IR 05000424/2024010

From kanterella
Jump to navigation Jump to search
– Fire Protection Team Inspection Report 0500424/2024010 and 05000425/2024010
ML24044A180
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/14/2024
From: Ellery Coffman
NRC/RGN-II/DRS/EB2
To: Coleman J
Southern Nuclear Operating Co
References
IR 2024010
Download: ML24044A180 (10)


Text

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - FIRE PROTECTION TEAM INSPECTION REPORT 05000424/2024010 AND 05000425/2024010

Dear Jaime Coleman:

On February 8, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1 and 2 and discussed the results of this inspection with Kevin Lowe and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Daniel M. Bacon, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000424 and 05000425

License Numbers:

NPF-68 and NPF-81

Report Numbers:

05000424/2024010 and 05000425/2024010

Enterprise Identifier:

I-2024-010-0032

Licensee:

Southern Nuclear Operating Company, Inc.

Facility:

Vogtle Electric Generating Plant, Units 1 and 2

Location:

Waynesboro, GA

Inspection Dates:

January 22, 2024 to February 09, 2024

Inspectors:

E. Coffman, Senior Reactor Inspector

W. Monk, Senior Reactor Inspector

D. Strickland, Reactor Inspector

Approved By:

Daniel M. Bacon, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection team inspection at Vogtle Electric Generating Plant,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)

The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) Halon Suppression System in Fire Area 2-CB-LA-G (Unit 2 A Shutdown Room)
(2) Pre-Action sprinkler system in Fire Area 2-CB-LA-K (Unit 2 A Cable Spreading Room)
(3) Unit 2 Chemical Volume & Control System
(4) Unit 1 4.16kV Electrical Distribution System

Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Fire Brigade Training Program

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)

The inspectors verified the following:

a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) SNC1193106, Remove Credit for Fixed 8-hour Battery Backed Emergency Lighting
(2) SNC1180861, Fire Pump Surveillance Extension from Monthly to Bi-Monthly (60 Days)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On February 8, 2024, the inspectors presented the fire protection team inspection results to Kevin Lowe and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2X4AX03-05878

Hydraulic Calc for Halon System Train A RSDP

09/14/1988

X4C2301S145

Hydraulic Calc for Sprinkler System 066

08/27/1987

Calculations

X4C2301S317

Post Fire Safe Shutdown Manual Action Feasibility

2/20/2021

CR 10670241

Recurring Concern - Inspection Tasks for Cold Shutdown

Inventories are Not Retained as QA Records

2/10/2019

CR 11040381

Fire Preplans Identified Missing Information on Secondary

Fires

01/17/2024

CR 11043018

No Recurring Task Exists to Perform 14968-C Safe

Shutdown Inventory Verification

2/08/2024

Corrective Action

Documents

TE 1096556

NRC Triennial Fire Protection Inspection (TFPI) 2021

Green Licensee Identified Violation

10/21/2021

CR 11042590

NRC Identified Unsecure Cabinet

01/23/2024

CR 11042990

149868-C Safe Shutdown Inventory Verification - Fire

Protection Errors and Enhancements Needed

01/24/2024

CR 11043018

No Recurring Task Exists to Perform 14968-C Safe

Shutdown Inventory Verification - Fire Protection

01/24/2024

CR 11043157

NRC Observation for 17103-A-C-GL97 Typo

01/24/2024

CR 11043343

X4C2301S316's Compliance Strategy and Comments to

Alternate Source Power is Available

01/25/2024

CR 11043371

NRC identified procedure 14958-C inconsistency

01/25/2024

CR 11043393

Tool Not Staged at Manual Action Location

01/25/2024

CR 11043537

Pre-Action Pressure Valve 2-HV-28226 Faulty

01/25/2024

CR 11043539

Cylinder Storage Area with 7 Tanks Unsecured in the

Racks

01/25/2024

CR 11045486

Minor Inconsistencies in the Vogtle VEGP-FSAR-9

Section 9.5.3.2.3

01/31/2024

CR 11047090

Procedure Enhancement Recommended

2/05/2024

CR 11047091

LDCR Impact Review Improvement Needs Evaluation

2/05/2024

CR 11047095

24 FPTI FSAR Fire Hazards Discrepancy with

Calculation and Procedure

2/05/2024

CR 11047537

24 FPTI Fire Barrier Inspections Missed

2/06/2024

71111.21N.05

Corrective Action

Documents

Resulting from

Inspection

CR 11048024

24 FPTI - Transient Combustible Permit Error

2/07/2024

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SNC1180861

Fire Pump Surveillance Extension from Monthly to bi-

monthly (60 days)

