ML20059K748

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Aug 1990 for Maine Yankee Atomic Power Station
ML20059K748
Person / Time
Site: Maine Yankee
Issue date: 08/31/1990
From: Hall S, Nichols S
Maine Yankee
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0020, RTR-NUREG-20 MN-90-92, SEN-90-261, NUDOCS 9009240209
Download: ML20059K748 (7)


Text

n MaineYankee Li gKsiTilT6iiii5ifVTWdiiw~r57G51 Tiin

!k, EDISON DRfVE

  • AUGUSTA MAINE 04336 * (207) 622 4868 i

r 1i September 11, 1990 MN-90-92 SEN-90-261 UNITED STATES NUCLEAR REGULATORY COMMISSION Attention:

Document Control Desk Washington, DC 20555

References:

(a)

License No. DPR-36 (Docket No. 50-309)

(b) NUREG-0020, Licensed Operating Reactor Status Summary b port

Subject:

-Maine Yankee Monthly Statistical Report - August Gentlemen:

Enclosed please find the Monthly Statistical Report for the Maine Yankee Atomic Power Station for August 1990. Also enclosed is a revised unit shutdown and power reduction sheet for July, 1990.. The revision.is indicted by a vertical bar in the right-hand margin.

Please contact me should you have further questions.

Very truly yours,.

SEschh S. E. Nichols Licensing Section Head SEN:SJJ Enclosure Mr.. Thomas T. Martin c:

Mr. Eric J. Leeds Mr. Charles S. Marschall 900924o209 900831 Ii PDR ADOCK 05000309i R

PNU L,

SEN90261.LTR

~2000

.TSU th J

._._.._...,._. _ _. _.___..._ _ - - _ - _. - - - ~ _..

i l

i l

l J

J i

l I

I l

j s

i maine gankee l

1 t

.r t

f

-1 s

i I

k l

F s

l l

M c> n t h 3 y Statistica3.

R es p o r t l~

l For August 1990 1~

l' i

I I

1 l

i l;

1 1

l 4

J

... -.. - *....... -. - -.....,,,.., _ _.. _..., +, -... -,,,,, _. _ _., _ -,. -, _, _.... _ _ _ _ _.. _ _ __

_..__.-___,._.._,.,-.,_.-.~,.~.v-.----+--,

k

..a.

F

' OPERATING DATA REPORT Docket No.

50-309 Date:

07/Sep/90 Completed By:

S.

L. Hall Telephone:

207-622-4868

-m L

1.

Unit Name............................

Maine Yankee 2.

R: porting Period.................................

Auoust 1990 c,3.1 Licensed Thermal Power (MWt)....................

2700 k.,4. Cimeplate Rat 1ng (Gross MWe)....................

890

5. - D: sign. Electrica?. P'ating (Net MWe)..............

840

-6.1M:ximum Dependable Capacity (Gross MWe)..........

870

7. Maximum Dependable Capacity (Net MWe)...........

830 i

<b'8. If Changes in Capacity Ratings (Itema Number 3-7)

Since Last Report, Give Reasons:

j

_NO CHANGES

'9. Power Level tr '4hich Restricted, if Any (Not MWe)-

'17.- R:asons for Restricti ons, if Anya' I

~

l THIS MONTH YEAR-TO-DATE CUMULATIVE ll.yH:ura In Reporting Period 744.00 5,831.00

-12.1Numbeefof. Hours Reactor

'aa' Critical...........

744.00-3,842.33 124.855.31 W

13.DR actor Reserve Shutdown

' Hours..................

0.00 0.00 0.00

- 14. Hours Generator On-line..

585.90__

3,612.20 121,284.63' e.15.EUnit. Reserve Shutdown-Hours..................

0.00 0.00' H0.00 p16.EGross Thermal Energy i

Generated-(MWH)........

1,414,733.00

__9,100,170.'00 281,312,771.00

'117-.-Gross Electrical Energy

~

Generated (MWH)........

472,870.00 3.052.950.00

'92.317,160.00

't 118 7 Nit ElectricalLEnergy _

88,384,352.00

Generated (MWH)........

457.145.00,__2,954.472.00-

~

]

a 19.: Unit Cervice Factor......

78.75. __.

61.95 77.72 120.u-Unit Availabilty Factor..-

78 11_ __

61.95

-77.72-u

21.+ Unit Capacity' Factor
(Using1 hDC. Net)........

74.03 61.05 71.15-J22.cUnit. Capacity Factor

-(Using DER Net)........

73.15 60.32 69.45 023., Unit Forced Outage Rate..

0.00 0.75 6.01 I

i

, 24. Shutdowra Scheduled over Next 6 Months:

NONE 25.:.If' Shutdown at End of Report Period, Estimated Date cf Startup N/A q

n

D.

  • b.

s M

Docket No 50-309 s

rh Unit Name:

Maine Yankee

+

q Date:

09-07-90 Completed By: S.

L.

Hall Telephone 207-622-4868

C; port Month: August, 1990 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES On August ist, the unit was taken off line for a maintenance shutdown-to. repair the Exciter Oil Bearing Leak.

m-

+

On-August'4th, the unit was phased to the grid.

