NUCLEAR POWER BUSINESS UNIT OPERATIONS REFUELING TESTS ORT 73 MINOR                                     :
NUCLEAR POWER BUSINESS UNIT ORT 73 OPERATIONS REFUELING TESTS MINOR Revision 8 I
Revision 8                                 !
ELECTRICAL PENETRATION LEAK TEST January 25.1997 UNIT 1
I        ELECTRICAL PENETRATION LEAK TEST                                             January 25.1997
.i,.,
.i,.,     UNIT 1 Date                               RECORD DSS                               PROCEDURE VERIFILD CURRENT AND CHECKED FOR TEMPOR/.RY CILANGES. IF FIELD COPIES REQUIRED. USE PBF-0026i LAW NP 1.2 4 AND DO E COMPLETE THIS BLOCK.
Date RECORD DSS PROCEDURE VERIFILD CURRENT AND CHECKED FOR TEMPOR/.RY CILANGES. IF FIELD COPIES REQUIRED. USE PBF-0026i LAW NP 1.2 4 AND DO E COMPLETE THIS BLOCK.
BY:                             DATE:
BY:
1.0     PURPOSE The purpose of ORT 73 is to perform a refueling interval leakage test of penetration E28 in the Unit i facade, El. 39'. Completing this ORT will not affect the operability of any equipment which has cables routed through this penetration.
DATE:
 
1.0 PURPOSE The purpose of ORT 73 is to perform a refueling interval leakage test of penetration E28 in the Unit i facade, El. 39'. Completing this ORT will not affect the operability of any equipment which has cables routed through this penetration.
==2.0    REFERENCES==


==2.0 REFERENCES==
IR 96-006, NRC Inspection Report, NRC Commitment for Operations procedure PMT/QC reviews.
IR 96-006, NRC Inspection Report, NRC Commitment for Operations procedure PMT/QC reviews.
3.0     PRECAUTIONS AND LIMITATIONS All electrical penetrations must be leak tested with nitrogen.
3.0 PRECAUTIONS AND LIMITATIONS All electrical penetrations must be leak tested with nitrogen.
INITIALS 4.0   INITIAL CONDITIONS                                                                     '
INITIALS 4.0 INITIAL CONDITIONS Permission to Perform Test The conditions required by this test are consistent with required plant conditions including equipment operability. Permission is granted to perform this test.
Permission to Perform Test The conditions required by this test are consistent with required plant conditions including equipment operability. Permission is granted to perform this test.
DSS Time Date 5.0 PROCEDURE NOTE:
DSS                           Time                           Date 5.0     PROCEDURE NOTE:       This penetration msg be leak tested with nitrogen.
This penetration msg be leak tested with nitrogen.
5.1     Open the isolation valve downstream of pressure gauge for the penetration to be tested and remove the test cap.
5.1 Open the isolation valve downstream of pressure gauge for the penetration to be tested and remove the test cap.
1 5.2     Remove the pressure gauge and Whitey valve assembly.
1 5.2 Remove the pressure gauge and Whitey valve assembly.
4 9'02180373 7              970210         x Page1of3                                       CONTINUOUS USE PDR     ADOCK 05000301                                   .        .
4 9'02180373 970210 Page1of3 CONTINUOUS USE x
P                      PM       ,
7 PDR ADOCK 05000301 P
PM


NUCLEAR POWER BUSINESS UNIT                                         ORT 73                                 l OPERATIONS REFUELING TESTS                                           MINOR                                 l I                                                                           Revision 8
NUCLEAR POWER BUSINESS UNIT ORT 73 OPERATIONS REFUELING TESTS MINOR I
} (g-         ELECTRICAL PENETRATION LEAK TEST                                   January 25,1997 UNIT 1 INITIALS NOTE:     Minimize the amount of time the leak rate tester is connected to the mechanicalpenetration.
Revision 8
5.3 Connect the test rig to the penetration test connection and test per 01-58.
} (g-ELECTRICAL PENETRATION LEAK TEST January 25,1997 UNIT 1 INITIALS NOTE:
5.4 Upon completion af the test, vent the penetration per 01-58.
Minimize the amount of time the leak rate tester is connected to the mechanicalpenetration.
5.5 Disconnect the test rig and replace the pressure gauge and Whitey valve assembly.
5.3 Connect the test rig to the penetration test connection and test per 01-58.
5.6 Repressurize the penetration to 15 psig. Close the isolation valve and replace the test cap.
5.4 Upon completion af the test, vent the penetration per 01-58.
PMT 5.7 Snoop disturbed fittings for leakage and tighten / initiate work order, as required.
5.5 Disconnect the test rig and replace the pressure gauge and Whitey valve assembly.
f 6.0     EVALUATION TO BE COMPLETED BY OPERATIONS MANAGER OR HIS REPRESENTATIVE.
5.6 Repressurize the penetration to 15 psig. Close the isolation valve and replace the test cap.
6.1 Individual leakages compared to allowable value and included in tabulation of total leak rate.
PMT 5.7 Snoop disturbed fittings for leakage and tighten / initiate work order, as required.
6.2 Results acceptable,0.6 L, not exceeded.
6.0 EVALUATION f
Yes                       No (if no, give details in the Remarks section and notify the Regulatory Services manager to determine reportability.)
TO BE COMPLETED BY OPERATIONS MANAGER OR HIS REPRESENTATIVE.
6.3 Data Analyzed - By Date Remarks:
6.1 Individual leakages compared to allowable value and included in tabulation of total leak rate.
Page 2 of 3                           CONTINUOUS USE
6.2 Results acceptable,0.6 L, not exceeded.
Yes No (if no, give details in the Remarks section and notify the Regulatory Services manager to determine reportability.)
6.3 Data Analyzed - By Date Remarks:
Page 2 of 3 CONTINUOUS USE


1 NUCLEAR POWER BUSINESS UNIT                             ORT 73 OPERATIONS REFUELING TESTS                             MINOR I
1 NUCLEAR POWER BUSINESS UNIT ORT 73 OPERATIONS REFUELING TESTS MINOR I
Revision 8 ELECTRICAL PENETRATION LEAK TEST                       January 25,1997 UNIT 1 LEAK TEST DATA SHEET Penetration E28 Pressure           Leak Rate Time       (pig)             (secm)
Revision 8 ELECTRICAL PENETRATION LEAK TEST January 25,1997 UNIT 1 LEAK TEST DATA SHEET Penetration E28 Pressure Leak Rate Time (pig)
Test Instrument ID                   Range (Circle one): Low Mid High Comments:
(secm)
i Test Operator                               Date l
Test Instrument ID Range (Circle one): Low Mid High Comments:
l l
i Test Operator Date i
l i
1 1
l 1
Page 3 of 3 CONTINUOUS USE e
1 Page 3 of 3                     CONTINUOUS USE e
m
m


