{{#Wiki_filter:
{{#Wiki_filter:_- -... -, - ~ . - . - - - _ . . _ . . - - . - - . . - -  . . . - - . . _ . .
  ,
  ,7.
 
November 20,1998 Carolina Power and Light Company -
  - ATTN: Mr. J. Vice President Brunswick Steam Electric Plant-l 0. O. Box 10429 i
Southport, NC 28461        l
.
'
  .
          ;
SUBJECT: SAFETY SYSTEM ENGINEERING INSPECTION (NRC INSPECTION REPORT    J NO. 50-325,324/99-01)
 
==Dear Mr. Keenan:==
I
          ;
The purpose of this letter is to announce a safety system engineering inspection (SSEI) at your
;  Brunswick facilny which is scheduled for January 11-15 and 25-29,1999. The designated team leader, Joseph J. Lenahan, will make arrangements with your staff to discuss the inspection plan in more detail.
 
l The inspection objective will be to evaluate the capability of the high pressure coolant injection
  ' (HPCI) and reactor core isolation cooling (RCIC) systems to perform safety functions required
!. by their design bases. The inspection will be conducted using Inspection Procedure 93809,
  " Safety System Engineering Inspection (SSEI)", and willinvolve a team of five inspectors.
 
The team will require the information outlined in the enclosure for the HPCI and RCIC systems
!-  to review in preparation for the inspection. This information will be needed by December 16, l  1998 in order to support the inspection effort.
 
!
l'  Thank you for your cooperation in this matter. If you have any questions regarding this    I inspection, please contact Mr. J. Lenahan at (404) 562-4625 or Mr. K. Landis at (404) 562-4605.  ;
          '
r l-
 
Sincerely,
;      Original signed by l      Kerry D. Landis    '
p Kerr) D. Landis, Chief -  -
Engineering Branch Division of Reactor Safety  -
Docket Nos. 50-325, 50-324 l  - License Nos. DPR-71, DPR-62 i:  Enclosure: Information Requested for High Pressure Coolant injection (HPCI) and
[
*
Reactor Core isolation Cooling (RCIC) Systems G
;  .cc w/ encl: (See page 2)
          '
(  ..
-
9812O20300 981120  f      >
'
PDR ADOCK 05000324  t G  PDR  ;
fdd/ ;
. . . . . . . - _  _ . _ _ _ - _- __ _ _ _ _
 
. . . _ _ _ _ _ . . _ . . _ . _ _ _ _ _ .... _ _ _ _ _ .. _ _ _ .  .- _ . - . . . .
  .
p CP&L    2
  - cc w/ encl:
Director    Karen E. Long Site Operations    Assistant Attorney General Brunswick Steam Electric Plant  State of North Carolina Carolina Power & Light Company  P. O. Box 629 P. O. Box 10429    Raleigh, NC 27602 Southport, NC 28461 Robert P. Gruber  j J. J. Lyash, Plant Manager. Executive Director  l
          '
Brunswick Steam Electric Plant  Public Staff NCUC Carolina Power & Light Company  P. O. Box 29520 P. O. Box 10429    Raleigh, NC 27626-0520 Southport, NC 28461 Public Service Commission D. B. Alexander, Manager  State of South Carolina Performance Evaluation and  P. O. Box 11649  I Regulatory Affairs CPB 9  Columbia, SC 29211  i Carolina Power & Light Company      i P. O. Box 1551 '    Jerry W. Jones, Chairman Raleigh, NC 27602-1551_  Brunswick County Board of  1 Commissioners  l K. R. Jury, Manager    P. O. Box. 249 Regulatory Affairs    Bolivia, NC 28422 l
'
Carolina Power & Light Company Brunswick Steam Electric Plant  Dan E. Summers P. O. Box 10429  _
Emergency Management Coordinator Southport, NC 28461-0429  New Hanover County Department of l  _
Emergency Management l  William D. Johnson    P. O. Box 1525
!-  ; Vice President & Senior Counsel -  Wilmington, NC 28402 Carolina Power and Light Company P. O. Box 1551    William H. Crowe, Mayor Raleigh, NC 27602    City of Southport 201 E. Moore Street Mel Fry, Director    Southport, NC 28461 Division of Radiation Protection N. C. Department of Environment  (Distribution w/enci - See next page)
  - and Natural Resources l .
3825 Barrett Drive
!  Raleigh, NC 27609-7721
          :
i
'k ::L
 
