Glen Chick Executive Vice President VEGP 3&4 Southern Nuclear Operating Co., INC.
7825 River Road Waynesboro, GA 30830
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT UNIT 3 - SECURITY BASELINE INSPECTION REPORT 05200025/2023401
Dear Glen Chick:
On July 14, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Vogtle Electric Generating Plant Unit 3 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket No. 05200025 License No. NPF-91
Enclosure:
As stated cc w/ encl: Distribution via LISTSERV July 31, 2023 Signed by Worosilo, Jannette on 07/31/23
SUNSI Review X
Non-Sensitive
Sensitive X
Publicly Available
Non-Publicly Available OFFICE RII/DRS/PSB RII/DRS/PSB NAME J. Brown J. Worosilo DATE 07/31/23 07/31/23
Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Number:
05200025 License Number:
NPF-91 Report Number:
05200025/2023401 Enterprise Identifier:
I-2023-401-0057 Licensee:
Southern Nuclear Operating Co., INC.
Facility:
Vogtle Electric Generating Plant Unit 3 Location:
Waynesboro, GA Inspection Dates:
July 10, 2023, to July 14, 2023 Inspectors:
J. Brown, Senior Physical Security Inspector Approved By:
Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety
2
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Vogtle Electric Generating Plant Unit 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified.
Additional Tracking Items None.
3 INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS 71130.02 - Access Control The inspectors evaluated the access control program through completion of the following inspection elements:
Access Control (1 Sample)
(1)
Tier I: All Requirements
Tier II: 8 Requirements: 02.06 a - d, 02.07 a, 02.08 a, b, e
Tier III: 1 Requirement: 02.09 71130.09 - Security Plan Changes The inspectors evaluated the security plan changes through completion of the following procedure elements:
Security Plan Changes (1 Sample)
(1)
Since the last NRC inspection of this program area, Vogtle Physical Security Plan, Version 18-VEGP-2, dated August 3, 2022, was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2), that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
OTHER ACTIVITIES - BASELINE 71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
4 PP01: Protected Area Security Equipment Performance Index Sample [AP1000] (IP Section 02.17) (1 Sample)
(1)
October 2022 through June 2023 INSPECTION RESULTS No findings were identified.
EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.
On July 14, 2023, the inspectors presented the security baseline inspection results to Glen Chick and other members of the licensee staff.
5 DOCUMENTS REVIEWED Inspection Procedure Type Designation Description or Title Revision or Date CR 10921027 Corrective Action Documents Resulting from Inspection TE - 1132424 Key / Core Control NMP-AD-013 Control of Safeguards Information (SGI)
Version 5.1 NMP-SE-021 Security Search Processes Version 13 71130.02 Procedures NMP-SE-023 Personnel Authorization and Badging Program Version 5.3 71130.09 Miscellaneous to 50.54p for 90305-c Version 17 71151 Procedures NMP-AD-029 Preparation and Reporting of Regulatory Assessment Performance Indicator Data and the Monthly Operating Report Version 3.2