| {{#Wiki_filter: | | {{#Wiki_filter:November 3, 2021 |
| | |
| | ==SUBJECT:== |
| | VOGTLE ELECTRICAL GENERATING PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000424/2021404 AND 05000425/2021404 |
| | |
| | ==Dear Mr. McGavin:== |
| | On October 21, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electrical Generating Plant, Units 1 and 2. On October 22, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report. |
| | |
| | No findings or violations of more than minor significance were identified during this inspection. |
| | |
| | This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. |
| | |
| | Sincerely, |
| | /RA/ |
| | Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81 |
| | |
| | ===Enclosure:=== |
| | As stated |
| | |
| | ==Inspection Report== |
| | Docket Numbers: 05000424 and 05000425 License Numbers: NPF-68 and NPF-81 Report Numbers: 05000424/2021404 and 05000425/2021404 Enterprise Identifier: I-2021-404-0012 Licensee: Southern Nuclear Operating Company, Inc. |
| | |
| | Facility: Vogtle Electrical Generating Plant, Units 1 and 2 Location: Waynesboro, Ga 30830 Inspection Dates: August 23-26, 2021 (Southern Company Corporate Office) |
| | October 18-21, 2021 (Vogtle) |
| | Inspectors: R. Patterson, Physical Security Inspector A. Richardson, Physical Security Inspector Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Enclosure |
| | |
| | =SUMMARY= |
| | The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Vogtle Electrical Generating Plant, |
| | Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. |
| | |
| | ===List of Findings and Violations=== |
| | |
| | No findings or violations of more than minor significance were identified. |
| | |
| | ===Additional Tracking Items=== |
| | None. |
| | |
| | =INSPECTION SCOPES= |
| | |
| | Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at: |
| | http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. |
| | |
| | ==SAFEGUARDS== |
| | ==71130.01 - Access Authorization== |
| | |
| | The inspectors evaluated the access authorization program. The following elements were evaluated: |
| | |
| | ===Access Authorization=== |
| | {{IP sample|IP=IP 71130.01|count=1}} |
| | : (1) Tier I: All Requirements Tier II: ( 02.05 a, b, 02.07 a, b, 02.08 a, c) |
| | Tier III: ( 02.09, 02.10 a-c) |
| | ==71130.08 - Fitness For Duty Program== |
| | |
| | The inspectors evaluated the fitness for duty program by completing the following inspection |
| | |
| | ===elements: Fitness For Duty Program=== |
| | {{IP sample|IP=IP 71130.08|count=1}} |
| | |
| | (1) |
| | * Tier I: All Requirements |
| | * Tier II: ( 02.05 a-h, 02.06 a-g, 02.07 a-e, 02.08 a, b, 02.09 a-e) |
| | * Tier III: ( 02.10, 02.11 a, 02.12 a, 02.13 a-d, 02,14 a-c) |
| | |
| | ==INSPECTION RESULTS== |
| | No findings were identified. |
| | |
| | ==EXIT MEETINGS AND DEBRIEFS== |
| | The inspectors verified no proprietary information was retained or documented in this report. |
| | * On October 22, 2021, the inspectors presented the security baseline inspection results to Stephen P. McGavin and other members of the licensee staff. |
| | |
| | =DOCUMENTS REVIEWED= |
| | |
| | Inspection Type Designation Description or Title Revision or |
| | Procedure Date |
| | 71130.01 Corrective Action 10606809 |
| | Documents 10640289 |
| | Corrective Action 10822941 |
| | Documents |
| | Resulting from |
| | Inspection |
| | Procedures 00662-C Unescorted Access Program Revision |
| | 29.0 |
| | 00665-C Vital Area Access Review Revison 10.0 |
| | AA-002 Access Authorization Program Version 8.0 |
| | AA-003 Adjudication of Derogatory Information and Appeal Process Version 4.2 |
| | AA-006 Access Authorization Confidential Information Processing Version 3.1 |
| | Procedure |
| | AA-008 Access Authorization Personnel Access Data System (PADs) Version 2.1 |
| | Procedure |
| | NMP-AD-005 Insider Mitigation Program (IMP) Access Authorization Version 9.2 |
| | NMP-AD-016 Fatigue Management Program Version 10.2 |
| | NMP-SE-023 Personnel Authorization and Badging Program Version 4.0 |
| | Self-Assessments NMP-GM-003- Check-In Self-Assessment (CISA) Plan and Report Version 3.0 |
| | F18 |
| | 71130.08 Corrective Action 19-10594136 |
| | Documents 19-10594140 |
| | 19-10594144 |
| | 19-10594148 |
| | 20-10695452 |
| | 20-10697078 |
| | 20-10697108 |
| | 20-10706195 |
| | 21-10784540 |
| | 21-10788029 |
| | 21-10789235 |
| | Inspection Type Designation Description or Title Revision or |
| | Procedure Date |
| | 21-50063923 |
| | 21-50063927 |
| | 21-50063933 |
| | 21-50063935 |
| | 21-50083075 |
| | 21-50092463 |
| | 21-50101177 |
| | Procedures 19-10599486 |
| | 20-001 SNC Corporate Policy- Fitness-For-Duty January 24, |
| | 2017 |
| | MS-FFD-001 Fitness-for-Duty Standard Operating and Collection Version 8 |
| | Procedure |
| | MS-FFD-003 Intoxilyzer Operations Version 3.1 |
| | MS-FFD-004 Random Selection and Verification Procedures Version 4.0 |
| | MS-FFD-005 Medical Review Officer Version 7.0 |
| | MS-FFD-006 Follow-up Testing Version 4.1 |
| | MS-FFD-007 Blind Performance Test/Quality Control Version 5.0 |
| | MS-FFD-008 FFD Records Version 3.2 |
| | MS-FFD-009 Contractor Review and Screening Procedure Version 2.0 |
| | MS-FFD-010 Interface and Reporting Version 4.1 |
| | MS-FFD-011 Training and Qualification of Fitness for Duty Personnel Version 6.0 |
| | MS-FFD-012 Testing for Other Legal and Illegal Substances Version 3.1 |
| | MS-FFD-013 Security of FFD Centers and Medical Facilities Version 3.2 |
