ML17223A175

From kanterella
Jump to navigation Jump to search
Responds to Violations Noted in Insp Rept 50-389/89-10. Corrective Actions:Containment Maint Hatch Retorqued to Spec Following Procedure & Addl Training,Scheduled for Completion by 890828,will Be Provided to Maint Personnel
ML17223A175
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/12/1989
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-211, NUDOCS 8906190073
Download: ML17223A175 (3)


Text

A.C CEM P>TED Dl ~i~Bt'Tt 05 DE M 04 ~ TRATIO. i SYpTgg REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ESSION NBR:8906190073 DOC.DATE: 89/06/12

~ NOTARIZED: NO DOCKET ACIL:50-389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co.

~

~ ~ ~

05000389 AUTH. NAME AUTHOR AFFILIATION WOODY,C.O. Florida Power & Light Co.

~ ~

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch '(Document Control Desk)

SUBJECT:

Responds to violations noted in Insp Rept 50-389/89-10.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of V'o ation Response NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 2 2 AEOD 1 1 AEOD/DEIIB 1 1 AEOD/TPAD 1 1 DEDRO 1 1 NRR SHANKMAN,S 1 1 NRR/DEST DIR 1 1 NRR/DLPQ/PQEB 1 1 NRR/DOEA DIR 11 1 1 NRR/DREP/EPB 10 1 1 NRR/DREP/RPB 10 2 2 NRR/PMAS/ILRB12 1 1 NUDOCS-ABSTRACT 1 1 OE LIEBERMAN,J 1 1 OGC/HDS2 1 1 1 1 RGN2 FILE 01 1 1 ERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

l D

MZE 'IO ALL "RIES" RECIPIENIS:

PIZASE HELP US IO REMKZ WM XZ!

RXR Pl-37 (EXT. 20079)

CONZACT ~ DOQ3MERI'XNIROL DESK, KO EZiQGZATE YOUR NAME PKH DIPHGBUTION LXPIS FOR DOCUMENI'S YOU DON'T NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

P,O. Box 14000, Juno Beach, FL 33408.0420 FPL JUBB 1 2 1989 L-89-211 10 CFR 2.201 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: St. Lucie Unit 2 Docket No. 50-389 Response to Notice of Violation Ins ection Re ort 89-10 Florida Power & Light Company has reviewed the subject inspection report and pursuant to 10 CFR 2.201 the response is attached.

Very truly yours, C. O. Woody Acting Senior Vice President Nuclear COW/GRM/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC SgO612 SgOgggOO 7~ 05QOOSSg pDOCK pDC lg

~Q) an FPL Group company

ATTACHMENT Re: St. Lucie Unit 2

~

~ ~

Docket No. 50-389 Response to Notice of Violation Ins ection Re ort 89-10 VIOLATION!

During the Nuclear Regulatory Commission inspection conducted on March 12 April 10, 1989, a violation of NRC requirements was identified. The violation involved failure to follow maintenance procedures in installing the Unit 2 containment maintenance hatch.

In accordance with the "General Statement of Policy and Procedures for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below:

Unit 2 Technical Specification (TS) 6.8.l.a requires that written procedures shall be established, implemented and maintained covering the activities recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978. Appendix A, paragraph 9.a.,

includes maintenance that can affect the performance of safety-related equipment. Paragraph 3.f includes procedures for maintaining integrity of the containment system.

Maintenance procedure M-0311, Rev. 5, Equipment Access Hatch Opening and Closing, specified a standard x-pattern for torque application in two passes, with the intermediate and final torque values specified. Maintenance procedure M-0039, Rev. 6, Threaded Fasteners of Closure Connections on Pressure Boundaries and Structural Steel, defined the standard x-pattern for the 12 closure bolts.

Contrary to the above, the personnel installing the hatch did not use a standard x-pattern for any pass. One bolt was also totally missed during the intermediate torque setting.

RESPONSE.

1. Florida Power & Light agrees with the violation as stated.
2. The reason for. the violation was failure to follow procedure.
3. The Unit 2 containment maintenance hatch was retorqued to specification following the procedure.
4. Additional training will be provided to maintenance personnel.

-5.~ The additional training is scheduled to be completed by August

~

28) 1989. ~