. U.S. NUCLEAR REGULATORY COMMISSION
 
==REGION II==
Docket Nos 50-413 and 50-414 License Nos: NPF-35 and NPF-52 Report No 98-02 Licensee Duke Energy Corpor'ation Facility: Catawba Nuclear Station Location: 422 South Church Street Charlotte, NC 28242 Dates:  January 12-13, 1998 Inspector: D. Thompson, Safeguards Inspector Accompanying George A. Belisle, Chief Personnel Special Inspection Branch Division of Reactor Safety Barry Manili, Licensing Reviewer Office of Nuclear Reactor Regulation Approved by: George A. Belisle, Chief Special Inspections Branch Division of Reactor Safety Documernevnemanetwowe estains senolove unciam the:I l O f # . C " "cu C E au - !
9802250196 900217 PDR ADOCK 05000413 G PDR
 
    - - . - . - - -
*
. .
EXECUTIVE SUMMARY Catawba Nuclear Power Station
-
NRC Inspection Report Nos. 50-413/98-02 and 50-414/98-02 This routine announced inspection was conducted in the area of plant support by a regional safeguards specialist. The specific area evaluated was the Malevolent Use of Vehicles at Nuclear Power Plant * The inspector concluded that the vehicle barrier system, using a combination of gates, jersey barriers, bollards, buildings, and terrain, was an acceptable barrier capable of stopping a design basis vehicle traveling at the established speed prior to the vehicle penetrating the protected area  '
perimeter and causing damage to vital equipment. The inspector concluded that the engineering staff had perforr.ed a good analysis of the vehicle threat and had installed an appropriate vehicle barrier to counter the threat. (S2.5.1)
* The inspector determined that the licensee had installed the vehicle barrier at a distance that would preclude an explosion from a bomb-laden vehicle from causing damage to vital targots required for the safe shutdown of the reacto (S2.5.2)
* Based on thr* inspector's review of the vehicle barrier system procedures and in discussion with the licensee, the inspector concluded that the plans and procedures were acceptable for implementing the vehicle barrier syste (S2.5.3)
h enmanne.e,.,% MMg a      ..
}}
}}

Revision as of 02:14, 1 January 2021

Partially Withheld Insp Repts 50-413/98-02 & 50-414/98-02 on 980112-13 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant
ML20203C469
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/17/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20203C461 List:
References
50-413-98-02, 50-413-98-2, 50-414-98-02, 50-414-98-2, NUDOCS 9802250196
Download: ML20203C469 (2)


Text

.

'

(

. U.S. NUCLEAR REGULATORY COMMISSION

REGION II

Docket Nos 50-413 and 50-414 License Nos: NPF-35 and NPF-52 Report No 98-02 Licensee Duke Energy Corpor'ation Facility: Catawba Nuclear Station Location: 422 South Church Street Charlotte, NC 28242 Dates: January 12-13, 1998 Inspector: D. Thompson, Safeguards Inspector Accompanying George A. Belisle, Chief Personnel Special Inspection Branch Division of Reactor Safety Barry Manili, Licensing Reviewer Office of Nuclear Reactor Regulation Approved by: George A. Belisle, Chief Special Inspections Branch Division of Reactor Safety Documernevnemanetwowe estains senolove unciam the:I l O f # . C " "cu C E au - !

9802250196 900217 PDR ADOCK 05000413 G PDR

- - . - . - - -

. .

EXECUTIVE SUMMARY Catawba Nuclear Power Station

-

NRC Inspection Report Nos. 50-413/98-02 and 50-414/98-02 This routine announced inspection was conducted in the area of plant support by a regional safeguards specialist. The specific area evaluated was the Malevolent Use of Vehicles at Nuclear Power Plant * The inspector concluded that the vehicle barrier system, using a combination of gates, jersey barriers, bollards, buildings, and terrain, was an acceptable barrier capable of stopping a design basis vehicle traveling at the established speed prior to the vehicle penetrating the protected area '

perimeter and causing damage to vital equipment. The inspector concluded that the engineering staff had perforr.ed a good analysis of the vehicle threat and had installed an appropriate vehicle barrier to counter the threat. (S2.5.1)

  • The inspector determined that the licensee had installed the vehicle barrier at a distance that would preclude an explosion from a bomb-laden vehicle from causing damage to vital targots required for the safe shutdown of the reacto (S2.5.2)
  • Based on thr* inspector's review of the vehicle barrier system procedures and in discussion with the licensee, the inspector concluded that the plans and procedures were acceptable for implementing the vehicle barrier syste (S2.5.3)