| Inspection procedure (IP) 71111.21N.03 is included in the inspection plan as a placeholder for your next Design Basis Assurance Inspection (Programs). The NRC is still determining the specific technical area to replace the previously performed power-operated valves programs inspection, IP 71111.21N.02. Once the inspection area has been determined, an inspection procedure will be issued publicly at least six months prior to the start of this inspection. | | Inspection procedure (IP) 71111.21N.03 is included in the inspection plan as a placeholder for your next Design Basis Assurance Inspection (Programs). The NRC is still determining the specific technical area to replace the previously performed power-operated valves programs inspection, IP 71111.21N.02. Once the inspection area has been determined, an inspection procedure will be issued publicly at least six months prior to the start of this inspection. |
|
| |
|
| In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process (ROP). Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling. | | In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process (ROP). Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions ( Agencywide Documents Access and Management System (ADAMS) Accession No. ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID -19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other K. Peters 2 |
|
| |
|
| The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.
| | changes needed due t o changing conditions i n the COVID -19 P HE. NRC staff will contact your appropriate r egulatory af fairs staff i n order t o coordinate inspection planning and scheduling. |
|
| |
|
| Additionally, during this period the NRC will schedule an additional inspection per a revised version of Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01) for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ADAMS Accession No.
| | The NRC w ill also be performing baseline inspections of l icensee cyber security pr ograms. The specific sch edule and pr ocedure to be use d f or these inspections i s bei ng developed by the NRC staff. The staff expects t o communicate the s chedule for these inspections to each utility separately. |
|
| |
|
| ML19163A176), which included an option for relying on annunciation and operator manual actions instead of automatic protective features to isolate a power supply affected by an open phase condition. Licensees will be individually notified when the NRC schedules these inspections. | | Additionally, during this period the NRC will schedule an additional inspection per a revised version of Temporary Instruction (TI) 2515/194, Ins pection of the Licensees Implementation of Industry I nitiative Associated with t he O pen P hase Condition Design Vulnerability i n Electrical Power S ystems ( NRC B ulletin 2012- 01) for any sites w ho elect to implement t he gui dance of the Industry Initiative on Open Phase Condition, Revision 3 ( ADAMS A ccession No. |
| | ML19163A176), which included an option for relying on annunciation and operator manual actions i nstead o f automatic pr otective features to isolate a pow er supply affect ed by an open phase condition. Licensees w ill be individually not ified when the NRC s chedules t hese inspections. |
|
| |
|
| In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | In accordance with Title 10 of t he Code of Fede ral Regulations ( 10 CFR) 2.390 of the NRC s Agency Rules o f Practice and Procedure, a copy of t his l etter w ill be available electronically f or public i nspection in the N RC P ublic Document R oom o r from the Publicly Available Records (PARS) co mponent of N RC's docu ment system ( ADAMS). ADAMS i s acc essible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public E lectronic R eading Room). |
|
| |
|
| Please contact me at (817) 200-1141 with any questions you have regarding this letter. | | Please contact me at (817) 200 -1141 with any qu estions yo u have r egarding this l etter. |
|
| |
|
| Sincerely, Cornelius Digitally signed by Cornelius F. O'Keefe F. O'Keefe Date: 2021.09.01 07:20:03 -05'00' | | Sincerely, Neil F. OKeefe, Chief Projects Branch B Division of Reactor Projects |
| Neil F. OKeefe, Chief Projects Branch B Division of Reactor Projects Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89 Enclosure: | | |
| Inspection Plan cc w/ encl: Distribution via LISTSERV | | Docket Nos. 50-445 and 50- 446 License Nos. NPF -87 and NPF-89 |
| | |
| | Enclosure: |
| | Inspection Plan |
| | |
| | cc w/ encl: Distribution via LISTSERV |
|
| |
|
| ML21237A513 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: | | ML21237A513 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: |
