 Issue dateTitleTopic
ML19317D09325 October 2019Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing
ML17194A82511 July 2017Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge ConnectionsAnchor Darling
ML17179A3787 June 2017TE Connectivity - Part 21 Transfer of Information TE-023
ML16294A26418 October 2016Part 21 Report - Defective Current to Pressure Transducers
ML15050A2495 February 2015Revision to 10 CFR Part 21 Final Notification for Event 50015 for GE CR120 Relays
ML14275A16225 September 2014Notification of Potential Part 21 Report - Electromatic Relief Valve Excessive WearUnanalyzed Condition
Fitness for Duty
ML14210A01023 July 2014Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot ValveSafe Shutdown
Shutdown Margin
Scram Discharge Volume
ML14204A70823 July 2014Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public)Safe Shutdown
Shutdown Margin
Scram Discharge Volume
ML14204A70723 July 2014Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV
ML14072A32613 March 2014Enclosure 2: Description of EvaluationShutdown Margin
Scram Discharge Volume
ML14072A32813 March 2014Part 21 60-Day Interim Report Notification Re Unseating of Valve Spring on SSPV
ML13165A34212 June 201360-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML13064A01225 February 2013Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate ValveAnchor Darling
ML13042A0968 February 2013Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology
ML13044A0758 February 2013Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology
ML12352A12313 December 201260-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML12348A13613 December 2012Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers
ML12347A30812 December 2012Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology
ML12319A01227 September 2012Error in Main Steam Line High Flow Calculational Methodology
ML12163A1306 June 2012Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld
ML12158A4476 June 2012Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld
ML12040A2837 February 2012Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML12038A0282 February 2012Failure of CRD Collet Retainer Tube/Outer Tube Weld
ML12032A2401 February 2012Notification of Potential Part 21 - 60-Day Interim Report Notification: Failure of CRD Collet Retainer Tube/Outer Tube Weld
ML11228A08412 August 2011Notification of Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
Scram Discharge Volume
ML11224014211 August 2011Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Channel-control blade interference
Scram Discharge Volume
ML11048005415 February 2011Notification of Potential Part 21 Reportable Condition: Crack Indications in Marathon Control Rod Blades
ML11046048715 February 2011Notification of Potential Part 21 Reportable Condition Re Design Life of D and s Lattice Marathon Control Blades
ML10351003115 December 2010Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10350017415 December 2010Notification of Potential Part 21 Re 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10295028120 October 2010Part 21 Notification - Crack Indications in Marathon Control Rod Blades
ML10293050520 October 2010GE Hitachi Nuclear Energy - Notification of Potential Part 21 60-Day Interim Report: Crack Indications in Marathon Control Rod Blades
ML10273006327 September 2010Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10270061427 September 2010Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML1025202193 September 2010Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML09306039530 October 2009Transnuclear, Inc. - Submittal of Thirty Day Written Report of a Potential Deviation and Failure to Comply Associated with Unsubstantiated Certified Materials Test Reports for Certain Small Parts Utilized in Products Fabricated
ML0927805881 October 2009Transnuclear, Inc Part 21 Report Re Fasteners on Spent Fuel Storage Devices Not Meeting Standards
ML08333018721 November 2008Notification of Potential Part 21 Re Tyco Electronics, Transfer of Information - CII-012
ML08319001712 November 2008Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28
ML08239010625 August 2008Notification of Potential Part 21 on Failure of F and G SwitchesTest box
ML08120088214 April 2008Notification of Potential Part 21 on Safety Related Noncompliance DeviationCoatings
ML0809906344 April 2008Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items
ML0734402117 December 2007Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters
ML0706802887 March 2007Notification of Potential Part 21 on Defect in E7000 Relays
ML0609504013 April 2006Director Office of Inspection & Enforcement Reference: 10 CFR 21 Notification of 3/30/06 Rev1
ML06033034523 January 200610CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0091, Rev. 0., Woodward DRU Controls (Manufactured Between November 2000 and November 2005)
ML05269008420 September 2005Part 21 Notification Completion: Critical Power Determination for GE14 and GE12 Fuel with Zircaloy SpacersAnticipated operational occurrence
ML05095042829 March 200510CFR21 Reportable Condition Notification: Involving Potential to Exceed Low Pressure Technical Specification Safety LimitAnticipated operational occurrence
Fuel cladding
ML03169038611 June 200310CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc., Report No. 10CFR21-0087, Rev 0, Emd Electric Start Motors at Oyster CreekCoast down