| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 5
| page count = 5
| project =  
| project = TAC:MA4764
| stage = Acceptance Review
| stage = Acceptance Review
}}
}}

Latest revision as of 13:28, 6 December 2021

Informs of Completion of Acceptance Review of Saxton Nuclear Experimental Facility License Termination Plan Submitted on 990203.Concludes That LTP Does Not Contain Sufficient Info at Present Time to Initiate Detailed Review
ML20206D121
Person / Time
Site: Saxton File:GPU Nuclear icon.png
Issue date: 04/27/1999
From: Marsh L
NRC (Affiliation Not Assigned)
To: Kuehn G
GENERAL PUBLIC UTILITIES CORP.
References
TAC-MA4764, NUDOCS 9905030305
Download: ML20206D121 (5)


Text

r, . , . .

l

t. ,. p" * %.r, 5

UNITED STATES l j[.,k.fii i NUCLEAR REGULATORY COMMISSION l

Q f'j saswnaron cc = w w

'5 -

April 27. 1 F Mr. G. A. Kuehn, Jr.

Program Director SNEC Facility GPU Nuclear. Inc.

2574 Interstate Dnve Harrisburg. Pennsylvania 17t10

SUBJECT:

ACCEPT ANCE REVIEW OF THE SAXTON NUCLEAR EXPERIMENTAL FACILITY LICENSE TERMINATION PLAN iTAC NO. MA47641

Dear Mr. Kuent':

The Nuc! ear Reg. cater $> Comm:ss on staf f ,tne staf fi has completed its acceptance review of it'e Sacor N. c ea* E.cer mentai Fac+tv SNEF. License Termination Plan (LTP) that

',oa suem tied r F ec .a , 2 3 ' 999 n accordance .vith 10 CFR 50.82(aH9). Your cover letter states that ,ou suonattea tne LTP at this time because you are within two years of completing the aecommissioning and remediation activities at the SNEF site. The purpose of the acceptance reuen is to ;udge completeness on the basis of the mintmum ,

information required to begin a detailed review. The acceptance review was performed l considenng the guidance in draf t NUREG-1700. "The Standard Review Plan for Evaluating Nuclear Power Reactor License 't ermination Plans" and Regulatory Guide 1.179, " Standard Format and Content of License Termination Plans for Nuclear Power Reactors."

The staff has concluded that there is not sufficient information in the LTP at this time to initiate a detailed review. Additional information is needed in the areas of the final status survey plan and site-specific decommissioning costs. The LTP does not contain details on the methods and assumptions used to demonstrate compliance with the radiological criteria 'or license termination. The LTP should contain detailed final status survey plan information in the areas of survey protocols. identification and characterization of each survey unit data on scans performed, investigation levels. and the reference coordinate p system established for the site areas. For site specific decommissicaing costs, information is needed in sufficient detail to allow the staff to independently estimate your decommissioning costs and financial assurance.

go\

9 k$ 5 Y

f.
  • es m 9905030305 990427 PDR ADOCK 05000146 P PDR  ;

r, <

]

(

Mr. G. A. Kuehn, Jr. i The staff will take no additional action on the LTP at this time. When the information referred to above is available, please resubmit your LTP as a complete application, if y3u ,

have any questions concerning the staff's review of your LTP, please contact Alexander Adams at 301-4151127 or myself at 301-415-1168.

Sincerely, Ledyard B. Marsh', Chief Events Assessment, Generic Communications and Non-Power Reactors Branch Division of Regulatory improvement Programs Office of Nuclear Reactor Regulation Docket No 50-146 cc: See next page DISTRIBUTION:

E-MAIL HARD COPY PDoyle TBurdick l Docket File 50-146! AAdams TDragoun MMendonca PUBLIC EHylton TMichaels WEresian OGC (015-B18) REXB r/f SHolmes Pisaac DMatthews CBassett i LMarsh TJohnson (T7-F27)

)

i

)

NMSS REX R REXB:BCh A

4

.on 4 /99 TJo%)rtsr LMarsh I' 4//2/9T 4/27/99 ,

OFFICIAL RECORD COPY DOCUMENT NAME: G:\SECY\ ADAMS \;;UEHN2 i

y-Mr. G. A. Kuehn, Jr. The staff will ta'ke no additional action on the LTP at this time. When the information f referred to above is available, please resubmit your LTP as a complete application, if you

{

have any questions concerning the staff's review of _your LTP. please contact Alexander Adams at 301-415 1127 or myself at 301-415-1168.