| By: DLP Yes No Publicly Available Sensitive NRC-002 OFFICE PE:DRP/PBB SPE:DRP/PBB BC:DRP/PBB NAME JMelfi JM DProulx DLP NOKeefe nfo DATE 08/23/2021 08/23/2021 09/01/2021 | | By: DLP Yes No Publicly Available Sensitive NRC-002 OFFICE PE:DRP/PBB SPE:DRP/PBB BC:DRP/PBB NAME JMelfi JM DProulx DLP NOKeefe nfo DATE 08/23/2021 08/23/2021 09/01/2021 |
| | |
| | IP 22b Site Inspection Activity Plan Comanche Peak |
| | |
| | 07/01/2021 - 06/30/2023 |
| | |
| | Unit Start End Activity CAC Title Staff Count |
| | |
| | Security Access Authorization.01 and Access Control.02 w/PIV 2 |
| | |
| | 1, 2 7/26/2021 7/30/2021 IP 71130.01 000733 Access Authorization |
| | |
| | 1, 2 7/26/2021 7/30/2021 IP 71130.02 000734 Access Control |
| | |
| | 1, 2 7/26/2021 7/30/2021 IP 71130.09 001656 Security Plan Changes |
| | |
| | 1, 2 7/26/2021 7/30/2021 IP 71151 001338 Performance Indicator Verification |
| | |
| | Security FFD.08 1 |
| | |
| | 1, 2 8/2/2021 8/6/2021 IP 71130.08 000740 Fitness For Duty Program |
| | |
| | Comanch Peak Biennial PI&R Inspection 4 |
| | |
| | 1, 2 8/9/2021 8/13/2021 IP 71152B 000747 Problem Identification and Resolution |
| | |
| | 1, 2 8/23/2021 8/27/2021 IP 71152B 000747 Problem Identification and Resolution |
| | |
| | Security Protective Strategy.05 w/Exercise 2 |
| | |
| | 1, 2 8/16/2021 8/20/2021 IP 71130.05 000737 Protective Strategy Evaluation |
| | |
| | TI 2515/194-CP 2 |
| | |
| | 1, 2 9/6/2021 9/10/2021 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01) |
| | |
| | Inservice Inspection 2RF19 - CP 1 |
| | |
| | 2 10/11/2021 10/22/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR) |
| | |
| | RP 1,2,PI 2 |
| | |
| | 1, 2 10/18/2021 10/22/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls |
| | |
| | 1, 2 10/18/2021 10/22/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls |
| | |
| | RP 5,8 2 |
| | |
| | 1, 2 1/31/2022 2/4/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation |
| | |
| | 1, 2 1/31/2022 2/4/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation |
| | |
| | Security Access Control.02 1 |
| | |
| | 1, 2 1/24/2022 5/6/2022 IP 71130.09 001656 Security Plan Changes |
| | |
| | 1, 2 3/21/2022 3/25/2022 IP 71130.02 000734 Access Control |
| | |
| | 1, 2 3/21/2022 3/25/2022 IP 71151 001338 Performance Indicator Verification |
| | |
| | Inservice Inspection 1RF22 - CP 1 |
| | |
| | 1 4/18/2022 4/29/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR) |
| | |
| | RP 1,2,PI 2 |
| | |
| | 1, 2 4/25/2022 4/29/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls |
| | |
| | 1, 2 4/25/2022 4/29/2022 IP 71124.02 000726 Occupational ALARA Planning and Controls |
| | |
| | Prepared on 8/18/2021 1:50:05 PM 1 of 3 IP 22b Site Inspection Activity Plan |
| | |
| | EP 2022 Exercise Scenario In-Office Review 71114.08 - CP 4 |
| | |
| | 1, 2 5/22/2022 6/30/2022 IP 71114.08 000723 Exercise Evaluation Scenario Review |
| | |
| | Heat Exchanger/Sink Performance Inspection - 07T - Comanche Peak 2 |
| | |
| | 1, 2 7/25/2022 7/29/2022 IP 71111.07T 000700 Heat Sink Performance |
| | |
| | EP 2022 Biennial EP Exercise & PI Inspection - CP 4 |
| | |
| | 1, 2 7/25/2022 7/29/2022 IP 71114.01 000716 Exercise Evaluation |
| | |
| | 1, 2 7/25/2022 7/29/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes |
|
| |
|
| IP 22b Site Inspection Activity Plan Comanche Peak 07/01/2021 - 06/30/2023 Unit Start End Activity CAC Title Staff Count Security Access Authorization .01 and Access Control .02 w/PIV 2 1, 2 7/26/2021 7/30/2021 IP 71130.01 000733 Access Authorization 1, 2 7/26/2021 7/30/2021 IP 71130.02 000734 Access Control 1, 2 7/26/2021 7/30/2021 IP 71130.09 001656 Security Plan Changes 1, 2 7/26/2021 7/30/2021 IP 71151 001338 Performance Indicator Verification Security FFD .08 1 1, 2 8/2/2021 8/6/2021 IP 71130.08 000740 Fitness For Duty Program Comanch Peak Biennial PI&R Inspection 4 1, 2 8/9/2021 8/13/2021 IP 71152B 000747 Problem Identification and Resolution 1, 2 8/23/2021 8/27/2021 IP 71152B 000747 Problem Identification and Resolution Security Protective Strategy .05 w/Exercise 2 1, 2 8/16/2021 8/20/2021 IP 71130.05 000737 Protective Strategy Evaluation TI 2515/194-CP 2 1, 2 9/6/2021 9/10/2021 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)
| | 10 CFR 50.59 Inspection - 17T - Comanche Peak 3 |
| Inservice Inspection 2RF19 - CP 1 2 10/11/2021 10/22/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
| |
| RP 1,2,PI 2 1, 2 10/18/2021 10/22/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 10/18/2021 10/22/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls RP 5,8 2 1, 2 1/31/2022 2/4/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation 1, 2 1/31/2022 2/4/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Security Access Control .02 1 1, 2 1/24/2022 5/6/2022 IP 71130.09 001656 Security Plan Changes 1, 2 3/21/2022 3/25/2022 IP 71130.02 000734 Access Control 1, 2 3/21/2022 3/25/2022 IP 71151 001338 Performance Indicator Verification Inservice Inspection 1RF22 - CP 1 1 4/18/2022 4/29/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
