MONTHYEARML20217J1481999-09-30030 September 1999 Notice of Violation from Investigation Conducted from 991028-980921.In Jan 1997,CH Tewksbury Engaged in Deliberate Misconduct That Caused Util to Be in Violation of 10CFR50.7 ML20217J1361999-09-30030 September 1999 Notice of Violation from Investigation on 971028-980921. Violation Noted:During Jan 1997,QV Dept Discriminated Against Qv Inspector,For Having Engaged in Protected Activities ML20206G9821999-04-30030 April 1999 Notice of Violation from Insp on 990408-21.Violation Noted:Licensee,Despite Having Considered Issue Closed in Corrective Action Program,Failed to Correct Condition Adverse to Quality ML20204E6931999-03-10010 March 1999 Notice of Violation from Insp on 990208-12.Violtion Noted: Licensee Did Not Make Adequate Surveys to Assure Compliance with 10CFR20.1902(b) Requiring Posting of Each High Radiation Area with Signs Displaying Listed Words ML20155E7131998-10-30030 October 1998 Notice of Violation from Insp on 980819-1001.Violation Noted:On 980909,operator Responding to Alarming Annunciator on Area Radiation Monitoring Sys Did Not Announce Annunciator to Control Room Supervisor ML20237B1531998-08-11011 August 1998 Notice of Violation from Insp on 980521.Violation Noted:On 980119,individual Exited RCA Utilizing Point Other than Designated Areas W/O Obtaining Approval from Radiological Operations Supervisor ML20236L3071998-07-0707 July 1998 Notice of Violation from Insp on 980504-08.Violation Noted: on 980213,ERDS Not Initiated within 1 H of Declaration of Alert & Only One Electrical Maint Personnel on Shift Trained & Assigned as Member of Emergency Response Organization ML20248J8641998-06-0303 June 1998 Notice of Violation from Insp on 980511-15.Violation Noted: Between 980429 & 980513,control Rod Drive Filter Area on 712 Elevation of Turbine Building,Radiation Area W/Radiation Dose of 8 Mrem Per Hour,Was Not Posted W/Warning Sign ML20217F4431998-04-22022 April 1998 Notice of Violation from Insp on 980323-27.Violation Noted: Description of Facility in USAR Not Accurate in All Matl Respects ML20202H7491998-02-13013 February 1998 Notice of Violation from Insp on 971125-980122.Violations Noted:Between 971018 & 1216,isolation Capability for Each Required Secondary Containment & Secondary Containment Bypass Penetration Flow Path Was Not Restored IR 07100007/20110241997-12-22022 December 1997 Notice of Violation from Insp on 971007-1124.Violations Noted:As of 971124,measures Were Not Established to Control Issuance of Documents Which Prescribe Activities Affecting Quality ML20199A8471997-11-12012 November 1997 NOV from Insp on 970826-1006.Violations Noted:On 970911,line Assistant Shift Supervisor Failed to Appropriately Direct Activities of Reactor Operators,Monitor Indicators to Detect Abnormal Trend & Initiate Action to Correct Situation ML20199A9681997-11-12012 November 1997 NOV from Insp on 970707-0825.Violations Noted:Operability Determinations Were Not Performed within 24 H of Discovery of Nonconforming Condition ML20212B4531997-10-14014 October 1997 Notice of Violation from Insp on 970524-0707.Violations Noted:On 970624,electrical Diagrams Were Not Referred to for Detailed Evaluation of Ground on Safety Related Motor Control Ctr 1A ML20217G7521997-09-29029 September 1997 Notice of Violation from Insp on 970313-0522.Violation Noted:Fpc Rev 18,dtd 970213,which Prescribed Shutting Down of FPC & Cleanup Sys an Activity Affecting Quality Was Not of Type Appropriate to Circumstances ML20210R6701997-08-25025 August 1997 Notice of Violation from Insp on 970714-18 & 27-28. Violations Noted:Licensee Did Not Make Surveys to Assure Compliance with 10CFR20.1201(a) Which Limits Radiation Exposure to Skin ML20217P3021997-08-0101 August 1997 Notice of Violation & Proposed Impositon of Civil Penalty from Insp on 970106-0307.Violations Noted:As of 970307, Licensee Failed to Assure That Listed Significant Condition Adverse to Quality Was Promptly Corrected ML20151K0131997-07-25025 July 1997 Notice of Violation from Insp on 970407-0523.Violation Noted:On 970408,2 Members of Plant Staff Failed to Perform Step 8.1.7 of Procedure CPS 9170.02, CR HVAC Chilled Water Valve Operability Test, Rev 26,in Order Written ML20149E2261997-07-14014 July 1997 Notice of Violation from Insp on 970519-23.Violation Noted: on 970423,licensee Identified That Worker Alarmed Security Portal Monitors Twice,Failed to Contact RP Personnel & Exited Plant ML20148H8251997-06-0909 June 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $450,000.Violation Noted:Operators Failed to Perform Steps in Sequence Specified in Section 8.2.4 as Demonstrated by Failure to Wait Until Loop Cooled ML20141K4741997-05-16016 May 1997 Notice of Violation from Insp on 970215-0329.Violation Noted:On 970331 Inspectors Identified That J/S 77 Through 87 & J/S 93 of Mwr D60080 Not Been Signed for as Work Performed ML20138K1721997-05-0505 May 1997 Notice of Violation from Insp on 970106-0307.Violation Noted:Measures Were Not Established to Assure That Design Basis Translated Correctly Into Specifications,Drawings, Procedures & Instructions ML20210M9801997-03-31031 March 1997 Notice of Violation from Investigation on 960708-1031. Violation Noted:On 960530,T Ferrill Engaged in Deliberate Misconduct Which Caused Licensee to Be in Violation of 10CFR50.9 by Deliberately Falsifying PM Task Data Sheet ML20137K4471997-03-21021 March 1997 Notice of Violation from Insp on 961213-970214.Violation Noted:Licensee Failed to Maintain Written Safety Evaluation to Document Basis for Determining That Change to Facility Described in FSAR Did Not Involve Safety Question ML20147F0111997-03-13013 March 1997 Notice of Violation from Insp on 970106-10 & 31.Violation Noted:Condition Rept (1-94-10-002) & Issued on 941003,indicated That Backup Meteorological Tower Wind Speed & Wind Direction Sensors Were Inoperable ML20147E4041997-02-11011 February 1997 Notice of Violation from Insp on 970730-1212.Violation Noted:Cps Procedure 3509.01C001, Div 1 Nsps Bus Outage Checklist, Was Adequate in That Valve 1G33-F004 Returned to Svc Prior to Restoration of RWCU Pump Protection Logic ML20059A2881993-12-23023 December 1993 Notice of Violation from Insp on 931115-1203.Violation Noted:Ist Procedure CPS 9069.01 Contained Inadequate Acceptance Criteria to Verify That Following Check Valves Were Exercised Quarterly to Full Open Position ML20058Q2161993-12-16016 December 1993 Notice of Violation from Insp on 931025-1202.Violation Noted:On 931008 Licensee Failed to Make Adequate Survey During Removal of Insulation from Feedwater Check Valve ML20058D0121993-11-22022 November 1993 Notice of Violation from Insp on 930914-1025.Violation Noted:Fire Pump Overspeed Protection Device Not Capable of Being Powered from Each Battery Independently ML20057B8161993-09-17017 September 1993 Notice of Violation from Insp on 930706-0824.Violation Noted:Licensee Identified & Documented More than Dozen Pipe Support Deficiences in RHR Sys a & B.Condition Repts Closed W/O Adequate Assessment to Determine Root Cause(S) ML20126B4921992-12-10010 December 1992 Notice of Violation from Insp on 921027-1207.Violation Noted:On 921122,entry Made Into Operational Condition 2 W/ Div II Containment & Drywell Hydrogen/Oxygen Analyzer Inoperable ML20217B1911991-03-0404 March 1991 Notice of Violation from Insp on 901217-910130.Violation Noted:Licensee Failed to Ensure That Adequate Design Control Measures Established to Support Field Alterations ML20062H3181990-11-26026 November 1990 