{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 9, 2018 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Plant, Units 1 and 2  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 9, 2018 LICENSEE:
Tennessee Valley Authority FACILITY:
Watts Bar Nuclear Plant, Units 1 and 2  


==SUBJECT:==
==SUBJECT:==
SUMMARY OF DECEMBER 20, 2017, PRE-SUBMITTAL MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS-OPERATING" (EPID L-2017-LRM-0038) On December 20, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and Tennessee Valley Authority (TVA) representatives. The purpose of the meeting was to discuss TVA's planned submittal of a license amendment request to revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification (TS) 3.8.9, "Distribution Systems -Operating." The proposed change would add a new Condition to support maintenance on a vital bus when the associated unit is shut down. The meeting notice and agenda, dated September 8, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17345A874. A list of participants is provided in the Enclosure. TVA staff provided a presentation on the purpose of the proposed amendment, an overview of the affected plant electrical systems, current testing requirements and maintenance practices, a brief technical analysis of the proposed change, a description of the current TS requirements, proposed TS changes and bases for the proposed changes, information regarding regulatory precedents, and its proposed schedule for submitting the amendment request. The presentation is available in the ADAMS at Accession No. ML 17352B033. The NRC staff queried the licensee about the basis for the proposed 8 hour completion time. TVA responded that the proposed time is consistent with similar TSs implemented at other facilities, including TVA's Sequoyah Nuclear Plant. The staff cautioned TVA to ensure the basis for the requested completion time is sufficiently justified in the application for implementation at Watts Bar. Members of the public did not attend the meeting. No Public Meeting Feedback forms were received. No regulatory decisions were made during the meeting. Please direct any inquiries to me at 301-415-6020, or Robert.Schaaf@nrc.gov. Docket Nos. 50-390 and 50-391  
 
SUMMARY OF DECEMBER 20, 2017, PRE-SUBMITTAL MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS-OPERATING" (EPID L-2017-LRM-0038)
On December 20, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and Tennessee Valley Authority (TVA) representatives.
The purpose of the meeting was to discuss TVA's planned submittal of a license amendment request to revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification (TS) 3.8.9, "Distribution Systems -Operating."
The proposed change would add a new Condition to support maintenance on a vital bus when the associated unit is shut down. The meeting notice and agenda, dated September 8, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17345A874.
A list of participants is provided in the Enclosure.
TVA staff provided a presentation on the purpose of the proposed amendment, an overview of the affected plant electrical  
: systems, current testing requirements and maintenance practices, a brief technical analysis of the proposed change, a description of the current TS requirements, proposed TS changes and bases for the proposed  
: changes, information regarding regulatory precedents, and its proposed schedule for submitting the amendment request.
The presentation is available in the ADAMS at Accession No. ML 17352B033.
The NRC staff queried the licensee about the basis for the proposed 8 hour completion time. TVA responded that the proposed time is consistent with similar TSs implemented at other facilities, including TVA's Sequoyah Nuclear Plant. The staff cautioned TVA to ensure the basis for the requested completion time is sufficiently justified in the application for implementation at Watts Bar. Members of the public did not attend the meeting.
No Public Meeting Feedback forms were received.
No regulatory decisions were made during the meeting.
Please direct any inquiries to me at 301-415-6020, or Robert.Schaaf@nrc.gov.
Docket Nos. 50-390 and 50-391  


==Enclosure:==
==Enclosure:==
List of Attendees cc: Listserv Robert G. Schaaf, Senior Proje t Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES DECEMBER 20, 2017, MEETING WITH TENNESSEE VALLEY AUTHORITY PRE-SUBMITTAL MEETING REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS -OPERATING" NAME ORGANIZATION Robert Schaaf U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Reactor Regulation (NRR) Vijay Goel NRC/NRR Pete Snyder NRC/NRR Khoi Nguyen NRC/NRR Russell Wells Tennessee Valley Authority (TVA) Larry Cross TVA Damon Fegley TVA Enclosure 


Meeting Notice ML 17345A87 4 Meeting Summary ML 18103A224 OFFICE NRR/D0RL/LPL2-2/PM NRR/D0RL/LPL2-2/LA NRR/D0RL/LPL2-2/BC(A) NAME RSchaaf BClayton BTindell DATE 5/8/2018 5/8/2018 5/9/2018 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 9, 2018 LICENSEE: Tennessee Valley Authority FACILITY: Watts Bar Nuclear Plant, Units 1 and 2  
List of Attendees cc: Listserv Robert G. Schaaf, Senior Proje t Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES DECEMBER 20, 2017, MEETING WITH TENNESSEE VALLEY AUTHORITY PRE-SUBMITTAL MEETING REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS -OPERATING" NAME ORGANIZATION Robert Schaaf U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Reactor Regulation (NRR) Vijay Goel NRC/NRR Pete Snyder NRC/NRR Khoi Nguyen NRC/NRR Russell Wells Tennessee Valley Authority (TVA) Larry Cross TVA Damon Fegley TVA Enclosure 
 