- . .    -  . . - -.. . - . _ . _ _ .
.
+
CP&L    3 Distribution w/ encl:
L. Plisco, Ril M. Ernstes, Ril D. Trimble, NRR J. Coley, Ril R. Baldwin, Rll J.Lenahan,Ril E. Testa, Rll D. Thompson, Rll D. Jones,Rll G. West, Rll PUBLIC NRC Resident inspector U. S. Nuclear Regulatory Commission 8470 River Road, SE Southport, NC 28461 T
OFFICE Rit: PRS Rit:DRS g ( F Ril:oRP _
SIGNATURE %b
  ~
M "
M/
NAME Jien'ahan:pd Klandit .
BBonser DATE _11/!# /98 f@ 198 _11/4 0/98 11/ /98 11/ 19 8 11/ 19 8 til 19 8 COPY? IYiS) NO DYES / NO /VnS NO YES NO YES NO YES NO YES NO OFAetIL RECORD CDPI DOCUii4ENT NAME: S:\DRS\EB\BRUSSEll.WPD
        .
j'_
      . ~ . ,  -
 
-. .-  .  . - . -  =- . - .
        ,
*
y INFORMATION REQUESTED FOR  !
<        I THE HIGH COOLANT INJECTION (HPCI) AND
  -
REACTOR CORE ISOLATION COOLING (RCIC) SYSTEMS
.
Site specific administrative procedures related to standard operation, abnormal operation, and emergency operation of the HPCI and RCIC systems. i
-
Design criteria for the HPCI and RCIC Systems in addition to support systems and interfaces including but not limited to the Main Steam System, Conden sate /feedwater System, the Class 1E AC Power System and the Class 1E DC Power system.  -
.
HPCI and RCIC Technical Specification requirements and associated surveillance test / calibration procedures.
 
.
HPCI and RCIC systems piping and instrumentation drawings; one line diagrams; electrical schematics; wiring and logic diagrams.
 
.
A list of engineering calculations (Electrical, Instrumentation and Controls and Mechanical / Nuclear) applicable to the HPCI and RCIC systems.
 
.
A list of plant modifications to the HPCI and RCIC systems implemented since plant licensing.
 
)
i i
.
Relevant regulatory information regarding information notices, generic letters and special j studies that CP&L has performed for the HPCI and RCIC systems, j
-
HPCI and RCIC systems related LERs for the past 24 months.
 
.
A list of Adverse Condition Reports and Condition Reports initiated since 1990 affecting the HPCI and RCIC systems.
 
.
List of current open temporary modifications and operator work arounds involving operation of the HPCI and RCIC systems.
 
.
System Health Report and Performance Trends for the HPCI and RCIC systems.
 
.
' Maintenance Rule Performance criteria for the HPCI system.
 
.
Documentation of corrective and preventive maintenance activities, including the maintenance rule event log, performed on the HPCI and RCIC systems in the past 12 months.
 
.
Copies of applicable sections of the UFSAR for the HPCI and RCIC systems.
 
.
An index of drawings for the HPCI and RCIC systems.
 
.
Copies of self-assessment pertamed on the HPCI and RCIC systems in the last 24 months.
 
The system description and operator training module for the HPCI and RCIC systems.
 
