==Dear Mr. Kelly:==
==Dear Mr. Kelly:==


By letter dated March 18,1999, Florida Power Corporation submitted a revised license amendment request, which included Framatome Technologies incorporated (FTI) Topical Report BAW-2342P, Revision 0. "OTSG Repair Roll Qualification Report, Addendum A", and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. A nonproprietary version was also submitted for placement in the public document room.
By {{letter dated|date=March 18, 1999|text=letter dated March 18,1999}}, Florida Power Corporation submitted a revised license amendment request, which included Framatome Technologies incorporated (FTI) Topical Report BAW-2342P, Revision 0. "OTSG Repair Roll Qualification Report, Addendum A", and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. A nonproprietary version was also submitted for placement in the public document room.
An affidavit dated March 17,1999, executed by yourself for FTI, the owner of the information, was included in the application. You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
An affidavit dated March 17,1999, executed by yourself for FTI, the owner of the information, was included in the application. You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a)    The information reveals data or material concerning FTl research or development plans or programs of present or potential competitive advantage to FTI.
(a)    The information reveals data or material concerning FTl research or development plans or programs of present or potential competitive advantage to FTI.

Latest revision as of 17:16, 6 December 2021

Informs That NRC Determined FTI Topical Rept BAW-2342P,Rev 0,entitled OTSG Repair Roll Qualification Rept,Addendum a, Marked as Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b)
ML20205S474
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/20/1999
From: Wiens L
NRC (Affiliation Not Assigned)
To: Joseph Kelly
FRAMATOME
References
NUDOCS 9904260228
Download: ML20205S474 (4)


Text

>

$ bhh

[$pa af.4 og<> UNITED STATES j, "t j NUCLEAR REGULATORY COMMISSION o WASHINGTON, D.C. 20555 4 001

% + .*. . + ,o April 20, 1999 I

)

Mr. Joseph J. Kelly Manager of B&W Owners Group Services Framatome Technologies, Inc. l P.O. Box 10935 Lynchburg, Virginia 24506-0935

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DI

Dear Mr. Kelly:

By )|letter dated March 18,1999]], Florida Power Corporation submitted a revised license amendment request, which included Framatome Technologies incorporated (FTI) Topical Report BAW-2342P, Revision 0. "OTSG Repair Roll Qualification Report, Addendum A", and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. A nonproprietary version was also submitted for placement in the public document room.

An affidavit dated March 17,1999, executed by yourself for FTI, the owner of the information, was included in the application. You stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(a) The information reveals data or material concerning FTl research or development plans or programs of present or potential competitive advantage to FTI.

i (B) The use of the information by a competitor would decrease his expenditures, in  !

time or resources, in designing, producing or marketing a similar product.

/

(c) The information consists of test data or other similar data concerning a process, method or component, the application of which results in a competitive advantage to FTI.

We have reviewed your affidavit and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted j

information sought to be withheld contains trade secrets or proprietary commercial information and should be withheld from public disclosure.  !

Therefore, we have determined that the FTl Topical Report BAW-2342P, Revision 0, entitled "OTSG Repair Roll Qualification Report, Addendum A," marked as proprietary, will be withheld '

from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. (~

i Withholding from public inspection shall not affect the right, if any, of persons properly and directly concemed to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

I- .[h h h A 9904260228 990420 PDR P

ADOCK 05000302 ,

PDR i L

1 i

F l

l Joesph J. Kelly l If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You should also understand that the NRC may have cause to review ,

this determination in the future, for example, if the scope of a Freedom of Information Act '

request includes your information. In all review situations,'if the NRC needs additional l information from you or makes a determination adverse to the above, you will be notified in l asivance of any public disclosure.

If you have any questions regarding this matter, I may be reached on (301) 415-1495.

Sincerely, l

i f

/ (}/

L. A. Wiens, Senior Project Manager, Section 2 Project Directorate II l Divisica of Licensing Project Management Office of Nuclear Reactor Regulation

! Docket No. 50-302 cc: See next page L

i i

)

l l  ;

i l

e Mesph J. Kelly April 20,1999 If the basis for withholding this iriiu mei m om public inspection should change in the future such that the information could then te e. Je available for public inspection, you should promptly notify the NRC. You shouid @ anderstand that the NRC may have cause to review this determination in the future, for enmple, if the scope of a Freedom of Information Act request includes your information, in all review situations, if the NRC needs additional information from you or makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached on (301) 415-1495.

Sincerely, original signed by: )

i L. A. Wiens, Senior Project Manager, Section 2 l Project Directorate 11 Division of Licensing Project Management j Office of Nuclear Reactor Regulation l 1

Docket No. 50-302 cc: See next page DISTRIBUTION:

M?!

PUBLIC PD-Il R/F JZwolinski/SBlack HBerkow SPeterson BClayton LWiens WBateman MPSiemien, OGC LWert, Rll C

Document Name: G:\CrystallPROA3592.WPD To receive a copy of this document,Inal6cata in the boc *C" = Copy without attachmen.8 enclosure 'E' = Copy with attachment / enclosure "N'=

No copy OFFICE PDil:PM e ( PDil-3:LA L EMCB ,, , 3 OGC lC/ PDil/SW4QQ LWiens/Rd

~

NAME BClayton 1AC/ WBateman(l)MA MPSiemierO)% SPeterso'n '

03/4/99 ~ @/, /99 DATE 03G/ /99' 0$/199 04/8/99 OFFICIAL RECORD COPY /"

W i..*

l' l

Mr. John Paul Cowan CRYSTAL RIVER UNIT NO. 3 Florida Power Corporation cc:

Mr. R. Alexander Glenn Ms. Sherry L. Bernhoft, Director Corporate Counsel Nuclear Regulatory Affairs (SA2A)

Florida Power Corporation Florida Power Corporation MAC-ASA Crystal River Energy Complex P.O. Box 14042 15760 W. Power Line Street St. Petersburg, Florida 33733-4042 Crystal River, Florida 34428-6708 Mr. Charles G. Pardee, Director Senior Resident inspector Nuclear Plant Operations (NA2C) Crystal River Unit 3 Florida Power Corporation U.S. Nuclear Regulatory. Commission Crystal River Energy Complex 6745 N. Tallahassee Road 15760 W. Power Line Street . Crystal River, Florida 34428 Crystal River, Florida 34428-6708 Mr. Gregory H. Halnon Mr. Michael A. Schoppman Director, Quality Programs (SA2C)

Framatome Technologies Inc. Florida Power Corporation 1700 Rockville Pike, Suite 525 Crystal River Energy Complex Rockville, Maryland 20852 15760 W. Power Line Street Crystal River, Florida 34428-6708 Mr. William A. Passetti, Chief Department of Health .

Bureau of Radiation Control 2020 Capital Circlel, SE, Bin #C21 Tallahassee, Florida 32399-1741 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners Citrus County

- 110 North Apopka Avenue inverness, Florida 34450-4245