Sincerely.

r ces:.5 Ledyard B. Marsh Chief Events Assessment Generic Communications and Non-Power Reactors Branch Division of Regulatory improvement Programs Office of Nuclear Reactor RegulaDon

.: c e .. . -; :

J. dee '.e X ' .dA l

I l

l l

1 I

l l

L

't 6

e Saxton Nuclear, Docket No. 50-146 Experimental Corporation (PAGE 1 OF 2) 9 cc:

Mr. Michael P. Murphy, Nuclear Engineer Carbon Township Supervisors Bureau of Radiation Protection ATTN: Penny Brode, Secretary

. Department of Environmental Protection R. D. #1, Box 222-C 13th Floor, Rachel Carson State Saxton, PA 16678

~

Office Building P.O. Box 8469 Hopewell Township Supervisors Harrisburg, PA 17105-8469 ATTN: Sally Giornesto, Secretary RR 1 Box 95 Mr. Jim Tydeman James Creek, PA 16657-9512 1402 Wall Street Saxton, PA 16678 Mr. D. Bud McIntyre, Chairman Broad Top Township Supervisors Mr. James H. Elder, Chairman Broad Top Municipal Building Concerned Citizens for SNEC Safety Defiance, PA 16633 Wall Street Ext.

Saxton, PA 16678 Mr. Don Weaver, Chairman Liberty Township Supervisors Mr. Ernest Fuller R.D.#1 R.D.#1 Saxton, PA 16678 Six Mile Run, PA 16679 U.S. Army Corps of Engineers Saxton Borough Council Baltimore District ATTN: Peggy Whited, Secretary ATTN: S. Snarski/P. Juhle 9th and Spring Streets P.O. Box 1715 Saxton, PA 16678 Baltimore, MD 21203 Ms. Norma ickes, Chair The Honorable Robert C. Jubelirer

- Bedford County Commissioners President Pro-Temp Senate of County Court House Pennsylvania 203 South Juliana Street - 30th District Bedford, PA 15522 State Capitol Harrisburg, PA 17120 Mr. Larry Sather, Chairman Huntingdon County Commissioners Dennis P. Kelly County Court House - Nuclear Safety Assessment Huntingdon, PA 16652 Oyster Creek Nuclear Generating Station P.O. Box 388 Saxton Community Library Forked River, NJ 08731-0388 Front Street Saxton, PA 16678

p , .. u a

0 Saxton Nuclear Docket No. 50-146 Experimental Corporation (PAGE 2 OF 2) cc:

Mr. Arthur Rone 'Jsmes Fockler, Chairrnan

.Vice President Nuclear Saxton Citizens Task Force Safety and Technical Services 1505 Liberty Street GPU Nuclear Inc. Saxton, PA 16678 1 Upper Pond Road Parsippany, NJ 07054 Dr. Rodger W. Granlund Saxton Independent Inspector Mr. Manuel Delgado Radiation Science and Engineering Center 2799 Battlefield Road The Pennsylvania State University Fishers Hill, VA 22626 Breazeale Nuclear Reactor University Park, PA 16802-2301 Mr. Eric Blocher 216 Logan Avenue Mr. Gareth McGrath Wyomissing, PA 19610 Altoona Mirror 301 Cayuga Avenue David Lewis, Esquire Altoona, PA 16603 Shaw, Pittman, Potts, and Trowbridge D. P. Baldassari 2300 N Street, NW President SNEC Washington, D.C. 20037. 2800 Pottsville Pike Reading, PA 19640-0001 Mr. David Sokolsky 1000 King Salmon Avenue Mr. G. A. Kuehn, Jr.

Eurda, CA 95503 Program Director SNEC Facility GPU Nuclear, Inc.

Mr. Gene Baker 2574 Interstate Drive 501 16th Street Harrisburg, PA 17110 Saxton, PA 16678 George W. Busch Mr. Dick Spargo Nuclear Safety Assessment 1004 Main Street Oyster Creek Nuclear Generating Station Saxton, PA 16678 GPU Nuclear Inc.

P.O. Box 388 Mr. Tom Strnad Forked River, NJ 08731-0388 TLG Services 148 New Milford Road East Bridgewater, CT 06752 Charles Barker RD 1 Box 143 James Creek, PA 16657 8

6 ,