Issue date | Title | Topic | |
---|---|---|---|
ML24032A025 | 5 February 2024 | NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026-2023009 | |
ML24031A610 | 31 January 2024 | Cyber Security Inspection Report 05200026/2024401 - Public | Cyber Security |
IR 05000424/2024403 | 26 January 2024 | Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 | |
ML23312A350 | 14 November 2023 | Integrated Inspection Report 05200026/2023003 | Safe Shutdown High winds Temporary Modification Functionality Assessment FLEX Operability Determination Fire Protection Program |
ML23318A458 | 14 November 2023 | Integrated Inspection Report 05200025/2023003 | Safe Shutdown High winds High Radiation Area Offsite Dose Calculation Manual Enforcement Discretion Locked High Radiation Area Residual transfer Significance Determination Process Maintenance Rule Program Fire Protection Program Scaffolding Grace period Unidentified leakage |
IR 05000424/2023402 | 6 November 2023 | Security Baseline Inspection Report 05000424/2023402 and 05000425/2023402 | Fitness for Duty |
IR 05000424/2023003 | 27 October 2023 | Integrated Inspection Report 05000424/2023003 and 05000425/2023003 | Boric Acid High Radiation Area Enforcement Discretion Nondestructive Examination Functionality Assessment Locked High Radiation Area Operability Determination Liquid penetrant Fire Protection Program |
ML23254A203 | 13 September 2023 | Initial Test Program and Operational Programs Inspection Report 05200025/2023013 | Significance Determination Process |
IR 05000424/2023091 | 5 September 2023 | Plan Units 1 and 2 - NRC Investigation Report 2-2022-006 and Notice of Violation - NRC Inspection Report 05000424/2023091 and 05000425/2023091 | |
ML23234A300 | 1 September 2023 | NRC Integrated Inspection Report 05200026/2023003 | Non-Destructive Examination Fire Barrier Hydrostatic Squib VT-2 Liquid penetrant |
IR 05000424/2023005 | 29 August 2023 | Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2023005 and 05000425/2023005 | Fitness for Duty Cyber Security License Renewal |
ML23223A002 | 14 August 2023 | (Vegp), Unit 3, Integrated Inspection Report 05200025/2023002 | Safe Shutdown Ultimate heat sink Time to boil Commercial Grade Dedication Enforcement Discretion Emergency Lighting Functionality Assessment Significance Determination Process Operability Determination Earthquake Maintenance Rule Program Fire Protection Program |
IR 05000424/2023011 | 11 August 2023 | Biennial Problem Identification and Resolution Inspection Report 05000424/2023011 and 05000425/2023011 | High Radiation Area Missed surveillance Significance Determination Process Operability Determination Maintenance Rule Program |
ML23215A082 | 4 August 2023 | (Vego), Unit 3 Initial Test Program and Operational Programs Integrated 05200025/2023011 Inspection Report | Significance Determination Process |
IR 05000424/2023401 | 31 July 2023 | Security Baseline Inspection Report 05000424/2023401 and 05000425/2023401 (Cover Letter) | Affidavit |
ML23212B061 | 31 July 2023 | Security Baseline Inspection Report 05200025/2023401 | |
ML23216A096 | 26 July 2023 | Document Request for Vogtle 1 & 2 RP Inspection, Report No. 05000424/2023003 and 05000425/2023003 | Process Control Program |
IR 05000424/2023002 | 24 July 2023 | Integrated Inspection Report 05000424/2023002 and 05000425/2023002 | Stroke time Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program |
ML23198A380 | 19 July 2023 | NRC Integrated Inspection Report 05200026/2023002 | Shutdown Margin Fire Barrier Hydrostatic Coatings Nondestructive Examination Squib Emergency Lighting Significance Determination Process Earthquake Liquid penetrant |
ML23199A089 | 18 July 2023 | (Vegp), Unit 4 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023007 | Squib Significance Determination Process Flow Induced Vibration |
IR 05000424/2023301 | 30 June 2023 | NRC Operator License Examination Report 05000424/2023301 and 05000425/2023301 | |
ML23128A293 | 11 May 2023 | NRC Integrated Inspection Report 05200026/2023001 | Hydrostatic Nondestructive Examination Squib Liquid penetrant |
ML23129A022 | 10 May 2023 | (Vegp), Unit 3 - Integrated Report 05200025/2023001 | Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Squib VT-2 Functionality Assessment Significance Determination Process Fuel cladding Fire Protection Program |
ML23128A349 | 9 May 2023 | (Vegp), Unit 4 Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2023006 | Squib Significance Determination Process |
ML23121A320 | 4 May 2023 | NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2023010 | Safe Shutdown Fire impairment Significance Determination Process Fire Protection Program |