==SUBJECT:==
 
SUMMARY OF DECEMBER 20, 2017, PRE-SUBMITTAL MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS -OPERATING" (EPID L-2017-LRM-0038)
DATED MAY 9, 2018 DISTRIBUTION:
PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDorlLpl2-2 Resource RidsNrrPMWattsBar Resource RidsNrrLABClayton Resource RidsRgn2MailCenter Resource VGoel, NRR PSnyder, NRR KNguyen, NRR JBowen, EDO ADAMS Accession No. Meeting Notice ML 17345A87 4 Meeting Summary ML 18103A224 OFFICE NRR/D0RL/LPL2-2/PM NRR/D0RL/LPL2-2/LA NRR/D0RL/LPL2-2/BC(A)
NAME RSchaaf BClayton BTindell DATE 5/8/2018 5/8/2018 5/9/2018 OFFICIAL RECORD COPY Handouts ML 173526033 NRR/D0RL/LPL2-2/PM RSchaaf 5/9/2018 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 9, 2018 LICENSEE:
Tennessee Valley Authority FACILITY:
Watts Bar Nuclear Plant, Units 1 and 2  


==SUBJECT:==
==SUBJECT:==
SUMMARY OF DECEMBER 20, 2017, PRE-SUBMITTAL MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS-OPERATING" (EPID L-2017-LRM-0038) On December 20, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and Tennessee Valley Authority (TVA) representatives. The purpose of the meeting was to discuss TVA's planned submittal of a license amendment request to revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification (TS) 3.8.9, "Distribution Systems -Operating." The proposed change would add a new Condition to support maintenance on a vital bus when the associated unit is shut down. The meeting notice and agenda, dated September 8, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17345A874. A list of participants is provided in the Enclosure. TVA staff provided a presentation on the purpose of the proposed amendment, an overview of the affected plant electrical systems, current testing requirements and maintenance practices, a brief technical analysis of the proposed change, a description of the current TS requirements, proposed TS changes and bases for the proposed changes, information regarding regulatory precedents, and its proposed schedule for submitting the amendment request. The presentation is available in the ADAMS at Accession No. ML 17352B033. The NRC staff queried the licensee about the basis for the proposed 8 hour completion time. TVA responded that the proposed time is consistent with similar TSs implemented at other facilities, including TVA's Sequoyah Nuclear Plant. The staff cautioned TVA to ensure the basis for the requested completion time is sufficiently justified in the application for implementation at Watts Bar. Members of the public did not attend the meeting. No Public Meeting Feedback forms were received. No regulatory decisions were made during the meeting. Please direct any inquiries to me at 301-415-6020, or Robert.Schaaf@nrc.gov. Docket Nos. 50-390 and 50-391  
 
SUMMARY OF DECEMBER 20, 2017, PRE-SUBMITTAL MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS-OPERATING" (EPID L-2017-LRM-0038)
On December 20, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and Tennessee Valley Authority (TVA) representatives.
The purpose of the meeting was to discuss TVA's planned submittal of a license amendment request to revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification (TS) 3.8.9, "Distribution Systems -Operating."
The proposed change would add a new Condition to support maintenance on a vital bus when the associated unit is shut down. The meeting notice and agenda, dated September 8, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17345A874.
A list of participants is provided in the Enclosure.
TVA staff provided a presentation on the purpose of the proposed amendment, an overview of the affected plant electrical  
: systems, current testing requirements and maintenance practices, a brief technical analysis of the proposed change, a description of the current TS requirements, proposed TS changes and bases for the proposed  
: changes, information regarding regulatory precedents, and its proposed schedule for submitting the amendment request.
The presentation is available in the ADAMS at Accession No. ML 17352B033.
The NRC staff queried the licensee about the basis for the proposed 8 hour completion time. TVA responded that the proposed time is consistent with similar TSs implemented at other facilities, including TVA's Sequoyah Nuclear Plant. The staff cautioned TVA to ensure the basis for the requested completion time is sufficiently justified in the application for implementation at Watts Bar. Members of the public did not attend the meeting.
No Public Meeting Feedback forms were received.
No regulatory decisions were made during the meeting.
Please direct any inquiries to me at 301-415-6020, or Robert.Schaaf@nrc.gov.
Docket Nos. 50-390 and 50-391  


