VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - FIRE PROTECTION TEAM INSPECTION REPORT 05000424/2024010 AND 05000425/2024010
Dear Jaime Coleman:
On February 8, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1 and 2 and discussed the results of this inspection with Kevin Lowe and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Daniel M. Bacon, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000424 and 05000425
License Numbers:
Report Numbers:
05000424/2024010 and 05000425/2024010
Enterprise Identifier:
I-2024-010-0032
Licensee:
Southern Nuclear Operating Company, Inc.
Facility:
Vogtle Electric Generating Plant, Units 1 and 2
Location:
Waynesboro, GA
Inspection Dates:
January 22, 2024 to February 09, 2024
Inspectors:
E. Coffman, Senior Reactor Inspector
W. Monk, Senior Reactor Inspector
D. Strickland, Reactor Inspector
Approved By:
Daniel M. Bacon, Chief
Engineering Branch 2
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a fire protection team inspection at Vogtle Electric Generating Plant,
Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.21N.05 - Fire Protection Team Inspection (FPTI) Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)
The inspectors verified that components and/or systems will function as required to support the credited functions stated for each sample. Additional inspection considerations are located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).
- (1) Halon Suppression System in Fire Area 2-CB-LA-G (Unit 2 A Shutdown Room)
- (2) Pre-Action sprinkler system in Fire Area 2-CB-LA-K (Unit 2 A Cable Spreading Room)
- (3) Unit 2 Chemical Volume & Control System
- (4) Unit 1 4.16kV Electrical Distribution System
Fire Protection Program Administrative Controls (IP Section 03.02) (1 Sample)
The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis. If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.
- (1) Fire Brigade Training Program
Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)
The inspectors verified the following:
a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.
b. The adequacy of the design modification, if applicable.
c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.
d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.
e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.
- (1) SNC1193106, Remove Credit for Fixed 8-hour Battery Backed Emergency Lighting
- (2) SNC1180861, Fire Pump Surveillance Extension from Monthly to Bi-Monthly (60 Days)
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On February 8, 2024, the inspectors presented the fire protection team inspection results to Kevin Lowe and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2X4AX03-05878
Hydraulic Calc for Halon System Train A RSDP
09/14/1988
X4C2301S145
Hydraulic Calc for Sprinkler System 066
08/27/1987
Calculations
X4C2301S317
Post Fire Safe Shutdown Manual Action Feasibility
2/20/2021
CR 10670241
Recurring Concern - Inspection Tasks for Cold Shutdown
Inventories are Not Retained as QA Records
2/10/2019
CR 11040381
Fire Preplans Identified Missing Information on Secondary
Fires
01/17/2024
CR 11043018
No Recurring Task Exists to Perform 14968-C Safe
Shutdown Inventory Verification
2/08/2024
Corrective Action
Documents
TE 1096556
NRC Triennial Fire Protection Inspection (TFPI) 2021
Green Licensee Identified Violation
10/21/2021
CR 11042590
NRC Identified Unsecure Cabinet
01/23/2024
CR 11042990
149868-C Safe Shutdown Inventory Verification - Fire
Protection Errors and Enhancements Needed
01/24/2024
CR 11043018
No Recurring Task Exists to Perform 14968-C Safe
Shutdown Inventory Verification - Fire Protection
01/24/2024
CR 11043157
NRC Observation for 17103-A-C-GL97 Typo
01/24/2024
CR 11043343
X4C2301S316's Compliance Strategy and Comments to
Alternate Source Power is Available
01/25/2024
CR 11043371
NRC identified procedure 14958-C inconsistency
01/25/2024
CR 11043393
Tool Not Staged at Manual Action Location
01/25/2024
CR 11043537
Pre-Action Pressure Valve 2-HV-28226 Faulty
01/25/2024
CR 11043539
Cylinder Storage Area with 7 Tanks Unsecured in the
Racks
01/25/2024
CR 11045486
Minor Inconsistencies in the Vogtle VEGP-FSAR-9
Section 9.5.3.2.3
01/31/2024
CR 11047090
Procedure Enhancement Recommended
2/05/2024
CR 11047091
LDCR Impact Review Improvement Needs Evaluation
2/05/2024
CR 11047095
24 FPTI FSAR Fire Hazards Discrepancy with
Calculation and Procedure
