High Pressure Coolant Injection (HPCI) System Isolation
a. HPCI Steam Line Flow - 1,2,3 1 F SR 3.3.6.1.4 < 409 inches High SR 3.3.6.1.8 (inboard)

SR 3.3.6.1.9 < 110 inches (outboard)

(continued)

(b) Allowable value is determined in accordance with the ODAM.

(c) During venting or purging of primary containment.

DAEC 3.3-58 Amendment 223

Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 3 of 5)

Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE

3. HPCI System Isolation (continued)
b. HPCI Steam Supply Line 1,2,3 2 F SR 3.3.6.1.4 > 50 psig and Pressure - Low SR 3.3.6.1.8 < 147.1 psig SR 3.3.6.1.9
c. HPCI Turbine 1,2,3 2 F SR 3.3.6.1.4 > 2.5 psig Exhaust Diaphragm SR 3.3.6.1.8 Pressure - High SR 3.3.6.1.9
d. Drywell Pressure - 1,2,3 1 F SR 3.3.6.1.4 < 2.2 psig High SR 3.3.6.1.8 SR 3.3.6.1.9
e. Suppression Pool 1,2,3 1 F SR 3.3.6.1.2 < 153.3°F Area Ambient SR 3.3.6.1.4 Temperature - High SR 3.3.6.1.8 SR 3.3.6.1.9
f. HPCI Leak Detection 1,2,3 1 F SR 3.3.6.1.4 N/A Time Delay SR 3.3.6.1.8 SR 3.3.6.1.9
g. Suppression Pool 1,2,3 1 F SR 3.3.6.1.2 < 51.5°F Area Ventilation SR 3.3.6.1.4 Differential SR 3.3.6.1.8 Temperature - High SR 3.3.6.1.9
h. HPCI Equipment Room 1,2,3 1 F SR 3.3.6.1.2 < 178.3°F Temperature - High SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9
i. HPCI Room Ventilation 1,2,3 1 F SR 3.3.6.1.2 < 51.5°F Differential SR 3.3.6.1.4 Temperature - High SR 3.3.6.1.8 SR 3.3.6.1.9 (continued)

DAEC 3.3-59 Amendment No. 231

Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 4 of 5)

Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE

4. Reactor Core Isolation Cooling (RCIC) System Isolation
a. RCIC Steam Line 1,2,3 1 F SR 3.3.6.1.4 < 164 inches Flow - High SR 3.3.6.1.8 (inboard)

SR 3.3.6.1.9 < 159 inches (outboard)

b. RCIC Steam Supply 1,2,3 2 F SR 3.3.6.1.4 > 50.3 psig Line Pressure - Low SR 3.3.6.1.8 SR 3.3.6.1.9
c. RCIC Turbine 1,2,3 2 F SR 3.3.6.1.4 > 3.3 psig Exhaust Diaphragm SR 3.3.6.1.6 Pressure - High SR 3.3.6.1.9
d. Drywell Pressure - 1,2,3 1 F SR 3.3.6.1.4 < 2.2 psig High SR 3.3.6.1.8 SR 3.3.6.1.9
e. RCIC Suppression 1,2,3 1 F SR 3.3.6.1.2 < 153.3°F Pool Area Ambient SR 3.3.6.1.4 Temperature - High SR 3.3.6.1.8 SR 3.3.6.1.9
f. RCIC Leak Detection 1,2,3 1 F SR 3.3.6.1.4 N/A Time Delay SR 3.3.6.1.8 SR 3.3.6.1.9
g. RCIC Suppression 1,2,3 1 F SR 3.3.6.1.2 < 51.5°F Pool Area Ventilation SR 3.3.6.1.4 Differential SR 3.3.6.1.8 Temperature - High SR 3.3.6.1.9
h. RCIC Equipment Room 1,2,3 1 F SR 3.3.6.1.2 < 178.3°F Temperature - High SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9
i. RCIC Room 1,2,3 1 F SR 3.3.6.1.2 < 51.5°F Ventilation SR 3.3.6.1.4 Differential SR 3.3.6.1.8 Temperature - High SR 3.3.6.1.9 (continued)

DAEC 3.3-60 Amendment No. 231

Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page 5 of 5)

Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE

5. Reactor Water Cleanup (RWCU) System Isolation
a. Differential Flow - 1,2,3 1 F SR 3.3.6.1.2 < 59 gpm High SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9
b. Area Temperature - High 1,2,3 (d) F SR 3.3.6.1.2 1 < 133.3°F SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9
c. Area Ventilation 1,2,3 (d) F SR 3.3.6.1.2 1

Differential SR 3.3.6.1.4 Temperature - High SR 3.3.6.1.8 SR 3.3.6.1.9 RWCU Pump Room < 22.5°F RWCU Pump A Room < 23.5°F RWCU Pump B Room < 34.5°F RWCU Heat Exch. Room < 51.5°F

d. SLC System Initiation 1,2 (e) I SR 3.3.6.1.9 NA 1
e. Reactor Vessel Water 1,2,3 2 F SR 3.3.6.1.1 > 112.65 Level - Low Low SR 3.3.6.1.4 inches SR 3.3.6.1.7 SR 3.3.6.1.9
f. Area Near TIP Room 1,2,3 1 F SR 3.3.6.1.2 < 115.7°F Ambient Temperature - SR 3.3.6.1.4 High SR 3.3.6.1.8 SR 3.3.6.1.9
6. Shutdown Cooling System Isolation
a. Reactor Steam Dome 1,2,3 1 F SR 3.3.6.1.4 < 152.7 psig Pressure - High SR 3.3.6.1.5 SR 3.3.6.1.9
b. Reactor Vessel Water 3,4,5 (f) J SR 3.3.6.1.1 > 165.6 inches 2

Level - Low SR 3.3.6.1.4 SR 3.3.6.1.8 SR 3.3.6.1.9

c. Drywell Pressure - 1,2,3 2 F SR 3.3.6.1.4 < 2.2 psig High SR 3.3.6.1.8 SR 3.3.6.1.9
7. Containment Cooling System Isolation
a. Containment Pressure - 1,2,3 4 K SR 3.3.6.1.3 > 1.25 psig High SR 3.3.6.1.8 SR 3.3.6.1.9 (d) Each Trip System must have either an OPERABLE Function 5.b or an OPERABLE Function 5.c channel in both the RWCU pump area and in the RWCU heat exchanger area.

(e) SLC System Initiation only inputs into one of the two trip systems.

(f) Only one trip system required in MODES 4 and 5 when RHR Shutdown Cooling System integrity maintained.

DAEC 3.3-61 Amendment 223

RHR Shutdown Cooling System Hot Shutdown 3.4.7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.7 Residual Heat Removal (RHR) Shutdown Cooling System Hot Shutdown LCO 3.4.7 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.


NOTES-------------------------------------------

1. Both required RHR shutdown cooling subsystems and recirculation pumps may not be in operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
2. One required RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the performance of Surveillances.

APPLICABILITY: MODE 3, with reactor steam dome pressure < the RCIC Steam Supply Line Pressure - Low isolation pressure.

ACTIONS


NOTE------------------------------------------------

Separate Condition entry is allowed for each RHR shutdown cooling subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or two required A.1 Initiate action to Immediately RHR shutdown cooling restore required RHR subsystems shutdown cooling inoperable. subsystem(s) to OPERABLE status.

AND (continued)

DAEC 3.4-15 AMD 255

RHR Shutdown Cooling System Hot Shutdown 3.4.7 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.2 Verify by 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> administrative means an alternate method of decay heat removal is available for each required inoperable RHR shutdown cooling subsystem.

AND A.3 Be in MODE 4. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> B. No RHR shutdown B.1 Initiate action to Immediately cooling subsystem in restore one RHR operation. shutdown cooling subsystem or one AND recirculation pump to operation.

No recirculation pump in operation. AND B.2 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from circulation by an discovery of no alternate method. reactor coolant circulation AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND B.3 Monitor reactor Once per hour coolant temperature and pressure.

DAEC 3.4-16 Amendment 223

RHR Shutdown Cooling System Hot Shutdown 3.4.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.7.1 ---------------------------NOTE---------------------------

Not required to be met until 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after reactor steam dome pressure is < the RCIC Steam Supply Line Pressure - Low isolation pressure.

Verify one required RHR shutdown cooling 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> subsystem or recirculation pump is operating.

