ML20129G638: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 15: Line 15:
| document type = APPLICATION, SENIOR OPERATOR LICENSE, TEXT-LICENSE APPLICATIONS & PERMITS
| document type = APPLICATION, SENIOR OPERATOR LICENSE, TEXT-LICENSE APPLICATIONS & PERMITS
| page count = 3
| page count = 3
| project =
| stage = Request
}}
}}



Latest revision as of 14:29, 21 August 2022

Partially Withheld Application for Renewal of Senior Operator Licesne Number SOP-2866-1 by J Seelinger
ML20129G638
Person / Time
Site: Three Mile Island  Constellation icon.png
Issue date: 11/09/1978
From: Seelinger J
METROPOLITAN EDISON CO.
To: Collins P
Office of Nuclear Reactor Regulation
Shared Package
ML20125B444 List: ... further results
References
FOIA-96-207 NUDOCS 9610070245
Download: ML20129G638 (3)


Text

'

e. -.-

METROPOLITAN EDISON COMPANY suusrotarcrcentuuvwcumumscovounon POST OFFICE DOX 480 MIDDLETOWN. PENNSYLVANIA 17057 TELEPHONE 717 944 4041 o

November 9,1978 i

lir. Paul F. Collins U.S. fluclear Regulatory Comission Office of fluclear Reactor Regulation liashington, D.C. 20555

Dear ftr. Collins,

Please consider this letter as my application for renewal of my Senior Operator License. In accordance with Section 55.33 of Regulation 10CFR55, the following information is given:

1. flanc: Janes L. Seelinger -

Address:

2. Citizenship:

3 Present Classification: Unit Superintendent Technical Support, Metropolitan Edison Company, Titree Mile Island fluclear Station, Units I and !!, Middletown, Pa.

4. License Serial flumber: Senior Reactor Operator, Serial flo.: SOP-2866-1
5. Experience: During 1976 I served on the Tri! Staff as Engineer Senior. in l this position I was responsible for various engineering nanagement projects including planning and execution of the Unit I first cycle turbine generator 4 overhaul and inspection. In 1977 I was promoted to the position of Unit 11 Superintendent - Technical Support. In this position I an responsible for the coordination of the technical engineering staff, including fluclear Engie,cering, I & C Engineering, liechanical Engineering, and Electrical Engineering. In addition to the above responsibilities I participated in the Unit 11 startup and power escalation program.

I l

6. Approximate flunber of Operating flours: 118 hours0.00137 days <br />0.0328 hours <br />1.951058e-4 weeks <br />4.4899e-5 months <br /> (
7. Requalification Program: During the effective term of my license I have satisfactorily coupleted the lietropolitan Edison Company Operator Requalification Program.

^

2.282 9610070245 960924 PDR FOIA h

DEKOK96-207 PDR

l e

tir. Paul F. Collins  !

8. . Medical Examination results are sent under separate cover.

Sincerely yours, m . J ' <)

James L. 'eelinger JLS/drg

  • Enclosure 1

i 0 1 l

l W

l I

2 '4.?O 1

  • .**' .
  • 1 i .*

. l i,

4 l

i i

LICENSEE CERTIFICATION ,

l ,.

Date: November 9.1978 i

I .

4 This is to certify that James L. Seelinger has discharged his Itcense responsibilities in a competent and i safe manner during his current license period.

1 Caff P. MtIler .

Station Superintendent j

. l l

i l

6 j l

l l

2.284

.