GE Hitachi Nuclear Energy Proprietary Notice Dale E. Porter This letter transmits proprietary information GE-Hitachi Nuclear Energy Americas LLC in accordance with 10CFR2.390. Upon Safety Evaluation Program Manager removal of Enclosure 1, the balance of this 3901 Castle Hayne Rd.,

letter may be considered non-proprietary. Wilmington, NC 28401 USA T 910 819-4491 Dale.Porter@GE.Com March 13, 2014 MFN 14-010 R0 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Part 21 60-Day Interim Report Notification:

Unseating of Valve Spring on SSPV This letter provides information concerning an evaluation being performed by GE Hitachi Nuclear Energy (GEH) regarding a malfunction of a Scram Solenoid Pilot Valve (SSPV), which has been observed to impair control rod scram performance. As stated herein, GEH has not concluded that this is a reportable condition in accordance with the requirements of 10CFR 21.21(d). The SSPV manufacturer (ASCO Valve, Inc.) has not yet concluded its own investigation under 10CFR 21, and the results of that investigation are needed as input for the GEH evaluation. The manufacturer has issued an Interim Report, which provides confidence that this condition is limited to a very small portion of the suspect population.

The information required for this GEH 60-Day Interim Report Notification per §21.21(a)(2) is provided in Attachment 2. The commitment for follow-on actions is provided in Attachment 2, item (vii).

If you have any questions, please call me at (910) 819-4491.

Sincerely, Dale E. Porter Safety Evaluation Program Manager GE-Hitachi Nuclear Energy Americas LLC

MFN 14-010 R0 Page 2 of 2 Attachments:

1. US Plants Potentially Affected
2. 60-Day Interim Report Notification Information per §21.21(a)(2)

Enclosures:

1. Description of Evaluation, GEH Proprietary Information - Class II (Internal)
2. Description of Evaluation, Non-Proprietary Information - Class I (Public)
3. Affidavit cc: J. Golla, USNRC S. S. Philpott, USNRC S. J. Pannier, USNRC O. Tabatabai-Yazdi, USNRC D. C. Crawford, GEH J. F. Harrison, GEH J. G. Head, GEH J. Burke, GEH P. L. Campbell, GEH Washington PRC File PLM Spec 000N5377 R0 Document Components:

001 MFN 14-010 R0 Cover Letter.pdf 002 MFN 14-010 R0 Enclosure 1 Proprietary.pdf 003 MFN 14-010 R0 Enclosure 2 Non-Proprietary.pdf 004 MFN 14-010 R0 Enclosure 3 Affidavit.pdf

MFN 14-010 R0 Page 1 of 1 Attachment 1 US Plants Potentially Affected US BWR Plants and Associated Facilities Utility Plant Constellation Energy Nine Mile Point 1-2 X Detroit Edison Co. Fermi 2 X Energy Northwest Columbia Entergy Grand Gulf Entergy River Bend Entergy FitzPatrick Entergy Pilgrim Entergy Vermont Yankee Exelon Clinton X Exelon Dresden 2-3 Exelon LaSalle 1-2 Exelon Limerick 1-2 X Exelon Oyster Creek X Exelon Peach Bottom 2-3 X Exelon Quad Cities 1-2 FirstEnergy Nuclear Operating Co. Perry 1 Florida Power & Light Duane Arnold Nebraska Public Power District Cooper PPL Susquehanna LLC Susquehanna 1-2 Progress Energy Brunswick 1-2 PSEG Services Corp. Hope Creek Southern Nuclear Operating Co. Hatch 1 - 2 X Tennessee Valley Authority Browns Ferry 1-3 Xcel Energy Monticello North East Utilities Millstone

MFN 14-010 R0 Page 1 of 2 Attachment 2 Day Interim Report Notification Information per §21.21(a)(2)

(i) Name and address of the individual or individuals informing the Commission.

Dale E. Porter GE Hitachi Nuclear Energy Safety Evaluation Program Manager 3901 Castle Hayne Road, Wilmington, NC 28401 (ii) Identification of the facility, the activity, or the basic component supplied for such facility which fails to comply or contains a defect.

See Attachment 1 for a list of potentially affected U.S. plants (iii) Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.

GE Hitachi Nuclear Energy (ASCO Valve, Inc., manufacturer)

(iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.

A malfunction of a Scram Solenoid Pilot Valve was attributed to the disengagement of the valve spring from the valve plunger. The effect of the malfunction is to degrade scram performance of an affected control rod. The safety significance of this condition cannot be determined at this time, but several mitigating and compensatory functions have been identified.

(v) The date on which the information of such defect or failure to comply was obtained.

A Potential Reportable Condition Evaluation in accordance with 10 CFR Part 21 was initiated on January 16, 2014.

(vi) In the case of a basic component which contains a defect or fails to comply, the number and location of these components in use at, supplied for, being supplied for, or may be supplied for, manufactured, or being manufactured for one or more facilities or activities subject to the regulations in this part.

SSPVs from a production population identified by the manufacturer are currently considered suspect (though considered to have low likelihood of being affected). Those SSPVs were shipped by GEH to the following plant sites in the quantities indicated in the following table.

MFN 14-010 R0 Page 2 of 2 Attachment 2 Day Interim Report Notification Information per §21.21(a)(2)

Plant Quantity Browns Ferry 3 Columbia Generating Station 20 Dresden 2 Enrico Fermi 2 162 Oyster Creek 88 Peach Bottom 8 Quad Cities 6 Non-U.S. Plant 110 (vii) The corrective action, which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.

After the 2012 occurrence of this condition, the manufacturer completed a corrective action to implement an in-process inspection to ensure that SSPV valve springs are properly engaged with the plungers. This action was completed in November 2012.

(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.

GEH suggests that plant staff with valves from the affected populated assist the manufacturers investigation as practical.

(ix) In the case of an early site permit, the entities to whom an early site permit was transferred.

This is not an early site permit concern.