|
---|
Category:License-Operator
MONTHYEARIR 05000331/20193012019-06-18018 June 2019 NRC Initial License Examination Report 05000331/2019301 ML22143A9352019-05-16016 May 2019 2019 DAEC Ile ES-201-1 ML22143A9382019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-201-3 ML22143A9392019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-301-7 ML22143A9412019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-401-4 ML22143A9422019-05-16016 May 2019 2019 DAEC Initial License Exam Form ES-401-9 ML22143A9432019-05-16016 May 2019 DAEC 2019 Outline Comments NG-19-0058, 2019 DAEC Addendum to Post Exam Submittal Letter-Comments on Q-70 Clarification2019-04-26026 April 2019 2019 DAEC Addendum to Post Exam Submittal Letter-Comments on Q-70 Clarification NG-19-0057, 2019 DAEC Initial License Examination Post Exam Submittal Letter2019-04-19019 April 2019 2019 DAEC Initial License Examination Post Exam Submittal Letter ML22143A9992019-04-0808 April 2019 2019 DAEC Ile Administered Admin JPMs ML22143B0002019-04-0808 April 2019 2019 DAEC Ile Administered Sim and Inplant JPMs ML22143B0012019-04-0808 April 2019 2019 DAEC Ile Scenarios ML22143B0022019-04-0808 April 2019 2019 Deac Ile Administered Written Exam ML22143B0032019-04-0808 April 2019 RO and SRO Exam Reference Handouts ML19087A3022019-03-28028 March 2019 Operator Licensing Examination Approval (Cdz) ML22144A0672019-02-22022 February 2019 2019 DAEC Ile Proposed RO and SRO Admin JPMs ML22144A0692019-02-22022 February 2019 2019 DAEC Ile Proposed Sim and Inplant JPMs ML22144A0712019-02-22022 February 2019 2019 DAEC Ile Proposed Scenarios ML22144A0732019-02-22022 February 2019 2019 DAEC Ile Proposed Written Exam ML22144A0742019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-301-3 ML22144A0752019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-301-4 ML22144A0762019-02-22022 February 2019 2019 Duane Arnold Initial License Exam Form ES-301-6 ML22144A0792019-02-22022 February 2019 2019 DAEC Initial License Exam Form ES-401-6 ML22145A4392019-01-23023 January 2019 2019 DAEC Initial License Examination Submittal Letter ML19009A2502019-01-0808 January 2019 GFE Annual Registration Letter - 2019 Examinations, Region III ML22143B0042018-12-21021 December 2018 2019 DAEC Ile ES-201-2 ML22143B0052018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-1 ML22143B0062018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-2 ML22143B0072018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-301-5 ML22143B0082018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-401-1 and 401-3 ML22143B0092018-12-21021 December 2018 2019 Duane Arnold Initial License Exam Forms ES-D1 ML22143B0102018-11-12012 November 2018 2019 DAEC Ile Outline Submittal Letter NG-18-0089, Preparation and Scheduling of Operator Licensing Examinations (Response to RIS 2018-02)2018-07-25025 July 2018 Preparation and Scheduling of Operator Licensing Examinations (Response to RIS 2018-02) ML18099A2622018-04-0909 April 2018 Gfes Results-March 2018, Duane Arnold Energy Center (Cover Letter Only) ML18086B0662018-03-27027 March 2018 Facility Cover Letter - Riii - March 2018 - GFE ML17361A0302017-12-26026 December 2017 GFE Annual Registration Letter - 2018 Examinations - Region III IR 05000331/20173012017-07-14014 July 2017 NRC Initial License Examination Report 05000331/2017301 (Meb) ML17214A0272017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam ES-401-6 ML17214A0282017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Admin RO-SRO JPMs ML17214A0342017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Operating JPMs ML17214A0362017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam Scenarios 1-2-3-Alt ML17214A0382017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam RO Written Examination ML17214A0502017-06-14014 June 2017 Dua 2017 Ile - Proposed Exam SRO Written Examination ML17214A2142017-06-14014 June 2017 Dua 2017 Ile - Administered Exam Scenarios ML17214A2322017-06-14014 June 2017 Dua 2017 Ile - Administered Exam Operating Sim and IP JPMs ML17214A2592017-06-14014 June 2017 Dua 2017 Ile - Administered Exam RO-SRO Admin JPMs ML17214A2952017-06-14014 June 2017 Dua 2017 Ile - Administered Exam RO Written Examination ML17214A3072017-06-14014 June 2017 Dua 2017 Ile - Administered Exam SRO Written Examination ML17214A3502017-06-14014 June 2017 Dua 2017 Ile - Administered Exam Written Examination Handouts ML17214A4012017-06-14014 June 2017 Dua 2017 Ile Administrative Files ES-401-4 2019-06-18
[Table view] Category:Part 55 Examination Related Material
[Table view] |
Text
DRAFT OUTLINE COMMENTS Facility: DUANE ARNOLD ENERGY CENTER First Exam Date: APRIL 8 - 19, 2019 Written Exam Outline (Prepared by NRC)
Comment Resolution Several KAs needed to be replaced due Replacement KAs were randomly selected to inapplicability and/or inability to write within the applicable category and approved 1
an operationally valid question at the by the Chief Examiner.