| |
| RP 1,2,PI 2 1, 2 4/25/2022 4/29/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 4/25/2022 4/29/2022 IP 71124.02 000726 Occupational ALARA Planning and Controls Prepared on 8/18/2021 1:50:05 PM 1 of 3
| |
|
| |
|
| IP 22b Site Inspection Activity Plan EP 2022 Exercise Scenario In-Office Review 71114.08 - CP 4 1, 2 5/22/2022 6/30/2022 IP 71114.08 000723 Exercise Evaluation Scenario Review Heat Exchanger/Sink Performance Inspection - 07T - Comanche Peak 2 1, 2 7/25/2022 7/29/2022 IP 71111.07T 000700 Heat Sink Performance EP 2022 Biennial EP Exercise & PI Inspection - CP 4 1, 2 7/25/2022 7/29/2022 IP 71114.01 000716 Exercise Evaluation 1, 2 7/25/2022 7/29/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 10 CFR 50.59 Inspection - 17T - Comanche Peak 3 1, 2 9/19/2022 9/23/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - CP 6 1, 2 10/3/2022 10/7/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 10/31/2022 11/4/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing CP 2022 BRQ 3 1, 2 10/23/2022 10/29/2022 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1, 2 10/23/2022 10/29/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance EP 2022 Program & PI Inspection - CP 1 1, 2 10/24/2022 10/28/2022 IP 71114.02 000717 Alert and Notification System Testing 1, 2 10/24/2022 10/28/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 10/24/2022 10/28/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 10/24/2022 10/28/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 10/24/2022 10/28/2022 IP 71151 001397 Performance Indicator Verification Cyber Security Inspection - CP 2 1, 2 10/24/2022 10/28/2022 IP 71130.10P 000741 Cyber Security Design Bases Assurance Inspection (Program) - 21N - Comanche Peak 3 1, 2 1/1/2023 6/30/2023 IP 71111.21N.03 Design Bases Assurance Inspections (Programs) 2023 Comanche Peak Biennial PI&R 4 1, 2 1/23/2023 1/27/2023 IP 71152B 000747 Problem Identification and Resolution 1, 2 2/6/2023 2/10/2023 IP 71152B 000747 Problem Identification and Resolution RP 2,4 2 1, 2 1/30/2023 2/3/2023 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 1/30/2023 2/3/2023 IP 71124.04 000728 Occupational Dose Assessment Security FFD .08 1 1, 2 2/13/2023 2/17/2023 IP 71130.08 000740 Fitness For Duty Program Inservice Inspection 2RF20 1 2 4/24/2023 5/12/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
| | 1, 2 9/19/2022 9/23/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments |
| Prepared on 8/18/2021 1:50:05 PM 2 of 3 | | |
| | FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - CP 6 |
| | |
| | 1, 2 10/3/2022 10/7/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing |
| | |
| | 1, 2 10/31/2022 11/4/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing |
| | |
| | CP 2022 BRQ 3 |
| | |
| | 1, 2 10/23/2022 10/29/2022 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1, 2 10/23/2022 10/29/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance |
| | |
| | EP 2022 Program & PI Inspection - CP 1 |
| | |
| | 1, 2 10/24/2022 10/28/2022 IP 71114.02 000717 Alert and Notification System Testing |
| | |
| | 1, 2 10/24/2022 10/28/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System |
| | |
| | 1, 2 10/24/2022 10/28/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes |
| | |
| | 1, 2 10/24/2022 10/28/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness |
| | |
| | 1, 2 10/24/2022 10/28/2022 IP 71151 001397 Performance Indicator Verification |
| | |
| | Cyber Security Inspection - CP 2 |
| | |
| | 1, 2 10/24/2022 10/28/2022 IP 71130.10P 000741 Cyber Security |
| | |
| | Design Bases Assurance Inspection (Program) - 21N - Comanche Peak 3 |
| | |
| | 1, 2 1/1/2023 6/30/2023 IP 71111.21N.03 Design Bases Assurance Inspections (Programs) 2023 |
| | |
| | Comanche Peak Biennial PI&R 4 |
| | |
| | 1, 2 1/23/2023 1/27/2023 IP 71152B 000747 Problem Identification and Resolution |
| | |
| | 1, 2 2/6/2023 2/10/2023 IP 71152B 000747 Problem Identification and Resolution |
| | |
| | RP 2,4 2 |
| | |
| | 1, 2 1/30/2023 2/3/2023 IP 71124.02 000726 Occupational ALARA Planning and Controls |
| | |
| | 1, 2 1/30/2023 2/3/2023 IP 71124.04 000728 Occupational Dose Assessment |
| | |
| | Security FFD.08 1 |
| | |
| | 1, 2 2/13/2023 2/17/2023 IP 71130.08 000740 Fitness For Duty Program |
| | |
| | Inservice Inspection 2RF20 1 |
| | |
| | 2 4/24/2023 5/12/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR) |
| | |
| | Prepared on 8/18/2021 1:50:05 PM 2 of 3 IP 22b Site Inspection Activity Plan |
| | |
| | RP 1,3,PI 2 |
| | |
| | 1, 2 5/1/2023 5/5/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls |
| | |
| | 1, 2 5/1/2023 5/5/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation |
| | |
| | EP 2023 Exercise Scenario In-Office Rvw 71114.08 - CP 4 |
| | |
| | 1, 2 5/21/2023 6/24/2023 IP 71114.08 000723 Exercise Evaluation Scenario Review |
