ML20128K405

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1993 for Maine Yankee.W/
ML20128K405
Person / Time
Site: Maine Yankee
Issue date: 01/31/1993
From: Stewart Bailey, Hebert J
Maine Yankee
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
JRH-93-26, MN-93-14, NUDOCS 9302180162
Download: ML20128K405 (6)


Text

- - - -- . . - - - - - - - . - - --

i ,

J ..

x MaineYankee F~ .

neurou sacra,caum uame swe an f EDISON DRIVE . AUGUSTA, MAINE 04330 .(207) 622 4868 l- i I

i

! February 11, 1993

MN-93-14'. JRH-93-26 i

i t

  • UNITED STATES NUCLEAR REGULATORY COMMISSION Attention: Document Control Desk '

Washington, DC- 20555 t . .

References:

(a)- License No. DPR-36 (Docket No. 50-309) l '(b) NUREG-0020, Licensed Operating Reactor Status Summary Report <

Subject:

Maine Yankee Monthly. Statistical' Report -- January 1993 j Gentlemen:

i

) Enclosed please find the Monthly Statistical Report for the Maine Yankee Atomic L Power Station for January 1993. Please contact.-me should you -have any further j.

questions.

f Very truly yours, i e Q. N -

h James R. Hebert,; Manager

{i Li. censing.&. Engineering Support Department

..  : SJB/ jag .) ,

l Enclosure q e

j/ c: Mr. Thomas T. Martin F Mr. Charles- S. - Marschall

!. . Mr. E;;H. Trottier

[ -Mr. Patrick J. Dostie

.t-K l

i!

i

[ cl:B;y97

-19302190162'930131-j PDR -ADOCK-05000309-

' 'R ~PDR: ']V l l  !

i 63msn4 -

i k.-

e

._________..L.,._.._,_.....,;~__-,_-....,,,_._

y ,

' OPERATING DATA REPORT Docket No.: 50-309 Date: 11/Feb/93 Completed By: S. J. BAILEY Telephone: 207-622-4868

1. Unit Name....................................... Maine Yankee
2. Reporting Period................................ January 1993
3. Licensed Thermal Power (HWt).................... 2700_
4. Nameplate Rating (Gross HWe).................... 92 _
5. Design Electrical Rating (Net HWe).............. 870
6. Maximum Dependable Capacity (Gross HWe)......... 900
7. Maximum Dependable Capacity (Net HWe)........... 860
8. If Changes in capacity Ratings (Items Number 3-7)

Since Last Report, Give Reasons:

NO CHANGES 4

9. Power Level to Which Restricted, if Any (Net HWe)
10. Reasons for Restrictions, if Any 4

THIS HONTH YEAR-TO-DATE CUHULnTIVE 4

11. Hours In Reporting Period 744.00 744.00
12. Number of Hours Reactor Was Critical........... 744.00 744.00 142.509.21
13. Reactor Reserve Shutdown Hours.................. 0.00 0.00 0,00

, 14. Hours Generator On-line.. 718.90 718.90 138.348.93

15. Unit Reserve Shutdown Hours.................. 0.00 R2 00 0.00
16. Gross Thermal Energy Generated (HWH)........ 1.847.550.00 1.847.550.00 325,000,473.00
17. Gross Electrical Energy Generated (HNH)........ 617.660.00 617.660.00 106.915,120.00
18. Het Electrical Energy Generated (HWH)........ 597.833.00 597.833.00 102.509,805.00_
19. Unit Service Factor...... 96.63 96.63 78.05
20. Unit Availabilty Factor.. 96.63 96.63 78.05
21. Unit Capacity Factor (Using HDC Net)........ 93.43 93.43 72.04
22. Unit Capacity Factor (Using DER Net)........ 92.36 92.36 70.43
23. Unit Forced Outage Rate.. 3.37 3.37 7.38
24. Shutdowns Scheduled Over Next 6 Honths: NONE
25. If Shutdown at End of Report Period, Estimated Date of scartup N/A

! i ,. .

Docket No: 50-309.

. Unit Name. Maine Yankee Date: 021193 Completed By: S.J. Hailey Telephone 207-622-4868 Report Month January, 1993 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCES At the beginning of the month, the unit was-operating at 1001 power.

On January 3, the unit.was manually shutdown to replace failing bearing on the geneiator leads cooling fan.

On January 4, repairs were completed on the generator leads cooling fan and the unit phased-on line.

On January 6, the unit was reduced to 70% due to problems with heater drain pump discharge control valve.