,            NUCLEARPOWERBUSINESS UNIT                                                                         ORTINDEX U2 OPERATIONSREFUELINGTESTS                                                                         Revision 177 January 31,1997                           ;
NUCLEARPOWERBUSINESS UNIT ORTINDEX U2 OPERATIONSREFUELINGTESTS Revision 177 January 31,1997 INDEX A
INDEX A '
UNIT 2
      )
)
UNIT 2 BIENNIAL PROCEDURE                                                                                     REVISION       EFFECTIVE         REVIEW     .
BIENNIAL PROCEDURE REVISION EFFECTIVE REVIEW NUMBER PROCEDURE TITLE NUMBER DATE DATE ORT INDEX A Completion Status Index.......................................... 8 06/05/95 09/24/92 ORT 3 Safety Injection Actuation with Loss of i
NUMBER                           PROCEDURE TITLE                                             NUMBER             DATE           DATE     ,
Engineered Safeguards AC................................... 28 C
ORT INDEX A Completion Status Index....... ... ................................ 8                               06/05/95         09/24/92 ORT 3               Safety Injection Actuation with Loss of                                                                                 i Engineered Safeguards AC ................................... 28                     C   01/25/97         01/25/97 Appendix C           Review of ORT 3 Test Results ....... . .............. ......... 4                       I   10/18/93         10/18/93 ORT 3A               Safety Injection Actuation with Loss of Engineered Safeguards AC ................................... 3 0                   C     11/03/95         10/19/93 ORT 3B               Safety Injection Actuation With Loss of Engineered Safeguards AC ................................... 29                   C     10/21/94         10/21/94 l ORT 4                 Main Turbine Mechanical Overspeed Trip Device.... 9                                   C     01/31/97         03/04/96 ORT 6               Containment Spray Sequence Test ...... ...................15                         R     02/12/96         02/12/ %
01/25/97 01/25/97 Appendix C Review of ORT 3 Test Results............................... 4 I
ORT 7               Operation of Backdraft Dampers ......................... ..... 4                     R     08/19/91         08/26/93 ORT 9               Preparation for Integrated Leak Rate Test...............12                           R     09/11/92         09/11/92   l Appendix A           Component Cooling to and from 2P-1 A (P15,17).... 7                                 R     07/21/93         07/21/93   i Appendix B           Component Cooling to and from 2P-1B (P16,18).... 6                                 R     09/22/92         09/22/92   !
10/18/93 10/18/93 ORT 3A Safety Injection Actuation with Loss of Engineered Safeguards AC................................... 3 0 C
Appendix C           Hot Leg Sample .........................................(P28A).... 4               R     09/28/91         09/28/91   !
11/03/95 10/19/93 ORT 3B Safety Injection Actuation With Loss of Engineered Safeguards AC................................... 29 C
Appendix D         Pressurizer Liquid Sampic .........................(P28B).... 5                     R       09/28/91         09/28/91 Appendix E         Pressurizer Steam Space Sample ...............(P28C).... 6                         R       04/16/93         04/16/93   i f      Appendix F           RMW to Containment................................(P30C).... 2                     R       09/28/91         09/28/91
10/21/94 10/21/94 l ORT 4 Main Turbine Mechanical Overspeed Trip Device.... 9 C
    \      Appendix G           Nitrogen to SI Accumulators .....................(P14C).... 2                       R       09/28/91         09/28/91 Appendix H           Instrument Air Supply................................(P33A).... 6                   R       09/28/91         09/28/91   i Appendix I           Instrument Air Supply..... ............. ............(P33B).... 5                 R       09/28/91         09/28/91' Appendix J           "A" Steam Generator Sample ... ... ............(P34B).... 4                       R       09/28/91         09/28/91 Appendix K           "B" Steam Generator Sample........... ........(P34C).... 4                         R       09/28/91         09/28/91 Appendix L           "B" Steam Generator Blowdown.... . ........ (P50).... 7                           R       09/22/92         09/22/92 Appendix M                                                                                               R      09/22/92          09/22/92 "A" Steam Generator Blowdown.... ............ (PS I).... 7 Appendix N           Nitrogen to PRT.........................................(P l 4 A).... 5             R       09/28/91         09/28/91 Appendix 0           Reactor Coolant Pump Seal Retum ............. (P11).... 2                           R       09/28/91         09/15/89 Appendix P           Demineralized Water Supply to Containment............................................(P12A).... 2             R       09/28/91         09/28/91 Appendix R           Sample Line from PRT to Gas Analyzer...(P34A).... 3                                 R       02/05/93         02/05/93 Appendix S           Sample Line from RCDT to Gas Analyzer (P34D).... 3                                 R       02/05/93         02/05/93 Appendix T           Heating Steam to Containment.................... (PS2).... 2                       R       09/28/91         09/28/91 Appendix U Containment Condensate Return ................. (P53).... 3 R                               00/22/92         09/22/92 Appendix V           Spray System, A Train, Containment Isolation Valves.....................................................................5   C       06/09/95         09/22/92 Appendix W           Spray System, B Train, Containment Isolation Valves.....................................................................5   R       01/19/93         09/22/92 Appendix X           2RE-211 and 212 Supply........................... (P-X I).... 4                   R       12/05/94         09/28/91
01/31/97 03/04/96 ORT 6 Containment Spray Sequence Test.........................15 R
02/12/96 02/12/ %
ORT 7 Operation of Backdraft Dampers.............................. 4 R
08/19/91 08/26/93 ORT 9 Preparation for Integrated Leak Rate Test...............12 R
09/11/92 09/11/92 l
Appendix A Component Cooling to and from 2P-1 A (P15,17).... 7 R
07/21/93 07/21/93 i
Appendix B Component Cooling to and from 2P-1B (P16,18).... 6 R
09/22/92 09/22/92 Appendix C Hot Leg Sample.........................................(P28A).... 4 R
09/28/91 09/28/91 Appendix D Pressurizer Liquid Sampic.........................(P28B).... 5 R
09/28/91 09/28/91 Appendix E Pressurizer Steam Space Sample...............(P28C).... 6 R
04/16/93 04/16/93 i
Appendix F RMW to Containment................................(P30C).... 2 R
09/28/91 09/28/91 f\\
Appendix G Nitrogen to SI Accumulators.....................(P14C).... 2 R
09/28/91 09/28/91 Appendix H Instrument Air Supply................................(P33A).... 6 R
09/28/91 09/28/91 i
Appendix I Instrument Air Supply..............................(P33B).... 5 R
09/28/91 09/28/91' Appendix J "A" Steam Generator Sample..................(P34B).... 4 R
09/28/91 09/28/91 Appendix K "B" Steam Generator Sample...................(P34C).... 4 R
09/28/91 09/28/91 Appendix L "B" Steam Generator Blowdown............. (P50).... 7 R
09/22/92 09/22/92 Appendix M "A" Steam Generator Blowdown................ (PS I).... 7 R
09/22/92 09/22/92 Appendix N Nitrogen to PRT.........................................(P l 4 A).... 5 R
09/28/91 09/28/91 Appendix 0 Reactor Coolant Pump Seal Retum............. (P11).... 2 R
09/28/91 09/15/89 Appendix P Demineralized Water Supply to Containment............................................(P12A).... 2 R
09/28/91 09/28/91 Appendix R Sample Line from PRT to Gas Analyzer...(P34A).... 3 R
02/05/93 02/05/93 Appendix S Sample Line from RCDT to Gas Analyzer (P34D).... 3 R
02/05/93 02/05/93 Appendix T Heating Steam to Containment.................... (PS2).... 2 R
09/28/91 09/28/91 Appendix U Containment Condensate Return................. (P53).... 3 R 00/22/92 09/22/92 Appendix V Spray System, A Train, Containment Isolation Valves.....................................................................5 C
06/09/95 09/22/92 Appendix W Spray System, B Train, Containment Isolation Valves.....................................................................5 R
01/19/93 09/22/92 Appendix X 2RE-211 and 212 Supply........................... (P-X I).... 4 R
12/05/94 09/28/91
* Indicates leak testing done with test rig located outside of containment.
* Indicates leak testing done with test rig located outside of containment.
C = Continuous Use R = Reference Use (T-Temporary Change)                                           Page1of4                                               I = Information Use
C = Continuous Use R = Reference Use (T-Temporary Change)
Page1of4 I = Information Use


