SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 & 2 - SECURITY BASELINE INSPECTION REPORT 05000424/2023402 AND 05000425/2023402

Dear Jamie Coleman:

On October 26, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1 & 2 and discussed the results of this inspection with Mr. E. Dean III and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000424 and 05000425

License Numbers:

NPF-68 and NPF-81

Report Numbers:

05000424/2023402 and 05000425/2023402

Enterprise Identifier:

I-2023-402-0042

Licensee:

Southern Nuclear Operating Co., Inc.

Facility:

Vogtle Electric Generating Plant, Units 1 & 2

Location:

Waynesboro, GA

Inspection Dates:

August 28, 2023, to August 31, 2023 (SNC Corporate)

October 23, 2023, to October 26, 2023 (Vogtle, Units 1&2)

Inspectors:

R. Patterson, Physical Security Inspector

J. Wallo, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Vogtle Electric Generating Plant,

Units 1 & 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program. The following elements were evaluated:

Access Authorization

(1)

  • Tier I: All Requirements
  • Tier II: (02.05 a, b, 02.07 a, b, 02.08 a, c )
  • Tier III: (02.09, 02.10 a-c)

71130.06 - Protection of Safeguards Information

The inspectors evaluated the safeguards information protection program. The following elements were evaluated from this IP:

Protection of Safeguards Information (1 Sample)

(1)

  • Tier I: All Requirements
  • Tier II: All Requirements
  • Tier III: All Requirements

71130.08 - Fitness For Duty Program

The inspectors evaluated the fitness for duty program by completing the following inspection

elements: Fitness For Duty Program

(1)

  • Tier I: All Requirements
  • Tier II: (02.05 a - h, 02.06 a - g, 02.07 a-e, 02.08 a, b, 02.09 a - e)
  • Tier III: (02.10, 02.11 a, 02.12 a, 02.14 a-c)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On October 26, 2023, the inspectors presented the security baseline inspection results to Mr. E. Dean III and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

20-10733638

20-10737380

20-10742533

20-10750193

20-10753136

20-1075359

20-10754619

21-1077119

21-10778276

21-10822941

2-10852467

2-10865656

2-10883146

2-10883148

2-10883152

2-10883153

2-10884144

2-10886505

2-10886510

2-10910040

2-1106642

23-10993103

23-10993106

23-1123993

Corrective Action

Documents

23-1123996

AA-001

Access Authorization, Functions, Responsibilities, and

Administration Access Authorization Section Conduct of

Operations

Version 5.1

AA-002

Access Authorization Program

Version 8.5

AA-003

Adjudication of Derogatory Information and Appeal Process

Version 5.0

71130.01

Procedures

AA-005

EMPACT User's Guide for Access Authorization

Version 3.1

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AA-005

EMPACT User's Guide for Access Authorization

Version 3.2

AA-006

Access Authorization Confidential Information Processing

Procedure

Version 3.1

AA-007

Access Authorization Electronic Media Program

Version 5.0

AA-008

Access Authorization Personnel Access Data System

(PADS) Procedure

Version 3.1

AA-009

Access Authorization Work Processes and Functions

Procedure

Version 4.3

AA-009

Access Authorization Work Processes and Functions

Procedure

Version 4.4

AA-011

Access Authorization Criminal History Processing Procedure

Version 3.0

AA-012

Psychological Assessment Processing Procedure

Version 5.0

AA010

Access Authorizations Definitions and Acronyms

Version 2.1

NMP-SE-022

Fleet Access Outage In-Processing

Version 1.0

NMP-SE-023

Personnel Authorization and Badging Program

Version 5.4

NMP-SE-023

Personnel Authorization and Badging Program

Version 5.5

Self-Assessments

Fleet AA, FFD NOS Audit 2022

April 25,

22

10676828

10693138

10877106

10878308

10878314

10878315

10975907

Corrective Action

Documents

10977685

Enercon 2022 Safeguards Audit - SNC

December 7,

22

Surveillance Report 2018-058 Sargent & Lundy SGI Audit

Report

July 19,

2018

23 AA, FFD, SGI CISA Final

May 24,

23

71130.06

Self-Assessments

Audit Report Fleet-SEC-2022

May 31,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

22

25044

NUPIC Audit Bechtel Power Corporation

January 24,

22

25110

NUPIC Audit Sargent & Lundy, LLC

April 1, 2022

215

NUPIC Audit Enercon Services, Inc

May 23,

22

Corrective Action

Documents

11013563

MS-FFD-001

Fitness-for-Duty Standard Operating and Collection

Procedure

Version 11

MS-FFD-001

Fitness-for-duty Standard Operating Procedure

Version 10.0

MS-FFD-003

Intoxilyzer Operations

Version 3.2

MS-FFD-004

Random Selection and Verification Procedure

Version 4.0

MS-FFD-004

Random Selection and Verification Procedure

Version 5.0

MS-FFD-005

Medical Review Officer

Version 7.0

MS-FFD-005

Medical Review Officer

Version 8.0

MS-FFD-006

Follow-up Testing

Version 7.0

MS-FFD-006

Follow-up Testing

Version 6.0

MS-FFD-007

Blind Performance Test/Quality Control

Version 7.1

MS-FFD-007

Blind Performance Test/Quality Control

Version 8.0

MS-FFD-008

FFD Records

Version 3.3

MS-FFD-008

FFD Records

Version 3.3

MS-FFD-009

Contractor Review and Screening Procedure

Version 7.0

MS-FFD-009

Contractors Review and Screening Procedure

Version 4.0

MS-FFD-010

Interface and Reporting

Version 8.0

MS-FFD-010

Interface and Reporting

Version 7.0

MS-FFD-011

Training and Qualification of FFD Personnel

Version 8.0

MS-FFD-011

Training and Qualifications of FFD Personel

Version 9.0

MS-FFD-012

Testing for other Legal and Illegal Substances

Version 4.0

MS-FFD-012

Testing for other Legal and Illegal Substances

Version 3.1

MS-FFD-013

Security of FFD Centers and Medical Facilities

Version 4.0

MS-FFD-013

Security of FFD Centers and Medical Facilities

Version 4.1

71130.08

Procedures

MS-FFD-014

Alcohol Screen Callouts to Perform Unscheduled Work

Version 3.0

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

MS-FFD-014

Alcohol Screen Callouts to Perform Unscheduled Work

Version 2.1

MS-FFD-015

Determination of Fitness Evaluations and Process

Version 6.0

NMP-AD-016

Fatigue Management Program

Version 11.1