09/13/2022

2X3AQ01-00345

Fire Protection Detection Plan Aux Building Level C Unit 2

Rev. 3

2X4DB116-1

P&I Diagram for Chemical & Volume Control System

Rev. 49.0

2X4DB116-2

P&I Diagram for Chemical & Volume Control System

Rev. 49

Drawings

AX4DJ8011

Fire Areas Aux. Building Floor Plan El 143 Level C

Rev. 7

Engineering

Changes

SNC1193106

Remove Credit for Fixed 8-hour Battery Backed

Emergency Lighting

Rev. 1.0

TE 1077540

NRC INFORMATION NOTICE 2020-03: RECALL OF

MECHANICAL RATE OF RISE AND FIXED-

TEMPERATURE HEAT DETECTORS

11/10/2020

TE 1081994

NRC INFORMATION NOTICE 2020-04: OPERATING

EXPERIENCE REGARDING FAILURE OF BURIED FIRE

PROTECTION MAIN YARD PIPING

2/03/2021

Engineering

Evaluations

TE 1137667

Information Notice 2023-04: Operating Experience

Related to Fire Events

09/26/2023

2719-2

Zone 19 - Auxiliary Building - CVCS Centrifugal Charging

Pump Rooms Fire Fighting Preplan

Rev. 1.1

2720-2

Zone 20 - Auxiliary Building - CVCS Pump RM Train A

Fire Fighting Preplan

Rev. 2.1

2791-1

Zone 91 - Control Building - Level A Fire Fighting

Preplan

Rev. 4.1

Fire Plans

2803-2

Zone 103 - Control Building - Level A Fire Fighting

Preplan

Rev. 2.2

17103A-C-GL97

Safe Shutdown Actions for Fire Zones: 2037-G5, 2052-

GD, 2055-GJ

1.0

ASME NQA-1-

1994

Quality Assurance Requirements for Nuclear Facility

Applications

07/29/1994

LDCR 2021045

Update FSAR Appendix 9B to Match Plant Configuration

in the EDG Buildings

10/12/2021

V-RQ-PP-60328

OPERATION FROM REMOTE SHUTDOWN PANELS

TRAINING

06/27/2002

Miscellaneous

VEGP-FSAR-9

APPENDIX 9A FIRE HAZARDS ANALYSIS

Rev. 23

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

11903-C

Fire Protection System Alignment

Rev. 41

13744B-1

Train B Essential Chilled Water System

15.2

14005-1

Shutdown Margin and K Calculations

31.0

14710C-1

Turbine Driven AFW Remote Shutdown Panel Transfer

Switch and Control Circuit 18 Month Surveillance Test

3.0

14968-C

Safe Shutdown Inventory Verification - Fire Protection

1.0

17103A-C

Annunciator Response Procedure for Fire Alarm

Computer

45.0

18038-2

U2 Operation from Remote Shutdown Panels

37.0

18038-2

Operation from Remote Shutdown Panels

Rev. 30.0

29107-2

Halon Systems Visual Inspection

Rev. 6

29142-C

Sprinkler System 18 Month Visual Inspection and

Cleaning (FSAR Fire Protection Surveillance)

Rev. 15.3

29145-C

CABLE AND RACEWAY FIRE BARRIER AND RADIANT

ENERGY SHIELD ASSEMBLIES 18 MONTH VISUAL

INSPECTION

Rev. 21.2

2005-C

Fire Response Procedure

34.1

NMP-ES-035

Fire Protection Program

Rev. 7

NMP-ES-035-001

Fire Protection Program Implementation

Rev. 14

NMP-ES-035-014

Fleet Transient Combustible Controls

Rev. 7

NMP-HP-501-005

Inspection, Repair and Storage of the MSA G1 SCBA

Rev. 2.2

SNC-1

Quality Assurance Topical Report

26.0

VEGP-FSAR-9

Section 9.5.1 FIRE PROTECTION PROGRAM

Rev. 22

VEGP-LR-AMP-

Buried Piping and Tanks Inspection Program License

Renewal Evaluation Document

Procedures

VEGP-LR-AMP-

Fire Protection Program License Renewal Evaluation

Document

SNC1023826

Year Surveillance of Fire Barrier Penetration Seals

06/01/2017

SNC1029930

Year Fire Area Penetration Seal Visual Inspection

06/14/2022

Work Orders

SNC1066814

Month Bravo Train RMT/Shutdown Transfer Switch &

Control Circuit Surveillance

09/15/2023

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SNC1353243

2301 - A2301 Pipe Hydro Vac Excavate AT FP Piping for

UT Inspections and Visual Inspections to Support License

Renewal.

2/09/2023

SNC1562426

2301 - 22301 Pipe Excavate AT FP Piping for UT

Inspections

10/23/2023

SNC950305

Month Train Alpha Verification of Remote Shutdown

Panel Transfer Switch & Control Circuit

03/30/2022

WO

SNC1117131

Fire Barrier PM Checklist #8

04/06/2023

WO

SNC1137227

2304R4001 - REPLACE THE FLEXIBLE DISCHARGE

HOSE ON THE HALON CYLINDERS

2/23/2023

WO

SNC1257612

2304R4001 FIRE PROTECTION HALON SYS - Halon

System Inspection

01/23/2023

WO

SNC1454643

2304R4001 FIRE PROTECTION HALON SYS Perform

Halon System Visual Inspection

01/04/2024

WO SNC863469

SPRINKLER SYS INSPECT-18M (TB, CB, EDG, TUN)

2/12/2023

WO SNC991220

AUTOMATIC FIRE DETECTION OPERATIONAL TEST

(LZIP NUMBER 21813Q3F05)

05/19/2022