{{#Wiki_filter:A.CCEMP>TEDDl~i~Bt'Tt05DEM04~TRATIO.iSYpTggREGULATORY
{{#Wiki_filter:A.C CEM P>TED Dl~i~Bt'Tt 05 DE M 04~TRATIO.i SYpTgg REGULATORY
INFORMATION
INFORMATION
DISTRIBUTION
DISTRIBUTION
SYSTEM(RIDS)~~~~~~~ESSIONNBR:8906190073
SYSTEM (RIDS)~~~~~~~ESSION NBR:8906190073
DOC.DATE:
DOC.DATE: 89/06/12 NOTARIZED:
89/06/12NOTARIZED:
NO ACIL:50-389
NOACIL:50-389
St.Lucie Plant, Unit 2, Florida Power 6 Light Co.AUTH.NAME AUTHOR AFFILIATION
St.LuciePlant,Unit2,FloridaPower6LightCo.AUTH.NAMEAUTHORAFFILIATION
WOODY,C.O.
WOODY,C.O.
FloridaPower&LightCo.RECIP.NAME
Florida Power&Light Co.RECIP.NAME
RECIPIENT
RECIPIENT AFFILIATION
AFFILIATION
Document Control Branch'(Document
DocumentControlBranch'(Document
Control Desk)SUBJECT: Responds to violations
ControlDesk)SUBJECT:Respondstoviolations
noted in Insp Rept 50-389/89-10.
notedinInspRept50-389/89-10.
DISTRIBUTION
DISTRIBUTION
CODE:IE01DCOPIESRECEIVED:LTR
CODE: IE01D COPIES RECEIVED:LTR
ENCLSIZE:TITLE:General(50Dkt)-Insp
ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
Rept/Notice
of V'o ation Response NOTES: DOCKET 05000389 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/DEIIB
ofV'oationResponseNOTES:DOCKET05000389RECIPIENT
DEDRO NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB
IDCODE/NAME
10 NUDOCS-ABSTRACT
PD2-2PDINTERNAL:
OGC/HDS2 RGN2 FILE 01 ERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD AEOD/TPAD NRR SHANKMAN,S
ACRSAEOD/DEIIB
DEDRONRR/DESTDIRNRR/DOEADIR11NRR/DREP/RPB
10NUDOCS-ABSTRACT
OGC/HDS2RGN2FILE01ERNAL:LPDRNSICCOPIESLTTRENCL112211111111221111111111RECIPIENT
IDCODE/NAME
NORRIS,JAEODAEOD/TPAD
NRRSHANKMAN,S
NRR/DLPQ/PQEB
NRR/DLPQ/PQEB
NRR/DREP/EPB
NRR/DREP/EPB
10NRR/PMAS/ILRB12
10 NRR/PMAS/ILRB12
OELIEBERMAN,J
OE LIEBERMAN,J
NRCPDRCOPIESLTTRENCL11111111111111111111RlDMZE'IOALL"RIES"RECIPIENIS:
NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 R l D MZE'IO ALL"RIES" RECIPIENIS:
PIZASEHELPUSIOREMKZWMXZ!CONZACT~DOQ3MERI'XNIROL
PIZASE HELP US IO REMKZ WM XZ!CONZACT~DOQ3MERI'XNIROL
DESK,RXRPl-37(EXT.20079)KOEZiQGZATE
DESK, RXR Pl-37 (EXT.20079)KO EZiQGZATE YOUR NAME PKH DIPHGBUTION
YOURNAMEPKHDIPHGBUTION
LXPIS FOR DOCUMENI'S
LXPISFORDOCUMENI'S
YOU DON'T NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24
YOUDON'TNEEDfTOTALNUMBEROFCOPIESREQUIRED:
P,O.Box 14000, Juno Beach, FL 33408.0420
LTTR24ENCL24
FPL JUBB 1 2 1989 L-89-211 10 CFR 2.201 U.S.Nuclear Regulatory
P,O.Box14000,JunoBeach,FL33408.0420
FPLJUBB121989L-89-21110CFR2.201U.S.NuclearRegulatory
Commission
Commission
Attn:DocumentControlDeskWashington,
Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
D.C.20555Gentlemen:
Re: St.Lucie Unit 2 Docket No.50-389 Response to Notice of Violation Ins ection Re ort 89-10 Florida Power&Light Company has reviewed the subject inspection
Re:St.LucieUnit2DocketNo.50-389ResponsetoNoticeofViolation
report and pursuant to 10 CFR 2.201 the response is attached.Very truly yours, C.O.Woody Acting Senior Vice President-Nuclear COW/GRM/gp
InsectionReort89-10FloridaPower&LightCompanyhasreviewedthesubjectinspection
reportandpursuantto10CFR2.201theresponseisattached.
Verytrulyyours,C.O.WoodyActingSeniorVicePresident
-NuclearCOW/GRM/gp
Attachment
Attachment
cc:StewartD.Ebneter,RegionalAdministrator,
cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant SgOgggOO 05QOOSSg 7~SgO612 pDOCK pDC lg~Q)an FPL Group company
RegionII,USNRCSeniorResidentInspector,
USNRC,St.LuciePlantSgOgggOO05QOOSSg7~SgO612pDOCKpDClg~Q)anFPLGroupcompany
ATTACHMENT
ATTACHMENT
~~~Re:St.LucieUnit2DocketNo.50-389ResponsetoNoticeofViolation
