{{#Wiki_filter:November 3, 2021
 
==SUBJECT:==
VOGTLE ELECTRICAL GENERATING PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000424/2021404 AND 05000425/2021404
 
==Dear Mr. McGavin:==
On October 21, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electrical Generating Plant, Units 1 and 2. On October 22, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
 
No findings or violations of more than minor significance were identified during this inspection.
 
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely,
/RA/
Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81
 
===Enclosure:===
As stated
 
==Inspection Report==
Docket Numbers: 05000424 and 05000425 License Numbers: NPF-68 and NPF-81 Report Numbers: 05000424/2021404 and 05000425/2021404 Enterprise Identifier: I-2021-404-0012 Licensee: Southern Nuclear Operating Company, Inc.
 
Facility: Vogtle Electrical Generating Plant, Units 1 and 2 Location: Waynesboro, Ga 30830 Inspection Dates: August 23-26, 2021 (Southern Company Corporate Office)
October 18-21, 2021 (Vogtle)
Inspectors: R. Patterson, Physical Security Inspector A. Richardson, Physical Security Inspector Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Enclosure
 
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Vogtle Electrical Generating Plant,
Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
 
===List of Findings and Violations===
 
No findings or violations of more than minor significance were identified.
 
===Additional Tracking Items===
None.
 
=INSPECTION SCOPES=
 
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
 
==SAFEGUARDS==
==71130.01 - Access Authorization==
 
The inspectors evaluated the access authorization program. The following elements were evaluated:
 
===Access Authorization===
{{IP sample|IP=IP 71130.01|count=1}}
: (1) Tier I: All Requirements Tier II: ( 02.05 a, b, 02.07 a, b, 02.08 a, c)
Tier III: ( 02.09, 02.10 a-c)
==71130.08 - Fitness For Duty Program==
 
The inspectors evaluated the fitness for duty program by completing the following inspection
 
===elements: Fitness For Duty Program===
{{IP sample|IP=IP 71130.08|count=1}}
 
    (1)
* Tier I: All Requirements
* Tier II: ( 02.05 a-h, 02.06 a-g, 02.07 a-e, 02.08 a, b, 02.09 a-e)
* Tier III: ( 02.10, 02.11 a, 02.12 a, 02.13 a-d, 02,14 a-c)
 
==INSPECTION RESULTS==
No findings were identified.
 
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
* On October 22, 2021, the inspectors presented the security baseline inspection results to Stephen P. McGavin and other members of the licensee staff.
 
=DOCUMENTS REVIEWED=
 
Inspection Type              Designation Description or Title                                      Revision or
Procedure                                                                                          Date
71130.01  Corrective Action 10606809
Documents        10640289
Corrective Action 10822941
Documents
Resulting from
Inspection
Procedures        00662-C    Unescorted Access Program                                Revision
29.0
00665-C    Vital Area Access Review                                  Revison 10.0
AA-002      Access Authorization Program                              Version 8.0
AA-003      Adjudication of Derogatory Information and Appeal Process Version 4.2
AA-006      Access Authorization Confidential Information Processing  Version 3.1
Procedure
AA-008      Access Authorization Personnel Access Data System (PADs)  Version 2.1
Procedure
NMP-AD-005  Insider Mitigation Program (IMP) Access Authorization    Version 9.2
NMP-AD-016  Fatigue Management Program                                Version 10.2
NMP-SE-023  Personnel Authorization and Badging Program              Version 4.0
Self-Assessments  NMP-GM-003- Check-In Self-Assessment (CISA) Plan and Report          Version 3.0
F18
71130.08  Corrective Action 19-10594136
Documents        19-10594140
19-10594144
19-10594148
20-10695452
20-10697078
20-10697108
20-10706195
21-10784540
21-10788029
21-10789235
Inspection Type            Designation Description or Title                                    Revision or
Procedure                                                                                        Date
21-50063923
21-50063927
21-50063933
21-50063935
21-50083075
21-50092463
21-50101177
Procedures      19-10599486
20-001    SNC Corporate Policy- Fitness-For-Duty                  January 24,
2017
MS-FFD-001  Fitness-for-Duty Standard Operating and Collection      Version 8
Procedure
MS-FFD-003  Intoxilyzer Operations                                  Version 3.1
MS-FFD-004  Random Selection and Verification Procedures            Version 4.0
MS-FFD-005  Medical Review Officer                                  Version 7.0
MS-FFD-006  Follow-up Testing                                        Version 4.1
MS-FFD-007  Blind Performance Test/Quality Control                  Version 5.0
MS-FFD-008  FFD Records                                              Version 3.2
MS-FFD-009  Contractor Review and Screening Procedure                Version 2.0
MS-FFD-010  Interface and Reporting                                  Version 4.1
MS-FFD-011  Training and Qualification of Fitness for Duty Personnel Version 6.0
MS-FFD-012  Testing for Other Legal and Illegal Substances          Version 3.1
MS-FFD-013  Security of FFD Centers and Medical Facilities          Version 3.2
MS-FFD-014  Call-ins to Perform Unscheduled Work                    Version 2.1
MS-FFD-015  Determination of Fitness Evaluations and Process        Version 4.4
Self-Assessments            Fleet MF/MRO 2019 Nuclear Oversight (NOS) Managing      April 9, 2019
Fatigue/Medical Review Officer Audit
5
}}
}}

