2019 DAEC Initial License Exam Form ES-301-3
ML22144A074
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/22/2019
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
NextEra Energy Duane Arnold
Baker R
Shared Package
ML17214A865 List:
References
Download: ML22144A074 (1)


Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facili : Duane Arnold Ener Center Date of Examination: A ril 8, 2019 0 eratin Test Number: 19-1 Initials

1. General Criteria a b*
a. The operating test conforms to the previously approved outline; changes are consistent with sam lin r uirements e. ., 10 CFR 55.45, o erational im ortance. safe function distnbution .
b. There is no day-to-day repetition between this and other operating tests to be administered durin this examination.

C. The o eratin test shall not du licate items from the a licants' audit test s see Section D.1.a..

d. Overlap with the written examination and between different parts of the operating test is within acce table limits.
e. It appears that the operating test will differentiate between competent and less-than-competent a licants at the des* nated ricense level.
2. Walkthrough Criteria
a. Each JPM includes the following, as applicable:

initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include--:

detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the se uence of ste s, if a licable

b. Ensure that any changes from the previously approved systems and administrative walkthrough outlines {Forms ES-301-1 and ES-301-2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last two NRC examinations s ecified on those forms and Form ES-201-2.
3. Simulator Criteria The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4, and a co is attached.
a. Author
b. Facility Reviewer{*)
c. NRC Chief Examiner (#)
d. NRC Supervisor
  • The facility licensee signature is not applicable for NRG-developed tests.
  1. The inde ndent NRC reviewer initials items in column "c"; the chief examiner concurrence is uired.