appropriate license level.
Administrative JPM Outline (11/19/2018)
Comment Resolution 1 RO Admins appear SAT.
Ensure SRO A1 is New when This JPM was created for the SRO to verify compared to previous 2017 SRO A1 their specific active license maintenance by 2
which was a bank JPM. evaluating the SRO watchstanding requirements.
Control Room / In-Plant System JPM Outline (11/19/2018)
Comment Resolution There does not appear to be an E This was corrected on the ES 301.
1 (emergency or abnormal) JPM provided for the In-Plant JPM.
Simulator Scenario Outline Comments (11/19/2018)
Comment Resolution General Comment Removed the information provided for the The 301-5 forms should specify which spare scenario with updated information on scenarios the applicants are in. (Also is the 301-5.
Scenario 4, as listed, the spare?)
General Comment Removed the identification of Critical Tasks For Scenario 3, two Critical Tasks have from the D-1.
been identified on the D-1, and none of the other scenarios have this. Why?
Page 1 of 2
Scenario 1 BOP is required to validate River Water Should Event 4 (DBE) be included as a Supply system flows for structural integrity.
1 setup action for Event 5 or 9? (What verifiable actions are available?)
Scenario 1 BOP will attempt to fill the Torus using HPCI What are the verifiable actions for the and/or Core Spray 2
BOP in Event 9? (Operation of SRVs?)
This could be a C failure for the ATC.
Scenario 2 Event 5, manual action is necessary by the What are the verifiable actions for the BOP/ATC to start the standby GSW/RBCCW ATC in Event 5 and 8? (BOP for 8?) pumps, respectively.
3 Event 8, BOP will take the associated diesel to Pull-to-Lock due to no ESW cooling.
Scenario 2 BOP will attempt to open 4 ADS/SRV, two What are the verifiable actions for the will fail to open, the Operator will open the 4
BOP in Event 9? (Operation of the two LLS SRV valves.
SRVs?)
Scenario 3 Security will contact the Control Room 5 What prompts entry into AOP 903 for Supervisor and relay the message that the Event 3? NWS has issued the storm warning.
Scenario 3 Updated initiating event to remove the What are the verifiable actions for the Startup transformer on the turbine trip. This ATC in Event 7? (Operation of the allowed us to complete the objectives of 6
SRVs?) ALC. The ATC will start RCIC for injection source and BOP will place the bus transfer switch to Manual per the AOP.
Scenario (4?)
What are the verifiable actions for the 7
BOP in Event 6? (Mitigating action for rising DW pressure?)
Scenario (4?)
What are the verifiable actions for the 8 Will complete these actions during onsite BOP in Event 8? (Mitigating action for validation.
rising DW temperature?)
Scenario (4?)
Should Event 8 Spray path failures be 9 included as a setup action for Event 9?
(Are the verifiable actions operation of the SRVs?)
Page 2 of 2