IR 05000715/2009030: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000461/1985041]]
{{Adams
| number = ML20133N108
| issue date = 10/22/1985
| title = Notice of Violation from Insp on 850715-0930
| author name = Harrison J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name =
| addressee affiliation =
| docket = 05000461
| license number =
| contact person =
| document report number = 50-461-85-41, NUDOCS 8510280392
| package number = ML20133N107
| document type = NOTICE OF VIOLATION OF A REGULATION, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 1
}}
 
{{IR-Nav| site = 05000715 | year = 2009 | report number = 030 }}
 
=Text=
{{#Wiki_filter:_ _
l
 
Appendix I i  N0'lICF 0F VIOLATION
; Illitofs Power Company  Docket No. 50-461 As a resu n of the inspection conducted on July 15 through September 30, 1985, ar.d in accardance with the General Policy and Procedures for NRC Enforcement Actions (10 CFR Part 2, Appendix C), the following violation was identified:
'
10 CFR 50, Appendix B, Criterion VII, as implemented by Illinois Power Company Nuclear Power Construction Quality Assurance Manual, Chapter 7, requires that measures be established to assure that purchased material, equipment, and services conform to the procurement document Contrary to the above, the licensee failed to establish measures to assure
.
that purchased items conform to procurement documents by verifying the l availability and acceptability of vendor documentation. This is exemplified by the finding that as of September 6, 1985, approximately 50 record packages have been identified where, due to a misinterpretation of Generic Resolution 27, the Documentation Checklists had been incorrectly revised by changing the
,
Receiving Inspection Report number.
 
) This is a Severity Level IV violation (Supplement II).
 
;
, Pursuant to the provisions of 10 CFR 2.201, you are nquired to submit to
: this office within thirty days of the date of this Notice a written statement i cr explanation in reply, incluaing for each violation: (1) corrective action 1 taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.
 
l Consideration may be given to extending your response time for good cause show ,
    '
00T 221985 Dated  J. J. Harrison, Chief Engineering Branch 8510280392 851022 PDR ADOCK 05000461 G  PDR
!    4
    '
L
}}

Latest revision as of 22:00, 25 September 2020

Notice of Violation from Insp on 850715-0930
ML20133N108
Person / Time
Site: Clinton, 05000715 Constellation icon.png
Issue date: 10/22/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20133N107 List:
References
50-461-85-41, NUDOCS 8510280392
Download: ML20133N108 (1)


Text

_ _

l

Appendix I i N0'lICF 0F VIOLATION

Illitofs Power Company Docket No. 50-461 As a resu n of the inspection conducted on July 15 through September 30, 1985, ar.d in accardance with the General Policy and Procedures for NRC Enforcement Actions (10 CFR Part 2, Appendix C), the following violation was identified

'

10 CFR 50, Appendix B, Criterion VII, as implemented by Illinois Power Company Nuclear Power Construction Quality Assurance Manual, Chapter 7, requires that measures be established to assure that purchased material, equipment, and services conform to the procurement document Contrary to the above, the licensee failed to establish measures to assure

.

that purchased items conform to procurement documents by verifying the l availability and acceptability of vendor documentation. This is exemplified by the finding that as of September 6, 1985, approximately 50 record packages have been identified where, due to a misinterpretation of Generic Resolution 27, the Documentation Checklists had been incorrectly revised by changing the

,

Receiving Inspection Report number.

) This is a Severity Level IV violation (Supplement II).

, Pursuant to the provisions of 10 CFR 2.201, you are nquired to submit to

this office within thirty days of the date of this Notice a written statement i cr explanation in reply, incluaing for each violation: (1) corrective action 1 taken and the results achieved; (2) corrective action to be taken to avoid further violations; and (3) the date when full compliance will be achieved.

l Consideration may be given to extending your response time for good cause show ,

'

00T 221985 Dated J. J. Harrison, Chief Engineering Branch 8510280392 851022 PDR ADOCK 05000461 G PDR