MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 ML23223A0022023-08-14014 August 2023 (Vegp), Unit 3, Integrated Inspection Report 05200025/2023002 IR 05000424/20230112023-08-11011 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000424/2023011 and 05000425/2023011 ML23215A0822023-08-0404 August 2023 (Vego), Unit 3 Initial Test Program and Operational Programs Integrated 05200025/2023011 Inspection Report IR 05000424/20234012023-07-31031 July 2023 Security Baseline Inspection Report 05000424/2023401 and 05000425/2023401 (Cover Letter) ML23212B0612023-07-31031 July 2023 Security Baseline Inspection Report 05200025/2023401 ML23216A0962023-07-26026 July 2023 Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003 IR 05000424/20230022023-07-24024 July 2023 Integrated Inspection Report 05000424/2023002 and 05000425/2023002 ML23198A3802023-07-19019 July 2023 NRC Integrated Inspection Report 05200026/2023002 ML23199A0892023-07-18018 July 2023 (Vegp), Unit 4 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023007 IR 05000424/20233012023-06-30030 June 2023 NRC Operator License Examination Report 05000424/2023301 and 05000425/2023301 ML23128A2932023-05-11011 May 2023 NRC Integrated Inspection Report 05200026/2023001 ML23129A0222023-05-10010 May 2023 (Vegp), Unit 3 - Integrated Report 05200025/2023001 ML23128A3492023-05-0909 May 2023 (Vegp), Unit 4 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023006 ML23121A3202023-05-0404 May 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2023010 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 IR 05000424/20230012023-04-26026 April 2023 Integrated Inspection Report 05000424/2023001 and 05000425/2023001 IR 05000424/20230902023-03-30030 March 2023 NRC Inspection Report 05000424/2023090 and 05000425/2023090, and Investigation Report 2-2022-006; and Apparent Violation ML23083B3702023-03-24024 March 2023 Security Baseline Inspection Report 05200026/2023401 IR 05000424/20220062023-03-0101 March 2023 Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2, NRC Inspection Reports 05000424/2022006 and 05000425/2022006 ML23044A3902023-02-14014 February 2023 Integrated Inspection Report05200025 2022007 ML23040A3612023-02-0909 February 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2022008 ML23040A0422023-02-0909 February 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022008 ML23033A3972023-02-0707 February 2023 NRC Integrated Inspection Report 05200026/2022007 IR 05000424/20220042023-01-23023 January 2023 Integrated Inspection Report 05000424/2022004 and 05000425/2022004 ML22356A2932022-12-23023 December 2022 Information Request for the Cyber Security Baseline Security Inspection, Notification to Perform Inspection IR 05000424/20220102022-12-0202 December 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000424/2022010 and 05000425/2022010 ML22327A0532022-11-30030 November 2022 Security Baseline Inspection Report 05200026/2022401 Cover Letter IR 05000424/20224032022-11-28028 November 2022 Security Baseline Inspection Report 05000424/2022403 and 05000425/2022403 (Cover Letter) ML22314A0702022-11-14014 November 2022 NRC Integrated Inspected Reports 05200025/2022005, 05200026/2022005 ML22318A1602022-11-14014 November 2022 Integrated Inspection Report 05200025/2022010 ML22304A1812022-11-0808 November 2022 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022011 ML22311A0062022-11-0808 November 2022 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2022006 IR 05000424/20220032022-10-27027 October 2022 Integrated Inspection Report 05000424/2022003 and 05000425/2022003 IR 05000424/20220052022-08-24024 August 2022 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2022005 and 05000425/2022005 ML22230C6702022-08-22022 August 2022 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022006 ND-22-0655, ITAAC Closure Notification on Completion of ITAAC 2.5.01.03a (Index Number 511)2022-08-12012 August 2022 ITAAC Closure Notification on Completion of ITAAC 2.5.01.03a (Index Number 511) IR 05000424/20220022022-08-11011 August 2022 Integrated Inspection Report 05000424/2022002 and 05000425/2022002 ML22220A1342022-08-0909 August 2022 Review of the Refueling Outage 1R23 (Fall 2021) Steam Generator Tube Inspection Report IR 05000424/20224012022-08-0404 August 2022 Cyber Security Inspection Report 05000424/2022401 and 05000425/2022401 2024-02-05