-
.
b      Enclosure l
}}
}}

Revision as of 05:21, 13 November 2020

Informs That Ssei Repts 50-324/99-01 & 50-325/99-01 at Brunswick Facility Have Been Scheduled for 990111-15 & 25-29.Insp Objective Will Be to Evaluate Capability of Hpci& RCIC Sys to Perform Safety Functions Required
ML20196D648
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/20/1998
From: Landis K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Keenan J
CAROLINA POWER & LIGHT CO.
References
50-324-99-01, 50-324-99-1, 50-325-99-01, 50-325-99-1, NUDOCS 9812020300
Download: ML20196D648 (4)


Text

_- -... -, - ~ . - . - - - _ . . _ . . - - . - - . . - - . . . - - . . _ . .

,

,7.

November 20,1998 Carolina Power and Light Company -

- ATTN: Mr. J. Vice President Brunswick Steam Electric Plant-l 0. O. Box 10429 i

Southport, NC 28461 l

.

'

.

SUBJECT: SAFETY SYSTEM ENGINEERING INSPECTION (NRC INSPECTION REPORT J NO. 50-325,324/99-01)

Dear Mr. Keenan:

I

The purpose of this letter is to announce a safety system engineering inspection (SSEI) at your

Brunswick facilny which is scheduled for January 11-15 and 25-29,1999. The designated team leader, Joseph J. Lenahan, will make arrangements with your staff to discuss the inspection plan in more detail.

l The inspection objective will be to evaluate the capability of the high pressure coolant injection

' (HPCI) and reactor core isolation cooling (RCIC) systems to perform safety functions required

!. by their design bases. The inspection will be conducted using Inspection Procedure 93809,

" Safety System Engineering Inspection (SSEI)", and willinvolve a team of five inspectors.

The team will require the information outlined in the enclosure for the HPCI and RCIC systems

!- to review in preparation for the inspection. This information will be needed by December 16, l 1998 in order to support the inspection effort.

!

l' Thank you for your cooperation in this matter. If you have any questions regarding this I inspection, please contact Mr. J. Lenahan at (404) 562-4625 or Mr. K. Landis at (404) 562-4605.  ;

'

r l-

Sincerely,

Original signed by l Kerry D. Landis '

p Kerr) D. Landis, Chief - -

Engineering Branch Division of Reactor Safety -

Docket Nos. 50-325, 50-324 l - License Nos. DPR-71, DPR-62 i: Enclosure: Information Requested for High Pressure Coolant injection (HPCI) and

[

Reactor Core isolation Cooling (RCIC) Systems G

.cc w/ encl
(See page 2)

'

( ..

-

9812O20300 981120 f >

'

PDR ADOCK 05000324 t G PDR  ;

fdd/ ;

. . . . . . . - _ _ . _ _ _ - _- __ _ _ _ _

. . . _ _ _ _ _ . . _ . . _ . _ _ _ _ _ .... _ _ _ _ _ .. _ _ _ . .- _ . - . . . .

.

p CP&L 2

- cc w/ encl:

Director Karen E. Long Site Operations Assistant Attorney General Brunswick Steam Electric Plant State of North Carolina Carolina Power & Light Company P. O. Box 629 P. O. Box 10429 Raleigh, NC 27602 Southport, NC 28461 Robert P. Gruber j J. J. Lyash, Plant Manager. Executive Director l

'

Brunswick Steam Electric Plant Public Staff NCUC Carolina Power & Light Company P. O. Box 29520 P. O. Box 10429 Raleigh, NC 27626-0520 Southport, NC 28461 Public Service Commission D. B. Alexander, Manager State of South Carolina Performance Evaluation and P. O. Box 11649 I Regulatory Affairs CPB 9 Columbia, SC 29211 i Carolina Power & Light Company i P. O. Box 1551 ' Jerry W. Jones, Chairman Raleigh, NC 27602-1551_ Brunswick County Board of 1 Commissioners l K. R. Jury, Manager P. O. Box. 249 Regulatory Affairs Bolivia, NC 28422 l

