ML20134L871: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:- | ||
MaineYankee RELIABLE ELECTRICITY SINCE 1972 329 BATH ROAD e BRUNSWICK, MAINE 04011 * (207) 798-4100 February 13,1997 MN-97-22 JRH-97-31 UNITED STATES NUCLEAR REGULATORY COMMISSION Attention: Document Control Desk Washington, DC 20555 | |||
==References:== | |||
(a) License No. DPR-36 (Docket No. 50-309) | |||
(b) NUREG-0020, Licensed Operating Reactor Status Summary Report | |||
==Subject:== | |||
Maine Yankee Monthly Statistical Report - January 1997 Gentlemen: | |||
Enclosed please find the January 1997 Monthly Statistical Report for Maine Yankee. | |||
If you have any questions, please do not hesitate to contact me. | |||
Very truly yours, m - | |||
ames R. Hebert, Manager Licensing & Engineering Support Department SJB Enclosures ,, \ | |||
c: Mr. Hubert Miller | |||
/ ' ]f Mr. J. T. Yerokun , | |||
Mr. Daniel H. Dorman Mr. Patrick J. Dostie , | |||
Mr. Uldis Vanags l | |||
DR DO K 05 0 309 R PDR l N:\ TRANSFER \MSR.LTR I | |||
. m . . __ | |||
l i | |||
. I OPERATING DATA REPORT Docket No.: 50-309 Date: 13/Feb/97 Completed By: S. J. BAILEY Telephone: 207-798-4241 i | |||
: 1. Unit Name....................................... Maine Yankee l | |||
: 2. Reporting Period................................ January 1997 | |||
: 3. Licensed Thermal Power (HWt).................... 2700 | |||
: 4. Nameplate Rating (Gross HWe).................... 920 | |||
: 5. Design Electrical Rating (Net NWe).............. 870 | |||
: 6. Maximum Dependable Capacity (Gross HWe)......... 900 | |||
: 7. Maximum Dependable Capacity (Net HWe)........... 860 | |||
: 8. If Changes in Capacity Ratings (Items Number 3-7) | |||
Since Last Report, Give Reasons: | |||
NO CHANGES | |||
: 9. Power Level to Which Restricted, if Any (Net HWe) 795 i | |||
: 10. Reasons for Restrictions, if Any: l By NRC Confirmatorv Order dated Jan. 3, 1996, Maine Yankee is restricted to 2440 MWt. A new computer code for Small Break LOCA | |||
, is beino evaluated at Maine Yankee to allow operation to 2700HWt THIS HONTH YEAR-TO-DATE CUHULATIVE j 11. Hours In Reporting Period 744.00 744.00 | |||
: 12. Number of Hours Reactor l Was Critical........... 0.00 0.00 163,902.19 | |||
: 13. Reactor Reserve Shutdown Hours.................. 0.00 0.00 0.00 | |||
: 14. Hours Generator On-line.. 0.00 0.00 159,020.30 | |||
: 15. Unit Reserve Shutdown Hours.................. 0.00 0.00 0.00 | |||
: 16. Gross Thermal Energy ' | |||
Generated (HWH)........ 0.00 0.00 377,611,'52.00, | |||
: 17. Gross Electrical Energy Generated (HWH)........ 0.00 0.00 124,570,384.00 | |||
: 18. Net ~ Electrical Energy Generated (HWH)........ 0.00 0.00 119,543,416.00 | |||
: 19. Unit Service Factor...... 0.00 0.00 74.88 | |||
: 23. Unit Availabilty Factor.. 0.00 0.00 74.88 i | |||
: 21. Unit Capacity Factor (Using HDC Net)........ 0.00 0.00 69.47 | |||
: 22. Unit Capacity Factor (Using DER Net)........ 0 . 0 0._ 0.00 68.02 | |||
: 23. Unit Forced Outage Rate.. 100.00_ 100.00 8.85 1 | |||
: 24. Shutdowns Scheduled Over Next 6 Honths: NONE | |||
: 25. If Shutdown at End of Report Period, Estimated Date of Startup: 8/31/97 | |||
d 1 | |||
AVERAGE DAILY UNIT POWER LEVEL FOR JANUARY 1997 Docket No.: 50-399 Unit Maine Yankee Date: 93/Feb/97 Completed By: S. J. BAILEY Telephone: 297-798-4241 l | |||
i D0y Avg. Daily Power Level Day Avg. Daily Power Leve l (MWe-Net) (MWe-Net) i I | |||