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $112,500.Violations Noted:Failure to Identify Potentially Significant Condition Adverse to Quality,Failure to Control Design & Testing Documents & Startup W/O DGs ML20055J3281990-07-25025 July 1990 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000.Violation Noted:On 900411,reactor in Operational Condition 1 at Thermal Power Greater than Low Power Setpoint ML20248H0571989-10-0505 October 1989 Notice of Violation from Insp on 890911-15.Violations Noted: Failure to Maintain Test Records Which Documented Results & Acceptability of Completed Testing of Fire Detector Voltages & Sensitivity Checks ML20247N6941989-07-25025 July 1989 Notice of Violation from Safety Insp on 890512-0707. Violation Noted:Secondary Containment Integrity Did Not Exist Due to Internal Conduit Seals Not Installed in Conduit Penetrations Through Secondary Containment Per Design ML20247N2891989-07-24024 July 1989 Notice of Violation from Insp on 890601-23.Violation Noted: Failure to Implement Technical Procedure CPS 2800.04, Generic Flush Procedure & Administrative Procedure CPS 1052.01, Conduct of Sys Lineups ML20247C5051989-07-20020 July 1989 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000.Noncompliance Noted:Environ Qualification Deficiencies W/Kynar Splices & Junction Boxes Not Corrected ML20245H4581989-06-23023 June 1989 Notice of Violation from Insp on 890206 & 0607.Violation Noted:Six Security Force Members Assigned to Security Shift Duties in Feb 1989 Were Not Trained or Had Not Demonstrated Capability to Perform 18 of 35 Crucial Tasks ML20244E4361989-06-12012 June 1989 Notice of Violation from Insp on 890316-0530.Violations Noted:Improper Mounting of Diesel Generator Svc Water HX, Failure to Adequately Control Svc Air Sys & Failure to Bypass Thermal Overload Protection on Valves ML20247A0871989-05-12012 May 1989 Notice of Violation from Insp on 890123-26,0227-28 & 0313-0407.Violation noted:13 Maint Procedures in Three Work packages,D02668,PEMSY053 & PEMSY054 Not Reverified Prior to Use to Ensure Rev Included Per CPC Procedure Np&S 2.51 ML20245A0861989-04-12012 April 1989 Notice of Violation from Insp on 890127-0316.Violations Noted:Neither Procedures CPS 1052.01 Nor CPS 9861.02 Contained Any Requirements for Temporary Changes to Approved Operating or Test Procedures to Be Reviewed Per Tech Specs ML20247C8611989-03-20020 March 1989 Notice of Violation from Insp on 890109-0214.Violations Noted:Procedure 8117.05 Not Appropriate,In That Procedure Did Not Address Area Radiation Monitor Interlock on Containment Polar Crane or Actions in Event of Alarm ML20235N0531989-02-15015 February 1989 Notice of Violation from Insp on 881206-890127.Violation Noted:On 881111,1C Diesel Generator Was Inoperable Because It Did Not Meet Design Basis,Per 10CFR50,App R,Gdc 2 ML20195C2641988-10-26026 October 1988 Notice of Violation from Insp on 880727-28 & 1018.Violation noted:23 Valves Identified That Were Not Included in Inservice Testing Program ML20205E6751988-10-21021 October 1988 Notice of Violation from Insp on 880926-30.Violation Noted: Low Specific Activity Radwaste Shipment from Clinton Station to Richland,Wa Burial Site Not Adequately Braced in That Front Bracing Failed & Permitted Load to Shift ML20154L7651988-09-16016 September 1988 Notice of Violation from Insp on 880810-0906.Violations Noted:Condition Adverse to Quality Identified But Not Promptly Corrected & NRC Not Notified within 4 H of Spill of 79 Gallons of Sulfuric Acid in Waste Water Sys on 880804 ML20151N8261988-07-29029 July 1988 Notice of Violation from Insp on 880518-0706.Violation Noted:Plant Mod A-128 to Install Seismic Restraints for Nitrogen Bottle Storage in Containment,Released W/O Instructions or Procedures ML20155C9071988-06-0808 June 1988 Notice of Violation from Insp on 880404-0518.Violation Noted:Required Overall Airlock Leakage Test Not Performed Prior to Operational Condition 2 Entry & Secondary Containment Integrity Not Maintained Per Tech Spec 3.6.6.1 ML20154S2951988-06-0101 June 1988 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000.Noncompliance Noted:Equipment Important to Safety Not Qualified by Appropriate Testing &/Or Analysis Under Postulated Environ Conditions 1999-09-30
