ML15050A249: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:QualTech NP125 West Park LoopHuntsville, AL 35806Phone 256.722.8500Fax: 256.722.8533I http://quaftechnp.cwfc.comCUR TISSFlow Control CompanyQualTech NPFebruary 5, 2015
==Subject:==
Revision to 10 CFR part 21 Final Notification for Event 50015 for GE CR120 RelaysOn April 9, 2014, QualTech NP provided an initial 10 CFR part 21 notification to the NuclearRegulatory Commission (NRC) concerning failures of General Electric Type CR120AD control relays.This was submitted due to failures of relays that were sent to Nebraska Public Power District (NPPD) asbasic components. There were two affected orders, both of which were shipped to NPPD and have sincebeen replaced with relays that have passed supplemental testing designed to identify the infant mortalityfailure mode described below.A failure analysis, performed by QualTech NP, revealed that the most likely initiator of the failure was aflaw or defect in the start wrap of the coil magnet wire. The flaw created an arc that involved windingsdirectly beneath the start wrap which resulted in an open circuit on the coil windings. This failure isclassified as infant mortality, which appears to be similar to the failure mode identified in the 30 day 10CFR part 21 report (accession number 9706190261) dated June 12, 1997 submitted by GPU Nuclear.QualTech NP performed a failure analysis and based on analysis / data provided from the failures foundin 2014, considered a 100 hour burn-in test combined with a 100 mechanical cycle test would identifythe infant mortality of subject relays. The replacement relays described in the first paragraph of this letterwere subjected to this testing.It has since come to the attention of QualTech NP engineering staff that a similar failure analysis wasperformed (NRC082495, Revision 1) in response to failures identified at GPU Nuclear Power Plant(Oyster Creek Nuclear Station) as reported in the 30 day 10 CFR Part 21 report issued on June 12, 1997(Accession Number 9706190261). The test method used to identify this failure mode in 1996 utilized alarger sample size and different testing methodology than was used by QualTech NP in 2014. Given therecent failures by what appears to be a similar mode, QualTech NP engineering staff is updating itsrecommendation on the testing required for these relays to be in line with the 1997 recommendations.The test method employed to identify failures included applying -1038 VDC (Voltage Limited) and 49mA (Current Limited) @ 1 cycle / second (50% duty cycle) to a 100% sample size, where a cycle isdefined as one second energized and one second de-energized. According to test data, a minimum of2280 cycles under the above conditions will identify 99.9% of the defective relays without damagingproperly constructed relays.Given the new recommendation by QualTech NP, replacement relays will be provided to NPPD aftersubjecting them to the new supplemental testing. A full report detailing this test data is available forreview upon request ("Approach to Detecting Manufacturing Defect in GE CR120AD03041AA Relays"NRC document NRC082495 Revision 1).Sincerely,Matthew Thelenmthelen(curtisswright.com QualTech NP125 West Park LoopHuntsville, AL 35806Phone 256.722.8500Fax: 256.722.8533f http://quattechnp.cwfc.comcuirm$%_))Flow Control CompanyQualTech NPFebruary 5, 2015
==Subject:==
Revision to 10 CFR part 21 Final Notification for Event 50015 for GE CR120 RelaysOn April 9, 2014, QualTech NP provided an initial 10 CFR part 21 notification to the NuclearRegulatory Commission (NRC) concerning failures of General Electric Type CR120AD control relays.This was submitted due to failures of relays that were sent to Nebraska Public Power District (NPPD) asbasic components. There were two affected orders, both of which were shipped to NPPD and have sincebeen replaced with relays that have passed supplemental testing designed to identify the infant mortalityfailure mode described below.A failure analysis, performed by QualTech NP, revealed that the most likely initiator of the failure was aflaw or defect in the start wrap of the coil magnet wire. The flaw created an arc that involved windingsdirectly beneath the start wrap which resulted in an open circuit on the coil windings. This failure isclassified as infant mortality, which appears to be similar to the failure mode identified in the 30 day 10CFR part 21 report (accession number 9706190261) dated June 12, 1997 submitted by GPU Nuclear.QualTech NP performed a failure analysis and based on analysis / data provided from the failures foundin 2014, considered a 100 hour bum-in test combined with a 100 mechanical cycle test would identifythe infant mortality of subject relays. The replacement relays described in the first paragraph of this letterwere subjected to this testing.It has since come to the attention of QualTech NP engineering staff that a similar failure analysis wasperformed (NRC082495, Revision 1) in response to failures identified at GPU Nuclear Power Plant(Oyster Creek Nuclear Station) as reported in the 30 day 10 CFR Part 21 report issued on June 12, 1997(Accession Number 9706190261). The test method used to identify this failure mode in 1996 utilized alarger sample size and different testing methodology than was used by QualTech NP in 2014. Given therecent failures by what appears to be a similar mode, QualTech NP engineering staff is updating itsrecommendation on the testing required for these relays to be in line with the 1997 recommendations.The test method employed to identify failures included applying -1038 VDC (Voltage Limited) and 49mA (Current Limited) @ 1 cycle / second (50% duty cycle) to a 100% sample size, where a cycle isdefined as one second energized and one second de-energized. According to test data, a minimum of2280 cycles under the above conditions will identify 99.9% of the defective relays without damagingproperly constructed relays.Given the new recommendation by QualTech NP, replacement relays will be provided to NPPD aftersubjecting them to the new supplemental testing. A full report detailing this test data is available forreview upon request ("Approach to Detecting Manufacturing Defect in GE CR120AD03041AA Relays"NRC document NRC082495 Revision 1).Sincerely,Matthew Thelenmthelen(curtisswright.com}}