1 .................... 9 16 .................... 9 1 | |||
1 2 .................... 9 17 .................... 9 1 i | |||
3 .................... 9 18 .................... 9 4 ............ ........ 9 19 .................... 9 , | |||
I 5 .................... 9 20 .................... 9 6 .................... 9 21 .................... 9 l t | |||
7 .................... 9 22 .................... 9 [ | |||
8 .................... 9 23 .................... 9 l l | |||
9 .................... 9 24 .................... 9 i | |||
10 .................... 9 25 .................... 9 l 11 .................... 9 26 .................... 9 12 .................... 9 27 .................... 9 13 .................... 9 28 .................... 9 : | |||
1 14 .................... 9 29 .................... 9 l l | |||
15 .................... 9 39 .................... 9 l l | |||
I 1 | |||
31 .................... 9 > | |||
i l | |||
i | |||
. ) | |||
* l i | |||
o | |||
\ | |||
Docket No: 50-309 < | |||
Unit Name: Maine Yankee l' Date: 02/10/97 Completed By: S.J. Bailey Telephones 207-798-4241 Report Month January, 1*97 NARRATIt's; | |||
==SUMMARY== | |||
OF OPERATING EXPERIENCES Plant remained off-line the month of January due to continued cable separation review and fuel inspection. | |||
I i | |||
6 NIT SHUTDOWNS AND POWER REDUCTIONS Docket No. ~ 50-309 FOR JANUARY 1997 Unit Haine Yankee Date: 10/Feb/97 Completed By: S. J. BAILEY Telephone: 207-798-4241 Page: 1 of 1 Number L.R. to 90.3% 06-96-15 Date h 960124 l 961205 h Type (1) 1 F 1 F Duration (Hours) 0 744 Reason (2) D D [ | |||
Hethod (3) J 4 1 l LER # [ N/A l 96-038 l System Code (4) ZZ IA Component Code (5) ZZZZZZZZ CKTBRK-A i i | |||
By NRC Confirma- Remained off-line tory Order, Maine due to continued ; | |||
Yankee is cable separation restricted to review and fuel Cause and 2440 MWTh until a inspection. | |||
Corrective new computer code Action is evaluated to allow operation at 2700 MWTh. | |||
: 1. TYPE: 2. REASON: (cont) 4. SYSTEM CODE: ) | |||
(F)orced F-Administrative Exhibit G-Instructions I (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain) Entry Sheets for | |||
: 2. REASON Licensee Event Report A-Equipment Failure 3. METHOD: (LSR) File (NUREG.0161) | |||
B-Haintenance or Test 1-Hanual C-Refueling 2-Hanual Scram 5. COMPONENT CODE: | |||
D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training & 4-Other (Explain) as above. | |||
License Examination}} |
Latest revision as of 19:39, 22 July 2020
ML20134L871 | |
Person / Time | |
---|---|
Site: | Maine Yankee |
Issue date: | 01/31/1997 |
From: | Stewart Bailey, Hebert J Maine Yankee |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
JRH-97-31, MN-97-22, NUDOCS 9702190326 | |
Download: ML20134L871 (5) | |
Text
-
MaineYankee RELIABLE ELECTRICITY SINCE 1972 329 BATH ROAD e BRUNSWICK, MAINE 04011 * (207) 798-4100 February 13,1997 MN-97-22 JRH-97-31 UNITED STATES NUCLEAR REGULATORY COMMISSION Attention: Document Control Desk Washington, DC 20555
References:
(a) License No. DPR-36 (Docket No. 50-309)
(b) NUREG-0020, Licensed Operating Reactor Status Summary Report
Subject:
Maine Yankee Monthly Statistical Report - January 1997 Gentlemen:
Enclosed please find the January 1997 Monthly Statistical Report for Maine Yankee.
If you have any questions, please do not hesitate to contact me.