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20217J1361999-09-30030 September 1999 Notice of Violation from Investigation on 971028-980921. Violation Noted:During Jan 1997,QV Dept Discriminated Against Qv Inspector,For Having Engaged in Protected Activities ML20217J1481999-09-30030 September 1999 Notice of Violation from Investigation Conducted from 991028-980921.In Jan 1997,CH Tewksbury Engaged in Deliberate Misconduct That Caused Util to Be in Violation of 10CFR50.7 IR 05000461/19990131999-08-19019 August 1999 Insp Rept 50-461/99-13 on 990611-0728.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000461/19990101999-07-16016 July 1999 Insp Rept 50-461/99-10 on 990422-0610.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990171999-07-0909 July 1999 Insp Rept 50-461/99-17 on 990607-11.No Violations Noted. Major Areas Inspected:Review of Access Authorization Program,Communications,Protected Areas Access Control of Personnel,Packages,Matl & Vehicles & Testing & Maint IR 05000461/19990121999-07-0707 July 1999 Insp Rept 50-461/99-12 on 990607-11.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Chemistry & Radiation Protection Programs Including Quality Control of Lab & Inline Instrumentation PNO-III-99-028, on 990506,reactor Achieved Criticality Starting Up from Sept 1995 Outage.Region III Maintained Continuous Insp Coverage Throughout Restart Period.Info in Preliminary Notification Reviewed1999-05-28028 May 1999 PNO-III-99-028:on 990506,reactor Achieved Criticality Starting Up from Sept 1995 Outage.Region III Maintained Continuous Insp Coverage Throughout Restart Period.Info in Preliminary Notification Reviewed IR 05000461/19990041999-05-0505 May 1999 Insp Rept 50-461/99-04 on 990301-0407.Non-cited Violations Noted.Major Areas Inspected:Effectiveness of Operators to Safely Operate Facility IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990111999-04-30030 April 1999 Insp Rept 50-461/99-11 on 990408-21.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20206G9821999-04-30030 April 1999 Notice of Violation from Insp on 990408-21.Violation Noted:Licensee,Despite Having Considered Issue Closed in Corrective Action Program,Failed to Correct Condition Adverse to Quality IR 05000461/19990031999-04-21021 April 1999 Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Engineering Organization Effectiveness & Readiness for Restart Through in-depth Review of Calculations IR 05000461/19990061999-04-21021 April 1999 Insp Rept 50-461/99-06 on 990217-0407.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980291999-03-24024 March 1999 Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted. Major Areas Inspected:Review of Circumstances Surrounding High Number of Licensed Operator Failures That Occurred as Result of 1998 Annual Operator Requalification Exam IR 05000461/19990021999-03-18018 March 1999 Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support ML20204E6931999-03-10010 March 1999 Notice of Violation from Insp on 990208-12.Violtion Noted: Licensee Did Not Make Adequate Surveys to Assure Compliance with 10CFR20.1902(b) Requiring Posting of Each High Radiation Area with Signs Displaying Listed Words IR 05000461/19990051999-03-10010 March 1999 Insp Rept 50-461/99-05 on 990208-12.Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of RP Program IR 05000461/19980281999-02-0101 February 1999 Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering IR 05000461/19980201999-01-22022 January 1999 Insp Rept 50-461/98-20 on 981118-990106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support PNO-III-99-002, on 990106,partial Loss of Offsite Power Occurred.Power Lost to Rhrs,Normal Shutdown Cooling Sys & in Svc at Time of Event.Plant Three EDGs Started Automatically & Provided Power to Safety Sys.Power Restored to Rhrs Pump1999-01-0808 January 1999 PNO-III-99-002:on 990106,partial Loss of Offsite Power Occurred.Power Lost to Rhrs,Normal Shutdown Cooling Sys & in Svc at Time of Event.Plant Three EDGs Started Automatically & Provided Power to Safety Sys.Power Restored to Rhrs Pump IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980181998-12-17017 December 1998 Insp Rept 50-461/98-18 on 981002-1117.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980261998-12-13013 December 1998 Insp Rept 50-461/98-26 on 981013-30.Violations Were Identified,But No Notice Was Issued.Major Areas Inspected: Engineering & Plant Support IR 05000461/19980191998-11-25025 November 1998 Insp Rept 50-461/98-19 on 980914-1009.No Violations Noted. Major Areas Inspected:Engineering ML20155E7131998-10-30030 October 1998 Notice of Violation from Insp on 980819-1001.Violation Noted:On 980909,operator Responding to Alarming Annunciator on Area Radiation Monitoring Sys Did Not Announce Annunciator to Control Room Supervisor IR 05000461/19980171998-10-30030 October 1998 Insp Rept 50-461/98-17 on 980819-1001.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980251998-10-28028 October 1998 Insp Rept 50-461/98-25 on 981005-09.No Violations Noted. Major Areas Inspected:Portion of EP Program,Review of Documentation,Tours & Observations of Emergency Response Facilities & Equipment & Follow Up on Previous Findings IR 05000461/19983011998-10-0909 October 1998 NRC Operator Licensing Retake Exam Rept 50-461/98-301(OL) Administered to One Applicant Requesting SRO License on 980831-0904.Applicant Passed Operating Retake Exam But Not Issued SRO License to Operate Plant IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20237B1531998-08-11011 August 1998 Notice of Violation from Insp on 980521.Violation Noted:On 980119,individual Exited RCA Utilizing Point Other than Designated Areas W/O Obtaining Approval from Radiological Operations Supervisor IR 05000461/19980111998-08-0707 August 1998 Insp Rept 50-461/98-11 on 980527-0710.Enforcement Discretion Being Exercised for Six Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program ML20236L3071998-07-0707 July 1998 Notice of Violation from Insp on 980504-08.Violation Noted: on 980213,ERDS Not Initiated within 1 H of Declaration of Alert & Only One Electrical Maint Personnel on Shift Trained & Assigned as Member of Emergency Response Organization ML20236L3171998-07-0707 July 1998 Insp Rept 50-461/98-09 on 980504-08.No Violations Noted. Major Areas Inspected:Review of Documentation Re Actual EP Activation,Evaluation of Quality of EP Program Related Audits & Reviews & Effectiveness of Mgt Controls IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20237E6641998-06-0505 June 1998 EN-98-044:informs Commission That NRC Intends to Exercise Enforcement Discretion & Not Issue Citation or Propose Civil Penalty for Four Violations of Maint Rule.Ltr Describing Action Will Be Issued on or About 980612 ML20248J8641998-06-0303 June 1998 Notice of Violation from Insp on 980511-15.Violation Noted: Between 980429 & 980513,control Rod Drive Filter Area on 712 Elevation of Turbine Building,Radiation Area W/Radiation Dose of 8 Mrem Per Hour,Was Not Posted W/Warning Sign IR 05000461/19980101998-06-0303 June 1998 Insp Rept 50-461/98-10 on 980511-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980061998-05-11011 May 1998 Insp Rept 50-461/98-06 on 980304-0414.