~~~Re: St.Lucie Unit 2 Docket No.50-389 Response to Notice of Violation Ins ection Re ort 89-10 VIOLATION!
InsectionReort89-10VIOLATION!
During the Nuclear Regulatory
DuringtheNuclearRegulatory
Commission
Commission
inspection
inspection
conducted
conducted on March 12-April 10, 1989, a violation of NRC requirements
onMarch12-April10,1989,aviolation
was identified.
ofNRCrequirements
The violation involved failure to follow maintenance
wasidentified.
Theviolation
involvedfailuretofollowmaintenance
procedures
procedures
ininstalling
in installing
theUnit2containment
the Unit 2 containment
maintenance
maintenance
hatch.Inaccordance
hatch.In accordance
withthe"GeneralStatement
with the"General Statement of Policy and Procedures
ofPolicyandProcedures
for NRC Enforcement
forNRCEnforcement
Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below: Unit 2 Technical Specification (TS)6.8.l.a requires that written procedures
Actions,"
shall be established, implemented
10CFRPart2,AppendixC(1988),theviolation
and maintained
islistedbelow:Unit2Technical
covering the activities
Specification
(TS)6.8.l.arequiresthatwrittenprocedures
shallbeestablished,
implemented
andmaintained
coveringtheactivities
recommended
recommended
inAppendixAofRegulatory
in Appendix A of Regulatory
Guide1.33,Revision2,February1978.AppendixA,paragraph
Guide 1.33, Revision 2, February 1978.Appendix A, paragraph 9.a., includes maintenance
9.a.,includesmaintenance
that can affect the performance
thatcanaffecttheperformance
of safety-related equipment.
ofsafety-relatedequipment.
Paragraph 3.f includes procedures
Paragraph
for maintaining
3.fincludesprocedures
integrity of the containment
formaintaining
integrity
ofthecontainment
system.Maintenance
system.Maintenance
procedure
procedure M-0311, Rev.5, Equipment Access Hatch Opening and Closing, specified a standard x-pattern for torque application
M-0311,Rev.5,Equipment
in two passes, with the intermediate
AccessHatchOpeningandClosing,specified
and final torque values specified.
astandardx-pattern
fortorqueapplication
intwopasses,withtheintermediate
andfinaltorquevaluesspecified.
Maintenance
Maintenance
procedure
procedure M-0039, Rev.6, Threaded Fasteners of Closure Connections
M-0039,Rev.6,ThreadedFasteners
on Pressure Boundaries
ofClosureConnections
and Structural
onPressureBoundaries
Steel, defined the standard x-pattern for the 12 closure bolts.Contrary to the above, the personnel installing
andStructural
the hatch did not use a standard x-pattern for any pass.One bolt was also totally missed during the intermediate
Steel,definedthestandardx-pattern
torque setting.RESPONSE.1.Florida Power&Light agrees with the violation as stated.2.The reason for.the violation was failure to follow procedure.
forthe12closurebolts.Contrarytotheabove,thepersonnel
3.The Unit 2 containment
installing
thehatchdidnotuseastandardx-pattern
foranypass.Oneboltwasalsototallymissedduringtheintermediate
torquesetting.RESPONSE.
1.FloridaPower&Lightagreeswiththeviolation
asstated.2.Thereasonfor.theviolation
wasfailuretofollowprocedure.
3.TheUnit2containment
maintenance
maintenance
hatchwasretorqued
hatch was retorqued to specification
tospecification
following the procedure.
following
theprocedure.
4.Additional
4.Additional
trainingwillbeprovidedtomaintenance
training will be provided to maintenance
personnel.
personnel.
-5.Theadditional
-5.The additional
trainingisscheduled
training is scheduled to be completed by August~~~28)1989.
tobecompleted
byAugust~~~28)1989.
}}
}}