NUCLEARPOWERBUSINESS UNIT                                                                                         ORTINDEX U2 OPERATIONSREFUELINGTESTS                                                                                         Revision 177 January 31,1997 INDEX UNIT 2 BlENNIAL PROCEDURE                                                                                                     REVISION                 EFFECTIVE       REVIEW NUMBER                           PROCEDURE TITLE                                                           NUMBER                       DATE           DATE Appendix Y           2RE-211 and 212 Return .... ..... ..... .... .... (P-X2).... 3                                           R           12/05/94       09/28/91 Appendix Z         Component Cooling to and from 2HX-4, Excess Letdown Heat Exchanger................. .......... 0                                           R         09/17/91       09/17/91 ORT 9 CL-1B Containment Integrity Checklist for ILRT ........... . .. 5                                                     R           08/l1/92       08/l1/92 ORT 10               Recovery from ILRT................ ...... .......................... 9                                   R           09/11/92       09/11/92 ORT 11               CVCS and CC Systems Check Valve Stroke Test..... 4                                                       R           04/16/93       04/16/93 ORT 12               Fuel Transfer Tube Flange Seal ...... .......................... 6                                       C           03/28/95       10/21/93 ORT 13               Equipment Hatch Flange Seals ..... . ..... .................... 6                                       C           03/28/95       03/25/93 ORT 15               Fuel Manipulator and Fuel Transfer System Ch ec k o u t . . . . . . . . . . . . . . .. . . . . . ... . . .. . ... .. .. ..... ..... . .. .. ... .R.. .. . 1 510/02/95       01/17/94 ORT 17               Containment Integrated Leak Rate Test......................!                                             C           03/19/93       03/19/93 ORT 18 ORT 19 ORT 20 ORT 21                                                                                                                                                               !
NUCLEARPOWERBUSINESS UNIT ORTINDEX U2 OPERATIONSREFUELINGTESTS Revision 177 January 31,1997 INDEX UNIT 2 BlENNIAL PROCEDURE REVISION EFFECTIVE REVIEW NUMBER PROCEDURE TITLE NUMBER DATE DATE Appendix Y 2RE-211 and 212 Return...................... (P-X2).... 3 R
ORT 22 ORT 23 ORT 24               SI Test Line CIVs Leakage Test..... .......................... 2                                       C           10/02/95       09/30/94 ORT 25               RCDT and Cavity Drain ................................ (P9)..14                                         C           03/28/95       03/28/95 ORT 26 Letdown Line ............................................... (P 10) ... I 1 C                                       03/28/95       02/07/94 ORT 27               Reactor Coolant Pump Seal Return ........... . (P11)..13                                               C           03/28/95       01/16/95 ORT 28               Demineralized Water Supply To Containment ,. ........................ .. ... . ......(P 12 A).. 1 I                                 C           03/28/95       08/27/93 ORT 29                                                                                                                       C Permanent Test Connection Unit 2............(P128).... 2                                                             10/25/96       10/25/96 ORT 30               RCDT To Vent Header ..............................(P 12C)... l 1                                       C           03/28/95       09/30/94 ORT 31               Nitrogen Supply to the Pressurizer Reli e f Tank..............................................(P 14 A).. 10                              C          03/28/95       05/14/93 ORT 32               Nitrogen to the Safety Injection Accumulators .......................................... (P 14C)... I 1C                                           10/16/95       10/16/95 CORT 33               Post-Accident Containment Vent Sys'em ....................................................... (P42) .. 12                           C           03/28/95       07/16/93 ORT 34               Norrr d Charging Line ................................. (P26)..14                                       C           09/22/95       09/22/95   --
12/05/94 09/28/91 Appendix Z Component Cooling to and from 2HX-4, Excess Letdown Heat Exchanger........................... 0 R
ORT 35               Hot Leg Sample Line.................................(P28A)..12                                         C           03/28/95       04/16/93 ORT 36               Pressurizer Liquid Sample Line... .............(P28B).... 8                                             C           03/28/95       11/30/93 ORT 37               Pressurizer Steam Space Sample Line.......(P28C).... 9                                                 C           03/28/95       11/30/93 ORT 38 ORT 39               Seal Injection to 2P-1 A .......... ...................(P29A)..12                                     C           03/28/95       06/29/92 ORT 40               Seal Injection to 2P-1 B ..............................(P29B)..12                                     C           03/28/95       06/29/92       l
09/17/91 09/17/91 ORT 9 CL-1B Containment Integrity Checklist for ILRT.............. 5 R
08/l1/92 08/l1/92 ORT 10 Recovery from ILRT................................................ 9 R
09/11/92 09/11/92 ORT 11 CVCS and CC Systems Check Valve Stroke Test..... 4 R
04/16/93 04/16/93 ORT 12 Fuel Transfer Tube Flange Seal................................ 6 C
03/28/95 10/21/93 ORT 13 Equipment Hatch Flange Seals............................... 6 C
03/28/95 03/25/93 ORT 15 Fuel Manipulator and Fuel Transfer System Ch ec k o u t............................................................ 1 5 R
10/02/95 01/17/94 ORT 17 Containment Integrated Leak Rate Test......................!
C 03/19/93 03/19/93 ORT 18 ORT 19 ORT 20 ORT 21 ORT 22 ORT 23 ORT 24 SI Test Line CIVs Leakage Test............................... 2 C
10/02/95 09/30/94 ORT 25 RCDT and Cavity Drain................................ (P9)..14 C
03/28/95 03/28/95 ORT 26 Letdown Line............................................... (P 10)... I 1 C 03/28/95 02/07/94 ORT 27 Reactor Coolant Pump Seal Return............ (P11)..13 C
03/28/95 01/16/95 ORT 28 Demineralized Water Supply To Containment,.....................................(P 12 A).. 1 I C
03/28/95 08/27/93 ORT 29 Permanent Test Connection Unit 2............(P128).... 2 C
10/25/96 10/25/96 ORT 30 RCDT To Vent Header..............................(P 12C)... l 1 C
03/28/95 09/30/94 ORT 31 Nitrogen Supply to the Pressurizer Reli e f Tank..............................................(P 14 A).. 10C 03/28/95 05/14/93 ORT 32 Nitrogen to the Safety Injection Accumulators.......................................... (P 14C)... I 1C 10/16/95 10/16/95 CORT 33 Post-Accident Containment Vent Sys'em....................................................... (P42).. 12 C
03/28/95 07/16/93 ORT 34 Norrr d Charging Line................................. (P26)..14 C
09/22/95 09/22/95 ORT 35 Hot Leg Sample Line.................................(P28A)..12 C
03/28/95 04/16/93 ORT 36 Pressurizer Liquid Sample Line................(P28B).... 8 C
03/28/95 11/30/93 ORT 37 Pressurizer Steam Space Sample Line.......(P28C).... 9 C
03/28/95 11/30/93 ORT 38 ORT 39 Seal Injection to 2P-1 A.............................(P29A)..12 C
03/28/95 06/29/92 ORT 40 Seal Injection to 2P-1 B..............................(P29B)..12 C
03/28/95 06/29/92
* Indicates leak testing done with test rig located outside of containment.
* Indicates leak testing done with test rig located outside of containment.
C = Continuous Use R = Reference Use       l (T - Temporary Change)                                               Page 2 of 4                                                             I = Information Use       l l
C = Continuous Use R = Reference Use (T - Temporary Change)
Page 2 of 4 I = Information Use


NUCLEARPOWER BUSINESSUNIT                                                               ORTINDEX U2 OPERATIONSREFUELINGTESTS                                                               Revision 177 January 31,1997 INDEX UNIT 2
NUCLEARPOWER BUSINESSUNIT ORTINDEX U2 OPERATIONSREFUELINGTESTS Revision 177 January 31,1997 INDEX UNIT 2
. {O           PROCEDURE                                                                           REVISION     EFFECTIVE BIENNIAL REVIEW NUMBER                       PROCEDURE RTLE                                       NUMBER           DATE           DATE ORT 41                                                                                       C      10/25/96      10/25/96 Permanent Test Connection Unit 2... ........(P30A).... 2 ORT 42                                                                                        C     02/06/95      09/30/94 RMUW To Containment................. ..........(P30C)..12
. {O BIENNIAL PROCEDURE REVISION EFFECTIVE REVIEW NUMBER PROCEDURE RTLE NUMBER DATE DATE ORT 41 Permanent Test Connection Unit 2...........(P30A).... 2 C
* ORT 43             Containment Sampling Line ......................(P31 B).... 7               C     04/21/95       08/02/93
10/25/96 10/25/96 ORT 42 RMUW To Containment...........................(P30C)..12 C
              ' ORT 44             Post-Accident Containment Ventilation System - Vent.......................................... (P31 C)... I 5     C     03/28/95       01/16/95 ORT 45 ORT 46           Auxiliary Charging Line............................(P32C)..12               C     09/22/95       09/22/95
02/06/95 09/30/94
            *0RT 47             Instrument Air Supply........................... . ..(P33A)...I 0           C     02/06/95       02/06/95
* ORT 43 Containment Sampling Line......................(P31 B).... 7 C
            ' ORT 48             Instrument Air Supply................ ...............(P33B).... 8           C     02/06/95       02/06/95
04/21/95 08/02/93
            ' ORT 49             Service Air Supply to Containment...........(P33C)..10                       C     03/28/95
' ORT 44 Post-Accident Containment Ventilation System - Vent.......................................... (P31 C)... I 5 C
'                                                                                                                                  05/14/93 l ORT 50               PRT to Gas Analyzer, Sample Line. .........(P34A).... 7                     C     01/31/97       02/06/95 ORT 51             "A" Steam Generator Sample Isolation .....(P34B).... 7                       C     02/06/95       02/06/95 ORT 52             "B" Steam Generator Sample Isolation......(P34C).... 7                       C     09/20/96       02/13/95 ORT 53             RCDT to Gas Analyzer Sample Line.........(P34D).... 8                       C     03/28/95       09/30/94 ORT 54                                                                                         C    04/03/95 Steam Generator B Blowdown .................... (P50).... 9                                       04/26/93 ORT 55                                                                                         C    04/03/95 Steam Generator A Blowdown.................... (P51).... 9                                       04/26/93 ORT 56             Heating Steam to Containment.................... (PS2).... 9                 C     04/03/95       08/02/93 w       ORT 57 Containment Condensate Retum ................. (P53)..10 C                         07/21/95       08/15/94 ORT 58 Containment Test Connection...................... (P56).... 8 C                   04/03/95       04/16/93
03/28/95 01/16/95 ORT 45 ORT 46 Auxiliary Charging Line............................(P32C)..12 C
* ORT 59             Train A Spray System CIV Leakage Test.... (P54)...!8                         C     01/31/97       09/30/94
09/22/95 09/22/95
          ' ORT 60             Train B Spray System CIV Leakage Test.... (P55)..18                         C     01/31/97       11/18/93     '
*0RT 47 Instrument Air Supply..............................(P33A)...I 0 C
          ' ORT 61             Containment Sump A Drain.......... .. ........ .. (P71)..10                 C     04/03/95       10/14/94 ORT 64               RE-211 and 212 Supply...... ...... . ... ..........(PX 1)... ] I             C     04/03/95       08/02/93 ORT 65 RE-211 and 212 Retum .. .... ...... ......... .....(PX2)..19                 C   04/03/95       12/21/93
02/06/95 02/06/95
* ORT 66A Containment Pressure .. ....... .. ...... ..........(P31 A).... 8C               02/13/95       02/13/95 ORT 66B Containment Pressure ........................ . .....(P14B).... 6C               02/13/95       02/13/95 ORT 66C                                                                                   6 Containment Pressure ................................(P32A)....             C   02/13/95       02/13/95 ORT 67             Component Cooling Water to and from the Excess Letdown Heat Exchanger, Unit 2 - Refueling Shutdown.............. (P19,20)..13                   C     01/31/97       07/16/93 ORT 68               Component Cooling Water to and from 2P-1 A - Refueling Shutdown.............. (P15,17)..14                   C     04/03/95       07/16/93 ORT 69               Component Cooling Water to and from 2P-1B - Refueling Shutdown.............. (P16,18)..15                   C     04/03/95       07/08/94 ORT 70 l ORT 71               Electrical Penetration Leak Test .......... .....(PE58) ...C 7 01/31/97 ORT 72                                                                                                                04/03/95 Electrical Penetration Leak Test ........(PE20, E22).... 9                 C     01/25/97 ORT 73                                                                                                                04/03/95 Electrical Penetration Leak Test ................ .(PEl)....               C 7 01/25/97         04/03/95 O
' ORT 48 Instrument Air Supply...............................(P33B).... 8 C
02/06/95 02/06/95
' ORT 49 Service Air Supply to Containment...........(P33C)..10 C
03/28/95 05/14/93 l ORT 50 PRT to Gas Analyzer, Sample Line..........(P34A).... 7 C
01/31/97 02/06/95 ORT 51 "A" Steam Generator Sample Isolation.....(P34B).... 7 C
02/06/95 02/06/95 ORT 52 "B" Steam Generator Sample Isolation......(P34C).... 7 C
09/20/96 02/13/95 ORT 53 RCDT to Gas Analyzer Sample Line.........(P34D).... 8 C
03/28/95 09/30/94 ORT 54 Steam Generator B Blowdown.................... (P50).... 9 C
04/03/95 04/26/93 ORT 55 Steam Generator A Blowdown.................... (P51).... 9 C
04/03/95 04/26/93 ORT 56 Heating Steam to Containment.................... (PS2).... 9 C
04/03/95 08/02/93 w
ORT 57 Containment Condensate Retum................. (P53)..10 C 07/21/95 08/15/94 ORT 58 Containment Test Connection...................... (P56).... 8 C
04/03/95 04/16/93
* ORT 59 Train A Spray System CIV Leakage Test.... (P54)...!8 C
01/31/97 09/30/94
' ORT 60 Train B Spray System CIV Leakage Test.... (P55)..18 C
01/31/97 11/18/93
' ORT 61 Containment Sump A Drain...................... (P71)..10 C
04/03/95 10/14/94 ORT 64 RE-211 and 212 Supply..........................(PX 1)... ] I C
04/03/95 08/02/93 ORT 65 RE-211 and 212 Retum..........................(PX2)..19 C
04/03/95 12/21/93
* ORT 66A Containment Pressure...........................(P31 A).... 8C 02/13/95 02/13/95 ORT 66B Containment Pressure..............................(P14B).... 6C 02/13/95 02/13/95 ORT 66C Containment Pressure................................(P32A)....
6 C
02/13/95 02/13/95 ORT 67 Component Cooling Water to and from the Excess Letdown Heat Exchanger, Unit 2 - Refueling Shutdown.............. (P19,20)..13 C
01/31/97 07/16/93 ORT 68 Component Cooling Water to and from 2P-1 A - Refueling Shutdown.............. (P15,17)..14 C
04/03/95 07/16/93 ORT 69 Component Cooling Water to and from 2P-1B - Refueling Shutdown.............. (P16,18)..15 C
04/03/95 07/08/94 ORT 70 l ORT 71 Electrical Penetration Leak Test...............(PE58)... 7 C
01/31/97 04/03/95 ORT 72 Electrical Penetration Leak Test........(PE20, E22).... 9 C
01/25/97 04/03/95 ORT 73 Electrical Penetration Leak Test.................(PEl).... 7 C
01/25/97 04/03/95 O
* Indicates leak testing done with test rig located outside of containment.
* Indicates leak testing done with test rig located outside of containment.
C = Continuous Use (T - Temporary Change)                                                                                         R = Reference Use Page 3 of 4 I = Information Use
C = Continuous Use R = Reference Use (T - Temporary Change)
Page 3 of 4 I = Information Use