IR 05000424/2004025 | 28 April 2023 | Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 | |
IR 05000424/2023001 | 26 April 2023 | Integrated Inspection Report 05000424/2023001 and 05000425/2023001 | Unanalyzed Condition Boric Acid Internal Flooding Past operability Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Fire Protection Program Power change |
IR 05000424/2023090 | 30 March 2023 | NRC Inspection Report 05000424/2023090 and 05000425/2023090, and Investigation Report 2-2022-006; and Apparent Violation | High Radiation Area Significance Determination Process |
ML23083B370 | 24 March 2023 | Security Baseline Inspection Report 05200026/2023401 | |
IR 05000424/2022006 | 1 March 2023 | Annual Assessment Letter for Vogtle Electric Generating Plant Units 1 and 2, NRC Inspection Reports 05000424/2022006 and 05000425/2022006 | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
ML23044A390 | 14 February 2023 | Integrated Inspection Report05200025 2022007 | Safe Shutdown Enforcement Discretion Squib Functionality Assessment Significance Determination Process Foreign Material Exclusion Fire Protection Program Scaffolding |
ML23040A361 | 9 February 2023 | NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2022008 | Squib Significance Determination Process |
ML23040A042 | 9 February 2023 | NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022008 | Significance Determination Process |
ML23033A397 | 7 February 2023 | NRC Integrated Inspection Report 05200026/2022007 | Safe Shutdown Hydrostatic Enforcement Discretion Nondestructive Examination Temporary Modification Significance Determination Process Earthquake Liquid penetrant |
IR 05000424/2022004 | 23 January 2023 | Integrated Inspection Report 05000424/2022004 and 05000425/2022004 | Functionality Assessment Operability Determination Fire Protection Program |
ML22356A293 | 23 December 2022 | Information Request for the Cyber Security Baseline Security Inspection, Notification to Perform Inspection | Cyber Security |
IR 05000424/2022010 | 2 December 2022 | Design Basis Assurance Inspection (Teams) Inspection Report 05000424/2022010 and 05000425/2022010 | Safe Shutdown Boric Acid Ultimate heat sink Stroke time Internal Flooding Large early release frequency Battery sizing Power-Operated Valves Scaffolding Weak link |
ML22327A053 | 30 November 2022 | Security Baseline Inspection Report 05200026/2022401 Cover Letter | |
IR 05000424/2022403 | 28 November 2022 | Security Baseline Inspection Report 05000424/2022403 and 05000425/2022403 (Cover Letter) | Affidavit |
ML22314A070 | 14 November 2022 | NRC Integrated Inspected Reports 05200025/2022005, 05200026/2022005 | Squib Cyber Security Loctite |
ML22318A160 | 14 November 2022 | Integrated Inspection Report 05200025/2022010 | Coatings Functionality Assessment Fire Protection Program |
ML22304A181 | 8 November 2022 | NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022011 | Offsite Dose Calculation Manual Significance Determination Process Process Control Program Liquid penetrant Dissimilar Metal Weld DM weld |
ML22311A006 | 8 November 2022 | NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200026/2022006 | Squib Significance Determination Process Job Performance Measure Flow Induced Vibration |
IR 05000424/2022003 | 27 October 2022 | Integrated Inspection Report 05000424/2022003 and 05000425/2022003 | Safe Shutdown High Radiation Area Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Maintenance Rule Program Fire Protection Program Fire Watch Overexposure |
IR 05000424/2022005 | 24 August 2022 | Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 & 2 - Report 05000424/2022005 and 05000425/2022005 | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
ML22230C670 | 22 August 2022 | NRC Initial Test Program and Operational Programs Integrated Inspection Report 05200025/2022006 | Significance Determination Process Job Performance Measure |
ND-22-0655, ITAAC Closure Notification on Completion of ITAAC 2.5.01.03a (Index Number 511) | 12 August 2022 | ITAAC Closure Notification on Completion of ITAAC 2.5.01.03a (Index Number 511) | |
IR 05000424/2022002 | 11 August 2022 | Integrated Inspection Report 05000424/2022002 and 05000425/2022002 | High Radiation Area Mission time Stroke time Internal Flooding Enforcement Discretion Functionality Assessment Condition Adverse to Quality Operability Determination Fire Protection Program Grace period Overexposure |
ML22220A134 | 9 August 2022 | Review of the Refueling Outage 1R23 (Fall 2021) Steam Generator Tube Inspection Report | |
IR 05000424/2022401 | 4 August 2022 | Cyber Security Inspection Report 05000424/2022401 and 05000425/2022401 | Cyber Security |