Revision as of 17:40, 7 July 2018

Responds to Violations Noted in Insp Rept 50-389/89-10. Corrective Actions:Containment Maint Hatch Retorqued to Spec Following Procedure & Addl Training,Scheduled for Completion by 890828,will Be Provided to Maint Personnel
ML17223A175
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/12/1989
From: WOODY C O
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-211, NUDOCS 8906190073
Download: ML17223A175 (3)


See also: IR 05000389/1989010

Text

A.C CEM P>TED Dl~i~Bt'Tt 05 DE M 04~TRATIO.i SYpTgg REGULATORY

INFORMATION

DISTRIBUTION

SYSTEM (RIDS)~~~~~~~ESSION NBR:8906190073

DOC.DATE: 89/06/12 NOTARIZED:

NO ACIL:50-389

St.Lucie Plant, Unit 2, Florida Power 6 Light Co.AUTH.NAME AUTHOR AFFILIATION

WOODY,C.O.

Florida Power&Light Co.RECIP.NAME

RECIPIENT AFFILIATION

Document Control Branch'(Document

Control Desk)SUBJECT: Responds to violations

noted in Insp Rept 50-389/89-10.

DISTRIBUTION

CODE: IE01D COPIES RECEIVED:LTR

ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice

of V'o ation Response NOTES: DOCKET 05000389 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/DEIIB

DEDRO NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB

10 NUDOCS-ABSTRACT

OGC/HDS2 RGN2 FILE 01 ERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD AEOD/TPAD NRR SHANKMAN,S

NRR/DLPQ/PQEB

NRR/DREP/EPB

10 NRR/PMAS/ILRB12

OE LIEBERMAN,J

NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 R l D MZE'IO ALL"RIES" RECIPIENIS:

PIZASE HELP US IO REMKZ WM XZ!CONZACT~DOQ3MERI'XNIROL

DESK, RXR Pl-37 (EXT.20079)KO EZiQGZATE YOUR NAME PKH DIPHGBUTION

LXPIS FOR DOCUMENI'S

YOU DON'T NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

P,O.Box 14000, Juno Beach, FL 33408.0420

FPL JUBB 1 2 1989 L-89-211 10 CFR 2.201 U.S.Nuclear Regulatory

Commission

Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: St.Lucie Unit 2 Docket No.50-389 Response to Notice of Violation Ins ection Re ort 89-10 Florida Power&Light Company has reviewed the subject inspection

report and pursuant to 10 CFR 2.201 the response is attached.Very truly yours, C.O.Woody Acting Senior Vice President-Nuclear COW/GRM/gp

Attachment

cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant SgOgggOO 05QOOSSg 7~SgO612 pDOCK pDC lg~Q)an FPL Group company

ATTACHMENT

~~~Re: St.Lucie Unit 2 Docket No.50-389 Response to Notice of Violation Ins ection Re ort 89-10 VIOLATION!

During the Nuclear Regulatory

Commission

inspection

conducted on March 12-April 10, 1989, a violation of NRC requirements

was identified.

The violation involved failure to follow maintenance

procedures

in installing

the Unit 2 containment

maintenance

hatch.In accordance

with the"General Statement of Policy and Procedures

for NRC Enforcement

Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below: Unit 2 Technical Specification (TS)6.8.l.a requires that written procedures

shall be established, implemented

and maintained

covering the activities

recommended

in Appendix A of Regulatory

Guide 1.33, Revision 2, February 1978.Appendix A, paragraph 9.a., includes maintenance

that can affect the performance

of safety-related equipment.

Paragraph 3.f includes procedures

for maintaining

integrity of the containment

system.Maintenance

procedure M-0311, Rev.5, Equipment Access Hatch Opening and Closing, specified a standard x-pattern for torque application

in two passes, with the intermediate

and final torque values specified.

Maintenance

procedure M-0039, Rev.6, Threaded Fasteners of Closure Connections

on Pressure Boundaries

and Structural

Steel, defined the standard x-pattern for the 12 closure bolts.Contrary to the above, the personnel installing

the hatch did not use a standard x-pattern for any pass.One bolt was also totally missed during the intermediate

torque setting.RESPONSE.1.Florida Power&Light agrees with the violation as stated.2.The reason for.the violation was failure to follow procedure.

3.The Unit 2 containment

maintenance

hatch was retorqued to specification

following the procedure.

4.Additional

training will be provided to maintenance

personnel.

-5.The additional

training is scheduled to be completed by August~~~28)1989.