Revision as of 20:49, 14 June 2018

Revision to 10 CFR Part 21 Final Notification for Event 50015 for GE CR120 Relays
ML15050A249
Person / Time
Site: Oyster Creek
Issue date: 02/05/2015
From: Thelen M
Curtiss-Wright Flow Control Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
50015
Download: ML15050A249 (2)


Text

QualTech NP125 West Park LoopHuntsville, AL 35806Phone 256.722.8500Fax: 256.722.8533I http://quaftechnp.cwfc.comCUR TISSFlow Control CompanyQualTech NPFebruary 5, 2015

Subject:

Revision to 10 CFR part 21 Final Notification for Event 50015 for GE CR120 RelaysOn April 9, 2014, QualTech NP provided an initial 10 CFR part 21 notification to the NuclearRegulatory Commission (NRC) concerning failures of General Electric Type CR120AD control relays.This was submitted due to failures of relays that were sent to Nebraska Public Power District (NPPD) asbasic components. There were two affected orders, both of which were shipped to NPPD and have sincebeen replaced with relays that have passed supplemental testing designed to identify the infant mortalityfailure mode described below.A failure analysis, performed by QualTech NP, revealed that the most likely initiator of the failure was aflaw or defect in the start wrap of the coil magnet wire. The flaw created an arc that involved windingsdirectly beneath the start wrap which resulted in an open circuit on the coil windings. This failure isclassified as infant mortality, which appears to be similar to the failure mode identified in the 30 day 10CFR part 21 report (accession number 9706190261) dated June 12, 1997 submitted by GPU Nuclear.QualTech NP performed a failure analysis and based on analysis / data provided from the failures foundin 2014, considered a 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> burn-in test combined with a 100 mechanical cycle test would identifythe infant mortality of subject relays. The replacement relays described in the first paragraph of this letterwere subjected to this testing.It has since come to the attention of QualTech NP engineering staff that a similar failure analysis wasperformed (NRC082495, Revision 1) in response to failures identified at GPU Nuclear Power Plant(Oyster Creek Nuclear Station) as reported in the 30 day 10 CFR Part 21 report issued on June 12, 1997(Accession Number 9706190261). The test method used to identify this failure mode in 1996 utilized alarger sample size and different testing methodology than was used by QualTech NP in 2014. Given therecent failures by what appears to be a similar mode, QualTech NP engineering staff is updating itsrecommendation on the testing required for these relays to be in line with the 1997 recommendations.The test method employed to identify failures included applying -1038 VDC (Voltage Limited) and 49mA (Current Limited) @ 1 cycle / second (50% duty cycle) to a 100% sample size, where a cycle isdefined as one second energized and one second de-energized. According to test data, a minimum of2280 cycles under the above conditions will identify 99.9% of the defective relays without damagingproperly constructed relays.Given the new recommendation by QualTech NP, replacement relays will be provided to NPPD aftersubjecting them to the new supplemental testing. A full report detailing this test data is available forreview upon request ("Approach to Detecting Manufacturing Defect in GE CR120AD03041AA Relays"NRC document NRC082495 Revision 1).Sincerely,Matthew Thelenmthelen(curtisswright.com QualTech NP125 West Park LoopHuntsville, AL 35806Phone 256.722.8500Fax: 256.722.8533f http://quattechnp.cwfc.comcuirm$%_))Flow Control CompanyQualTech NPFebruary 5, 2015