==Enclosure:==
==Enclosure:==
List of Attendees cc: Listserv Robert G. Schaaf, Senior Proje t Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES DECEMBER 20, 2017, MEETING WITH TENNESSEE VALLEY AUTHORITY PRE-SUBMITTAL MEETING REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS -OPERATING" NAME ORGANIZATION Robert Schaaf U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Reactor Regulation (NRR) Vijay Goel NRC/NRR Pete Snyder NRC/NRR Khoi Nguyen NRC/NRR Russell Wells Tennessee Valley Authority (TVA) Larry Cross TVA Damon Fegley TVA Enclosure 


Meeting Notice ML 17345A87 4 Meeting Summary ML 18103A224 OFFICE NRR/D0RL/LPL2-2/PM NRR/D0RL/LPL2-2/LA NRR/D0RL/LPL2-2/BC(A) NAME RSchaaf BClayton BTindell DATE 5/8/2018 5/8/2018 5/9/2018}}
List of Attendees cc: Listserv Robert G. Schaaf, Senior Proje t Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES DECEMBER 20, 2017, MEETING WITH TENNESSEE VALLEY AUTHORITY PRE-SUBMITTAL MEETING REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS -OPERATING" NAME ORGANIZATION Robert Schaaf U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Reactor Regulation (NRR) Vijay Goel NRC/NRR Pete Snyder NRC/NRR Khoi Nguyen NRC/NRR Russell Wells Tennessee Valley Authority (TVA) Larry Cross TVA Damon Fegley TVA Enclosure 
 
==SUBJECT:==
 
SUMMARY OF DECEMBER 20, 2017, PRE-SUBMITTAL MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS -OPERATING" (EPID L-2017-LRM-0038)
DATED MAY 9, 2018 DISTRIBUTION:
PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDorlLpl2-2 Resource RidsNrrPMWattsBar Resource RidsNrrLABClayton Resource RidsRgn2MailCenter Resource VGoel, NRR PSnyder, NRR KNguyen, NRR JBowen, EDO ADAMS Accession No. Meeting Notice ML 17345A87 4 Meeting Summary ML 18103A224 OFFICE NRR/D0RL/LPL2-2/PM NRR/D0RL/LPL2-2/LA NRR/D0RL/LPL2-2/BC(A)
NAME RSchaaf BClayton BTindell DATE 5/8/2018 5/8/2018 5/9/2018 OFFICIAL RECORD COPY Handouts ML 173526033 NRR/D0RL/LPL2-2/PM RSchaaf 5/9/2018}}

Revision as of 00:42, 29 June 2018

Summary of December 20, 2017, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Proposed License Amendment to Technical Specification 3.8.9, Distribution Systems Operating (EPID L-2017-LRM-0038)
ML18103A224
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 05/09/2018
From: Schaaf R G
Plant Licensing Branch II
To: Shea J W, Skaggs M D
Tennessee Valley Authority
Schaaf R G
References
EPID L-2017-LRM-0038
Download: ML18103A224 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 9, 2018 LICENSEE:

Tennessee Valley Authority FACILITY:

Watts Bar Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY OF DECEMBER 20, 2017, PRE-SUBMITTAL MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS-OPERATING" (EPID L-2017-LRM-0038)

On December 20, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and Tennessee Valley Authority (TVA) representatives.

The purpose of the meeting was to discuss TVA's planned submittal of a license amendment request to revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification (TS) 3.8.9, "Distribution Systems -Operating."

The proposed change would add a new Condition to support maintenance on a vital bus when the associated unit is shut down. The meeting notice and agenda, dated September 8, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17345A874.

A list of participants is provided in the Enclosure.

TVA staff provided a presentation on the purpose of the proposed amendment, an overview of the affected plant electrical

systems, current testing requirements and maintenance practices, a brief technical analysis of the proposed change, a description of the current TS requirements, proposed TS changes and bases for the proposed
changes, information regarding regulatory precedents, and its proposed schedule for submitting the amendment request.

The presentation is available in the ADAMS at Accession No. ML 17352B033.

The NRC staff queried the licensee about the basis for the proposed 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> completion time. TVA responded that the proposed time is consistent with similar TSs implemented at other facilities, including TVA's Sequoyah Nuclear Plant. The staff cautioned TVA to ensure the basis for the requested completion time is sufficiently justified in the application for implementation at Watts Bar. Members of the public did not attend the meeting.

No Public Meeting Feedback forms were received.

No regulatory decisions were made during the meeting.

Please direct any inquiries to me at 301-415-6020, or Robert.Schaaf@nrc.gov.