[Table view] Category:Letter
MONTHYEARML24032A0252024-02-0505 February 2024 NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 ML24010A0712024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports and Recordkeeping and Suspicious Activity Reporting) ML24031A6102024-01-31031 January 2024 Cyber Security Inspection Report 05200026/2024401 - Public ML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML24016A1132024-01-30030 January 2024 Correction of Unit 1 Amendment Nos. 96 and 190 and Unit 2 Amendment Nos. 74 and 173 Adoption of Standard Technical Specifications Westinghouse Plants NL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 IR 05000424/20244032024-01-26026 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23347A2092024-01-17017 January 2024 Voluntary Requests for Data, Information, And/Or Observation ML23279A0042024-01-17017 January 2024 Amendment No. 194 to Remove Combined License Appendix C NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23317A2072023-12-22022 December 2023 Issuance of Amendments 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-1448 ML23335A1222023-12-19019 December 2023 Safety Evaluation Regarding Implementation of Mitigating Strategies Related to Order EA-12-049 (EPID L-2023-LRQ-0002) - Letter ML23353A1702023-12-19019 December 2023 LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23338A2182023-12-0606 December 2023 Project Manager Reassignment NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 ML23318A4582023-11-14014 November 2023 Integrated Inspection Report 05200025/2023003 ML23312A3502023-11-14014 November 2023 Integrated Inspection Report 05200026/2023003 ML23306A3552023-11-0808 November 2023 NRC Initial Test Program and Operational Programs Integrated Inspection Report 052000/262023008 ML23268A0572023-11-0707 November 2023 Issuance of Amendments 194 & 191 Request for License Amendment Relocation of Technical Specification 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) IR 05000424/20234022023-11-0606 November 2023 Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 IR 05000424/20230032023-10-27027 October 2023 Integrated Inspection Report 05000424/2023003 and 05000425/2023003 ML23291A1512023-10-18018 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 0520026/2024401 ML23263A9852023-10-12012 October 2023 Issuance of Amendments Nos. 221 and 204, Regarding Technical Specification 5.5.11.C, Acceptance Criteria for Charcoal Filter Testing ML23283A0472023-10-0808 October 2023 Neop Letter Dated October 8, 2023 - Vogtle 3 & 4 - TS 3.7.6 License Amendment Request NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report ML23254A2032023-09-13013 September 2023 Initial Test Program and Operational Programs Inspection Report 05200025/2023013 ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report ML23234A2352023-09-0808 September 2023 Request for Withholding Information from Public Disclosure Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events IR 05000424/20230912023-09-0505 September 2023 Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 ML23234A3002023-09-0101 September 2023 NRC Integrated Inspection Report 05200026/2023003 ML23243A0092023-08-31031 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 & 4 (Report 05200025 2023005 & 05200026 2023005) NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) ML23243B0252023-08-30030 August 2023 Exam Corporate Notification Letter (210 Day) IR 05000424/20230052023-08-29029 August 2023 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) 2024-02-05
[Table view] |
Text
May 4, 2023 Jamie Coleman Regulatory Affairs Director Southern Nuclear Company 7825 River Road, BIN 63031 Waynesboro, GA 30830
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNIT 3 - NRC INITIAL TEST PROGRAM AND OPERATIONAL PROGRAMS INTEGRATED INSPECTION REPORT 05200025/2023010
Dear Jamie Coleman:
On March 31, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 3. The enclosed inspection report documents the inspection results, which the inspectors discussed on April 25, 2023, with Mr. Glen Chick, Vogtle Electric Generating Plant, Units 3 & 4 Executive Vice President, and other members of your staff.