Very truly yours, m -
ames R. Hebert, Manager Licensing & Engineering Support Department SJB Enclosures ,, \
c: Mr. Hubert Miller
/ ' ]f Mr. J. T. Yerokun ,
Mr. Daniel H. Dorman Mr. Patrick J. Dostie ,
Mr. Uldis Vanags l
DR DO K 05 0 309 R PDR l N:\ TRANSFER \MSR.LTR I
. m . . __
l i
. I OPERATING DATA REPORT Docket No.: 50-309 Date: 13/Feb/97 Completed By: S. J. BAILEY Telephone: 207-798-4241 i
- 1. Unit Name....................................... Maine Yankee l
- 2. Reporting Period................................ January 1997
- 3. Licensed Thermal Power (HWt).................... 2700
- 4. Nameplate Rating (Gross HWe).................... 920
- 5. Design Electrical Rating (Net NWe).............. 870
- 6. Maximum Dependable Capacity (Gross HWe)......... 900
- 7. Maximum Dependable Capacity (Net HWe)........... 860
- 8. If Changes in Capacity Ratings (Items Number 3-7)
Since Last Report, Give Reasons:
NO CHANGES
- 9. Power Level to Which Restricted, if Any (Net HWe) 795 i
- 10. Reasons for Restrictions, if Any: l By NRC Confirmatorv Order dated Jan. 3, 1996, Maine Yankee is restricted to 2440 MWt. A new computer code for Small Break LOCA
, is beino evaluated at Maine Yankee to allow operation to 2700HWt THIS HONTH YEAR-TO-DATE CUHULATIVE j 11. Hours In Reporting Period 744.00 744.00
- 12. Number of Hours Reactor l Was Critical........... 0.00 0.00 163,902.19
- 13. Reactor Reserve Shutdown Hours.................. 0.00 0.00 0.00
- 14. Hours Generator On-line.. 0.00 0.00 159,020.30
- 15. Unit Reserve Shutdown Hours.................. 0.00 0.00 0.00
- 16. Gross Thermal Energy '
Generated (HWH)........ 0.00 0.00 377,611,'52.00,
- 17. Gross Electrical Energy Generated (HWH)........ 0.00 0.00 124,570,384.00
- 18. Net ~ Electrical Energy Generated (HWH)........ 0.00 0.00 119,543,416.00
- 19. Unit Service Factor...... 0.00 0.00 74.88
- 23. Unit Availabilty Factor.. 0.00 0.00 74.88 i
- 21. Unit Capacity Factor (Using HDC Net)........ 0.00 0.00 69.47
- 22. Unit Capacity Factor (Using DER Net)........ 0 . 0 0._ 0.00 68.02
- 23. Unit Forced Outage Rate.. 100.00_ 100.00 8.85 1
- 24. Shutdowns Scheduled Over Next 6 Honths: NONE
- 25. If Shutdown at End of Report Period, Estimated Date of Startup: 8/31/97
d 1
AVERAGE DAILY UNIT POWER LEVEL FOR JANUARY 1997 Docket No.: 50-399 Unit Maine Yankee Date: 93/Feb/97 Completed By: S. J. BAILEY Telephone: 297-798-4241 l
i D0y Avg. Daily Power Level Day Avg. Daily Power Leve l (MWe-Net) (MWe-Net) i I
1 .................... 9 16 .................... 9 1
1 2 .................... 9 17 .................... 9 1 i
3 .................... 9 18 .................... 9 4 ............ ........ 9 19 .................... 9 ,
I 5 .................... 9 20 .................... 9 6 .................... 9 21 .................... 9 l t
7 .................... 9 22 .................... 9 [
8 .................... 9 23 .................... 9 l l
9 .................... 9 24 .................... 9 i
10 .................... 9 25 .................... 9 l 11 .................... 9 26 .................... 9 12 .................... 9 27 .................... 9 13 .................... 9 28 .................... 9 :
1 14 .................... 9 29 .................... 9 l l
15 .................... 9 39 .................... 9 l l
I 1
31 .................... 9 >
i l
i
. )
- l i
o
\
Docket No: 50-309 <
Unit Name: Maine Yankee l' Date: 02/10/97 Completed By: S.J. Bailey Telephones 207-798-4241 Report Month January, 1*97 NARRATIt's;
SUMMARY
OF OPERATING EXPERIENCES Plant remained off-line the month of January due to continued cable separation review and fuel inspection.
I i
6 NIT SHUTDOWNS AND POWER REDUCTIONS Docket No. ~ 50-309 FOR JANUARY 1997 Unit Haine Yankee Date: 10/Feb/97 Completed By: S. J. BAILEY Telephone: 207-798-4241 Page: 1 of 1 Number L.R. to 90.3% 06-96-15 Date h 960124 l 961205 h Type (1) 1 F 1 F Duration (Hours) 0 744 Reason (2) D D [
Hethod (3) J 4 1 l LER # [ N/A l 96-038 l System Code (4) ZZ IA Component Code (5) ZZZZZZZZ CKTBRK-A i i
By NRC Confirma- Remained off-line tory Order, Maine due to continued ;
Yankee is cable separation restricted to review and fuel Cause and 2440 MWTh until a inspection.
Corrective new computer code Action is evaluated to allow operation at 2700 MWTh.
- 1. TYPE: 2. REASON: (cont) 4. SYSTEM CODE: )
(F)orced F-Administrative Exhibit G-Instructions I (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain) Entry Sheets for
- 2. REASON Licensee Event Report A-Equipment Failure 3. METHOD: (LSR) File (NUREG.0161)
B-Haintenance or Test 1-Hanual C-Refueling 2-Hanual Scram 5. COMPONENT CODE:
D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training & 4-Other (Explain) as above.
License Examination