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20217F4431998-04-22022 April 1998 Notice of Violation from Insp on 980323-27.Violation Noted: Description of Facility in USAR Not Accurate in All Matl Respects ML20217F4611998-04-22022 April 1998 Insp Rept 50-461/98-07 on 980323-27.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980031998-03-27027 March 1998 Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19973131998-03-24024 March 1998 NRC Operator Licensing Exam Rept 50-461/97-313OL Conducted on 980126-0205.Exam Results:Exam Was Administered to Two RO & Seven SRO Applicants.Five SRO & Two RO Applicants Passed All Portions of Exam & Two SRO Applicants Failed ML20217D8511998-03-20020 March 1998 EN-98-014:informs Commission That NRC Will Exercise Enforcement Discretion Per Section VII.B.2 of Enforcement Policy & Not Issue NOV to Il Power Co for Several Violations Associated W/Loss of Shutdown Cooling Event on 980213 IR 05000461/19980041998-03-20020 March 1998 Insp Rept 50-461/98-04 on 980213-16.No Violations Noted. Major Areas Inspected:Operations & Maint 1999-09-30
[Table view] |
Text
._
l l
NOTICE OF VIOLATION lilinois Power Docket No. 50-461 Clinton Power Station License No. NPF-62 During an NRC inspection conducted on July 30 through November 23,1996, violations of !
NRC requirements were identified. In accordance with the " General Statement of Policy '
l and Procedure for NRC Enforcement Actions," 95 FR-1592, June 29,1995, the violations are listed below:
- 1. 10 CFR 50, Appendix B, Criterion V, requires, in part, that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of ;
a type appropriate to the circumstances.
Contrary to the above, on October 30,1996, Clinton Power Station (CPS) ;
Procedure 3509.01 COO 1, " Division i Nuclear System Protective System (NSPS) Bus i Outage Checklist," a procedure affecting quality, was inadequate in that valve 1G33-FOO4 was returned to service prior to restoration of reactor water cleanup pump protection logic, resulting in failure of the pump.
This is a Severity Level IV violation (Supplement 1).
- 2. Technical Specification (TS) 3.6.2.1.1 requires verification that suppression pool average temperature is within the applicable limits at a frequency of 5 minutes when performing testing which adds heat to the suppression pool.
CPS Procedure 9000.05, " Suppression Pool Temperature Log," required recording suppression pool temperature when performing testing which added heat to the suppression pool.
Contrary to the above, on July 11,1996, suppression pool temperature was not recorded every 5 minutes during Reactor Core Isolation Cooling System testing, an activity that added heat to the suppression pool.
This is a Severity Level IV violation (Supplement 1).
- 3. 10 CFR 50.54(l), " Conditions of Licenses," requires, in part, that the licensee shall designate individuals, licensed as senior operators pursuant to Part 55, to be responsible for directing the licensed activities of licensed operators.
10 CFR 55.53.(e), " Conditions of Licenses," requires in part, that to maintain active status, the licensee licensed operator shall actively perform the functions of an operator or senior operator on a minimum of seven 8-hour or five 12-hour shifts per calendar quarter.
10 CFR 55.4, " Definitions," defines actively performing the functions of an operator or senior operator to mean that an individual has a position on the shift crew that requires the individual to be licensed as defined in the facility's technical specifications, and that the individual carries out and is responsible for the duties covered by that position.