On January 9, the unit reached 100t power.

On January 12, the unit was reduced to 781-due to large amounts ot grass and seaweed partially blocking the circulating water intake rack and traveling water tareens.

On January 13, the unit reached 1001 power.

On January 31, the unf' commenced a power reduction to investigate lucreased vibration It - s on Reactor Coolant Pump #3..

At the end of the month, the unit was operating at 48% power.

r AVERAGE

  • DAILY UNIT POWER LEVEL FOR JANUARY 1993 Dacket No.: 50-309 Unit: Haine Yankee Date 12/Feb/93 Completed By: S. J. BAILEY Telephone: 2e7-622-4868 Day Avg. Daily Power Level Day Avg. Daily' Power Level (HWe-Met) (HWe-Met) 1 .................... 883 16 .................... 881 2 .................... 882 17 ....................- 881 3 .................... 794 18 .................... 881 4 .................... 2 19 .................... 880 5 .................... 355 20 .................... 881 -

4 6 .................... 658 21 .................... 881 7 .................... 551 22 .................... 880 q 8 ............. ..... 726 23 .................... 882 9 .................... 881 24 .................... 881 10 .................... 880 25 .................... 884 11 .................... 881 26 .................... 880 12 .................... -778 27 .................... 883 13 .................... 879 28 .................... 880 14 .................... 881 29 .................... 883 15 .................... '882 30 -.................... 881 31 .................... 778

- =_- ------__-_ --_ _-- ._ .

UNIT SHUTDONNS AND PONER REDUCTIONS Docket No.: 50-309

(- POR JANUARY 1993 Unit: Haine Yankee Date: 12/Feb/93 Completed By: S. J. BAILEY Telephone: 207-622-4868 Page: 1 of 2 Nu0ber 07-93-13 L.R. to 70% L.R. to 781 Date [ 930103 930106 ,

930112 Type (1) F L F h F Duration (Hours) 25.1 0 0 Reason (2) [ A i A l B Hethod (3)  !

1 1 4 L 4 LER # 1 N/A [ N/A ,

N/A System Code (4) HA HH HF Cooponent Code (5) GENERA-X VALVEX-F HTEXCH-D On January 3, the On January 6, the On Jan. 12, unit unit was manually unit was reduced reduced to 78% due shutdown to to 70% due to to large amounts replace failing problems with of grass and sea-Cause and bearing on the heater drain pump weed partially Corrective generator leads discharge control blocking the cir-Action cooling fan. The valve. The unit culating water unit phased was returned to intake rack and on line January 4. 100% power on traveling water January 9. screens. The unit reached 1001 1/13.

1. TYPE: 2. REASON: (cont) 4. SYSTEM CODE:

(F)orced F-Administrative Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain) Entry Sheets for

2. RFASON Licensee Event Report A-Equipment Failure 3. HETHOD: (LER) File (NUREG.0161)

B-Haintenance or Test 1-Hanual C-Refueling 2-Manual Scram 5. COMPONENT CODE:

D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source E-Operator Training & 4-Other (Explain) as above.

License Examination

.~

UNIT SHUfDONNS AND PONER REDUCTIONS Docket No.: 50-309 FOR JANUARY 1993 Unit Maine Yankee Date: 12/Feb/93 Completed By: S. J. BAILEY Telephone 207-622-4868 Page: 2 of 2 J

Nu0bor L.R. to 481

, Date  !

930131 L Type (1) q F ,

l' Duration

(Hours) 0 Recoon (2) l A 4 Hethod (3) 4 h j i LER # N/A
System Coda (4) CB 4 Corponent 1 Codo (S) PUMPII-B i ' On January 31, the unit commenced a power reduction to investigate in-Causo and creased vibration a Corrective levels on Reactor Action Coolant Pump #3.

At the end of the month, the unit was operating at 481 power.

1. TYPE: 2. REASON: (cont) 4. SYSTEM CODE:

(Florced F-Administrawive Exhibit G-Instructions (S)cheduled G-Operational Error for Preparation of Data H-Other (Explain) Entry Sheets for

2. REASON Licensee Event Report A-Equipment Failure 3. HETHOD: (LER) File (NUREG.0161)

B-Heintenance or Test 1-Manual C-Refueling 2-Manual Scram 5. COMPONENT CODE:

D-Regulatory Restriction 3-Automatic Scram Exhibit I-Same source i E-Operator Training & 4-Other (Explain) as above. l License Examination j l