NUCLEARPOWERBUSINESS UNIT                                                                                                                 ORTINDEX U2 OPERATIONSREFUELINGTESTS                                                                                                                   Revision 177 January 31,1997 INDEX UNIT 2 BIENNIAL PROCEDURE                                                                                                                             REVISION       EFFECTIVE       REVIEW NUMBER                                       PROCEDURE TITLE                                                                         NUMBER           DATE           DATE_
NUCLEARPOWERBUSINESS UNIT ORTINDEX U2 OPERATIONSREFUELINGTESTS Revision 177 January 31,1997 INDEX UNIT 2 BIENNIAL PROCEDURE REVISION EFFECTIVE REVIEW NUMBER PROCEDURE TITLE NUMBER DATE DATE_
ORT 74
ORT 74
    ' ORT 75             Mechanical Penetration Leak Test..........(P50,51,
' ORT 75 Mechanical Penetration Leak Test..........(P50,51,
                            ............................................................52,53)....7                                                   C     04/03/95       04/03/95 CORT 76           Mechanical Penetration Leak Test....... ....... (P58).... 6                                                                   C     04/03/95       04/03/95
............................................................52,53)....7 C
      ' ORT 77           Mechanical Penetration Leak Test............... (P57).... 6                                                                   C     04/03/95       04/03/95
04/03/95 04/03/95 CORT 76 Mechanical Penetration Leak Test.............. (P58).... 6 C
      ' ORT 78           Mechanical Penetration Leak Test... (P71,70,69).... 6                                                                       C     04/03/95       04/03/95 CORT 79             Mechanical Penetration Leak Test.....(Fuel Trans.
04/03/95 04/03/95
                            ................................................................. Tube)....6                                             C     04/21/95       07/20/91
' ORT 77 Mechanical Penetration Leak Test............... (P57).... 6 C
    ' ORT 80             Mechanical Penetration Leak Test... (P29,13,27).... 8                                                                       C     04/21/95       04/21/95
04/03/95 04/03/95
    ' ORT 81             Mechanical Penetration Leak Test.....(P37,38,36
' ORT 78 Mechanical Penetration Leak Test... (P71,70,69).... 6 C
                            ........................................................40,48,45,
04/03/95 04/03/95 CORT 79 Mechanical Penetration Leak Test.....(Fuel Trans.
                            .........................................................44,46)....6                                                       C     04/21/95       04/21/95
................................................................. Tube)....6 C
* ORT 82             Mechanical Penetration Leak Test....(P47,43,39,
04/21/95 07/20/91
                            ......................................................35,55,54,
' ORT 80 Mechanical Penetration Leak Test... (P29,13,27).... 8 C
                            ....................................................................5,6)....5                                             C     04/21/95       04/21/95
04/21/95 04/21/95
* ORT 83             Mechanical Penetration Leak Test....(P15,16,17,
' ORT 81 Mechanical Penetration Leak Test.....(P37,38,36
                          . . .. . . . . . . .. . . . . . .. .. . . .. .. . . . . ..... ... . . . .. .. . .. ..... . .. .. I 8, 1 0, 1 1 ) . ... 5   C     Od M i95       04/21/95
........................................................40,48,45,
    ' ORT 84           Mechanical Penetration Leak Test... (P8, 7, 9,22).... 6                                                                       C     04/21/95       04/21/95 CORT 85             Eddy Current Cable Penetration .................. (P67).... 2                                                                 C     04/21/95       09/24/92
.........................................................44,46)....6 C
04/21/95 04/21/95
* ORT 82 Mechanical Penetration Leak Test....(P47,43,39,
......................................................35,55,54,
....................................................................5,6)....5 C
04/21/95 04/21/95
* ORT 83 Mechanical Penetration Leak Test....(P15,16,17,
........................................................... I 8, 1 0, 1 1 ).... 5 C
Od M i95 04/21/95
' ORT 84 Mechanical Penetration Leak Test... (P8, 7, 9,22).... 6 C
04/21/95 04/21/95 CORT 85 Eddy Current Cable Penetration.................. (P67).... 2 C
04/21/95 09/24/92 O
* Indicates leak testing done with test rig located outside of containment.
* Indicates leak testing done with test rig located outside of containment.
O C = Continuous Use R = Reference Use (T - Temporary Change)                                                                   Page 4 of 4                                                       I = Information Use
C = Continuous Use R = Reference Use (T - Temporary Change)
                                                                                                                                                          .}}
Page 4 of 4 I = Information Use
.}}

