ML17214A027
| ML17214A027 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 06/14/2017 |
| From: | Bielby M Operations Branch III |
| To: | NextEra Energy Duane Arnold |
| Shared Package | |
| ML16308A458 | List: |
| References | |
| Download: ML17214A027 (1) | |
Text
ES-401 Written Examination Quality Ghecklist Form ES-401-6 The facility reviewer's nitials or signature are not applicable for NRc-developed examinations.
lndependent NRC reviewer intials items in Column "c"; chief examiner concurrence required, Note:
3-,-ø-l z g..-t7 4y's/ tz tl,ln Printed Name /
Date 6ie ichde(
s.
- a. Author
- c. NRC Chief Examiner (#)
Róo
- d. NRC Regional Supervisor J/3lr
- b. Facility Reviewer (.)
ll,ltg qrü^
./fu
- 11.
The exam contains the requred number of one-point, multiple choice items; the total is correct and agrees with the value on the cover sheet.
eø.LI\\
b
- 10.
Question psychometric quality and format meet the guidelines in ES Appendx B.
t/4ç fnrt 4,.\\
-É
- 9.
Question content conforms to specific l(A statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; deviations are justified.
(hu,t b?
- 8.
References/handouts provided do not gve away answers or aid in the elimination of distractors.
lvt ço
ø 41t19
(
34t6 btla c/A Memory Between 50 and 60 percent of the questions on the RO exam are written at the comprehension/ analysis level; the SRO exam may exceed 60 percent if the randomly selected l(As support the higher cognitive levels; enter the actual RO / SRO question distribution(s) at right.
7 l
312 t9/5 th45 Onu\\
tu
'firrc, Bank use meets limits (no more than 75 percent from the bank, at least 10 percent new, and the rest new or modified); enter the actual RO / SRO-only question distribution(s) at right 6.
New Modified Bank ynn
?^
-ø Question duplication from the licensee screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate The audit exam was systematically and randomly developed; or
_ the audit exam was completed before the license exam was started; or the examinations were developed independently; or
_X_ the licensee certifies that there is no duplication; or
_ other (explain) 5.
The sampling process was random and systematic (lf more than 4 RO or 2 SRO questions were /,
repeated from the last two NRC licensing exams, consult the NRFyNRO OL program office). t 4
yyt a^
/h t 1?4 w,\\
-/
- 3.
SRO questions are appropriate in accordance with Section D'2'd of ES-401 NRC KAs are referenced for all questions.
learning objectives are referenced as available.
a.
b.
(
2.
Facility ryLclg
+tr,-
ø
(
tn%
Q,u.
-/u Questions and answers are technically accurate and applicable to the facility.
t I
b*
ân c*#
Item Description lnitial Facility: Duane Arnold Energy Center Date of Exam; 615117-6117117 SRO X Exam Level: RO X