'

Carolina Power & Light Company Brunswick Steam Electric Plant Dan E. Summers P. O. Box 10429 _

Emergency Management Coordinator Southport, NC 28461-0429 New Hanover County Department of l _

Emergency Management l William D. Johnson P. O. Box 1525

!-  ; Vice President & Senior Counsel - Wilmington, NC 28402 Carolina Power and Light Company P. O. Box 1551 William H. Crowe, Mayor Raleigh, NC 27602 City of Southport 201 E. Moore Street Mel Fry, Director Southport, NC 28461 Division of Radiation Protection N. C. Department of Environment (Distribution w/enci - See next page)

- and Natural Resources l .

3825 Barrett Drive

! Raleigh, NC 27609-7721

i

'k ::L

- . . - . . - -.. . - . _ . _ _ .

.

+

CP&L 3 Distribution w/ encl:

L. Plisco, Ril M. Ernstes, Ril D. Trimble, NRR J. Coley, Ril R. Baldwin, Rll J.Lenahan,Ril E. Testa, Rll D. Thompson, Rll D. Jones,Rll G. West, Rll PUBLIC NRC Resident inspector U. S. Nuclear Regulatory Commission 8470 River Road, SE Southport, NC 28461 T

OFFICE Rit: PRS Rit:DRS g ( F Ril:oRP _

SIGNATURE %b

~

M "

M/

NAME Jien'ahan:pd Klandit .

BBonser DATE _11/!# /98 f@ 198 _11/4 0/98 11/ /98 11/ 19 8 11/ 19 8 til 19 8 COPY? IYiS) NO DYES / NO /VnS NO YES NO YES NO YES NO YES NO OFAetIL RECORD CDPI DOCUii4ENT NAME: S:\DRS\EB\BRUSSEll.WPD

.

j'_

. ~ . , -

-. .- . . - . - =- . - .

,

y INFORMATION REQUESTED FOR  !

< I THE HIGH COOLANT INJECTION (HPCI) AND

-

REACTOR CORE ISOLATION COOLING (RCIC) SYSTEMS

.

Site specific administrative procedures related to standard operation, abnormal operation, and emergency operation of the HPCI and RCIC systems. i

-

Design criteria for the HPCI and RCIC Systems in addition to support systems and interfaces including but not limited to the Main Steam System, Conden sate /feedwater System, the Class 1E AC Power System and the Class 1E DC Power system. -

.

HPCI and RCIC Technical Specification requirements and associated surveillance test / calibration procedures.

.

HPCI and RCIC systems piping and instrumentation drawings; one line diagrams; electrical schematics; wiring and logic diagrams.

.

A list of engineering calculations (Electrical, Instrumentation and Controls and Mechanical / Nuclear) applicable to the HPCI and RCIC systems.

.

A list of plant modifications to the HPCI and RCIC systems implemented since plant licensing.

)

i i

.

Relevant regulatory information regarding information notices, generic letters and special j studies that CP&L has performed for the HPCI and RCIC systems, j

-

HPCI and RCIC systems related LERs for the past 24 months.

.

A list of Adverse Condition Reports and Condition Reports initiated since 1990 affecting the HPCI and RCIC systems.

.

List of current open temporary modifications and operator work arounds involving operation of the HPCI and RCIC systems.

.

System Health Report and Performance Trends for the HPCI and RCIC systems.

.

' Maintenance Rule Performance criteria for the HPCI system.

.

Documentation of corrective and preventive maintenance activities, including the maintenance rule event log, performed on the HPCI and RCIC systems in the past 12 months.

.

Copies of applicable sections of the UFSAR for the HPCI and RCIC systems.

.

An index of drawings for the HPCI and RCIC systems.

.

Copies of self-assessment pertamed on the HPCI and RCIC systems in the last 24 months.

The system description and operator training module for the HPCI and RCIC systems.

-

.

b Enclosure l