2/05/2024
CR 11047537
24 FPTI Fire Barrier Inspections Missed
2/06/2024
71111.21N.05
Corrective Action
Documents
Resulting from
Inspection
CR 11048024
24 FPTI - Transient Combustible Permit Error
2/07/2024
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SNC1180861
Fire Pump Surveillance Extension from Monthly to bi-
monthly (60 days)
09/13/2022
2X3AQ01-00345
Fire Protection Detection Plan Aux Building Level C Unit 2
Rev. 3
2X4DB116-1
P&I Diagram for Chemical & Volume Control System
Rev. 49.0
2X4DB116-2
P&I Diagram for Chemical & Volume Control System
Rev. 49
Drawings
AX4DJ8011
Fire Areas Aux. Building Floor Plan El 143 Level C
Rev. 7
Engineering
Changes
SNC1193106
Remove Credit for Fixed 8-hour Battery Backed
Rev. 1.0
TE 1077540
NRC INFORMATION NOTICE 2020-03: RECALL OF
MECHANICAL RATE OF RISE AND FIXED-
TEMPERATURE HEAT DETECTORS
11/10/2020
TE 1081994
NRC INFORMATION NOTICE 2020-04: OPERATING
EXPERIENCE REGARDING FAILURE OF BURIED FIRE
PROTECTION MAIN YARD PIPING
2/03/2021
Engineering
Evaluations
TE 1137667
Information Notice 2023-04: Operating Experience
Related to Fire Events
09/26/2023
2719-2
Zone 19 - Auxiliary Building - CVCS Centrifugal Charging
Pump Rooms Fire Fighting Preplan
Rev. 1.1
2720-2
Zone 20 - Auxiliary Building - CVCS Pump RM Train A
Fire Fighting Preplan
Rev. 2.1
2791-1
Zone 91 - Control Building - Level A Fire Fighting
Preplan
Rev. 4.1
Fire Plans
2803-2
Zone 103 - Control Building - Level A Fire Fighting
Preplan
Rev. 2.2
17103A-C-GL97
Safe Shutdown Actions for Fire Zones: 2037-G5, 2052-
GD, 2055-GJ
1.0
ASME NQA-1-
1994
Quality Assurance Requirements for Nuclear Facility
Applications
07/29/1994
LDCR 2021045
Update FSAR Appendix 9B to Match Plant Configuration
in the EDG Buildings
10/12/2021
V-RQ-PP-60328
OPERATION FROM REMOTE SHUTDOWN PANELS
TRAINING
06/27/2002
Miscellaneous
VEGP-FSAR-9
APPENDIX 9A FIRE HAZARDS ANALYSIS
Rev. 23
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
11903-C
Fire Protection System Alignment
Rev. 41
13744B-1
Train B Essential Chilled Water System
15.2
14005-1
Shutdown Margin and K Calculations
31.0
14710C-1
Turbine Driven AFW Remote Shutdown Panel Transfer
Switch and Control Circuit 18 Month Surveillance Test
3.0
14968-C
Safe Shutdown Inventory Verification - Fire Protection
1.0
17103A-C
Annunciator Response Procedure for Fire Alarm
Computer
45.0
18038-2
U2 Operation from Remote Shutdown Panels
37.0
18038-2
Operation from Remote Shutdown Panels
Rev. 30.0
29107-2
Halon Systems Visual Inspection
Rev. 6
29142-C
Sprinkler System 18 Month Visual Inspection and
Cleaning (FSAR Fire Protection Surveillance)
Rev. 15.3
29145-C
CABLE AND RACEWAY FIRE BARRIER AND RADIANT
ENERGY SHIELD ASSEMBLIES 18 MONTH VISUAL
INSPECTION
Rev. 21.2
2005-C
Fire Response Procedure
34.1
NMP-ES-035
Rev. 7
NMP-ES-035-001
Fire Protection Program Implementation
Rev. 14
NMP-ES-035-014
Fleet Transient Combustible Controls
Rev. 7
NMP-HP-501-005
Inspection, Repair and Storage of the MSA G1 SCBA
Rev. 2.2
SNC-1
Quality Assurance Topical Report
26.0
VEGP-FSAR-9
Section 9.5.1 FIRE PROTECTION PROGRAM
Rev. 22
VEGP-LR-AMP-
Buried Piping and Tanks Inspection Program License
Renewal Evaluation Document
Procedures
VEGP-LR-AMP-
Fire Protection Program License Renewal Evaluation
Document
SNC1023826
Year Surveillance of Fire Barrier Penetration Seals
06/01/2017
SNC1029930
Year Fire Area Penetration Seal Visual Inspection
06/14/2022
Work Orders
SNC1066814
Month Bravo Train RMT/Shutdown Transfer Switch &
Control Circuit Surveillance
09/15/2023
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SNC1353243
2301 - A2301 Pipe Hydro Vac Excavate AT FP Piping for
UT Inspections and Visual Inspections to Support License
Renewal.
2/09/2023
SNC1562426
2301 - 22301 Pipe Excavate AT FP Piping for UT
Inspections
10/23/2023
SNC950305
Month Train Alpha Verification of Remote Shutdown
Panel Transfer Switch & Control Circuit
03/30/2022
SNC1117131
Fire Barrier PM Checklist #8
04/06/2023
SNC1137227
2304R4001 - REPLACE THE FLEXIBLE DISCHARGE
HOSE ON THE HALON CYLINDERS
2/23/2023
SNC1257612
2304R4001 FIRE PROTECTION HALON SYS - Halon
System Inspection
01/23/2023
SNC1454643
2304R4001 FIRE PROTECTION HALON SYS Perform
Halon System Visual Inspection
01/04/2024
WO SNC863469
SPRINKLER SYS INSPECT-18M (TB, CB, EDG, TUN)
2/12/2023
WO SNC991220
AUTOMATIC FIRE DETECTION OPERATIONAL TEST
(LZIP NUMBER 21813Q3F05)
05/19/2022