IR 05000483-13-403, 12/18/2013, Callaway Plant - NRC Security Inspection Report; Cover Letter
ML14023A686
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/22/2014
From: Mark Haire
Plant Support Branch-1
To: Heflin A
Union Electric Co
References
IR-13-403
Download: ML14023A686 (3)


Text

UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON ary 22, 2014

SUBJECT:

CALLAWAY PLANT - NRC SECURITY INSPECTION REPORT 05000483/2013403

Dear Mr. Heflin:

On December 18, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Callaway Plant and discussed the results of this inspection with Mr. L. H. Graeselle, Senior Director Operations Support, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.

The NRC inspector documented one violation of very low security significance in this report.

This violation is being treated as a noncited violation (NCV) of NRC requirements and was determined to be Severity Level IV under the traditional enforcement process.

If you contest the violation or significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Callaway Plant.

In accordance with Title of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket: 50-483 License: NPF-30 Nonpublic Enclosure:

NRC Inspection Report 05000483/2013403 w/Attachment: Supplemental Information cc w/enclosure:

Mr. Eric Olson Security Manager Callaway Plant, Unit 1 5 Miles North of Hwy 94 Portland, MO 65067 Mr. Fadi Diya Vice President - Nuclear Operations Ameren Missouri Callaway Nuclear Plant P.O. 620 Fulton, MO 65251 cc w/o enclosure: Electronic Distribution for Callaway Plant ML14023A686 Cover Letter Only Non Sensitive Publicly Available SUNSI Review MKB Sensitive MKB Non-Publicly Available MKB KEYWORD: SUNSI Review Complete Entire Report Non Sensitive Publicly Available SUNSI Review MKB Sensitive MKB Non-Publicly Available MKB KEYWORD: MD 3.4 Non-Public A.3 PSI:PSB1 PSI:PSB1 C:PSB1 C:PBB C:PSB1 MBrooks JBuchanan MHaire NOKeefe MHaire

/RA/ /RA/ /RA/ /RA/ /RA/

1/17/14 1/17/14 1/17/14 1/22/14