Latest revision as of 18:56, 11 December 2024

Rev 8 to Ort 73, Electrical Penetration Leak Test for Unit 1
ML20138K496
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/25/1997
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20138K159 List: ... further results
References
ORT-73, NUDOCS 9702180373
Download: ML20138K496 (7)


Text

_

[

NUCLEAR POWER BUSINESS UNIT ORT 73 OPERATIONS REFUELING TESTS MINOR Revision 8 I

ELECTRICAL PENETRATION LEAK TEST January 25.1997 UNIT 1

.i,.,

Date RECORD DSS PROCEDURE VERIFILD CURRENT AND CHECKED FOR TEMPOR/.RY CILANGES. IF FIELD COPIES REQUIRED. USE PBF-0026i LAW NP 1.2 4 AND DO E COMPLETE THIS BLOCK.

BY:

DATE:

1.0 PURPOSE The purpose of ORT 73 is to perform a refueling interval leakage test of penetration E28 in the Unit i facade, El. 39'. Completing this ORT will not affect the operability of any equipment which has cables routed through this penetration.

2.0 REFERENCES

IR 96-006, NRC Inspection Report, NRC Commitment for Operations procedure PMT/QC reviews.

3.0 PRECAUTIONS AND LIMITATIONS All electrical penetrations must be leak tested with nitrogen.

INITIALS 4.0 INITIAL CONDITIONS Permission to Perform Test The conditions required by this test are consistent with required plant conditions including equipment operability. Permission is granted to perform this test.

DSS Time Date 5.0 PROCEDURE NOTE:

This penetration msg be leak tested with nitrogen.

5.1 Open the isolation valve downstream of pressure gauge for the penetration to be tested and remove the test cap.

1 5.2 Remove the pressure gauge and Whitey valve assembly.

4 9'02180373 970210 Page1of3 CONTINUOUS USE x

7 PDR ADOCK 05000301 P

PM

NUCLEAR POWER BUSINESS UNIT ORT 73 OPERATIONS REFUELING TESTS MINOR I

Revision 8

} (g-ELECTRICAL PENETRATION LEAK TEST January 25,1997 UNIT 1 INITIALS NOTE:

Minimize the amount of time the leak rate tester is connected to the mechanicalpenetration.

5.3 Connect the test rig to the penetration test connection and test per 01-58.

5.4 Upon completion af the test, vent the penetration per 01-58.

5.5 Disconnect the test rig and replace the pressure gauge and Whitey valve assembly.

5.6 Repressurize the penetration to 15 psig. Close the isolation valve and replace the test cap.

PMT 5.7 Snoop disturbed fittings for leakage and tighten / initiate work order, as required.

6.0 EVALUATION f

TO BE COMPLETED BY OPERATIONS MANAGER OR HIS REPRESENTATIVE.

6.1 Individual leakages compared to allowable value and included in tabulation of total leak rate.

6.2 Results acceptable,0.6 L, not exceeded.

Yes No (if no, give details in the Remarks section and notify the Regulatory Services manager to determine reportability.)