DAEC 3.4-17 Amendment 223

RHR Shutdown Cooling System Cold Shutdown 3.4.8 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.8 Residual Heat Removal (RHR) Shutdown Cooling System Cold Shutdown LCO 3.4.8 Two RHR shutdown cooling subsystems shall be OPERABLE, and, with no recirculation pump in operation, at least one RHR shutdown cooling subsystem shall be in operation.


NOTES--------------------------------------

1. Both required RHR shutdown cooling subsystems and recirculation pumps may not be in operation for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period.
2. One required RHR shutdown cooling subsystem may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the performance of Surveillances.

APPLICABILITY: MODE 4.

ACTIONS


NOTE-------------------------------------------------------

Separate Condition entry is allowed for each shutdown cooling subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A. One or two required A.1 Verify by 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> RHR shutdown administrative cooling subsystems means an alternate AND inoperable. method of decay heat removal is Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> available for each thereafter inoperable required RHR shutdown cooling subsystem.

(continued)

DAEC 3.4-18 Amendment No. 234

RHR Shutdown Cooling System Cold Shutdown 3.4.8 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. No RHR shutdown B.1 Verify reactor coolant 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> from cooling subsystem in circulation by an discovery of no operation. alternate method. reactor coolant circulation AND AND No recirculation pump in operation. Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter AND B.2 Monitor reactor Once per hour coolant temperature.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.8.1 Verify one required RHR shutdown cooling 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> subsystem or one recirculation pump is operating.

DAEC 3.4-19 Amendment 223

ECCS Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of four safety/relief valves shall be OPERABLE.

APPLICABILITY: MODE 1, MODES 2 and 3, except High Pressure Coolant Injection (HPCI) is not required to be OPERABLE with reactor steam dome pressure 150 psig and ADS valves are not required to be OPERABLE with reactor steam dome pressure 100 psig.

ACTIONS


NOTE----------------------------------------------------

LCO 3.0.4.b is not applicable to HPCI.

CONDITION REQUIRED ACTION COMPLETION TIME A. One Residual Heat A.1 Restore RHR pump to 30 Days Removal (RHR) pump OPERABLE status.

inoperable.

B. One low pressure ECCS B.1 Restore low pressure 7 days subsystem inoperable for ECCS subsystem to reasons other than OPERABLE status.

Condition A.

C. One Core Spray C.1 Restore Core Spray 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> subsystem inoperable. subsystem to AND OPERABLE status.

One or two RHR OR pump(s) inoperable. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> C.2 Restore RHR pump(s) to OPERABLE status.

D. Both Core Spray D.1 Restore one Core 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> subsystems inoperable. Spray subsystem to OPERABLE status.

(continued)

DAEC 3.5-1 AMD 255

ECCS Operating 3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E. Required Action and E.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A, B, AND C, or D not met.

E.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> F. HPCI System F.1 Verify by Immediately inoperable. administrative means RCIC System is OPERABLE.

AND F.2 Restore HPCI 14 days System to OPERABLE status.

G. HPCI System G.1 Restore HPCI 7 days inoperable. System to OPERABLE status.

AND OR One RHR pump inoperable. G.2 Restore RHR pump to OPERABLE 7 days status.

H. HPCI System H.1 Restore HPCI 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. System to OPERABLE status.

AND OR One low pressure ECCS subsystem is H.2 Restore low pressure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable for reasons ECCS subsystem to other than Condition A. OPERABLE status.

I. HPCI System I.1 Restore HPCI 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. System to OPERABLE status.

AND OR One ADS valve inoperable. I.2 Restore ADS valve to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> OPERABLE status.

(continued)

DAEC 3.5-2 Amendment 223

ECCS Operating 3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME J. Required Action and J.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition F, G, AND H, or I not met. J.2 Reduce reactor steam 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> dome pressure to 150 psig.

K. One ADS valve K.1 Restore ADS valve to 30 days inoperable. OPERABLE status.

L. One ADS valve L.1 Restore ADS valve to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable. OPERABLE status.

AND OR One low pressure L.2 Restore low pressure 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> ECCS subsystem ECCS subsystem to inoperable for reasons OPERABLE status.

other than Condition A.