| | |
| | CP 2023 INITIAL EXAM 4 |
| | |
| | 1, 2 5/14/2023 5/20/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV) |
|
| |
|
| IP 22b Site Inspection Activity Plan RP 1,3,PI 2 1, 2 5/1/2023 5/5/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 5/1/2023 5/5/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation EP 2023 Exercise Scenario In-Office Rvw 71114.08 - CP 4 1, 2 5/21/2023 6/24/2023 IP 71114.08 000723 Exercise Evaluation Scenario Review CP 2023 INITIAL EXAM 4 1, 2 5/14/2023 5/20/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
| |
| 1, 2 6/11/2023 6/17/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD) | | 1, 2 6/11/2023 6/17/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD) |
| Fire Protection Inspection - CP 3 1, 2 6/12/2023 6/16/2023 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI) | | |
| | Fire Protection Inspection - CP 3 |
| | |
| | 1, 2 6/12/2023 6/16/2023 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI) |
| | |
| 1, 2 6/26/2023 6/30/2023 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI) | | 1, 2 6/26/2023 6/30/2023 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI) |
| Prepared on 8/18/2021 1:50:05 PM 3 of 3 | | |
| | Prepared on 8/18/2021 1:50:05 PM 3 of 3 |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARML24232A2262024-08-19019 August 2024 Information Request, Security IR 2024404 ML24232A2412024-08-19019 August 2024 Information Request, ISFSI Security IR 2024401 IR 05000445/20240052024-08-15015 August 2024 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2024005 and 05000446/2024005) ML24205A2162024-07-23023 July 2024 September 2024 Emergency Preparedness Program Inspection - Request for Information ML24185A1382024-07-0202 July 2024 Inservice Inspection Request for Information IR 05000445/20230062024-02-28028 February 2024 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 Reports 05000445/2023006 and 05000446/2023006 IR 05000445/20230052023-08-23023 August 2023 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2023005 and 05000446/2023005)- Mid Cycle Letter 2023 ML23068A3782023-03-0909 March 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000445/2023011 and 05000446/2023011) and Request for Information IR 05000445/20220062023-03-0101 March 2023 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022006 and 05000446/2022006) IR 05000445/20220052022-08-22022 August 2022 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022005 and 05000446/2022005) IR 05000445/20224012022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000445/2022401; 05000446/2022401 ML22124A3042022-05-0505 May 2022 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000445/2022003 and 05000446/2022003) and Request for Information IR 05000445/20210062022-03-0202 March 2022 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021006 and 05000446/2021006) ML21253A2332021-09-0909 September 2021 Request for Information: Comanche Peak Nuclear Power Plant, Units 1 and 2 (05000445 and 05000446); Occupation Radiation Safety (71124.01, 71124.02, 7511) ML21245A3072021-09-0202 September 2021 Request for Information ML21245A307 IR 05000445/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021005 and 05000446/2021005) ML21176A1292021-06-25025 June 2021 CPNPP FFD Inspection Doc Request 2021 ML21103A3982021-04-13013 April 2021 CP Security Inspection Information Request 2021403 ML21027A4322021-01-27027 January 2021 Information Request, Security IR 2021401 ML20309A3602020-11-0404 November 2020 Notification of NRC Design Bases Assurance Inspection (Teams) (Inspection Report 05000445/2021011 and 05000446/2021011) and Initial Request for Information IR 05000445/20200052020-09-0101 September 2020 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2020005 and 05000446/2020005) ML20139A1452020-05-18018 May 2020 Notification of NRC Design Bases Assurance Inspection (Programs) (05000445/2020010 and 05000446/2020010) and Initial Request for Information ML20055E1052020-03-0303 March 2020 CP2019006 Annual Assessment Letter ML20045E3512020-02-13013 February 2020 Information Request February 13, 2020 Notification of Inspection and Request for Information Comanche Peak Unit 2 NRC Inspection Report 05000446/2020002 IR 05000445/20190052019-08-30030 August 2019 Updated Inspection Plan for Comanche Peak, Units 1 and 2, Reports 05000445/2019005 and 05000446/2019005 IR 05000445/20180062019-03-0404 March 2019 Annual Assessment Letter for Comanche Peak, Units 1 and 2 (Report 05000445/2018006 and 05000446/2018006) ML19043A9442019-02-20020 February 2019 2019 CP Brq RFI Letter IR 05000445/20180052018-08-31031 August 2018 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2018005 and 05000446/2018005) IR 05000445/20170062018-03-0101 March 2018 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2017006 and 05000446/2017006) IR 