IR 05000483/2013501: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 21: Line 21:
[[Issue date::March 3, 2014]]
[[Issue date::March 3, 2014]]


Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer  
 
Union Electric Company P.O. Box 620 Fulton, MO 65251


SUBJECT: CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2013501
SUBJECT: CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2013501


==Dear Mr. Diya:==
==Dear Mr. Diya:==
On December 31, 2013, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Callaway Plant. This inspection began on January 1, 2013. Issuance of this letter closes NRC Inspection Report 05000483/2013501. The inspection results associated with the 2013-501 reports are documented in Integrated Resident Inspector Reports 2013-002, 2013-003, 2013-004, and 2013-005.
On December 31, 2013, the Nuclear Regulator y Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Callaway Plant. This  
 
inspection began on January 1, 2013. Issuance of this letter closes NRC Inspection Report 05000483/2013501. The inspection results associated with the 2013-501 reports are documented in Integrated Resident Inspector Reports 2013-002, 2013-003, 2013-004, and 2013-005.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket: 50-483 License: NPF-30  
Sincerely,/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket: 50-483 License: NPF-30  


Electronic Distribution to Callaway Plant  
Electronic Distribution to Callaway Plant  
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511


A. Heflin - 2 -  
A. Heflin - 2 -  


S:\DRS\PSB 1\MID-CYCLE & END-OF-CYCLE\EOC 501 Letters\EOC 2013501 Letters\CAL2013501- EOC-LTR-pje.docx ML14063A055 ADAMS: No x Yes x SUNSI Review Complete Reviewer Initials: MSH x Publicly Available x Non-Sensitive Non-publicly Available Sensitive C:PSB-1 MSHaire /RA/ 3/3/14 OFFICIAL RECORD COPY  T=Telephone E=E-mail F=Fax
S:\DRS\PSB 1\MID-CYCLE & END-OF-CYCLE\EOC 501 Letters\EOC 2013501 Letters\CAL2013501- EOC-LTR-pje.docx ML14063A055 ADAMS: No x Yes x SUNSI Review Complete Reviewer Initials: MSH x Publicly Available x Non-Sensitive Non-publicly Available Sensitive C:PSB-1 MSHaire  
/RA/ 3/3/14 OFFICIAL RECORD COPY  T=Telephone E=E-mail F=Fax
}}
}}

Revision as of 10:57, 2 July 2018

IR 05000483-13-501, 12/31/2013, Callaway, NRC Emergency Preparedness Annual Inspection
ML14063A055
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/03/2014
From: Haire M S
Plant Support Branch-1
To: Diya F
Union Electric Co
M. Haire
References
IR-13-501
Download: ML14063A055 (2)


Text

March 3, 2014

Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer

Union Electric Company P.O. Box 620 Fulton, MO 65251

SUBJECT: CALLAWAY PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000483/2013501

Dear Mr. Diya:

On December 31, 2013, the Nuclear Regulator y Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Callaway Plant. This

inspection began on January 1, 2013. Issuance of this letter closes NRC Inspection Report 05000483/2013501. The inspection results associated with the 2013-501 reports are documented in Integrated Resident Inspector Reports 2013-002, 2013-003, 2013-004, and 2013-005.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket: 50-483 License: NPF-30

Electronic Distribution to Callaway Plant

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511

A. Heflin - 2 -

S:\DRS\PSB 1\MID-CYCLE & END-OF-CYCLE\EOC 501 Letters\EOC 2013501 Letters\CAL2013501- EOC-LTR-pje.docx ML14063A055 ADAMS: No x Yes x SUNSI Review Complete Reviewer Initials: MSH x Publicly Available x Non-Sensitive Non-publicly Available Sensitive C:PSB-1 MSHaire

/RA/ 3/3/14 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax