July 09, 2021

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000424/2021402 AND 05000425/2021402

Dear Mr. McGavin:

On June 18, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1 and 2. On June 24, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety

Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000424 and 05000425

License Numbers:

NPF-68 and NPF-81

Report Numbers:

05000424/2021402 and 05000425/2021402

Enterprise Identifier: I-2021-402-0016

Licensee:

Southern Nuclear Operating Company, Inc.

Facility:

Vogtle Electric Generating Plant, Units 1 and 2

Location:

Waynesboro, Ga. 30830

Inspection Dates:

June 14, 2021 to June 18, 2021

Inspectors:

A. Richardson, Physical Security Inspector

J. Tornow, Physical Security Inspector

J. Wallo, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Vogtle Electric Generating Plant,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1) Tier I: All Requirements Tier II: 10 Requirements (02.06 a-d, 02.07 a, 02.08 a-e)

Tier III: 1 Requirement (02.09)

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:

Protective Strategy Evaluation (2 Samples)

(1) Tier I: All Requirements Tier II: 14 Requirements: 02.06(a - d, f, h, i, m, n), 02.07(a - e)
(2) Tier III: 4 Requirements: 02.08, 02.09(b), 02.10(a), 02.11(a)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

The inspectors evaluated the security plan changes through completion of the following procedure elements:

(1) Since the last NRC inspection of this program area, Security Plan Revision(s) 17 to 18 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17) (1 Sample)

The inspectors evaluated the security plan changes through completion of the following procedure elements:

(1) Unit 1: June 2020 through June 2021 Unit 2: June 2020 through June

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On June 24, 2021, the inspectors presented the security baseline inspection results to Stephen P. McGavin and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Corrective Action

Documents

10732538

Access Control

08/23/2020

Procedures

00008-C

Plant Lock and Key Control

Ver. 18

NMP-SE-021

Security Search Processes

Ver. 9.0

NMP-SE-023

Personnel Authorization and Badging Program

Ver. 4.0

71130.05

Corrective Action

Documents

10784371

Strategy Training Requirement

10789586

Security Diesel Generator

04/11/2021

10789741

Drill Scenario Forms incomplete

4/12/2021

10792665

Security Computer Issue

10793535

Gaitronics not transmitting properly

4/27/2021

Procedures

NMP-GM-002-

GL03 Version

30.2

Cause Analysis and Corrective Action Guidelines

NMP-SE-006

Security Drill and Exercise Program

Ver. 7.0

71130.09

Corrective Action

Documents

Resulting from

Inspection

10808349

Multiple Strategy Cameras Inoperative

Miscellaneous

Physical Security Plan

Rev. 18

71151

Miscellaneous

Key Performance

Indicators

PPO Security Equipment Performance Index - Vogtle 1 and 2 6/4/2021

Procedures

NMP-AD-029

Preparation and Reporting of Regulatory Assessment

Performance Indicator Data and the Monthly

Operating Report

Ver. 3.0