Docket Nos. 50-390 and 50-391

Enclosure:

List of Attendees cc: Listserv Robert G. Schaaf, Senior Proje t Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES DECEMBER 20, 2017, MEETING WITH TENNESSEE VALLEY AUTHORITY PRE-SUBMITTAL MEETING REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS -OPERATING" NAME ORGANIZATION Robert Schaaf U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Reactor Regulation (NRR) Vijay Goel NRC/NRR Pete Snyder NRC/NRR Khoi Nguyen NRC/NRR Russell Wells Tennessee Valley Authority (TVA) Larry Cross TVA Damon Fegley TVA Enclosure

SUBJECT:

SUMMARY OF DECEMBER 20, 2017, PRE-SUBMITTAL MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS -OPERATING" (EPID L-2017-LRM-0038)

DATED MAY 9, 2018 DISTRIBUTION:

PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDorlLpl2-2 Resource RidsNrrPMWattsBar Resource RidsNrrLABClayton Resource RidsRgn2MailCenter Resource VGoel, NRR PSnyder, NRR KNguyen, NRR JBowen, EDO ADAMS Accession No. Meeting Notice ML 17345A87 4 Meeting Summary ML 18103A224 OFFICE NRR/D0RL/LPL2-2/PM NRR/D0RL/LPL2-2/LA NRR/D0RL/LPL2-2/BC(A)

NAME RSchaaf BClayton BTindell DATE 5/8/2018 5/8/2018 5/9/2018 OFFICIAL RECORD COPY Handouts ML 173526033 NRR/D0RL/LPL2-2/PM RSchaaf 5/9/2018 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 9, 2018 LICENSEE:

Tennessee Valley Authority FACILITY:

Watts Bar Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY OF DECEMBER 20, 2017, PRE-SUBMITTAL MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS-OPERATING" (EPID L-2017-LRM-0038)

On December 20, 2017, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and Tennessee Valley Authority (TVA) representatives.

The purpose of the meeting was to discuss TVA's planned submittal of a license amendment request to revise the Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification (TS) 3.8.9, "Distribution Systems -Operating."

The proposed change would add a new Condition to support maintenance on a vital bus when the associated unit is shut down. The meeting notice and agenda, dated September 8, 2017, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 17345A874.

A list of participants is provided in the Enclosure.

TVA staff provided a presentation on the purpose of the proposed amendment, an overview of the affected plant electrical

systems, current testing requirements and maintenance practices, a brief technical analysis of the proposed change, a description of the current TS requirements, proposed TS changes and bases for the proposed
changes, information regarding regulatory precedents, and its proposed schedule for submitting the amendment request.

The presentation is available in the ADAMS at Accession No. ML 17352B033.

The NRC staff queried the licensee about the basis for the proposed 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> completion time. TVA responded that the proposed time is consistent with similar TSs implemented at other facilities, including TVA's Sequoyah Nuclear Plant. The staff cautioned TVA to ensure the basis for the requested completion time is sufficiently justified in the application for implementation at Watts Bar. Members of the public did not attend the meeting.

No Public Meeting Feedback forms were received.

No regulatory decisions were made during the meeting.

Please direct any inquiries to me at 301-415-6020, or Robert.Schaaf@nrc.gov.

Docket Nos. 50-390 and 50-391

Enclosure:

List of Attendees cc: Listserv Robert G. Schaaf, Senior Proje t Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES DECEMBER 20, 2017, MEETING WITH TENNESSEE VALLEY AUTHORITY PRE-SUBMITTAL MEETING REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS -OPERATING" NAME ORGANIZATION Robert Schaaf U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Reactor Regulation (NRR) Vijay Goel NRC/NRR Pete Snyder NRC/NRR Khoi Nguyen NRC/NRR Russell Wells Tennessee Valley Authority (TVA) Larry Cross TVA Damon Fegley TVA Enclosure

SUBJECT:

SUMMARY OF DECEMBER 20, 2017, PRE-SUBMITTAL MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING PROPOSED LICENSE AMENDMENT TO TECHNICAL SPECIFICATION 3.8.9, "DISTRIBUTION SYSTEMS -OPERATING" (EPID L-2017-LRM-0038)

DATED MAY 9, 2018 DISTRIBUTION:

PUBLIC PM File Copy RidsACRS_MailCTR Resource RidsNrrDorlLpl2-2 Resource RidsNrrPMWattsBar Resource RidsNrrLABClayton Resource RidsRgn2MailCenter Resource VGoel, NRR PSnyder, NRR KNguyen, NRR JBowen, EDO ADAMS Accession No. Meeting Notice ML 17345A87 4 Meeting Summary ML 18103A224 OFFICE NRR/D0RL/LPL2-2/PM NRR/D0RL/LPL2-2/LA NRR/D0RL/LPL2-2/BC(A)

NAME RSchaaf BClayton BTindell DATE 5/8/2018 5/8/2018 5/9/2018 OFFICIAL RECORD COPY Handouts ML 173526033 NRR/D0RL/LPL2-2/PM RSchaaf 5/9/2018