ML20204C167: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 3
| page count = 3
| project =  
| project = TAC:54373
| stage = Approval
| stage = Approval
}}
}}


=Text=
=Text=
{{#Wiki_filter:.                                                                July 22, 1986 Docket No. 50-267 Mr. R. O. Williams, Jr.
{{#Wiki_filter:July 22, 1986 Docket No. 50-267 Mr. R. O. Williams, Jr.
Vice President, Nuclear Operations Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201-0840
Vice President, Nuclear Operations Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201-0840


==Dear Mr. Williams:==
==Dear Mr. Williams:==
==SUBJECT:==
==SUBJECT:==
FIRE PROTECTION EXEMPTIONS FOR FORT ST. VRAIN We are responding to your letter dated April 28, 1986, regarding an exemption from fire protection requirements pursuant to 10 CFR 50.12. Although technical review of the exemptions has not been completed, your submittals adequately address the Section 50.12 special circumstances criteria.
FIRE PROTECTION EXEMPTIONS FOR FORT ST. VRAIN We are responding to your {{letter dated|date=April 28, 1986|text=letter dated April 28, 1986}}, regarding an exemption from fire protection requirements pursuant to 10 CFR 50.12. Although technical review of the exemptions has not been completed, your submittals adequately address the Section 50.12 special circumstances criteria.
Therefore, no further information need be submitted at this time.
Therefore, no further information need be submitted at this time.
Your request for schedular relief from the requirements of 10 CFR 50.48 cannot be acted upon. The Section 50.48 schedule for Fort St. Vrain has expired and therefore cannot be extended by exemption. However, in our letter dated July 10, 1985, we accepted your proposed interim compensatory measures justifying operation of the facility during the period of noncompliance. Continued operation of Fort St. Vrain is permissible based upon these measures pending completion of all required fire protection modifications.
Your request for schedular relief from the requirements of 10 CFR 50.48 cannot be acted upon. The Section 50.48 schedule for Fort St. Vrain has expired and therefore cannot be extended by exemption. However, in our {{letter dated|date=July 10, 1985|text=letter dated July 10, 1985}}, we accepted your proposed interim compensatory measures justifying operation of the facility during the period of noncompliance. Continued operation of Fort St. Vrain is permissible based upon these measures pending completion of all required fire protection modifications.
Sincerely, original si.gned by Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation cc: See next page
Sincerely, original si.gned by Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation cc: See next page
    , DISTRIBUTION:
, DISTRIBUTION:
EDocket Fileg                  WShields NRC PDR                     OGC Local POR                   FMiraglia SSPD Reading               Edordan PNoonan                     BGrimes KHeitner                   JPartlow CHinson                     NThompson 0 Lynch                     ACRS (10)                               ,
EDocket File WShields g
HBerkow                                                       s
NRC PDR OGC Local POR FMiraglia SSPD Reading Edordan PNoonan BGrimes KHeitner JPartlow CHinson NThompson 0 Lynch ACRS (10)
                                                                          /          U,    ;
U, ;
DP       SSPD     DPWRL- S PD   DPWRL             SPD   D _RLVB:SSPD  OG          PW  :SS.'D F                 KHeitner:cw   CHinson                       ch      WShields    H8'e @ow OVff/86           07/ R/86       07/g/86                  OLg%/86 07/             07/L@86 07//f/86 8607310030 860722 DR   ADOCK 0500       7
HBerkow
/
s V
H8'e @ow PW
:SS.'D D _RL B:SSPD OG DP SSPD DPWRL-S PD DPWRL SPD OLg%/86 ch WShields F
KHeitner:cw CHinson OVff/86 07/ R/86 07/g/86 07/
07/L@86 07//f/86 8607310030 860722 DR ADOCK 0500 7


p"     'd UNITED STATES
p"
  ,    f            '^
'd UNITED STATES f
n            NUCLF.AR REGULATORY COMMISSION
'^
  ,    g           , g                     WASHINGTON, D. C. 20555 ti %9f/ /                                       July 22, 1986 Docket No. 50-267 Mr. R. O. Williams, Jr.
NUCLF.AR REGULATORY COMMISSION n
Vice President, Nuclear Operations Public Service Company I               of Colorado i             P. O. Box 840 Denver, Colorado 80201-0840
g
, g WASHINGTON, D. C. 20555 ti %9f/ /
July 22, 1986 Docket No. 50-267 Mr. R. O. Williams, Jr.
Vice President, Nuclear Operations Public Service Company I
of Colorado i
P. O. Box 840 Denver, Colorado 80201-0840


