Dua 2017 Ile Outline Submission ES-D-1 Scenarios 1-2-Alt
ML17206A226
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 03/03/2017
From:
NextEra Energy Duane Arnold
To:
NRC/RGN-III
Bielby M
Shared Package
ML16308A457 List:
References
NG-17-0054
Download: ML17206A226 (6)


Text

Appendix D Scenario Outline Form ES-D-1 Facility: Duane Arnold Energy Center Scenario No.: _____1___ Op-Test No.: 17-1 Examiners: Chuck Zoia Operators: SRO-U (2), SRO-I (7), RO (3)

Mike Bielby _____________________________

Randy Baker _____________________________

Initial Conditions/Turnover:

When the crew assumes the shift reactor power is approximately 80% following a sequence exchange. On the last shift, repairs were made to the B FRV due to internal fault that caused the B FRV to lock. Once the crew takes the shift they will be required to reset the B FRV lockup using ARP 1C05A (F-1) section 4.

Following a sequence exchange, RE will request the crew to raise Reactor Power by 5% and hold prior to continuing raising power to 100%.

Event Malf. Event Event No. No. Type* Description 1 N ATC Reset B FRV 2 R ATC Raise power with recirc pump and rods N SRO 3 FW12B I ATC B FRV fails downscale 4 RD0602 C ATC Control Rod drift in 19 5 ED08C I BOP Loss of 1B20 TS SRO Tech Spec Entry (3.7.2/3.8.7) 6 AN1C08 I BOP Remove S/U Transformer from service A(7)

TS SRO Tech Spec Entry (3.8.1) 7 RR15A M ALL LOCA in Drywell 8 M ALL Alternate Level Control 9 M ALL Emergency Depressurization required 10 STRH0 C BOP MO-1905 fails to open 1,

STRH0 2

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: _____ Event No.: _____ Page ___ of ___

Event

Description:

Time Position Applicants Actions or Behavior

Appendix D Scenario Outline Form ES-D-1 Facility: Duane Arnold Energy Center Scenario No.: _____2___ Op-Test No.: 17-1 Examiners: Chuck Zoia Operators: SRO-U (2), SRO-I (7), RO (3)

Mike Bielby _____________________________

Randy Baker _____________________________

Initial Conditions/Turnover:

The plant is starting up following a forced outage to repair ARFP operating at 10%

Turnover:

  • Transfer Feed from the SUFRV to the A FRV Event Malf. Event Event No. No. Type* Description Transfer Reactor Feed from the Startup Feed Regulating Valve to 1 N ATC the A Feed Regulating Valve R ATC 2 Pull Control Rods to achieve BPV 2 at 50% open N-SRO RD04A(x 3 I ATC Control Rod Position lost entry to AOP 255.1 x-xx)

RM03R I BOP RE-4116B Inoperable due to electrical power supply fault 4

E4116B TS SRO Tech Spec Inoperable (3.3.6.1 Function 2C C BOP A SBDG Start with erratic Voltage Control - Place SBDG control DG07A, switch to P-T-L 5

DG05A TS SRO Tech Spec Entry (3..8.1 Condition B / 3.7.3 Condition A)

Steam Leak in the Steam Tunnel (SCRAM prior to Max Safe 6 MS04A M ALL Operating Temperature)

MS20I, 7 C BOP MO 4423, MO4424 failure to close on Group 1 Isolation MS20J RP05A,B 8 M ALL Electrical ATWS (Drifting Control Rods is successful)

,C,D,E,F 9 STRC01 C ATC RCIC Failure to Auto Start

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: _____ Event No.: _____ Page ___ of ___

Event

Description:

Time Position Applicants Actions or Behavior

Appendix D Scenario Outline Form ES-D-1 Facility: Duane Arnold Energy Center Scenario No.: _____ALT___ Op-Test No.: 17-1 Examiners: Chuck Zoia Operators: _____________________________

Mike Bielby _____________________________

Randy Baker _____________________________

Initial Conditions/Turnover:

When the crew assumes the shift reactor power is approximately 100%. The B RHR Pump is inoperable due to breaker refurbishment; return time is approximately three days. After crew turnover, maintenance has requested immediately securing the B CRD Pump for a GE Service Bulletin that directs replacing the oil in the gear box.

Event Malf. Event Event No. No. Type* Description 1 N BOP Swap running EHC pumps 2 RR36B C BOP B Recirculation pump runback RR06 TS SRO Tech Spec Entry (3.4.1) 3 RR06B R ATC B Recirculation pump trip I BOP N SRO 4 RD11A, I BOP A CRD pump trip with accumulator lights RD0706 15, TS SRO Tech Spec Entry (3.1.5)

RD0734 35, RD0738 19 5 RR15B M ALL Coolant leak from steam line in containment 6 RP05G M ALL Hydraulic ATWS 7 DI-RH- I BOP Containment enable switch for A side inoperable 014 8 DI-RH- C BOP MO-2000 Inboard Drywell Spray valve fails to open 076

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: _____ Scenario No.: _____ Event No.: _____ Page ___ of ___

Event

Description:

Time Position Applicants Actions or Behavior