05000445/20170052017-08-28028 August 2017 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2017005 and 05000446/2017005) IR 05000445/20160062017-03-0101 March 2017 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2016006 and 05000446/2016006) ML16302A1002016-10-27027 October 2016 Notification of Inspection (NRC Inspection Report 05000445/2017002 and 05000446/2017002) and Request for Information IR 05000445/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2016005 and 05000446/2016005) IR 05000445/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant (NRC Physical Security Inspection Report Numbers 05000445/2016401 and 05000446/2016401) ML16239A2522016-08-31031 August 2016 Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2016005 and 05000446/2016005) IR 05000445/20150062016-03-0202 March 2016 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2015006 and 05000446/2015006) IR 05000445/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2015005 and 05000446/2015005) IR 05000445/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant (NRC Physical Security Inspection Report Numbers 05000445/2015401 and 05000446/2015401) IR 05000445/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant (NRC Physical Security Inspection Report Numbers 05000445/2014402 and 05000446/2014402) IR 05000445/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2014006 and 05000446/2014006) IR 05000445/20130012014-03-0404 March 2014 IR 05000445-13-001 & 05000446-13-001, 02/12/2014, Comanche Peak, Units 1 & 2, Annual Assessment Inspection Plan ML13282A5002013-10-0909 October 2013 Notification of NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000445-14-008 and 05000446-14-008) and Request for Information IR 05000445/20130062013-09-0303 September 2013 (Report 05000445/2013006 and 05000446/2013006) IR 05000445/20128012013-03-0404 March 2013 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2012801 and 05000446/2012801) ML13060A4352013-03-0101 March 2013 Notification of NRC Component Design Bases Inspection IR 05000445-13-007 and 05000446-13-007, and Initial Request for Information IR 05000445/20120062012-09-0404 September 2012 Mid-Cycle Letter for Comanche Peak Nuclear Power Plant Units 1 and 2 (Reports 05000445/2012006 and 05000446/2012006) IR 05000445/20120012012-03-0505 March 2012 Annual Assessment Letter for Comanche Peak Nuclear Power Plant Units 1 and 2 (Report 05000445/2012001 and 05000446/2012001) ML1124306442011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Comanche Peak Nuclear Power Plant - Units 1 and 2 CP-201101031, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 0 (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2010, Third Interval)2011-08-0202 August 2011 Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 0 (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2010, Third Interval) CP-201101030, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 6, (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2000, Second Interval)2011-08-0202 August 2011 Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 6, (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2000, Second Interval) 2024-08-19
[Table view] Category:Letter
MONTHYEARIR 05000445/20240032024-10-30030 October 2024 Integrated Inspection Report 05000445/2024003 and 05000446/2024003 IR 05000445/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000445/2024404 and 05000446/2024404 (Public) IR 07200074/20244012024-10-10010 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200074/2024401 Public 05000445/LER-2024-002-01, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-10-0303 October 2024 Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions 05000446/LER-2024-001-01, Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-09-30030 September 2024 Unit Two, Recurring Reactor Scrams Associated with Main Feedwater System Modifications CP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel ML24031A6322024-09-11011 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4), Final Safety Analysis Report Update Schedule (EPID L-2023-LLE-0023) - Letter ML24243A0152024-09-0303 September 2024 – Notification of Comprehensive Engineering Team Inspection (05000445/2025012 and 05000446/2025012) and Request for Information ML24194A1332024-08-28028 August 2024 Issuance of Amendment Nos. 190 and 190, Respectively, Revision to Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24228A2252024-08-22022 August 2024 Relief to Use Later Code Edition for Inservice Inspection Program ML24179A0772024-08-20020 August 2024 Issuance of Amendment Nos. 189 and 189, Respectively, Extension of Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24232A2262024-08-19019 August 2024 Information Request, Security IR 2024404 ML24232A2412024-08-19019 August 2024 Information Request, ISFSI Security IR 2024401 CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000445/20240052024-08-15015 August 2024 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2024005 and 05000446/2024005) CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-13013 August 2024 (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality ML24177A2692024-08-0707 August 2024 Issuance of Amendment Nos. 188 and 188, Respectively, Revision to Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality IR 05000445/20240022024-07-31031 July 2024 Units 1 and 2 - Integrated Inspection Report 05000445/2024002 and 05000446/2024002,and Independent Spent Fuel Storage Installation Inspection Report 07200074/2024001 IR 05000445/20244032024-07-16016 July 2024 Security Baseline Inspection Report 05000445/2024403 and 05000446/2024403 (Full Report) ML24187A0372024-07-15015 July 2024 Withdrawal of Requested Licensing Action Exemption from Select Requirements of 10 CFR Part 55, Operators Licenses ML24192A1862024-07-10010 July 2024 Notification of Inspection (NRC Inspection Report 05000445/2024003 and 05000446/2024003) and Request for Information ML24185A1382024-07-0202 July 2024 Inservice Inspection Request for Information CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 IR 05000445/20244012024-06-26026 June 2024 MC&A Program Inspection Report 05000445-2024401 and 05000446-2024401 Public-Final CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 IR 05000445/20240122024-06-17017 June 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000445/2024012 and 05000446/2024012 ML24120A3632024-06-10010 June 2024 Issuance of Amendment Nos. 187 and 187, Respectively Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants 05000445/LER-1924-002, (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions2024-06-0303 June 2024 (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator 05000446/LER-2024-001, (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications2024-05-13013 May 2024 (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications 05000445/LER-2024-001, Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning2024-05-0606 May 2024 Re Potential Loss of Safety Function Due to Inoperability of Both Trains of Uninterruptible Power Supply Heating, Ventilation & Air Conditioning ML24120A3042024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Sylestine, R, Alabama-Coushatta Tribe of Texas ML24120A2902024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Bunch, J, United Keetoowah Band of Cherokee Indians ML24120A2912024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cooper, D, Apache Tribe of Oklahoma ML24120A3032024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-SpottedBird, L, Kiowa Indian Tribe ML24107B1012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cernek, J, Coushatta Tribe of Louisiana ML24120A3022024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Pierite, M, Tunica-Biloxi Tribe of Louisiana ML24120A2922024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Dotson, Delaware Nation ML24120A2952024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Johnson, L.J., Seminole Nation of Oklahoma CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters ML24120A3052024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Woommavovah, M, Comanche Nation ML24120A3072024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Yargee, W, Alabama-Quassarte Tribal Town ML24120A2932024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Garza, Jr, Juan, Kickapoo Traditional Tribe of Texas ML24120A3002024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Morrow, R K, Thlopthlocco Tribal Town ML24120A2942024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Gonzalez, B, Caddo Nation ML24120A3012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Parton, T, Wichita and Affiliated Tribes ML24120A2972024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Martin, R, Tonkawa Tribe of Oklahoma ML24120A2962024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Kaskaske, D, Kickapoo Tribe of Oklahoma 2024-09-30
[Table view] |
Text
September 1, 2021
SUBJECT:
UPDATED INSPECTION PLAN FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000445/2021005 AND 05000446/2021005)
Dear Mr. Peters:
The enclosed inspection plan lists the inspections scheduled through June 30, 2023 for the Comanche Peak Nuclear Power Plant. The U.S. Nuclear Regulatory Commission (NRC)
provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
Inspection procedure (IP) 71111.21N.03 is included in the inspection plan as a placeholder for your next Design Basis Assurance Inspection (Programs). The NRC is still determining the specific technical area to replace the previously performed power-operated valves programs inspection, IP 71111.21N.02. Once the inspection area has been determined, an inspection procedure will be issued publicly at least six months prior to the start of this inspection.
