ML20058L200

From kanterella
Jump to navigation Jump to search
Provides Current Status of Reg Guide 1.97 Activities. Pressurizer Heater Status & Main Steam Safety/Relief Valve Position Indications Completed
ML20058L200
Person / Time
Site: Crystal River 
Issue date: 08/02/1990
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-01.097, RTR-REGGD-1.097 3F0890-01, 3F890-1, NUDOCS 9008070056
Download: ML20058L200 (2)


Text

1 E

r L

i y

C 3

kC g

COR PO R At ION August 2, 1990 3F0890-01 i

U.S. Nuclear Regulatory Commission Attn:. Document Control Desk Washington, D.

C.

20555 Sub-)ect:

Crystal River Unit 3 l

Docket No. 50-302 Operating License No. DPR-72 NUREG 0737, Supplement 1, Regulatory Guide 1.97

References:

A.

FPC to NRC letter No. 3F0189-11, dated L

January 25, 1989 B.

FPC to NRC letter No. 3F1289-12, dated December 15, 1989 t

C.

FPC to NRC letter No. 3F0190-06, dated i

January 10, 1990 Dear Sir.

l-Florida. Power Corporation (FPC) is submitting this letter to provide the current status of Regulatory Guide 1.97. activities.

The two Regulatory Guide 1.97 items identified in Reference A have been completed.

These items are the Pressurizer Heater Status Indication and the Main Steam Safety / Relief Valve Position Indications.

L.

In Reference B, FPC stated that HPI flow had been redesignated to i

be a Type A variable in accordance with-Regulatory Guide 1.97.

i Reference C subsequently described FPC's approach and schedule to

. meet Regulatory Guide 1.97 guidance for this instrumentation.

The action to upgrade the 0-200 gpm indicators, to meet safety-related criteria-with the exception of redundancy, was completed in Refuel 7 consistent with Reference'C, Item 5.

The.only outstanding action is to complete the modifications to the HPI flow indication, as described in Reference C, Item 6, during l

Refuel 8.

9008070056 900802 PDR ADOCK 05000302 i-gg3 P

PDC POST OFFICE box 219

  • CRYSTAL RIVER, FLORIDA 326294219 * (904) 7954486

/

A Florida Progress Company

~

~ -.

.c..

.l, o

August 2,.1Fie0 3F0890-01 Page 2 The above actions will compivte the FPC response to Regulatory Guide 1.97 guidance as required by Supplement 1 to NUREG-0737.

FPC will submit a complete set of revised Regulatory Guide 1.97 variable data sheets by December 31, 1990. The revised data sheets will reflect completion of modifications and operating procedure changes.

Sincerely, M. Beard, Jr.

l Senio Vice President Nuclear Operations PMB/ead cc:

Regional Administrator Region II Senior' Resident Inspector i

l l