On August 5th, the unit was held at 75% power to perform mussel control icnd Cire. Water Box cleaning.

l On' August-6th, the unit was at 100% power.

-On August 16th,'the' unit was-taken off.line for a maintenance shutdown i

L to, repair.a failed valve in the Reactor Purification System.

On August l19th,fthe unit was phased to the Drid.

-On August 20th, the unit was: held at 75% power to perform' mussel control' cnd Circ.- Water Box-cleaning.

1-:

On: August 23rd, the unit was at 100% power.

L At : the end of the month, the unit was at 1'00% power.

i+

5 l'

l 1

t 9

r

-i

(

s.

b g.

b.

I 4

a ENh5tAGE SAILY UNIT POWER LEVEL' L,7,s FOR> AUGUST 1990

.n

,~ ~ ~

Docket No.s.

50-309

-Unit:

Maine Yankee Dates.

07/Sep/90-S.-L.

Hall Completed By:-

Telephone:

207-622-4868'

D yl,-.

JAvg.. Daily Power Level.

Day Avg.' Daily Power Level; (MWa-Net)-

(MWe-Net)-
'11 49-16

..........z

22i

'.)

. 2. -

0 17'

c...........-.........;

O ',

1

. s3j 0

'18 0

L4:

41 19

-54:

a

5!

564 20 a

586 4

i i

6

, 6 ;-

863 21' 796.

3

i.

f 7m

t....................

867 22-

.'.........'.....'...l.

. 849L d

- : 3 :-

t.

r 8-870

,23 868 H

i

-p 9

...'....=.............

867 24 c....i.........l......

871'-

d s

t

' 110 872 25 872' 4

11-868 26 j

873'*_~,

a

. 4 q

il2i 870 27'

, 868 y

o 4

,s a+5 M 13i 867

.28

............1...:.;..

-~ 8 6 6L 1

t 114l E....................

845 29.'

!866 q

15:

4.......'...........

493, 30,

....-..........~.......

850.s.

g.:...................

- '862 i

[

+

i?

..y s

i

..m n'

u:

_=,

'4 P

i ' ['

r h

i e

N(i 4

k

.3

- 1 e9,,

- j-;} p

=

+

z.

,a.

~..

UNIT SHUTDOWNS AND POWER REDUCTIONS Docket No. :

50-309 FOR. AUGUST 1990 Unit Maine Yankee Date:

07/Sep/90 Completed Dyr S.

L.

Hall Telephone:

207-622-4058 Page 1 of 1 Number.

04-90-12 05-90-12 Date l

900801

]

900816

]

Type (1) l l S

l S

.l Duration (Hours) 77.1 81 h

A g

A

]

Reason (2) 1

]

Method (3) p 1

]

LER #

h N/A N/A h

i System Code (4)

HA CG N

Component I

Code (5)

GENERA-D VALVE-E i

The unit was taken The unit was taken u off line for a off line to repair Maintenance S/D a failed valve in to repair the the Reactor Cause and Exciter Oil i*1 cation Corrective Bearing Leak.

On Systa.

On August

. Action August 4th, the 23rd, t unit was unit was returned returned to 100%

to 100% power.

Power.

a.--

1.

TYPE:

2.

REASON: (cont) 4.

SYSTEM CODE :

(F)orced F-Administrative Exhibit G-Instructions (S)cheduled 0-Operational Error for Preparation of Data H-Other (Explain)

Entry Sheets for Licensee Event Report 2.

REASON A-Equipment Failure 3.

METHOD:

(LER) File (NUREG.0161)

D-Maintenance or Tent 1-Manual C-RefuelinD-2-Manual Scram 5.

COMPONENT CODE:

D-Regulatory Restriction 3-Automatic Scram Exhibit 1-Same source C-Operator Training &

4-Other (Explain) as above.

License Examination

UNIT SHUTDOWNS AND POWER REDUCTIONS D:ckot No.:

50-309 FOR JULY 1990 Unit:

Maino Ycnkoo Date:

10/Aug/90 Completed By:

S.

L. Hall Telephone:

207-622-4868 l

Page:

2 of 2 l

l'

\\

Nu:bar L.R.

to 84.9%

i i

f, f,

Dato 900731 l

Typ3 (1)

O S

h I

R Durction l

(Hours) 0 l

i f

A Roccon (2) h M thcd (3) l 4

f h

f LER #

N/A i

i Syctim Ccdo (4)

HA l

\\

i Cocp nont-I Cedo (5)

GENERA-D Power was reduced to 84.9% for the exciter seal ring outage.

The unit

.Couno and was at 84% at the Corrcctive end of the month.

Action l

i l

I 1.

TYPE:

2. REASON: (cont) 4.

SYSTEM CODE:

(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain)

Entry Sheets.for

2. REASON Licensee Event Report l.

A-Equipment Failure 3.

METHOD:

(LER) File (NUREG.0161)

B-Mnintenance or Test 1-Manual C-Rcfueling 2-Manual Scram

5. COMPONENT CODE:

D-R:gulatory Restriction 3-Automatic Scram Exhibit I-Same source l

E-Optrator Training &

4-Other (Explain) as above.

l.'

License Examination l

l

.