3F0790-06, Forwards Rev 1 to Cycle 8 Core Operating Limits Rept, Correcting Typo in Note 1 of Figures 1-8 & Note 2 of Figures 1,2 & 4-8

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Cycle 8 Core Operating Limits Rept, Correcting Typo in Note 1 of Figures 1-8 & Note 2 of Figures 1,2 & 4-8
ML20055F944
Person / Time
Site: Crystal River Duke energy icon.png
Issue date: 07/12/1990
From: Beard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20055F945 List:
References
3F0790-06, 3F790-6, NUDOCS 9007200002
Download: ML20055F944 (1)


Text

.]

)

4 e i tee enT i I

C O R P O R A T I O *d July 12, 1990 '

3F0790 06 U.S. Nuclear Regulatory Commission 1 Attn: Document Control Desk Washington, D.C. 20555

Subject:

Crystal River Unit 3  !

Docket No. 50-302 Operating License No. DPR 72 Cycle 8 Core Operating Limits Report, Revision 1 .

l

Dear Sir:

Florida Power Corporation hereby submits Revision One to the Crystal River Unit 3-(CR-3) Cycle 8 Core Operating Limits Report (COLR). This revision corrects a typographical error in Note 1 of Figures 1 - 8. The revision also corrects Note 2 of Figures 1,2 and 4 - 8. Note 2, as it appeared in the original COLR, was incorrectly applied to several of the figures. The COLR and supplements thereto are required to be submitted to the NRC in accordance with CR-3 Technical Specification 6.9.1.7.

. Sincerely, ,

0 P. M. ~ Beard, Jr.

Senior Vice President Nuclear Operations Attachment PMB/BPW xc: Regional Administrator, Region II Resident Inspector 9007200002 900712

/h k

t PDR ADOCK 05000302 ip P PDC g POST OFFICE BOX 219

  • CRYSTAL RIVER, FLORIDA 32629 0219 * (904) 563 2943 A Florida Progress Company