IR 05000389/1989010

From kanterella
Jump to navigation Jump to search
Responds to Violations Noted in Insp Rept 50-389/89-10. Corrective Actions:Containment Maint Hatch Retorqued to Spec Following Procedure & Addl Training,Scheduled for Completion by 890828,Will Be Provided to Maint Personnel
ML17223A175
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/12/1989
From: WOODY C O
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-211, NUDOCS 8906190073
Download: ML17223A175 (3)


Text

A.CCEMP>TEDDl~i~Bt'Tt05DEM04~TRATIO.iSYpTggREGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)~~~~~~~ESSIONNBR:8906190073DOC.DATE:89/06/12NOTARIZED:NOACIL:50-389St.LuciePlant,Unit2,FloridaPower6LightCo.AUTH.NAMEAUTHORAFFILIATIONWOODY,C.O.FloridaPower&LightCo.RECIP.NAMERECIPIENTAFFILIATIONDocumentControlBranch'(DocumentControlDesk)

SUBJECT: RespondstoviolationsnotedinInspRept50-389/89-10.DISTRIBUTIONCODE:IE01DCOPIESRECEIVED:LTRENCLSIZE:TITLE:General(50Dkt)-InspRept/NoticeofV'oationResponseNOTES:DOCKET05000389RECIPIENTIDCODE/NAMEPD2-2PDINTERNAL:ACRSAEOD/DEIIBDEDRONRR/DESTDIRNRR/DOEADIR11NRR/DREP/RPB10NUDOCS-ABSTRACTOGC/HDS2RGN2FILE01ERNAL:LPDRNSICCOPIESLTTRENCL112211111111221111111111RECIPIENTIDCODE/NAMENORRIS,JAEODAEOD/TPADNRRSHANKMAN,SNRR/DLPQ/PQEBNRR/DREP/EPB10NRR/PMAS/ILRB12OELIEBERMAN,JNRCPDRCOPIESLTTRENCL11111111111111111111RlDMZE'IOALL"RIES"RECIPIENIS:PIZASEHELPUSIOREMKZWMXZ!CONZACT~DOQ3MERI'XNIROLDESK,RXRPl-37(EXT.20079)KOEZiQGZATEYOURNAMEPKHDIPHGBUTIONLXPISFORDOCUMENI'SYOUDON'TNEEDfTOTALNUMBEROFCOPIESREQUIRED:LTTR24ENCL24 P,O.Box14000,JunoBeach,FL33408.0420FPLJUBB121989L-89-21110CFR2.201U.S.NuclearRegulatoryCommissionAttn:DocumentControlDeskWashington,D.C.20555Gentlemen:Re:St.LucieUnit2DocketNo.50-389ResponsetoNoticeofViolationInsectionReort89-10FloridaPower&LightCompanyhasreviewedthesubjectinspectionreportandpursuantto10CFR2.201theresponseisattached.Verytrulyyours,C.O.WoodyActingSeniorVicePresident-NuclearCOW/GRM/gpAttachmentcc:StewartD.Ebneter,RegionalAdministrator,RegionII,USNRCSeniorResidentInspector,USNRC,St.LuciePlantSgOgggOO05QOOSSg7~SgO612pDOCKpDClg~Q)anFPLGroupcompany ATTACHMENT~~~Re:St.LucieUnit2DocketNo.50-389ResponsetoNoticeofViolationInsectionReort89-10VIOLATION!DuringtheNuclearRegulatoryCommissioninspectionconductedonMarch12-April10,1989,aviolationofNRCrequirementswasidentified.TheviolationinvolvedfailuretofollowmaintenanceproceduresininstallingtheUnit2containmentmaintenancehatch.Inaccordancewiththe"GeneralStatementofPolicyandProceduresforNRCEnforcementActions,"10CFRPart2,AppendixC(1988),theviolationislistedbelow:Unit2TechnicalSpecification(TS)6.8.l.arequiresthatwrittenproceduresshallbeestablished,implementedandmaintainedcoveringtheactivitiesrecommendedinAppendixAofRegulatoryGuide1.33,Revision2,February1978.AppendixA,paragraph9.a.,includesmaintenancethatcanaffecttheperformanceofsafety-relatedequipment.Paragraph3.fincludesproceduresformaintainingintegrityofthecontainmentsystem.MaintenanceprocedureM-0311,Rev.5,EquipmentAccessHatchOpeningandClosing,specifiedastandardx-patternfortorqueapplicationintwopasses,withtheintermediateandfinaltorquevaluesspecified.MaintenanceprocedureM-0039,Rev.6,ThreadedFastenersofClosureConnectionsonPressureBoundariesandStructuralSteel,definedthestandardx-patternforthe12closurebolts.Contrarytotheabove,thepersonnelinstallingthehatchdidnotuseastandardx-patternforanypass.Oneboltwasalsototallymissedduringtheintermediatetorquesetting.RESPONSE.1.FloridaPower&Lightagreeswiththeviolationasstated.2.Thereasonfor.theviolationwasfailuretofollowprocedure.3.TheUnit2containmentmaintenancehatchwasretorquedtospecificationfollowingtheprocedure.4.Additionaltrainingwillbeprovidedtomaintenancepersonnel.-5.TheadditionaltrainingisscheduledtobecompletedbyAugust~~~28)1989.