Subject:

Revision to 10 CFR part 21 Final Notification for Event 50015 for GE CR120 RelaysOn April 9, 2014, QualTech NP provided an initial 10 CFR part 21 notification to the NuclearRegulatory Commission (NRC) concerning failures of General Electric Type CR120AD control relays.This was submitted due to failures of relays that were sent to Nebraska Public Power District (NPPD) asbasic components. There were two affected orders, both of which were shipped to NPPD and have sincebeen replaced with relays that have passed supplemental testing designed to identify the infant mortalityfailure mode described below.A failure analysis, performed by QualTech NP, revealed that the most likely initiator of the failure was aflaw or defect in the start wrap of the coil magnet wire. The flaw created an arc that involved windingsdirectly beneath the start wrap which resulted in an open circuit on the coil windings. This failure isclassified as infant mortality, which appears to be similar to the failure mode identified in the 30 day 10CFR part 21 report (accession number 9706190261) dated June 12, 1997 submitted by GPU Nuclear.QualTech NP performed a failure analysis and based on analysis / data provided from the failures foundin 2014, considered a 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> bum-in test combined with a 100 mechanical cycle test would identifythe infant mortality of subject relays. The replacement relays described in the first paragraph of this letterwere subjected to this testing.It has since come to the attention of QualTech NP engineering staff that a similar failure analysis wasperformed (NRC082495, Revision 1) in response to failures identified at GPU Nuclear Power Plant(Oyster Creek Nuclear Station) as reported in the 30 day 10 CFR Part 21 report issued on June 12, 1997(Accession Number 9706190261). The test method used to identify this failure mode in 1996 utilized alarger sample size and different testing methodology than was used by QualTech NP in 2014. Given therecent failures by what appears to be a similar mode, QualTech NP engineering staff is updating itsrecommendation on the testing required for these relays to be in line with the 1997 recommendations.The test method employed to identify failures included applying -1038 VDC (Voltage Limited) and 49mA (Current Limited) @ 1 cycle / second (50% duty cycle) to a 100% sample size, where a cycle isdefined as one second energized and one second de-energized. According to test data, a minimum of2280 cycles under the above conditions will identify 99.9% of the defective relays without damagingproperly constructed relays.Given the new recommendation by QualTech NP, replacement relays will be provided to NPPD aftersubjecting them to the new supplemental testing. A full report detailing this test data is available forreview upon request ("Approach to Detecting Manufacturing Defect in GE CR120AD03041AA Relays"NRC document NRC082495 Revision 1).Sincerely,Matthew Thelenmthelen(curtisswright.com