The inspection examined a sample of construction activities conducted under your Combined License (COL) as it relates to safety and compliance with the Commissions rules and regulations and with the conditions of these documents. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any), will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact us.
Sincerely, Signed by Davis, Bradley on 05/04/23 Bradley J. Davis, Chief Construction Inspection Branch 2 Division of Construction Oversight Docket No.: 5200025 License No: NPF-91
Enclosure:
NRC Inspection Report (IR) 05200025/2023010 w/attachment: Supplemental Information cc w/ encl: Distribution via LISTSERV
ML23121A320 x Non-Sensitive x Publicly Available x SUNSI Review Sensitive Non-Publicly Available OFFICE RII: DCO RII: DCO RII: DCO NAME J. Eargle C. Even B. Davis DATE 05/01/2023 05/03/2023 05/04/2023 U.S. NUCLEAR REGULATORY COMMISSION Region II Docket Numbers: 5200025 License Numbers: NPF-91 Report Numbers: 05200025/2023010 Enterprise Identifier: I-2023-010-0048 Licensee: Southern Nuclear Operating Company, Inc.
Facility: Vogtle Unit 3 Combined License Location: Waynesboro, GA Inspection Dates: January 1, 2023, through March 31, 2023 Inspectors: J. Eargle, Senior Resident Inspector - Testing, Division of Construction Oversight (DCO)
S. Egli, Senior Construction Inspector, DCO J. Parent, Resident Inspector, DCO J. England, Senior Construction Inspector, DCO J. Montgomery, Senior Reactor Inspector, Division of Reactor Safety Approved by: Bradley J. Davis, Chief Construction Inspection Branch 2 Division of Construction Oversight
Enclosure
SUMMARY
OF FINDINGS Inspection Report (IR) 05200025/2023010; January 1 - March 31, 2023; Vogtle Unit 3 Combined License, initial test program and operational programs integrated inspection report.
This report covers a three-month period of announced inspections of startup testing and operational programs by resident and regional inspectors. The significance of most findings is indicated by their color (Green, White, Yellow, or Red), using Inspection Manual Chapter (IMC) 0609, Significance Determination Process. Cross-cutting aspects are determined using IMC 0310, Aspects Withing the Cross-Cutting Areas. All violations of NRC requirements are dispositioned in accordance with the NRCs Enforcement Policy. The NRCs program for oversight of AP1000 start-up activities is described in IMC 2514, AP1000 Reactor Inspection Program - Startup Testing Phase.
A. NRC-Identified and Self Revealed Findings None B. Licensee-Identified Violations None 2
REPORT DETAILS Summary of Plant Construction Status During this report period for Unit 3, the licensee completed pre-critical testing, and surveillance testing to meet Technical Specification Mode 2 requirements prior to commencing Unit 3 reactor startup. The licensee also completed initial criticality, low power physics testing, and surveillance testing to meet Technical Specification Mode 1 requirements prior to entering power operation.
- 3. OPERATIONAL READINESS Cornerstones: Operational Programs IMC 2504, Construction Inspection Program - Inspection of Construction and Operational Programs 3P01 Fire Protection Program (FPP)
- 64705-02.01 - Implemented Operational Feature of the FPP
- 64705-02.02 - Adequacy and operational readiness
- a. Inspection Scope The inspectors reviewed aspects of the licensees FPP to determine if reasonable assurance existed at the time of the inspection to verify that the reviewed aspects of the program met the requirements of Title 10 of the Code of Federal Regulations, Part 50.48, Fire Protection. The inspectors reviewed the sites FPP document, fire hazards analysis, and fleet and site-specific procedures to determine if the requirements of BTP CMEB 9.5-1 were incorporated into the FPP.