M. Two or more ADS M.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> valves inoperable.

AND OR M.2 Reduce reactor steam 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Required Action and dome pressure to associated Completion 100 psig.

Time of Condition K or L not met.

(continued)

DAEC 3.5-3 Amendment 223

ECCS Operating 3.5.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME N. Two or more low N.1 Enter LCO 3.0.3. Immediately pressure ECCS subsystems inoperable for reasons other than Condition C or D.

OR HPCI System and two or more ADS valves inoperable.

OR HPCI System and two or more low pressure ECCS subsystems inoperable.

OR One ADS valve and two or more low pressure ECCS subsystems inoperable.

OR One ADS valve and HPCI System and one low pressure ECCS subsystem inoperable.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.1 Verify, for each ECCS injection/spray In accordance with the subsystem, the piping is filled with water Surveillance from the pump discharge valve to the Frequency Control injection valve. Program (continued)

DAEC 3.5-4 Amendment 280

ECCS Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.1.2 -------------------------------NOTE-------------------------------------

The low pressure coolant injection (LPCI) system may be considered OPERABLE during alignment and operation for decay heat removal in MODE 3, if capable of being manually realigned and not otherwise inoperable.

Verify each ECCS injection/spray subsystem power In accordance operated and automatic valve in the flow path, that is not with the locked, sealed, or otherwise secured in position, is in the Surveillance correct position. Frequency Control Program SR 3.5.1.3 Verify a 100 day supply of nitrogen exists for each ADS In accordance accumulator. with the Surveillance Frequency Control Program SR 3.5.1.4 Verify the following ECCS pumps develop the specified In accordance flow rate against a system head corresponding to the with the specified reactor pressure. Inservice Testing Program SYSTEM HEAD NO. CORRESPONDING OF TO A REACTOR SYSTEM FLOW RATE PUMPS PRESSURE OF Core Spray 2718 gpm 1 113 psig LPCI 4320 gpm 1 20 psig (continued)

DAEC 3.5-5 Amendment 280

ECCS Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.1.5 ----------------------------NOTE----------------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure 1025 and 940 In accordance psig, the HPCI pump can develop a flow rate with the 2700 gpm against a system head Inservice Testing corresponding to reactor pressure. Program SR 3.5.1.6 -----------------------------NOTE---------------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure 160 psig, the In accordance HPCI pump can develop a flow rate 2700 with the gpm against a system head corresponding to Surveillance reactor pressure. Frequency Control Program SR 3.5.1.7 ----------------------------NOTES--------------------------

1. Vessel injection /spray may be excluded.
2. For the LPCI System, the Surveillance may be met by any series of sequential and/or overlapping steps, such that the LPCI Loop Select function is tested.

Verify each ECCS injection/spray subsystem In accordance actuates on an actual or simulated automatic with the initiation signal. Surveillance Frequency Control Program (continued)

DAEC 3.5-6 Amendment 280

ECCS Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.1.8 -------------------------NOTE-------------------------------

Valve actuation may be excluded.

Verify the ADS actuates on an actual or In accordance simulated automatic initiation signal. with the Surveillance Frequency Control Program SR 3.5.1.9 Verify each ADS valve actuator strokes when In accordance manually actuated. with the Inservice Testing Program DAEC 3.5-7 Amendment 282

Secondary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1 The secondary containment shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During Operations with a Potential for Draining the Reactor Vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Secondary containment A.1 Restore secondary 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable in MODE 1, containment to 2, or 3. OPERABLE status.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not AND met.

B.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> C. Secondary containment C.1 -----------NOTE----------

inoperable during LCO 3.0.3 is not OPDRVs. applicable.

Initiate action to Immediately suspend OPDRVs.

(continued)

DAEC 3.6-35 Amendment 237

Secondary Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.4.1.1 Verify all secondary containment equipment 31 days hatches are closed.

SR 3.6.4.1.2 -----------------------NOTE----------------------------

Doors in high radiation areas may be verified by administrative means.

Verify that either the outer door(s) or the 31 days inner door(s) in each secondary containment access opening are closed.

SR 3.6.4.1.3 Verify each SBGT subsystem can maintain 24 months on a 0.25 inch of vacuum water gauge in the STAGGERED secondary containment at a flow rate 4000 TEST BASIS cfm.

DAEC 3.6-36 Amendment 237