In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the Reactor Oversight Process (ROP). Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions ( Agencywide Documents Access and Management System (ADAMS) Accession No. ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here: https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID -19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other K. Peters 2
changes needed due t o changing conditions i n the COVID -19 P HE. NRC staff will contact your appropriate r egulatory af fairs staff i n order t o coordinate inspection planning and scheduling.
The NRC w ill also be performing baseline inspections of l icensee cyber security pr ograms. The specific sch edule and pr ocedure to be use d f or these inspections i s bei ng developed by the NRC staff. The staff expects t o communicate the s chedule for these inspections to each utility separately.
Additionally, during this period the NRC will schedule an additional inspection per a revised version of Temporary Instruction (TI) 2515/194, Ins pection of the Licensees Implementation of Industry I nitiative Associated with t he O pen P hase Condition Design Vulnerability i n Electrical Power S ystems ( NRC B ulletin 2012- 01) for any sites w ho elect to implement t he gui dance of the Industry Initiative on Open Phase Condition, Revision 3 ( ADAMS A ccession No.
ML19163A176), which included an option for relying on annunciation and operator manual actions i nstead o f automatic pr otective features to isolate a pow er supply affect ed by an open phase condition. Licensees w ill be individually not ified when the NRC s chedules t hese inspections.
In accordance with Title 10 of t he Code of Fede ral Regulations ( 10 CFR) 2.390 of the NRC s Agency Rules o f Practice and Procedure, a copy of t his l etter w ill be available electronically f or public i nspection in the N RC P ublic Document R oom o r from the Publicly Available Records (PARS) co mponent of N RC's docu ment system ( ADAMS). ADAMS i s acc essible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public E lectronic R eading Room).
Please contact me at (817) 200 -1141 with any qu estions yo u have r egarding this l etter.
Sincerely, Neil F. OKeefe, Chief Projects Branch B Division of Reactor Projects
Docket Nos. 50-445 and 50- 446 License Nos. NPF -87 and NPF-89
Enclosure:
Inspection Plan
cc w/ encl: Distribution via LISTSERV
ML21237A513 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: DLP Yes No Publicly Available Sensitive NRC-002 OFFICE PE:DRP/PBB SPE:DRP/PBB BC:DRP/PBB NAME JMelfi JM DProulx DLP NOKeefe nfo DATE 08/23/2021 08/23/2021 09/01/2021
IP 22b Site Inspection Activity Plan Comanche Peak
07/01/2021 - 06/30/2023
Unit Start End Activity CAC Title Staff Count
Security Access Authorization.01 and Access Control.02 w/PIV 2
1, 2 7/26/2021 7/30/2021 IP 71130.01 000733 Access Authorization
1, 2 7/26/2021 7/30/2021 IP 71130.02 000734 Access Control
1, 2 7/26/2021 7/30/2021 IP 71130.09 001656 Security Plan Changes
1, 2 7/26/2021 7/30/2021 IP 71151 001338 Performance Indicator Verification
Security FFD.08 1
1, 2 8/2/2021 8/6/2021 IP 71130.08 000740 Fitness For Duty Program
Comanch Peak Biennial PI&R Inspection 4
1, 2 8/9/2021 8/13/2021 IP 71152B 000747 Problem Identification and Resolution
1, 2 8/23/2021 8/27/2021 IP 71152B 000747 Problem Identification and Resolution
Security Protective Strategy.05 w/Exercise 2
1, 2 8/16/2021 8/20/2021 IP 71130.05 000737 Protective Strategy Evaluation
TI 2515/194-CP 2
1, 2 9/6/2021 9/10/2021 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)
Inservice Inspection 2RF19 - CP 1
2 10/11/2021 10/22/2021 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP 1,2,PI 2
1, 2 10/18/2021 10/22/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
