IR 05000424/2021402
| ML21190A141 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 07/09/2021 |
| From: | Jannette Worosilo Division of Reactor Safety II |
| To: | Mcgavin S Southern Nuclear Operating Co |
| References | |
| IR 2021402 | |
| Download: ML21190A141 (7) | |
Text
July 09, 2021
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000424/2021402 AND 05000425/2021402
Dear Mr. McGavin:
On June 18, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant, Units 1 and 2. On June 24, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 05000424 and 05000425 License Nos. NPF-68 and NPF-81
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000424 and 05000425
License Numbers:
Report Numbers:
05000424/2021402 and 05000425/2021402
Enterprise Identifier: I-2021-402-0016
Licensee:
Southern Nuclear Operating Company, Inc.
Facility:
Vogtle Electric Generating Plant, Units 1 and 2
Location:
Waynesboro, Ga. 30830
Inspection Dates:
June 14, 2021 to June 18, 2021
Inspectors:
A. Richardson, Physical Security Inspector
J. Tornow, Physical Security Inspector
J. Wallo, Senior Physical Security Inspector
Approved By:
Jannette G. Worosilo, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Vogtle Electric Generating Plant,
Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
- (1) Tier I: All Requirements Tier II: 10 Requirements (02.06 a-d, 02.07 a, 02.08 a-e)
Tier III: 1 Requirement (02.09)
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:
Protective Strategy Evaluation (2 Samples)
- (1) Tier I: All Requirements Tier II: 14 Requirements: 02.06(a - d, f, h, i, m, n), 02.07(a - e)
- (2) Tier III: 4 Requirements: 02.08, 02.09(b), 02.10(a), 02.11(a)
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following procedure elements:
Review Security Plan Changes (IP Section 02.01) (1 Sample)
The inspectors evaluated the security plan changes through completion of the following procedure elements:
- (1) Since the last NRC inspection of this program area, Security Plan Revision(s) 17 to 18 were implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 03.17) (1 Sample)
The inspectors evaluated the security plan changes through completion of the following procedure elements:
- (1) Unit 1: June 2020 through June 2021 Unit 2: June 2020 through June
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On June 24, 2021, the inspectors presented the security baseline inspection results to Stephen P. McGavin and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
10732538
Access Control
08/23/2020
Procedures
00008-C
Plant Lock and Key Control
Ver. 18
NMP-SE-021
Security Search Processes
Ver. 9.0
NMP-SE-023
Personnel Authorization and Badging Program
Ver. 4.0
Corrective Action
Documents
10784371
Strategy Training Requirement
10789586
Security Diesel Generator
04/11/2021
10789741
Drill Scenario Forms incomplete
4/12/2021
10792665
Security Computer Issue
10793535
Gaitronics not transmitting properly
4/27/2021
Procedures
NMP-GM-002-
GL03 Version
30.2
Cause Analysis and Corrective Action Guidelines
NMP-SE-006
Security Drill and Exercise Program
Ver. 7.0
Corrective Action
Documents
Resulting from
Inspection
10808349
Multiple Strategy Cameras Inoperative
Miscellaneous
Physical Security Plan
Rev. 18
71151
Miscellaneous
Key Performance
Indicators
PPO Security Equipment Performance Index - Vogtle 1 and 2 6/4/2021
Procedures
NMP-AD-029
Preparation and Reporting of Regulatory Assessment
Performance Indicator Data and the Monthly
Operating Report
Ver. 3.0