==Dear Mr. Williams:==
==Dear Mr. Williams:==
==SUBJECT:==
==SUBJECT:==
FIRE PROTECTION EXEMPTIONS FOR FORT ST. VRAIN We are responding to your letter dated April 28, 1986, regarding an exemption from fire protection requirements pursuant to 10 CFR 50.12. Although technical review of the exemptions has not been completed, your submittals adequately address the Section 50.12 special circumstances criteria.
FIRE PROTECTION EXEMPTIONS FOR FORT ST. VRAIN We are responding to your {{letter dated|date=April 28, 1986|text=letter dated April 28, 1986}}, regarding an exemption from fire protection requirements pursuant to 10 CFR 50.12. Although technical review of the exemptions has not been completed, your submittals adequately address the Section 50.12 special circumstances criteria.
Therefore, no further information need be submitted at this time.
Therefore, no further information need be submitted at this time.
Your request for schedular relief from the requirements of 10 CFR 50.48 cannot be acted upon. The Section 50.48 schedule for Fort St. Vrain has expired and therefore cannot be extended by exemption. However, in our letter dated July 10, 1985, we accepted your proposed interim compensatory measures justifying operation of the facility during the period of noncompliance.
Your request for schedular relief from the requirements of 10 CFR 50.48 cannot be acted upon. The Section 50.48 schedule for Fort St. Vrain has expired and therefore cannot be extended by exemption. However, in our {{letter dated|date=July 10, 1985|text=letter dated July 10, 1985}}, we accepted your proposed interim compensatory measures justifying operation of the facility during the period of noncompliance.
Continued operation of Fort St. Vrain is permissible based upon these measures pending completion of all required fire protection modifications.
Continued operation of Fort St. Vrain is permissible based upon these measures pending completion of all required fire protection modifications.
Sincerely.
Sincerely.
Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation cc: See next page
Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation cc: See next page


Mr. R. O. Williams D"k'ir tarvice Company of Colorado     Fort St. Vrain cc:
Mr. R. O. Williams D"k'ir tarvice Company of Colorado Fort St. Vrain cc:
                "r. O. W. Warembourg, Manager         Albert J. Hazle, Director Nuclear Engineering Division           Radiation Control Division Public Service Company                 Department of Health of Colorado                         4210 East lith Avenue P. O. Box 840                           Denver, Colorado 80220 Denver, Colorado 80201 Mr. David Alberstein, 14/159A           Mr. J. W. Gahm, Manager GA Technologies, Inc.                   Nuclear Production Division Post Office Box 85608                   Public Service Company of Colorado San Diego, California 92138             16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division     Mr. L. W. Singleton, Manager Public Service Company of Cc'orado     Quality Assurance Division P. O. Box 840                           Fort St. Vrain Nuclear Station uenver, colorado 80201                 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. 0. Box 640 Platteville, Colorado 80651 Kelley, Stansfield & 0'Donnell Public Service Company Building
"r. O. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201 Mr. David Alberstein, 14/159A Mr. J. W. Gahm, Manager GA Technologies, Inc.
                .,cc.T. C00 550 15th Street Denver, Colorado 80202 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000
Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. L. W. Singleton, Manager Public Service Company of Cc'orado Quality Assurance Division P. O. Box 840 Fort St. Vrain Nuclear Station uenver, colorado 80201 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. 0. Box 640 Platteville, Colorado 80651 Kelley, Stansfield & 0'Donnell Public Service Company Building
      .        Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1800 Lincoln Street Denver, Colorado 80203
.,cc.T. C00 550 15th Street Denver, Colorado 80202 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1800 Lincoln Street Denver, Colorado 80203
          . .-.                          . _ _ _ _}}
. _ _ _ _}}

