Jamie Coleman Regulatory Affairs Director Southern Nuclear Company, In Colonnade Parkway Birmingham, AL 35243 SUBJECT:

UPDATED INSPECTION PLAN FOR VOGTLE ELECTRIC GENERATING PLANT, UNITS 1&2 - REPORT 05000424/2023005 AND 05000425/2023005 Ms. Coleman:

The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for Vogtle Electric Generating Plant, Units 1&2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4415 with any questions you have regarding this letter.

Sincerely, Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81 Enclosure(s):

Inspection Plan cc w/ encl: Distribution via LISTSERV August 29, 2023 Signed by Blamey, Alan on 08/29/23

ML23235A323 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII/DRP RII/DRP NAME A. Alen A. Blamey DATE 08/25/2023 08/29/2023

Site Inspection Activity Plan Prepared on 8/15/2023 12:38:26 PM 1 of 3 07201039 - Vogtle (ISFSI)

09/01/2023 - 06/30/2025 OPERATION OF AN ISFSI

Unit Start End Activity CAC Title Staff Count 6/2/2025 6/6/2025 IP 60855 001001 Operation Of An ISFSI

Site Inspection Activity Plan Prepared on 8/15/2023 12:38:26 PM 2 of 3 Vogtle 09/01/2023 - 06/30/2025 Unit Start End Activity CAC Title Staff Count UNIT 2 IN-SERVICE INSPECTION

2 9/11/2023 9/15/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION

1,2 9/11/2023 9/15/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 9/11/2023 9/15/2023 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 9/11/2023 9/15/2023 IP 71151 000746 Performance Indicator Verification SECURITY BASELINE INSPECTION

1,2 10/23/2023 10/27/2023 IP 71130.01 000733 Access Authorization 1,2 10/23/2023 10/27/2023 IP 71130.06 000738 Protection of Safeguards Information 1,2 10/23/2023 10/27/2023 IP 71130.08 000740 Fitness For Duty Program FOCUSED ENGINEERING INSPECTION (FPTI)

1,2 1/22/2024 1/26/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1,2 2/5/2024 2/9/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

CYBER SECURITY INSPECTION

EMERGENCY PREPAREDNESS EXERCISE INSPECTION

1,2 5/20/2024 5/24/2024 IP 71114.01 000716 Exercise Evaluation 1,2 5/20/2024 5/24/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 5/20/2024 5/24/2024 IP 71151 001397 Performance Indicator Verification MATERIAL CONTROL AND ACCOUNTING

RP PUBLIC RAD SAFETY BASELINE INSPECTION

1,2 6/10/2024 6/14/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 6/10/2024 6/14/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program 1,2 6/10/2024 6/14/2024 IP 71151 000746 Performance Indicator Verification SECURITY BASELINE INSPECTION

1,2 7/29/2024 8/2/2024 IP 71130.02 000734 Access Control 1,2 7/29/2024 8/2/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 7/29/2024 8/2/2024 IP 71130.07 000739 Security Training 1,2 7/29/2024 8/2/2024 IP 71130.09 001656 Security Plan Changes 1,2 7/29/2024 8/2/2024 IP 71151 001338 Performance Indicator Verification UNIT 1 POST-APPROVAL LICENSE RENEWAL PHASE 1

1 9/16/2024 9/20/2024 IP 71003 000687 Post-Approval Site Inspection for License Renewal 1,2 3/25/2024 3/29/2024 IP 71130.10 000741 Cybersecurity 1,2 6/10/2024 6/14/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)

Site Inspection Activity Plan Prepared on 8/15/2023 12:38:26 PM 3 of 3 RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION

1,2 9/16/2024 9/20/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 9/16/2024 9/20/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 9/16/2024 9/20/2024 IP 71124.04 000728 Occupational Dose Assessment 1,2 9/16/2024 9/20/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 9/16/2024 9/20/2024 IP 71151 000746 Performance Indicator Verification 1,2 10/7/2024 10/11/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 10/7/2024 10/11/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 10/7/2024 10/11/2024 IP 71124.04 000728 Occupational Dose Assessment 1,2 10/7/2024 10/11/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 10/7/2024 10/11/2024 IP 71151 000746 Performance Indicator Verification SECURITY BASELINE INSPECTION

1,2 10/21/2024 10/25/2024 IP 71130.05 000737 Protective Strategy Evaluation VOGTLE 1 AND 2 INITIAL LICENSE EXAM

UNIT 2 IN-SERVICE INSPECTION +SG

RP OCCUPATIONAL RAD SAFETY AND TRANSPORATATION BASELINE INSPECTION

1,2 3/17/2025 3/21/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 3/17/2025 3/21/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 3/17/2025 3/21/2025 IP 71151 000746 Performance Indicator Verification PROBLEM IDENTIFICATION AND RESOLUTION

1,2 4/21/2025 4/25/2025 IP 71152B 000747 Problem Identification and Resolution 1,2 5/5/2025 5/9/2025 IP 71152B 000747 Problem Identification and Resolution OPERATION OF AN ISFSI

1,2 6/2/2025 6/6/2025 IP 60855 001001 Operation Of An ISFSI FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - VOG

1,2 6/2/2025 6/6/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 6/23/2025 6/27/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing UNIT 1 IN-SERVICE INSPECTION +SG

1 9/16/2024 9/27/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

3/17/2025 3/28/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

1,2 10/27/2024 11/2/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)