Latest revision as of 11:58, 18 January 2022

Electrical Generating Plant, Units 1 and 2 Security Baseline Inspection Report 05000424/2021404 and 05000425/2021404
ML21307A021
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/03/2021
From: Jannette Worosilo
NRC/RGN-II/DRS/PSB2
To: Mcgavin S
Southern Nuclear Operating Co
References
IR 2021404
Download: ML21307A021 (7)


Text

November 3, 2021

SUBJECT:

VOGTLE ELECTRICAL GENERATING PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000424/2021404 AND 05000425/2021404

Dear Mr. McGavin:

On October 21, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electrical Generating Plant, Units 1 and 2. On October 22, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000424 and 05000425 License Numbers: NPF-68 and NPF-81 Report Numbers: 05000424/2021404 and 05000425/2021404 Enterprise Identifier: I-2021-404-0012 Licensee: Southern Nuclear Operating Company, Inc.

Facility: Vogtle Electrical Generating Plant, Units 1 and 2 Location: Waynesboro, Ga 30830 Inspection Dates: August 23-26, 2021 (Southern Company Corporate Office)

October 18-21, 2021 (Vogtle)

Inspectors: R. Patterson, Physical Security Inspector A. Richardson, Physical Security Inspector Approved By: Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Vogtle Electrical Generating Plant,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization

(1) Tier I: All Requirements Tier II: ( 02.05 a, b, 02.07 a, b, 02.08 a, c)

Tier III: ( 02.09, 02.10 a-c)

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

elements: Fitness For Duty Program

(1)

  • Tier I: All Requirements
  • Tier II: ( 02.05 a-h, 02.06 a-g, 02.07 a-e, 02.08 a, b, 02.09 a-e)
  • Tier III: ( 02.10, 02.11 a, 02.12 a, 02.13 a-d, 02,14 a-c)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 22, 2021, the inspectors presented the security baseline inspection results to Stephen P. McGavin and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71130.01 Corrective Action 10606809

Documents 10640289

Corrective Action 10822941

Documents

Resulting from

Inspection

Procedures 00662-C Unescorted Access Program Revision

29.0

00665-C Vital Area Access Review Revison 10.0

AA-002 Access Authorization Program Version 8.0

AA-003 Adjudication of Derogatory Information and Appeal Process Version 4.2

AA-006 Access Authorization Confidential Information Processing Version 3.1

Procedure

AA-008 Access Authorization Personnel Access Data System (PADs) Version 2.1

Procedure

NMP-AD-005 Insider Mitigation Program (IMP) Access Authorization Version 9.2

NMP-AD-016 Fatigue Management Program Version 10.2

NMP-SE-023 Personnel Authorization and Badging Program Version 4.0

Self-Assessments NMP-GM-003- Check-In Self-Assessment (CISA) Plan and Report Version 3.0

F18

71130.08 Corrective Action 19-10594136

Documents 19-10594140

19-10594144

19-10594148

20-10695452

20-10697078

20-10697108

20-10706195

21-10784540

21-10788029

21-10789235

Inspection Type Designation Description or Title Revision or

Procedure Date

21-50063923

21-50063927

21-50063933

21-50063935

21-50083075

21-50092463

21-50101177

Procedures 19-10599486

20-001 SNC Corporate Policy- Fitness-For-Duty January 24,

2017

MS-FFD-001 Fitness-for-Duty Standard Operating and Collection Version 8

Procedure

MS-FFD-003 Intoxilyzer Operations Version 3.1

MS-FFD-004 Random Selection and Verification Procedures Version 4.0

MS-FFD-005 Medical Review Officer Version 7.0

MS-FFD-006 Follow-up Testing Version 4.1

MS-FFD-007 Blind Performance Test/Quality Control Version 5.0

MS-FFD-008 FFD Records Version 3.2

MS-FFD-009 Contractor Review and Screening Procedure Version 2.0

MS-FFD-010 Interface and Reporting Version 4.1

MS-FFD-011 Training and Qualification of Fitness for Duty Personnel Version 6.0

MS-FFD-012 Testing for Other Legal and Illegal Substances Version 3.1

MS-FFD-013 Security of FFD Centers and Medical Facilities Version 3.2

MS-FFD-014 Call-ins to Perform Unscheduled Work Version 2.1

MS-FFD-015 Determination of Fitness Evaluations and Process Version 4.4

Self-Assessments Fleet MF/MRO 2019 Nuclear Oversight (NOS) Managing April 9, 2019

Fatigue/Medical Review Officer Audit

5