| | MS-FFD-014 Call-ins to Perform Unscheduled Work Version 2.1 |
| | MS-FFD-015 Determination of Fitness Evaluations and Process Version 4.4 |
| | Self-Assessments Fleet MF/MRO 2019 Nuclear Oversight (NOS) Managing April 9, 2019 |
| | Fatigue/Medical Review Officer Audit |
| | 5 |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 IR 05000424/20244032024-05-0101 May 2024 Cyber Security Inspection Report 05000424/2024403 and 05000425/2024403 Public IR 05000424/20240012024-04-23023 April 2024 –Integrated Inspection Report 05000424/2024001 and 05000425/2024001 IR 05000424/20230062024-02-28028 February 2024 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2 - NRC Inspection Report 05000424-2023006 and 05000425-2023006 IR 05000424/20240102024-02-14014 February 2024 – Fire Protection Team Inspection Report 0500424/2024010 and 05000425/2024010 IR 05000202/20300042024-02-13013 February 2024 Integrated Inspection Report 052000250/2023004 and 05200026/2023004 IR 05000424/20230042024-02-0505 February 2024 Integrated Inspection Report 05000424-2023004 and 05000425-2023004 ML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 ML23223A0022023-08-14014 August 2023 (Vegp), Unit 3, Integrated Inspection Report 05200025/2023002 IR 05000424/20230112023-08-11011 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000424/2023011 and 05000425/2023011 ML23215A0822023-08-0404 August 2023 (Vego), Unit 3 Initial Test Program and Operational Programs Integrated 05200025/2023011 Inspection Report ML23212B0612023-07-31031 July 2023 Security Baseline Inspection Report 05200025/2023401 IR 05000424/20234012023-07-31031 July 2023 Security Baseline Inspection Report 05000424/2023401 and 05000425/2023401 (Cover Letter) ML23216A0962023-07-26026 July 2023 Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003 IR 05000424/20230022023-07-24024 July 2023 Integrated Inspection Report 05000424/2023002 and 05000425/2023002 ML23198A3802023-07-19019 July 2023 NRC Integrated Inspection Report 05200026/2023002 ML23199A0892023-07-18018 July 2023 (Vegp), Unit 4 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023007 IR 05000424/20233012023-06-30030 June 2023 NRC Operator License Examination Report 05000424/2023301 and 05000425/2023301 ML23128A2932023-05-11011 May 2023 NRC Integrated Inspection Report 05200026/2023001 ML23129A0222023-05-10010 May 2023 (Vegp), Unit 3 - Integrated Report 05200025/2023001 ML23128A3492023-05-0909 May 2023 (Vegp), Unit 4 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023006 ML23121A3202023-05-0404 May 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2023010 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 IR 05000424/20230012023-04-26026 April 2023 Integrated Inspection Report 05000424/2023001 and 05000425/2023001 IR 05000424/20230902023-03-30030 March 2023 NRC Inspection Report 05000424/2023090 and 05000425/2023090, and Investigation Report 2-2022-006; and Apparent Violation ML23083B3702023-03-24024 March 2023 Security Baseline Inspection Report 05200026/2023401 IR 05000424/20220062023-03-0101 March 2023 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2, NRC Inspection Reports 05000424/2022006 and 05000425/2022006 ML23044A3902023-02-14014 February 2023 Integrated Inspection Report05200025 2022007 ML23040A3612023-02-0909 February 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2022008 ML23040A0422023-02-0909 February 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022008 ML23033A3972023-02-0707 February 2023 NRC Integrated Inspection Report 05200026/2022007 IR 05000424/20220042023-01-23023 January 2023 Integrated Inspection Report 05000424/2022004 and 05000425/2022004 ML22356A2932022-12-23023 December 2022 Information Request for the Cyber Security Baseline Security Inspection, Notification to Perform Inspection 2024-08-26
[Table view] Category:Letter
MONTHYEARML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, (Vegp), Unit 2, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 (Vegp), Unit 2, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, (Vegp), Unit 4, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 (Vegp), Unit 4, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) IR 05000424/20244032024-05-0101 May 2024 Cyber Security Inspection Report 05000424/2024403 and 05000425/2024403 Public ML24120A2832024-04-30030 April 2024 Project Manager Reassignment NL-24-0170, Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report2024-04-25025 April 2024 Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000424/20240012024-04-23023 April 2024 –Integrated Inspection Report 05000424/2024001 and 05000425/2024001 NL-24-0154, Preservice Inspection Progam Owners Activity Report2024-04-16016 April 2024 Preservice Inspection Progam Owners Activity Report ML24030A9092024-04-10010 April 2024 Issuance of Amendment Nos. 224 and 207, Regarding Revision to Technical Specification 3.4.14 (Reactor Coolant System) Pressure Isolation Valve Leakage Surveillance Requirement 3.4.14.1 2024-09-09
[Table view] |
Text
November 3, 2021
SUBJECT:
VOGTLE ELECTRICAL GENERATING PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000424/2021404 AND 05000425/2021404
Dear Mr. McGavin:
On October 21, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electrical Generating Plant, Units 1 and 2. On October 22, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000424 and 05000425 License Numbers: NPF-68 and NPF-81 Report Numbers: 05000424/2021404 and 05000425/2021404 Enterprise Identifier: I-2021-404-0012 Licensee: Southern Nuclear Operating Company, Inc.
