Notice of Violation from Insp on 880926-30.Violation Noted: Low Specific Activity Radwaste Shipment from Clinton Station to Richland,Wa Burial Site Not Adequately Braced in That Front Bracing Failed & Permitted Load to Shift
ML20205E675
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/21/1988
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20205E674 List:
References
50-461-88-26, NUDOCS 8810270437
Download: ML20205E675 (1)


Text

_ - _.

'V NCTICE OF VIOLATION d

Illinois Power Company Docket No. 50-461 Clinton Power Station License No. NPF-62

. As a result of the inspection conducted on Septeober 26-30, 1988, and in accordance with the "General Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the following violation was identified:

10 CFR 71.S(a) r,611res that each Itcensee who transports licensed material outside the confines of its plant or other place of use, or who delivers licensed material to a carrier for transport, shall comply with the applicable requirements of the regulations appropriate to the mode of transpo:t ' ' the Department of Transportation (DOT) in 49 CFR Parts 170 through 180 49 CFR 173.425(b)(6) requires that packaged shipments of LSA material consigned as exclusive use and not in a DOT Specification 7A, Type A package be braced so as to provent shifting of lading under conditions rormally incident 'o transportation.

Contrary to the above, a July 22, 1988 LSA radwaste shipment from Clinton Station to the Richland,'Wa>hington burial site was not adequately braced to prevent shifting. Specifically, according to State of Washington inrpectors, the front brating failed and permitted the load (56 drums) to shif t forward approximately one foot.

This is a Severity Level IV violation (Supplement V).

l The inspection showed that actions had been taken to correct the idensified violation and to prevent recurrence. Consequently, no reply to the violation t

is required and we have no further questions regarding this matter.

i i

CNDT 21 1999 f

w t_.

Dated

. D.

a fe r,' Chi e f Laergency Preparedness and Radiological Protection Branch i

I i

i l

88102704s* 381021 POR Argv 05000461 Q

PDC i

i

- -