Latest revision as of 20:33, 7 December 2024

Responds to 860428 Request for Exemption from Fire Protection Requirements,Per 10CFR50.12.Although Technical Review Not Completed,Submittals Adequately Address Criteria. Request for Relief from 10CFR50.48 Cannot Be Acted Upon
ML20204C167
Person / Time
Site: Fort Saint Vrain 
Issue date: 07/22/1986
From: Heitner K
Office of Nuclear Reactor Regulation
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
References
TAC-54373, NUDOCS 8607310030
Download: ML20204C167 (3)


Text

July 22, 1986 Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

FIRE PROTECTION EXEMPTIONS FOR FORT ST. VRAIN We are responding to your letter dated April 28, 1986, regarding an exemption from fire protection requirements pursuant to 10 CFR 50.12. Although technical review of the exemptions has not been completed, your submittals adequately address the Section 50.12 special circumstances criteria.

Therefore, no further information need be submitted at this time.

Your request for schedular relief from the requirements of 10 CFR 50.48 cannot be acted upon. The Section 50.48 schedule for Fort St. Vrain has expired and therefore cannot be extended by exemption. However, in our letter dated July 10, 1985, we accepted your proposed interim compensatory measures justifying operation of the facility during the period of noncompliance. Continued operation of Fort St. Vrain is permissible based upon these measures pending completion of all required fire protection modifications.

Sincerely, original si.gned by Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation cc: See next page

, DISTRIBUTION:

EDocket File WShields g

NRC PDR OGC Local POR FMiraglia SSPD Reading Edordan PNoonan BGrimes KHeitner JPartlow CHinson NThompson 0 Lynch ACRS (10)

U, ;

HBerkow

/

s V

H8'e @ow PW

SS.'D D _RL B:SSPD OG DP SSPD DPWRL-S PD DPWRL SPD OLg%/86 ch WShields F

KHeitner:cw CHinson OVff/86 07/ R/86 07/g/86 07/

07/L@86 07//f/86 8607310030 860722 DR ADOCK 0500 7

p"

'd UNITED STATES f

'^

NUCLF.AR REGULATORY COMMISSION n

g

, g WASHINGTON, D. C. 20555 ti %9f/ /

July 22, 1986 Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company I

of Colorado i

P. O. Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

FIRE PROTECTION EXEMPTIONS FOR FORT ST. VRAIN We are responding to your letter dated April 28, 1986, regarding an exemption from fire protection requirements pursuant to 10 CFR 50.12. Although technical review of the exemptions has not been completed, your submittals adequately address the Section 50.12 special circumstances criteria.

Therefore, no further information need be submitted at this time.

Your request for schedular relief from the requirements of 10 CFR 50.48 cannot be acted upon. The Section 50.48 schedule for Fort St. Vrain has expired and therefore cannot be extended by exemption. However, in our letter dated July 10, 1985, we accepted your proposed interim compensatory measures justifying operation of the facility during the period of noncompliance.

Continued operation of Fort St. Vrain is permissible based upon these measures pending completion of all required fire protection modifications.

Sincerely.

Kenneth L. Heitner, Project Manager Standardization and Special Projects Directorate Division of PWR Licensing-B Office of Nuclear Reactor Regulation cc: See next page

Mr. R. O. Williams D"k'ir tarvice Company of Colorado Fort St. Vrain cc:

"r. O. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201 Mr. David Alberstein, 14/159A Mr. J. W. Gahm, Manager GA Technologies, Inc.

Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. L. W. Singleton, Manager Public Service Company of Cc'orado Quality Assurance Division P. O. Box 840 Fort St. Vrain Nuclear Station uenver, colorado 80201 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. 0. Box 640 Platteville, Colorado 80651 Kelley, Stansfield & 0'Donnell Public Service Company Building

.,cc.T. C00 550 15th Street Denver, Colorado 80202 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1800 Lincoln Street Denver, Colorado 80203

. _ _ _ _