6.3 Data Analyzed - By Date Remarks:

Page 2 of 3 CONTINUOUS USE

1 NUCLEAR POWER BUSINESS UNIT ORT 73 OPERATIONS REFUELING TESTS MINOR I

Revision 8 ELECTRICAL PENETRATION LEAK TEST January 25,1997 UNIT 1 LEAK TEST DATA SHEET Penetration E28 Pressure Leak Rate Time (pig)

(secm)

Test Instrument ID Range (Circle one): Low Mid High Comments:

i Test Operator Date i

1 1

Page 3 of 3 CONTINUOUS USE e

m

NUCLEARPOWERBUSINESS UNIT ORTINDEX U2 OPERATIONSREFUELINGTESTS Revision 177 January 31,1997 INDEX A

UNIT 2

)

BIENNIAL PROCEDURE REVISION EFFECTIVE REVIEW NUMBER PROCEDURE TITLE NUMBER DATE DATE ORT INDEX A Completion Status Index.......................................... 8 06/05/95 09/24/92 ORT 3 Safety Injection Actuation with Loss of i

Engineered Safeguards AC................................... 28 C

01/25/97 01/25/97 Appendix C Review of ORT 3 Test Results............................... 4 I

10/18/93 10/18/93 ORT 3A Safety Injection Actuation with Loss of Engineered Safeguards AC................................... 3 0 C

11/03/95 10/19/93 ORT 3B Safety Injection Actuation With Loss of Engineered Safeguards AC................................... 29 C

10/21/94 10/21/94 l ORT 4 Main Turbine Mechanical Overspeed Trip Device.... 9 C

01/31/97 03/04/96 ORT 6 Containment Spray Sequence Test.........................15 R

02/12/96 02/12/ %

ORT 7 Operation of Backdraft Dampers.............................. 4 R

08/19/91 08/26/93 ORT 9 Preparation for Integrated Leak Rate Test...............12 R

09/11/92 09/11/92 l

Appendix A Component Cooling to and from 2P-1 A (P15,17).... 7 R

07/21/93 07/21/93 i

Appendix B Component Cooling to and from 2P-1B (P16,18).... 6 R

09/22/92 09/22/92 Appendix C Hot Leg Sample.........................................(P28A).... 4 R

09/28/91 09/28/91 Appendix D Pressurizer Liquid Sampic.........................(P28B).... 5 R

09/28/91 09/28/91 Appendix E Pressurizer Steam Space Sample...............(P28C).... 6 R

04/16/93 04/16/93 i

Appendix F RMW to Containment................................(P30C).... 2 R

09/28/91 09/28/91 f\\

Appendix G Nitrogen to SI Accumulators.....................(P14C).... 2 R

09/28/91 09/28/91 Appendix H Instrument Air Supply................................(P33A).... 6 R

09/28/91 09/28/91 i

Appendix I Instrument Air Supply..............................(P33B).... 5 R

09/28/91 09/28/91' Appendix J "A" Steam Generator Sample..................(P34B).... 4 R

09/28/91 09/28/91 Appendix K "B" Steam Generator Sample...................(P34C).... 4 R

09/28/91 09/28/91 Appendix L "B" Steam Generator Blowdown............. (P50).... 7 R

09/22/92 09/22/92 Appendix M "A" Steam Generator Blowdown................ (PS I).... 7 R

09/22/92 09/22/92 Appendix N Nitrogen to PRT.........................................(P l 4 A).... 5 R

09/28/91 09/28/91 Appendix 0 Reactor Coolant Pump Seal Retum............. (P11).... 2 R

09/28/91 09/15/89 Appendix P Demineralized Water Supply to Containment............................................(P12A).... 2 R

09/28/91 09/28/91 Appendix R Sample Line from PRT to Gas Analyzer...(P34A).... 3 R

02/05/93 02/05/93 Appendix S Sample Line from RCDT to Gas Analyzer (P34D).... 3 R

02/05/93 02/05/93 Appendix T Heating Steam to Containment.................... (PS2).... 2 R

09/28/91 09/28/91 Appendix U Containment Condensate Return................. (P53).... 3 R 00/22/92 09/22/92 Appendix V Spray System, A Train, Containment Isolation Valves.....................................................................5 C

06/09/95 09/22/92 Appendix W Spray System, B Train, Containment Isolation Valves.....................................................................5 R

01/19/93 09/22/92 Appendix X 2RE-211 and 212 Supply........................... (P-X I).... 4 R

12/05/94 09/28/91

  • Indicates leak testing done with test rig located outside of containment.

C = Continuous Use R = Reference Use (T-Temporary Change)

Page1of4 I = Information Use

NUCLEARPOWERBUSINESS UNIT ORTINDEX U2 OPERATIONSREFUELINGTESTS Revision 177 January 31,1997 INDEX UNIT 2 BlENNIAL PROCEDURE REVISION EFFECTIVE REVIEW NUMBER PROCEDURE TITLE NUMBER DATE DATE Appendix Y 2RE-211 and 212 Return...................... (P-X2).... 3 R

12/05/94 09/28/91 Appendix Z Component Cooling to and from 2HX-4, Excess Letdown Heat Exchanger........................... 0 R

09/17/91 09/17/91 ORT 9 CL-1B Containment Integrity Checklist for ILRT.............. 5 R

08/l1/92 08/l1/92 ORT 10 Recovery from ILRT................................................ 9 R

09/11/92 09/11/92 ORT 11 CVCS and CC Systems Check Valve Stroke Test..... 4 R

04/16/93 04/16/93 ORT 12 Fuel Transfer Tube Flange Seal................................ 6 C

03/28/95 10/21/93 ORT 13 Equipment Hatch Flange Seals............................... 6 C

03/28/95 03/25/93 ORT 15 Fuel Manipulator and Fuel Transfer System Ch ec k o u t............................................................ 1 5 R

10/02/95 01/17/94 ORT 17 Containment Integrated Leak Rate Test......................!

C 03/19/93 03/19/93 ORT 18 ORT 19 ORT 20 ORT 21 ORT 22 ORT 23 ORT 24 SI Test Line CIVs Leakage Test............................... 2 C

10/02/95 09/30/94 ORT 25 RCDT and Cavity Drain................................ (P9)..14 C

03/28/95 03/28/95 ORT 26 Letdown Line............................................... (P 10)... I 1 C 03/28/95 02/07/94 ORT 27 Reactor Coolant Pump Seal Return............ (P11)..13 C

03/28/95 01/16/95 ORT 28 Demineralized Water Supply To Containment,.....................................(P 12 A).. 1 I C

03/28/95 08/27/93 ORT 29 Permanent Test Connection Unit 2............(P128).... 2 C

10/25/96 10/25/96 ORT 30 RCDT To Vent Header..............................(P 12C)... l 1 C

03/28/95 09/30/94 ORT 31 Nitrogen Supply to the Pressurizer Reli e f Tank..............................................(P 14 A).. 10C 03/28/95 05/14/93 ORT 32 Nitrogen to the Safety Injection Accumulators.......................................... (P 14C)... I 1C 10/16/95 10/16/95 CORT 33 Post-Accident Containment Vent Sys'em....................................................... (P42).. 12 C

03/28/95 07/16/93 ORT 34 Norrr d Charging Line................................. (P26)..14 C

09/22/95 09/22/95 ORT 35 Hot Leg Sample Line.................................(P28A)..12 C

03/28/95 04/16/93 ORT 36 Pressurizer Liquid Sample Line................(P28B).... 8 C

03/28/95 11/30/93 ORT 37 Pressurizer Steam Space Sample Line.......(P28C).... 9 C

03/28/95 11/30/93 ORT 38 ORT 39 Seal Injection to 2P-1 A.............................(P29A)..12 C

03/28/95 06/29/92 ORT 40 Seal Injection to 2P-1 B..............................(P29B)..12 C

03/28/95 06/29/92

  • Indicates leak testing done with test rig located outside of containment.