Specifically, the inspectors reviewed various aspects of the FPP to determine if:
- fire protection features were in place to protect safe shutdown (SSD) capability and satisfied the license specific separation requirements;
- adequate operational procedures for SSD of the plant due to fire were in place;
- the licensees alternative shutdown methodology properly identified the systems and components necessary to achieve and maintain SSD conditions for each fire area, room, or zone selected for review;
- personnel required to place and maintain the plant in hot shutdown following a fire using the alternative/dedicated shutdown system were properly trained and available at all times among the onsite shift staff, exclusive of fire brigade; adequate procedures for the use of the alternative shutdown system were in place; and that the licensee conducts periodic operational tests of the alternative shutdown transfer capability and that the tests are adequate to prove the functionality of the alternative shutdown capability;
- communications equipment used by the fire brigade were functional; 3
- manual suppression equipment to be used by the fire brigade was available and functional; and
- the pre-operational and startup testing program for fire protection systems and components provided assurance that the equipment was ready for plant commercial operation.
- b. Findings No findings were identified.
IMC 2514, AP1000 Reactor Inspection Program - Startup Testing Phase 3T01 Initial Test Program (Startup)
- a. Inspection Scope The inspectors used appropriate portions of IP 72304 to observe the licensee's performance of the following procedure for demonstrating the performance of the rapid power reduction system, entering Mode 2, achieving initial criticality, and testing to determine moderator temperature coefficient. The inspectors observed the conduct of these procedures to verify if they satisfied the applicable quality and technical requirements of the UFSAR and the Technical Specifications.
- 3-PLS-ITPS-605, Rapid Power Reduction Startup Test Procedure, Version
- B-GEN-RES-004, Low Power Physics Testing, Ver. 7.0
- 3-GEN-ITPS-611, Initial Criticality and Low Power Physics Test Startup Test Procedure, Ver. 3.2
- b. Findings No findings were identified.
3T02 Initial Test Program (Startup)
- a. Inspection Scope 4
The inspectors used appropriate portions of IP 72304 to review the results of the following procedure used to verify if the operators were capable of transferring controls from the main control room to the remote shutdown workstation in order to bring the plant to hot standby conditions from normal operating pressure and temperature, and place normal residual heat removal system in service to cool the plant an additional 50 degrees Fahrenheit without exceeding cooldown limits. The results were reviewed to verify whether the test satisfied the applicable technical and quality requirements of the UFSAR.
- 3-GEN-ITPS-640, Remote Shutdown Workstation Startup Test Procedure, Section 4.2, Ver. 3.0
- b. Findings No findings were identified.
3T03 Initial Test Program (Startup)
- a. Inspection Scope The inspectors used appropriate portions of IP 72304 to review the licensee's results of the following procedures for entering Mode 2, achieving initial criticality, and testing to determine moderator temperature coefficient. The inspectors reviewed the procedures to verify if they satisfied the applicable quality and technical requirements of the UFSAR and the Technical Specifications.
- B-GEN-RES-004, Low Power Physics Testing, Ver. 7
- 3-GEN-ITPS-611, Initial Criticality and Low Power Physics Test Startup Test Procedure, Ver. 3.2
- b. Findings No findings were identified.
- 4. OTHER INSPECTION RESULTS 4OA6 Meetings, Including Exit
.1 Exit Meeting.
On April 25, 2023, the inspectors presented the inspection results to Mr. Glen Chick, Vogtle Electric Generating Plant, Units 3 &4 Executive Vice President, and other licensee and contractor staff members. Proprietary information was reviewed during the inspection period, but was not included in the inspection report.