9702190406 970211 PDR ADOCK 05000461 0 PDR
_ _. _ m . __ __
l 1
i Notice of Violation 10 CFR 55.53(f) requires, in part, that if paragraph 55.53(e) is not met then before ,
resumption of functions authorized by a license issued under this part an authorized ;
representative of the facility licenses shall certify that the licensee has completed a !
minimum of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of shift functions under the direction of an operator or senior ;
operator as appropriate and in the position to which the individual will be assigned.
Contrary to the above, during the second, third, and fourth quarter of 1996, the licensee designated individuals to be responsible for directing the licensed activities of licensed operators, had neither actively performed the required quarterly shifts nor completed a minimum of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> of shift function under the direction of a senior operator.
This is a Severity Level IV violation (Supplement 1).
- 4. 10 CFR 50, Appendix B, Criterion XVI, requires, in part, that measures shall be established to assure that conditions adverse to quality are promptly identified and corrected.
Contrary to the above, conditions adverse to quality were not promptly corrected in tbst wors in safety tagging resulted in unintended isolation of power for security lighting on July 25, September 6, and September 29,1996.
This is a Severity Level IV violation (Supplement 1).
l
! 5. 10 CFR 50, Appendix B, Criterion V, requires, in part, that activities affecting quality shall be accomplished in accordance with instructions, procedures, or drawings.
l Contrary to the above, on November 3,1996, while performing CPS 3882.01,
" Diesel Gene ~ator Overspeed Trip Test," an activity affecting quality, personnel
' performing the activity did not follow procedural steps 8.3.a and 8.3.i.
! This is a Severity Level IV violation (Supplement 1).
- 6. 10 CFR 50, Appendix B, Criterion XVI, requires, in part, that measures shall be i -. established to assure that conditions adverse to quality are promptly identified and l l corrected.
- Contrary to the above, corrective actions to correct a lack of timeliness in performing use-history analyses (UHAs) identified in 1994, June 1995, January 1996, and August 1996 failed to correct the issue. Specifically, on October 25, i
1996,57 UHAs of measuring and test equipment had not been performed in a timely manner.
This is a Severity Level IV violation (Supplement 1). I i
i 2- ,
i R
I Notice of Violation I 7. Technical Specification 5.4.1.a requires, in part, that procedures be implemented for activities recommended in Regulatory Guide 1.33, Revision 2, Appendix A, February 1978.
Regulatory Guide 1.33, Revision 2, Appendix A, Paragraph 7.e(4), requires that contamination controls be covered by procedures.
CPS Procedure 1024, " Contamination Control," required, in part that protective clothing was required for entry into contamination areas.
Contrary to the above, on October 3,1996, an individual failed to wear protective clothing when they crossed a contamination boundary while pushing a potentially contaminated laundry bag.
This is a Severity Level IV violation (Supplement 1).
- 8. Technical Specification 5.4.1.b, requires, in part, that written procedures shall be established, implemented and maintained covering the emergency operating !
procedures (EOFs) required to implement the requirements of NUREG-0737 and NUREG-0737, Supplement 1.
Contrary to the above, on Novernber 16,1996, it was identified that EOP-8,
" Secondary Containment Control," was not properly maintained in that it contained !
errors in Table U that had not been corrected.
This is a Severity Level IV violation (Supplement 1).
Pursuant to the provisions of 10 CFR 2.201, Illinois Power Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555, with a copy to the Regional Administrator, Region lil, and a copy to the NRC resident inspector at the facility that is the subject of this Notice, within 30 days of the date of the letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation- (1) the reason for the violation, or, if ,
contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Your response may reference or include previous docketed correspondence, if the correspondence adequately addresses the required response. If an adequate reply is not received within the time ,
specified in this Notice, an order or e Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be give to extending the response time. i
l Notice of Violation -4 Because the response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the POR without redaction. However, if it is necessary to include such information, it should clearly indicate the specific information
- j. that should not be placed in the PDR, and provide the legal basis to support the request fer withholding the information from the public. j l
l j Dated at Lisle, Illinois this 11th day of February 1997 i