ML20138J005

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Re Second 10-yr Interval Insp Program Plan Request for Relief 95-050,rev 1.INEL Technical Ltr Rept Also Encl
ML20138J005
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/05/1997
From: Hebdon F
NRC (Affiliation Not Assigned)
To: Richard Anderson
FLORIDA POWER CORP.
Shared Package
ML20138J009 List:
References
TAC-M94772, NUDOCS 9705070361
Download: ML20138J005 (2)


Text

-

-. ~.

Mr?RoyA. Anderson Senior Vice President, Nuclear Operations l

Florida Power Corporation May 5,1997 ATTN: Manager, Nuclear Licensing (SA2A)

Crystal River Energy Complex 15760 W Power Line Street Crystal River, Florida 34428-6708

SUBJECT:

EVALUATION OF THE SECOND TEN-YEAR INTERVAL INSPECTION PROGRAM PLAN REQUEST FOR RELIEF 95-050, REVISION 1 - CRYSTAL RIVER NUCLEAR GENERATING PLANT, UNIT 3 (TAC NO. M94772)

Dear Mr. Anderson:

By letter dated February 6, 1996, as supplemented January 15, 1997, you submitted Relief Request (RR)95-050, Revision 1, relating to inspection of the core flood nozzle-to-vessel welds. With technical assistance from our j

contractor, the Idaho National Engineering Laboratory (INEL), we have reviewed and evaluated your ' submittal. Based on our review, we have concluded that a

your RR is authorized by law and will not endanger life or property, or the common defense and security, and is otherwise in the public interest given due consideration to the burden that could result if the requirements were imposed i

on your facility.

Therefore, relief is granted pursuant to 10 CFR 50.55a(g)(6)(i). Our evaluation and conclusions are contained in Enclosure 1.

is the INEL Technical Letter Report.

i l

This completes our effort under Technical Assignment Control (TAC) No. M94772

)

and, therefore, the TAC is closed.

Sincerely, Original signed by Frederick J. Hebdon, Director Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-302 l

Enclosures:

1.

Safety Evaluation 2.

INEL Technical Letter Report cc: w/ enclosures:

See next page Distribution GHill (2)

Docket file PUBLIC

'CR3' Reading' S. Varga t

J. Zwolinski T. Harris (e-mail only TLH3)

OGC copy of safety evaluation C

8 ACRS J. Johnson, RII DOCUMENT NAME:

G:\\ CRYSTAL \\94772.REL Ta voceive a copy of th6s document, indicate in the boa: "C" = Copy without ettechment/ enclosure l

E" = Copy with attachn ent/ enclosure

  • N" = No copy

. I\\

/

OFFICE PDil 3/PM

,g l

PDII-3/LA \\\\ h (l

OGC V f7/ V lA7 PDil-3/D

)

l C.

NAME U '*#

BClayton M\\'

tO MO/.& F)f.

FHebdon M DATE 04/*)Lf97 04/ V /97 '

'\\

\\)

04/)767 QF/ 1 /97 OFFICIAL' RECORD COPY 4,'

D'10 0 b b 9705070361 970505 PDR ADOCK 05000302 P

PDR l

Mr. Roy A. Anderson.

CRYSTAL RIVER UNIT N0. 3

~

Florida Power Corporation GENERATING PLANT 4

CC:

Mr. R. Alexander Glenn Senior Resident Inspector l

Corporate Counsel Crystal River Unit 3 Florida Power Corporation U.S. Nuclear Regulatory Commission e

MAC-A5A 6745 Ne Tallahassee Road P.O. Box 14042 Crystal River, Florida 34428 i

St. Petersburg, Florida 33733-4042 Mr. John P. Cowan Mr. Bruce J. Hickle, Director Vice President, Nuclear Production Nuclear Plant Operations (NA2C)

(SA2C) l Florida Power Corporation Florida Power Corporation Crystal River Energy Complex Crystal River Energy Complex 15760 W. Power Line Street 15760 W. Power Line Street i

Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 g.

Mr. Robert B. Borsum Regional Administrator, Region II B&W Nuclear Technologies U.S. Nuclear Regulatory Commission 1700 Rockville Pike, Suite 525 61 Forsyth Street, SW., Suite 23T85 Rockville, Maryland 20852 Atlanta, Georgia 30303-3415 a

Mr. Bill Passetti Mr. Kerry Landis i

Office of Radiat*on Control U.S. Nuclear Regulatory Commission Department of Hea:!h and 61 Forsyth Street, SW., Suite 23T85 Rehabilitative Services Atlanta, Georgia 30303-3415 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners Citrus County 110 North Apopka Avenue Iverness, Florida 34450-4245 Mr. David Kunsemiller, Director Nuclear Operations Site Support (SA2A)

Florida Power Corporation Crystal River Energy Complex 1

15760 W. Power Line Street Crystal River, Florida 34428-6708 i

J