1, 2 10/18/2021 10/22/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls
RP 5,8 2
1, 2 1/31/2022 2/4/2022 IP 71124.05 000729 Radiation Monitoring Instrumentation
1, 2 1/31/2022 2/4/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation
Security Access Control.02 1
1, 2 1/24/2022 5/6/2022 IP 71130.09 001656 Security Plan Changes
1, 2 3/21/2022 3/25/2022 IP 71130.02 000734 Access Control
1, 2 3/21/2022 3/25/2022 IP 71151 001338 Performance Indicator Verification
Inservice Inspection 1RF22 - CP 1
1 4/18/2022 4/29/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP 1,2,PI 2
1, 2 4/25/2022 4/29/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
1, 2 4/25/2022 4/29/2022 IP 71124.02 000726 Occupational ALARA Planning and Controls
Prepared on 8/18/2021 1:50:05 PM 1 of 3 IP 22b Site Inspection Activity Plan
EP 2022 Exercise Scenario In-Office Review 71114.08 - CP 4
1, 2 5/22/2022 6/30/2022 IP 71114.08 000723 Exercise Evaluation Scenario Review
Heat Exchanger/Sink Performance Inspection - 07T - Comanche Peak 2
1, 2 7/25/2022 7/29/2022 IP 71111.07T 000700 Heat Sink Performance
EP 2022 Biennial EP Exercise & PI Inspection - CP 4
1, 2 7/25/2022 7/29/2022 IP 71114.01 000716 Exercise Evaluation
1, 2 7/25/2022 7/29/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
10 CFR 50.59 Inspection - 17T - Comanche Peak 3
1, 2 9/19/2022 9/23/2022 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments
FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - CP 6
1, 2 10/3/2022 10/7/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
1, 2 10/31/2022 11/4/2022 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
CP 2022 BRQ 3
1, 2 10/23/2022 10/29/2022 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1, 2 10/23/2022 10/29/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
EP 2022 Program & PI Inspection - CP 1
1, 2 10/24/2022 10/28/2022 IP 71114.02 000717 Alert and Notification System Testing
1, 2 10/24/2022 10/28/2022 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
1, 2 10/24/2022 10/28/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1, 2 10/24/2022 10/28/2022 IP 71114.05 000720 Maintenance of Emergency Preparedness
1, 2 10/24/2022 10/28/2022 IP 71151 001397 Performance Indicator Verification
Cyber Security Inspection - CP 2
1, 2 10/24/2022 10/28/2022 IP 71130.10P 000741 Cyber Security
Design Bases Assurance Inspection (Program) - 21N - Comanche Peak 3
1, 2 1/1/2023 6/30/2023 IP 71111.21N.03 Design Bases Assurance Inspections (Programs) 2023
Comanche Peak Biennial PI&R 4
1, 2 1/23/2023 1/27/2023 IP 71152B 000747 Problem Identification and Resolution
1, 2 2/6/2023 2/10/2023 IP 71152B 000747 Problem Identification and Resolution
RP 2,4 2
1, 2 1/30/2023 2/3/2023 IP 71124.02 000726 Occupational ALARA Planning and Controls
1, 2 1/30/2023 2/3/2023 IP 71124.04 000728 Occupational Dose Assessment
Security FFD.08 1
1, 2 2/13/2023 2/17/2023 IP 71130.08 000740 Fitness For Duty Program
Inservice Inspection 2RF20 1
2 4/24/2023 5/12/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
Prepared on 8/18/2021 1:50:05 PM 2 of 3 IP 22b Site Inspection Activity Plan
RP 1,3,PI 2
1, 2 5/1/2023 5/5/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
1, 2 5/1/2023 5/5/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
EP 2023 Exercise Scenario In-Office Rvw 71114.08 - CP 4
1, 2 5/21/2023 6/24/2023 IP 71114.08 000723 Exercise Evaluation Scenario Review
CP 2023 INITIAL EXAM 4
1, 2 5/14/2023 5/20/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1, 2 6/11/2023 6/17/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
Fire Protection Inspection - CP 3
1, 2 6/12/2023 6/16/2023 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1, 2 6/26/2023 6/30/2023 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
Prepared on 8/18/2021 1:50:05 PM 3 of 3