Facility: Vogtle Electrical Generating Plant, Units 1 and 2 Location: Waynesboro, Ga 30830 Inspection Dates: August 23-26, 2021 (Southern Company Corporate Office)
October 18-21, 2021 (Vogtle)
Inspectors: R. Patterson, Physical Security Inspector A. Richardson, Physical Security Inspector Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Vogtle Electrical Generating Plant,
Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
SAFEGUARDS
71130.01 - Access Authorization
The inspectors evaluated the access authorization program. The following elements were evaluated:
Access Authorization
Main article: IP 71130.01
- (1) Tier I: All Requirements Tier II: ( 02.05 a, b, 02.07 a, b, 02.08 a, c)
Tier III: ( 02.09, 02.10 a-c)
The inspectors evaluated the fitness for duty program by completing the following inspection
Main article: IP 71130.08
(1)
- Tier II: ( 02.05 a-h, 02.06 a-g, 02.07 a-e, 02.08 a, b, 02.09 a-e)
- Tier III: ( 02.10, 02.11 a, 02.12 a, 02.13 a-d, 02,14 a-c)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On October 22, 2021, the inspectors presented the security baseline inspection results to Stephen P. McGavin and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71130.01 Corrective Action 10606809
Documents 10640289
Corrective Action 10822941
Documents
Resulting from
Inspection
Procedures 00662-C Unescorted Access Program Revision
29.0
00665-C Vital Area Access Review Revison 10.0
AA-002 Access Authorization Program Version 8.0
AA-003 Adjudication of Derogatory Information and Appeal Process Version 4.2
AA-006 Access Authorization Confidential Information Processing Version 3.1
Procedure
AA-008 Access Authorization Personnel Access Data System (PADs) Version 2.1
Procedure
NMP-AD-005 Insider Mitigation Program (IMP) Access Authorization Version 9.2
NMP-AD-016 Fatigue Management Program Version 10.2
NMP-SE-023 Personnel Authorization and Badging Program Version 4.0
Self-Assessments NMP-GM-003- Check-In Self-Assessment (CISA) Plan and Report Version 3.0
F18
71130.08 Corrective Action 19-10594136
Documents 19-10594140
19-10594144
19-10594148
20-10695452
20-10697078
20-10697108
20-10706195
21-10784540
21-10788029
21-10789235
Inspection Type Designation Description or Title Revision or
Procedure Date
21-50063923
21-50063927
21-50063933
21-50063935
21-50083075
21-50092463
21-50101177
Procedures 19-10599486
20-001 SNC Corporate Policy- Fitness-For-Duty January 24,
2017
MS-FFD-001 Fitness-for-Duty Standard Operating and Collection Version 8
Procedure
MS-FFD-003 Intoxilyzer Operations Version 3.1
MS-FFD-004 Random Selection and Verification Procedures Version 4.0
MS-FFD-005 Medical Review Officer Version 7.0
MS-FFD-006 Follow-up Testing Version 4.1
MS-FFD-007 Blind Performance Test/Quality Control Version 5.0
MS-FFD-008 FFD Records Version 3.2
MS-FFD-009 Contractor Review and Screening Procedure Version 2.0
MS-FFD-010 Interface and Reporting Version 4.1
MS-FFD-011 Training and Qualification of Fitness for Duty Personnel Version 6.0
MS-FFD-012 Testing for Other Legal and Illegal Substances Version 3.1
MS-FFD-013 Security of FFD Centers and Medical Facilities Version 3.2
MS-FFD-014 Call-ins to Perform Unscheduled Work Version 2.1
MS-FFD-015 Determination of Fitness Evaluations and Process Version 4.4
Self-Assessments Fleet MF/MRO 2019 Nuclear Oversight (NOS) Managing April 9, 2019
Fatigue/Medical Review Officer Audit