5
SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensees and Contractor Personnel S. Briggs, Testing and Turnover Director A. Nix, ITP Director E. Loehlein, Operations Director J. Coleman, Regulatory Affairs Director R. Nicoletto, NI Manager J. Hartman, Shift Operations Manager D. Trafford, Operations Support Manager C. Parkes, Operations Services Manager S. Leighty, Regulatory Affairs Manager W. Garrett, Licensing Manager C. Houseal, Startup Manager J. Olsen, NI Supervisor F. Bonilla, Startup M. Lindquist, Startup K. Middlebrooks, Startup P. Miner, Startup J. Abshire, Startup J. Andino Valle, Startup M. Easter, Startup LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED Item Number Type Status Description None LIST OF DOCUMENTS REVIEWED
- 3. OPERATIONAL READINESS Section 3P01 Procedures 3-AOP-601, Evacuation of Main Control Room, Revision (Rev.) 3 3-AOP-902, Fire Response Emergency, Ver. 2.1 B-GEN-ENG-008, Fire Protection Functionality and Fire Protection Impairments (FPI)
Requirements, Ver. 5 B-FPS-MMM-004, Portable Fire Extinguishers and Fire Hose Stations Visual Inspection, Ver. 5 Miscellaneous SV3-FPS-ITR-800337, Unit 3 Fire Detection Alarm Testing: ITAAC 2.3.04.10, Rev. 0 SV3-PMS-ITR-800543, Unit 3 PMS Transfer of Control Capability from the MCR to the RSW:
ITAAC 2.5.02.08b.ii, Rev. 0 APP-AF01-Z0R-002, Fire Extinguisher Datasheets and Report for Nuclear Island Areas, Rev. 0 6
List of Open Fire Impairment Permits, 1/3/2023 Work Orders SV3-FPS-T0W-1123556, Fire Protection Testing Portable Communication Equipment, Rev. 1 SV3-FPS-T0W-1123549, Periodic Testing of Portable Fire Extinguishers, Rev. 0 SV3-FPS-T0W-1068464, Perform FPS System Pre-Operational Testing Per 3-FPS-ITPP-502, Rev. 0 SV3-FPS-T0W-1058692, Perform 3-FPS-ITPP-501, Motor Driven Fire Pump, Rev. 0 SV3-FPS-T0W-1058419, Component Test on SV3-FPS-MP-01A, Rev. 0 SV3-FPS-T0W-1058435, Perform Component Testing on SV3-FPS-MP-02, Rev. 0 SV3-FPS-T0W-1058427, Component Test on SV3-FPS-MP-01B, Rev. 0 SNC 1341467, (1M-NEIL) 012 - Aux Building (RCA) Fire Extinguisher Inspection, Rev. 0 SNC 1340791, (1M-NEIL) 012 - Aux Building (Non-RCA) Fire Extinguisher Inspection, Rev. 0 Design Changes APP-AF01-GEF-006, Fire Extinguisher Updates, Rev. 0 Condition Reports Reviewed During Inspection TE 45001409, Action: Update Pre-Fire Plans to Reflect Field Walkdowns of As-Built, Equipment Locations, 9/6/2022 Condition Reports Generated During Inspection CR 10938827, UFSAR Table 9.5.1-1 Does Not Accurately Point to Fire Brigades Primary Communication Capability Section 3T01 3-GEN-ITPS-610, Initial Criticality and LPPT Sequence Startup Test Procedure, Ver. 2 NMP-RE-019, Beacon 10 Estimated Critical Condition, Ver. 4.1 3-GOP-302, Reactor Startup Mode 3 to Mode 2, Ver. P=0.15 B-GEN-RES-004, Low Power Physics Testing, Ver. 7 3-RLS-CSP-001, Primary System Sampling Using the RSI Primary Sampling Panel, Ver. 2 NMP-CH-701, Determination of Boron, Ver. 4 Section 3T02 3-GEN-ITPS-640, Remote Shutdown Workstation Startup Test Procedure, Ver. 3.0 3-GEN-ITPS-606, Post Fuel Load Pre-critical Test Sequence, Ver. 5.1 3-GOP-205, Plant Cooldown from Mode 3 to Mode 5, Ver. L=0.11 3-AOP-601, Evacuation of Control Room, Ver. 3.0 WO 1115729 Section 3T03 NMP-RE-019, Beacon 10 Estimated Critical Condition, Ver. 4.1 3-GOP-302, Reactor Startup Mode 3 to Mode 2, Ver. P=0.15 NMP-RE-008-F01, Detailed Reactivity Management Plan, Power Ascension Testing - Initial Criticality to Completion of 25% RTP Plateau, Ver. 2.1 7