ML20069L960: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20069L960
| number = ML20069L960
| issue date = 04/29/1983
| issue date = 04/29/1983
| title = Advises That Justification for Continued Operation Will Be Included in 830520 Submittal Per 830223 Ltr Re Environ Qualification of Electrical Equipment,In Response to 830323 Ltr.Facility Presently Shut Down for Refueling
| title = Advises That Justification for Continued Operation Will Be Included in 830520 Submittal Per Re Environ Qualification of Electrical Equipment,In Response to .Facility Presently Shut Down for Refueling
| author name = Westafer G
| author name = Westafer G
| author affiliation = FLORIDA POWER CORP.
| author affiliation = FLORIDA POWER CORP.
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
| project = TAC:42512
| stage = Other
}}
}}


Line 27: Line 29:
==Dear Sir:==
==Dear Sir:==


Florida Power Corocration (FPC) has received your letter dated March 23,1983, regarding Environmental Qualification of Electrical Equipment. This !stter requested a 30 day response to advise of any changes to FPC's February 23, 1983, submittal as a result of our review of your Safety Evaluation (SE) dated January 11,1983.
Florida Power Corocration (FPC) has received your {{letter dated|date=March 23, 1983|text=letter dated March 23,1983}}, regarding Environmental Qualification of Electrical Equipment. This !stter requested a 30 day response to advise of any changes to FPC's February 23, 1983, submittal as a result of our review of your Safety Evaluation (SE) dated January 11,1983.
l                FPC's review of this SE is continuing and any changes to the February 11,1983, submittal, will be included in the May 20,1983, submittal required by 10CFR50.49. Justification for continued operation is not required at this time since Crystal River 3 is shut down for refueling. Any necessary justification for continued operation will be included in the May 20,1983, submittal.
l                FPC's review of this SE is continuing and any changes to the February 11,1983, submittal, will be included in the May 20,1983, submittal required by 10CFR50.49. Justification for continued operation is not required at this time since Crystal River 3 is shut down for refueling. Any necessary justification for continued operation will be included in the May 20,1983, submittal.
Sincerely,
Sincerely,

Latest revision as of 11:03, 31 May 2023

Advises That Justification for Continued Operation Will Be Included in 830520 Submittal Per Re Environ Qualification of Electrical Equipment,In Response to .Facility Presently Shut Down for Refueling
ML20069L960
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/29/1983
From: Westafer G
FLORIDA POWER CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
3F-0483-29, 3F-483-29, TAC-42512, NUDOCS 8305030050
Download: ML20069L960 (1)


Text

.-

44 N%

h[k  %

scfL MMg I6[NNf8p gow aega M

Power C O a P 0 m a i e o ne April 29,1983 3F-04"3-29 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Environmental Qualification of Electrical Equipment

Dear Sir:

Florida Power Corocration (FPC) has received your letter dated March 23,1983, regarding Environmental Qualification of Electrical Equipment. This !stter requested a 30 day response to advise of any changes to FPC's February 23, 1983, submittal as a result of our review of your Safety Evaluation (SE) dated January 11,1983.

l FPC's review of this SE is continuing and any changes to the February 11,1983, submittal, will be included in the May 20,1983, submittal required by 10CFR50.49. Justification for continued operation is not required at this time since Crystal River 3 is shut down for refueling. Any necessary justification for continued operation will be included in the May 20,1983, submittal.

Sincerely,

/

G. R. Westafer gg Manager goo wo Nuclear Licensing and Fuel Management OY O@ AEF:mm t>

o" cc: Mr. James P. O'Reilly

$$ Regional Administrator, Region II oo Of fice of Inspection & Enforcement o"t U.S. Nuclear Regulatory Commission gg 101 Marietta Street N.W., Suite 2900 no Atlanta, GA 30303 (Dn.A General Office 3201 Thirty-iourtn street souin . P O Box 14042, St Petersburg. Florgsa 33733 e 813-866 5151