C = Continuous Use R = Reference Use (T - Temporary Change)

Page 2 of 4 I = Information Use

NUCLEARPOWER BUSINESSUNIT ORTINDEX U2 OPERATIONSREFUELINGTESTS Revision 177 January 31,1997 INDEX UNIT 2

. {O BIENNIAL PROCEDURE REVISION EFFECTIVE REVIEW NUMBER PROCEDURE RTLE NUMBER DATE DATE ORT 41 Permanent Test Connection Unit 2...........(P30A).... 2 C

10/25/96 10/25/96 ORT 42 RMUW To Containment...........................(P30C)..12 C

02/06/95 09/30/94

  • ORT 43 Containment Sampling Line......................(P31 B).... 7 C

04/21/95 08/02/93

' ORT 44 Post-Accident Containment Ventilation System - Vent.......................................... (P31 C)... I 5 C

03/28/95 01/16/95 ORT 45 ORT 46 Auxiliary Charging Line............................(P32C)..12 C

09/22/95 09/22/95

  • 0RT 47 Instrument Air Supply..............................(P33A)...I 0 C

02/06/95 02/06/95

' ORT 48 Instrument Air Supply...............................(P33B).... 8 C

02/06/95 02/06/95

' ORT 49 Service Air Supply to Containment...........(P33C)..10 C

03/28/95 05/14/93 l ORT 50 PRT to Gas Analyzer, Sample Line..........(P34A).... 7 C

01/31/97 02/06/95 ORT 51 "A" Steam Generator Sample Isolation.....(P34B).... 7 C

02/06/95 02/06/95 ORT 52 "B" Steam Generator Sample Isolation......(P34C).... 7 C

09/20/96 02/13/95 ORT 53 RCDT to Gas Analyzer Sample Line.........(P34D).... 8 C

03/28/95 09/30/94 ORT 54 Steam Generator B Blowdown.................... (P50).... 9 C

04/03/95 04/26/93 ORT 55 Steam Generator A Blowdown.................... (P51).... 9 C

04/03/95 04/26/93 ORT 56 Heating Steam to Containment.................... (PS2).... 9 C

04/03/95 08/02/93 w

ORT 57 Containment Condensate Retum................. (P53)..10 C 07/21/95 08/15/94 ORT 58 Containment Test Connection...................... (P56).... 8 C

04/03/95 04/16/93

  • ORT 59 Train A Spray System CIV Leakage Test.... (P54)...!8 C

01/31/97 09/30/94

' ORT 60 Train B Spray System CIV Leakage Test.... (P55)..18 C

01/31/97 11/18/93

' ORT 61 Containment Sump A Drain...................... (P71)..10 C

04/03/95 10/14/94 ORT 64 RE-211 and 212 Supply..........................(PX 1)... ] I C

04/03/95 08/02/93 ORT 65 RE-211 and 212 Retum..........................(PX2)..19 C

04/03/95 12/21/93

  • ORT 66A Containment Pressure...........................(P31 A).... 8C 02/13/95 02/13/95 ORT 66B Containment Pressure..............................(P14B).... 6C 02/13/95 02/13/95 ORT 66C Containment Pressure................................(P32A)....

6 C

02/13/95 02/13/95 ORT 67 Component Cooling Water to and from the Excess Letdown Heat Exchanger, Unit 2 - Refueling Shutdown.............. (P19,20)..13 C

01/31/97 07/16/93 ORT 68 Component Cooling Water to and from 2P-1 A - Refueling Shutdown.............. (P15,17)..14 C

04/03/95 07/16/93 ORT 69 Component Cooling Water to and from 2P-1B - Refueling Shutdown.............. (P16,18)..15 C

04/03/95 07/08/94 ORT 70 l ORT 71 Electrical Penetration Leak Test...............(PE58)... 7 C

01/31/97 04/03/95 ORT 72 Electrical Penetration Leak Test........(PE20, E22).... 9 C

01/25/97 04/03/95 ORT 73 Electrical Penetration Leak Test.................(PEl).... 7 C

01/25/97 04/03/95 O

  • Indicates leak testing done with test rig located outside of containment.

C = Continuous Use R = Reference Use (T - Temporary Change)

Page 3 of 4 I = Information Use

NUCLEARPOWERBUSINESS UNIT ORTINDEX U2 OPERATIONSREFUELINGTESTS Revision 177 January 31,1997 INDEX UNIT 2 BIENNIAL PROCEDURE REVISION EFFECTIVE REVIEW NUMBER PROCEDURE TITLE NUMBER DATE DATE_

ORT 74

' ORT 75 Mechanical Penetration Leak Test..........(P50,51,

............................................................52,53)....7 C

04/03/95 04/03/95 CORT 76 Mechanical Penetration Leak Test.............. (P58).... 6 C

04/03/95 04/03/95

' ORT 77 Mechanical Penetration Leak Test............... (P57).... 6 C

04/03/95 04/03/95

' ORT 78 Mechanical Penetration Leak Test... (P71,70,69).... 6 C

04/03/95 04/03/95 CORT 79 Mechanical Penetration Leak Test.....(Fuel Trans.

................................................................. Tube)....6 C

04/21/95 07/20/91

' ORT 80 Mechanical Penetration Leak Test... (P29,13,27).... 8 C

04/21/95 04/21/95

' ORT 81 Mechanical Penetration Leak Test.....(P37,38,36

........................................................40,48,45,

.........................................................44,46)....6 C

04/21/95 04/21/95

......................................................35,55,54,

....................................................................5,6)....5 C

04/21/95 04/21/95

........................................................... I 8, 1 0, 1 1 ).... 5 C

Od M i95 04/21/95

' ORT 84 Mechanical Penetration Leak Test... (P8, 7, 9,22).... 6 C

04/21/95 04/21/95 CORT 85 Eddy Current Cable Penetration.................. (P67).... 2 C

04/21/95 09/24/92 O

  • Indicates leak testing done with test rig located outside of containment.

C = Continuous Use R = Reference Use (T - Temporary Change)

Page 4 of 4 I = Information Use

.