| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
| project = TAC:M94772
| stage = Approval
}}
}}


Line 27: Line 29:
==Dear Mr. Anderson:==
==Dear Mr. Anderson:==


By letter dated February 6, 1996, as supplemented January 15, 1997, you submitted Relief Request (RR) 95-050, Revision 1, relating to inspection of the core flood nozzle-to-vessel welds. With technical assistance from our j                contractor, the Idaho National Engineering Laboratory (INEL), we have reviewed and evaluated your ' submittal. Based on our review, we have concluded that                                                          a your RR is authorized by law and will not endanger life or property, or the
By {{letter dated|date=February 6, 1996|text=letter dated February 6, 1996}}, as supplemented January 15, 1997, you submitted Relief Request (RR) 95-050, Revision 1, relating to inspection of the core flood nozzle-to-vessel welds. With technical assistance from our j                contractor, the Idaho National Engineering Laboratory (INEL), we have reviewed and evaluated your ' submittal. Based on our review, we have concluded that                                                          a your RR is authorized by law and will not endanger life or property, or the
;                common defense and security, and is otherwise in the public interest given due i
;                common defense and security, and is otherwise in the public interest given due i
consideration to the burden that could result if the requirements were imposed                                                        '
consideration to the burden that could result if the requirements were imposed                                                        '

Latest revision as of 00:18, 13 December 2021

Forwards Safety Evaluation Re Second 10-yr Interval Insp Program Plan Request for Relief 95-050,rev 1.INEL Technical Ltr Rept Also Encl
ML20138J005
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/05/1997
From: Hebdon F
NRC (Affiliation Not Assigned)
To: Richard Anderson
FLORIDA POWER CORP.
Shared Package
ML20138J009 List:
References
TAC-M94772, NUDOCS 9705070361
Download: ML20138J005 (2)


Text

- - . ~ . .. -- -.. . - - . - - - . _ - - . - .. - . .-

-- Mr?RoyA. Anderson

< Senior Vice President, Nuclear Operations l Florida Power Corporation May 5,1997 ATTN: Manager, Nuclear Licensing (SA2A)

Crystal River Energy Complex 15760 W Power Line Street Crystal River, Florida 34428-6708

SUBJECT:

EVALUATION OF THE SECOND TEN-YEAR INTERVAL INSPECTION PROGRAM PLAN REQUEST FOR RELIEF 95-050, REVISION 1 - CRYSTAL RIVER NUCLEAR GENERATING PLANT, UNIT 3 (TAC NO. M94772)

Dear Mr. Anderson:

By letter dated February 6, 1996, as supplemented January 15, 1997, you submitted Relief Request (RR)95-050, Revision 1, relating to inspection of the core flood nozzle-to-vessel welds. With technical assistance from our j contractor, the Idaho National Engineering Laboratory (INEL), we have reviewed and evaluated your ' submittal. Based on our review, we have concluded that a your RR is authorized by law and will not endanger life or property, or the

common defense and security, and is otherwise in the public interest given due i

consideration to the burden that could result if the requirements were imposed '

on your facility. Therefore, relief is granted pursuant to 10 CFR 50.55a(g)(6)(i). Our evaluation and conclusions are contained in Enclosure 1.

Enclosure 2 is the INEL Technical Letter Report. i l

This completes our effort under Technical Assignment Control (TAC) No. M94772 )

and, therefore, the TAC is closed.  !

l Sincerely, Original signed by Frederick J. Hebdon, Director Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-302 l

Enclosures:

1. Safety Evaluation
2. INEL Technical Letter Report cc: w/ enclosures: See next page Distribution GHill (2)

Docket file PUBLIC

'CR3' Reading' S. Varga t J. Zwolinski T. Harris (e-mail only TLH3)

OGC copy of safety evaluation C 8 ACRS J. Johnson, RII DOCUMENT NAME: G:\ CRYSTAL \94772.REL ,

, Ta voceive a copy of th6s document, indicate in the boa: "C" = Copy without ettechment/ enclosure * # l E" = Copy with attachn ent/ enclosure *N" = No copy . I\ /

OFFICE PDil 3/PM ,g l PDII-3/LA \\ h (l OGC V f7/ V lA7 PDil-3/D ) l C.

NAME U '*# BClayton M\' tO MO/.& F)f. FHebdon M DATE 04/*)Lf97 04/ V /97 ' '\ \) 04/)767 QF/ 1 /97

$ OFFICIAL' RECORD COPY 4,'

D'10 0 b b ..

9705070361 970505 PDR ADOCK 05000302 P PDR l - . __

Mr. Roy A. Anderson . CRYSTAL RIVER UNIT N0. 3 Florida Power Corporation

~

GENERATING PLANT 4

CC:

! Mr. R. Alexander Glenn Senior Resident Inspector l Corporate Counsel Crystal River Unit 3 Florida Power Corporation U.S. Nuclear Regulatory Commission e

MAC-A5A 6745 Ne Tallahassee Road P.O. Box 14042 Crystal River, Florida 34428 i St. Petersburg, Florida 33733-4042

' Mr. John P. Cowan Mr. Bruce J. Hickle, Director Vice President, Nuclear Production

Nuclear Plant Operations (NA2C) (SA2C) l Florida Power Corporation Florida Power Corporation Crystal River Energy Complex Crystal River Energy Complex 15760 W. Power Line Street 15760 W. Power Line Street i Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 ,

g.

. Mr. Robert B. Borsum Regional Administrator, Region II

! B&W Nuclear Technologies U.S. Nuclear Regulatory Commission

! 1700 Rockville Pike, Suite 525 61 Forsyth Street, SW., Suite 23T85 a

Rockville, Maryland 20852 Atlanta, Georgia 30303-3415

! Mr. Bill Passetti Mr. Kerry Landis i

Office of Radiat*on Control U.S. Nuclear Regulatory Commission

Department of Hea:!h and 61 Forsyth Street, SW., Suite 23T85 Rehabilitative Services Atlanta, Georgia 30303-3415 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 l Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Iverness, Florida 34450-4245  !

Mr. David Kunsemiller, Director Nuclear Operations Site Support ,

I (SA2A)

Florida Power Corporation i Crystal River Energy Complex 1 15760 W. Power Line Street  !

Crystal River, Florida 34428-6708 i